HomeMy WebLinkAboutCity of Tamarac Resolution R-2018-110E Temp. Reso. #13167 September 12, 2018 Page 1 of 5 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2018 /! 0 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, APPROVING CHANGE ORDER NUMBER 1 TO THE AGREEMENT WITH CC CONTROL CORPORATION UTILIZING PRICING FROM AN AGREEMENT OBTAINED THROUGH A FORMAL COMPETETIVE PROCESS BY THE CITY OF OAKLAND PARK, RFP NO. 022414 FOR THE LIFT STATIONS / WELLS SCADA IMPROVEMENTS PROJECT, FOR ADDITIONAL ITEMS OUTSIDE THE SCOPE OF THE PIGGY -BACK CONTRACT, IDENTIFIED DURING CONSTRUCTION, AT A COST NOT TO EXCEED $68,402.00; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE CHANGE ORDER NUMBER 1; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Tamarac owns, operates and maintains the water supply, treatment, and distribution systems along with the Wastewater Pump Stations; and WHEREAS, on March 22, 2017, the City Commission approved the award of a contract to CC Control Corporation utilizing pricing from an agreement obtained through a formal competitive process by the City of Oakland Park, RFP No. 022414 for the Lift Stations / Wells SCADA Improvements Project through Resolution No. R- 2017-22, a copy of said Resolution is incorporated herein by reference and on file in the office of the City Clerk; and Temp. Reso. #13167 September 12, 2018 Page 2 of 5 WHEREAS, at that time, the Director of Public Services chose to utilize available contracts awarded by other governmental entities for the Lift Stations / Wells SCADA Improvements Project, as provided by City Code Section 6-148 (d), which states that the purchasing officer may utilize contracts with other governmental agencies; and WHEREAS, during preparation of the SCADA Improvement Project, it was determined there were four (4) specific locations within the Water Treatment Plant site that were also utilizing the existing outdated Modicon PLC system components that were being replaced by the proposed SCADA improvements throughout the City of Tamarac Utility System; and WHEREAS, in order to provide a complete updated SCADA System, it is recommended that the Modicon Quantum PLC be removed and replaced with the new Allen-Bradley equipment being provided by the Lift Stations / Wells SCADA Improvements Project; and WHEREAS, CC Control Corporation has agreed to perform the additional work at a cost not to exceed $68,402.00 per the proposal, dated August 15, 2018, a copy of said proposal is hereto attached as "Exhibit 1 "; and WHEREAS, Public Services staff have reviewed said proposal and have determined that the pricing is competitive and acceptable; and WHEREAS, the cost of additional services attributed to this change order necessitates an additional expenditure in an amount not to exceed $68,402.00; and Temp. Reso. #13167 September 12, 2018 Page 3 of 5 WHEREAS, available funding exists in the project's contingency allowance (PO No. 200631) for said purpose, previously approved by City Commission via Resolution R-2017-22; and WHEREAS, Change Order Number 1 for additional items identified during the construction of the Lift Stations / Wells SCADA Improvements Project, in the amount not to exceed $68,402.00, is attached hereto as Exhibit 2; and WHEREAS, the Director of Public Services, the Director of Financial Services, and the Purchasing and Contracts Manager recommend the authorization of Change Order No. 1 to the contract for the Lift Stations / Wells SCADA Improvements Project in an amount not to exceed $68,402.00, and WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to approve Change Order No. 1 to the contract for the Lift Stations / Wells SCADA Improvements Project and authorize an additional expenditure in an amount not to exceed $68,402.00 for said purpose. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: The foregoing "WHEREAS" clauses are HEREBY ratified and confirmed as being true and correct and are HEREBY made a specific part of this Resolution. All Exhibits attached hereto are incorporated herein and made a specific Temp. Reso. #13167 September 12, 2018 Page 4 of 5 r-, part of this Resolution. SECTION 2: The City Commission HEREBY approves Change Order No. 1 to the contract with CC Control Corporation, for the Lift Stations / Wells SCADA Improvements Project, to account for the costs of additional items that were not included in the piggy -back contract at a cost not to exceed $68,402.00, and authorizes the appropriate City Officials to accept and execute said Change Order in an amount not to exceed $68,402.00, a copy of Change Order No. 1 is hereto attached as "Exhibit 2". SECTION 3: An additional expenditure in an amount not to exceed $68,402.00 is HEREBY approved. SECTION 4: All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 5: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. 1 1 1 Temp. Reso. #13167 September 12, 2018 Page 5 of 5 SECTION 6: This Resolution shall become effective immediately upon adoption. PASSED, ADOPTED AND APPROVED this /a day of ; 2018. ATTEST: 070 I HEREBY CERTIFY THAT I HAVE APPROVED THIS RESOLUTION AS TO FORM . SAMUEL S. GOREN CITY ATTORNEY H R Y ESSLER MAYOR RECORD OF COMMISSION VOTE: MAYOR DRESSLER DIST 1: COMM. BOLTON DIST 2: V/M GOMEZ DIST 3: COMM. FISHMAN DIST 4: COMM. PLACKO Tn1ms7 Exhibit FE ECKLER ENGINEERING., INC. August 15.2O18 442'O1O.O1 Mr. Earl Henry, p.E. City nfTamarac, Public Services 10101 State Street Tamarac, FL333Z1 Dear Mr. Henry: Reference: Proposed Change Order No. 1 (PCO#1) Lift 8tationo/VVeUoGC/\DAImprovements City of Tamarac PO No.: 200631 During preparation ofthe original piggyback contract and purchase order for the Lift Stations/Wells SCADAImprovement, dwas determined that there were four specific locations within the water treatment plant site that were also utilizing the existing Modicon PLC system components that were being replaced by the proposed 8CADA improvements throughout the City of Tamarac Utility System. In order to provide a complete Updated 8C/\OA SySteO8, it is recommended that the Modicon Quantum PLC be removed and nap|amad with the new Allen-Bradley equipment being provided bythe GCAOASystem Improvements project. The specific improvements proposed are as follows: Modifications to the existing hypuCh|orde building PLC panel, including removal and replacement ofexisting programmable logic controller (PLC)and communication upgrades compliant to the current SCADA System Improvements. (Cost Proposal Item No. C) 2. Modifications tVthe existing hypochlorite generation PLC panel iDdUdiAQ removal and rep|aCeDlgrd of existing PLC, nB[DOVa| of existing HU[DGD Machine Interface (MK8U and replacement with an industrial touch screen pC, and communication upgrades compliant to the cumentSCADA System Improvements. (Cost Proposal Item No. D) 3. Modifications to the existing Greenleaf filter PLC panel including removal and replacement of existing PLC. nernmma| of existing Human Machine Interface (MKA|) and replacement with an industrial touch screen PC, and communication upgrades compliant tothe current SCADA System Improvements. (Cost Proposal Item No. E) 4. Automatic Transfer Switch (ATG)PLC modification. The new automatic transfer switch has an outdated PLC and the recommendation is to remove this PLC and hard wire the 1/0 to existing netmmrk8C/\DA PLC panel within the AT8 building. (Cost Proposal Item No. F) The cost to complete this work at above four locations was determined and originally provided by C.{}.Control Corp. onJanuary 11.2O17. Anupdated proposal with just the above referenced four items was completed and provided bvC.C.Control Corp. onAugust 13.2O18. The cost inthe updated proposal remains the same as proposed in January of2O17. In accordance with the updated documents, we are in agreement with the following compensation to complete the work described above: ° Proposed cost for these items= $68,402.00 01 Proposed increase qa ^n00RIVERSIDE umvE,SUITE no 95+1510-4700 TR 13167 - Exhibit I Mr. Earl Henry, P.E. August 15, 2018 Page 2 Funds to cover this type of additional work were included in PO #200631 issued to C, C. Control Corp. as Line Item No. 2, Contingency Allowance. This contingency amount was $83,772.70. The current status of the Contingency Allowance, inclusive of PCO #1, is as follows: ► Contingency Allowance $83,772.70 ► Previous Approvals = $0.00 ► PCO #1 = $68,402.00 Contingency Remaining Balance $15,370.70 We recommend that the City of Tamarac prepare a Change Order document to authorize utilization of the Purchase Order No. 200631, Contingency Line Item No. 2, for the amount recommended above. Once the City of Tamarac Change Order document has been prepared, you may submit this document to our office and we can provide assistance to obtain signatures from C. C. Control Corp. as needed. If you have any questions or require additional information pertaining to this PCO or the project in general, please do not hesitate to contact me. Si rely Douglas K. Hammann, P.E. Encl. YADocurnents\Tarnarac\442-016.01 LS and Wells SCADA ImprovernentsTroposed Change Orders\PCO No. 1\PCO #1 to E. Henry.wpd TR 13167 - Exhibit 1 C. C. CONTROL CORP. 5760 CORPORATE WAY, SUITE 100 WEST PALM BEACH, FLORIDA 33407 PHONE: 561 293-3975 FAX: 561 293-3976 CUSTOMER: CITY OF TAMARAC ATTN: PHONE: PROJECT: RTU SYSTEM UPGRADES CITY OF TAMARAC DATE: 8/13/2018 TOTAL DESCRIPTION QUAN PAGES 3 ALTERNATE BID ITEMS C. C. CONTROL CORP. PROPOSES TO FURNISH THE FOLLOWING COMPLETE WITH EXCEPTIONS AS LISTED: ITEM NO.0 )MODS TO EXIST. HYPOCHLORITE PLC PANEL (PLC & COMM. UPGRADE AB MICROLOGIX 1400 PN. 1766-L32BXBA PROCESSOR 1 AB 1766-MM1 MEMORY MODULE 1 AB 1762-IQ16 16PT 24VDC INPUT MODULE 1 AB 1762-IF4 4CH. ANALOG INPUT MODULE 3 AB 1762-OF4 4CH, ANALOG OUTPUT MODULE 3 NTRON 306FX2-N-ST 6 PORT ETHERNET SWITCH 1 ETHERNET PATCH CORDS 2 BLACK BOX EVNSL643-0200 CAT 6 ETHERNET CABLE 1 BLACK BOX CAT 6 MODULAR RJ-45 CONNECTORS LOT AB PLC PROGRAMMING LOT EXIST. SCADA PROGRAMMING LOT FIELD SERVICE TO REPLACE EXIST. PLC LOT AS BUILT DRAWINGS LOT STARTUP AND TRAINING LOT ITEM NO.D MODS TO EXIST. HYPOCHLORITE GEN. PLC PANEL (PLC. HMI & COMM. UPGRADE) PHOENIX CONTACT 2400184/D21U/A20/135/R17/M47/OS41/TOO/ 1 EPO/S00 15 TOUCH SCREEN INDUSTRIAL PC GE INTELLUTION IFX (CLIENT RUNTIME 1 AB MICROLOG►X 1400 PN. 1766-L32BXBA PROCESSOR 1 AB 1766-MM1 MEMORY MODULE 1 AB 1762-IF4 4CH. ANALOG INPUT MODULE 1 AB 1762-OF4 4CH. ANALOG OUTPUT MODULE 1 TR 13167 - Exhibit 1 NTRON 306TX 6 PORT ETHERNET SWITCH 1 ETHERNET PATCH CORDS 1 AB PLC PROGRAMMING LOT EXIST. SCADA PROGRAMMING LOT FIELD SERVICE TO REPLACE EXIST. PLC LOT AS BUILT DRAWINGS LOT STARTUP AND TRAINING LOT ITEM NO.E MODS TO EXIST. GREENLEAF FILTER PLC PANEL (PLC & HMI UPGRADE PHOENIX CONTACT 2400184/D21 U/A20/135/R17/M47/OS41/T00/ 1 EPO/S00 15" TOUCH SCREEN INDUSTRIAL PC GE INTELLUTION IFX ICLIENT RUNTIME 1 PULS SL5.100 5A 24VDC POWER SUPPLY 1 AB MICROLOGIX 1400 PN. 1766-L32BXBA PROCESSOR 1 AB 1766-MM1 MEMORY MODULE 1 AB 1762-IQ16 16PT 24VDC INPUT MODULE 1 AB 1762-OW16 DISCRETE OUTPUT MODULE 3 AB 1762-IF4 4CH. ANALOG INPUT MODULE 1 AB 1762-OF4 4CH. ANALOG OUTPUT MODULE 1 NTRON 306TX 6 PORT ETHERNET SWITCH 1 ETHERNET PATCH CORDS 1 TESSCO CUSTOM JUMPER 2FT. TNC-M/N-M 1 POWER SONICS P1218OF 18AH 12VDC BATTERY 1 RS232 EXTENSION CABLE 1 POLYPHASER IS-50NX-C2 COAX. SURGE PROT. 1 RHINO PSP24-DC12-1 DC -DC CONVERTER 1 HUBBELL GF151LA GROUND FAULT RECEPTACLE 2 PULS ML50.102 12VDC 4.2A POWER SUPPLY 1 MDS SD RADIO 1 A&J CUSTOM ALUMINUM MOUNTING PLATE 1 AB PLC PROGRAMMING LOT EXIST. SCADA PROGRAMMING LOT FIELD SERVICE TO REPLACE EXIST. PLC LOT AS BUILT DRAWINGS LOT STARTUP AND TRAINING LOT ITEM NO.F ATS PLC REPLACEMENT (REMOVE EXIST. PLC AND HARDWIRE SIGNALS INTO EXIST. PLC PANEL LOCATED NEXT TO ATS) MSC. WIRE 1 EXIST. PLC PROGRAMMING LOT EXIST. SCADA PROGRAMMING LOT FIELD SERVICE TO WIRE NEW SIGNALS TO EXIST, PLC LOT AS BUILT DRAWINGS LOT STARTUP AND TRAINING LOT SUMMARY QTY. TOTAL ITEM NO.0 1 16900.00 ITEM NO.D 1 21100.00 ITEM NO.E 1 24100.00 Tn1mor Exhibit 0EMNO.F FOB: JOB SITE DEL: 10-12VVEEKS AFTER APPROVED DRAWINGS TERMS: NET 3ODAYS (SUBJECT T0CREDIT APPROVAL) 6302.00 TOTAL 68402.00 WARRANTY: ALL WARRANTIES SHALL EXPIRE ONE (1)YEAR FROM DATE 0FSTART-UP FROM SELLER TOBUYER UNLESS SPECIALLY INDICATED OTHERWISE AND WILL BENULL AND VOID UNLESS MATERIALS ARE STORED UNDER PROPER CONDITIONS DETERMINED BYC.C.CONTROL CORP. C ty of Tamara Pt rcr asrnq end Cor t acfs f pis, ra CHANGE ORDER DATE OF ISSUANCE: August 23, 2018 OWNER: CITY OF TAMARAC 7525 NW 88th Avenue Tamarac, FL 33321-2401 CONTRACTOR: CC Control Corporation 5760 Corporate Way West Palm Beach, FL 33407 CHANGE ORDER NO. 1 PROJECT NAME: Lift Stations SCADA Improvements BID NO. Piggyback(R-2017-22) PROJECT NO. UT16J P.O. NUMBER; 200631 IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS: DESCRIPTION: Addition of items that are not covered by Piggy Back Contract, including removing existing Modicon Quantum programmable controls and replace them with the new Allen-Bradley equipment in order to provide a complete updated SCADA System PURPOSE OF CHANGE ORDER: The purpose of this Change Order is to provide for the inclusion of several items listed in Exhibit 3 of the related agenda item. These items were not included in the Piggy Back Contract but are necessary to provide a complete updated SCADA system within this project. C.HAN(.F IN rONTRACT PRICF CHANGE IN CONTRACT TIME Original Contract Price Original Contact Time $ 921,499.70 N/A Previous Change Order No. 1 to No. Net Change From Previous Change Orders $ 0 0 Days Contract Price Prior To This Change Order Contract Time Prior To This Change Order $ 921,499.70 N/A Net (Increase) Of This Change Order Net (Increase) Of This Change Order $ 68,402.00 0 Days Contract Price With All Approved Change Orders Contract Time With All Approved Change Orders $ 989,901.70 N/A Account No(s) Affected: 441-6040-535.63-10 Amount Affected $ 68,402.00 ROUTING: Dept. Director, Contractor, Purchasing Manager, City Manager, Purchasing Manager DED A V PPR9QL, BY _ BY tr c or ` City Manager Co tractor Date Date — — Date �--3