Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2005-172Temp. Reso. # 10770 July 20, 2005 Page 1 of 3 Rev. 1 — September 6, 2005 Rev. 2 — September 7, 2005 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2005--_ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO AMEND THE BUILDING AND CODE COMPLIANCE DEPARTMENT SCHEDULE OF PERMIT FEES; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Florida Statutes s. 553.8 provides for the collection of permit fees to support activities associated with enforcement of the Florida Building Code; and WHEREAS, the last comprehensive adjustment to the Tamarac Building and Code Compliance Department Schedule of Permit Fees to offset the Building Department subsidy by the general fund was made in 1997; and WHEREAS; the existing Schedule of Permit Fees does not accurately reflect the cost of the activities associated with enforcement of the Florida Building Code; and WHEREAS, Section 5-1(a) of the Tamarac City Code authorizes the City Commission to review, alter, add to, modify, deduct from or in any way change any fees or any categories of building permit fees by Resolution; and WHEREAS, the Director of Building and Code Compliance recommends that the Schedule of Permit Fees be modified to more accurately reflect the costs associated with performance of the activities connected with enforcement of the Florida Building Code as provided for in the Florida Statutes, said modifications are hereto attached as Exhibit A; and Temp. Reso. # 10770 July 20, 2005 Page 2 of 3 Rev. 1 — September 6, 2005 Rev. 2 — September 7, 2005 WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interests of the citizens and residents of the City of Tamarac that the City amend the Building and Code Compliance Department Schedule of Permit Fees. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution. SECTION 2: That the schedule of Permit Fees, attached hereto as Exhibit A and made a part hereof, is hereby approved. SECTION 3: All resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. L .qFr.T1nN -9;- passage and adoption. Temp. Reso. # 10770 July 20, 2005 Page 3 of 3 Rev. 1 - September 6, 2005 Rev. 2 - September 7, 2005 This Resolution shall become effective immediately upon its PASSED, ADOPTED AND APPROVED this 14th day of SCp em be ►f' , 2005. ATTEST: MARION SWE SON, CMC CITY CLERK I HEREBY CERTIFY that I have approved this RESOLUTION as to form. 4SAEL S. GOREN INTERIM CITY ATTORNEY JOE SCHREIBER MAYOR RECORD OF COMMISSION VOTE: MAYOR SCHREIBER DIST 1: COMM. PORTNER nO� DIST 2: V/M TALABISCO DIST 3: COMM. SULTANOF DIST 4: COMM. ROBERTS av 1/z Exhibit A: Proposed Changes to Schedule of Permit Fees CITY OF TAMARAC BUILDING &CODE COMPLIANCE DEPARTMENT SCHEDULE OF PERMIT FEES LtLnderline indicates new Ian-gua-ge) (Strikethr-ough Ghanged figUFesAPvGFding) SECTION 1: As set forth in Section 304 104 of the South Florida Building Code, it is unlawful for any person, firm or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration or repair on or within private property, and such act is punishable as provided in Section 1-13 of the Tamarac City Code. SECTION II: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous,. signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of $0.30 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the Occupancy and the value of which does not exceed eight hundred ($800.00) $1,500.0 dollars in labor and material as determined by the Building Official. A. EXPIRED PERMIT FEES Renewal -Expired Permits -All Disciplines (a) Within 90 days of expiration Oitmgmnalfeea Reissue of Expired Permits(s) (No change in bygq�gg code)... m ....... 60% (b) Renewal afteF 90 days of e*pwra#Gn OFiginal fee at . ..... ........... i 00% .... ew Plans Re'q'u*ir"e"* (bj Reissue -of gx ired Permiiis Others'ik ...... ..................... 100% j2 B. MISCELLANEOUS FEES I. Copies (as per Section 6-35 of Tamarac City Code) (i) Microfilm .............................................................................. 4 pages or less $2.00 otherwise $0.50 per page (ii) Photocopies ................................................................................. $0.15 per page 2. Building & Code Department Research for Determination of Dpen mn Violations on a Per Address Basis ............................ $50.00 3. Inspection for Certificate of Occupancy or Safety Inspection purposes only Includes afl four 4 disciplines ......................$126-8A $240.00 4. Board of Rules Appeals (BORA) fee.....................................$0.35 per $1,000.00 cost of job 5. Radon......................................................................................................$0.006 per SF 6. Construction Recovery Fund......................................................................$0.005 per SF 6. 7. Any item not explicitly listed shall be based on the required number of inspections x $45.00 $60.00. 8. Certificate of Occupancy 50.00 (a) Commercial . .Plus for each 1,000 SF $ 3.00 (b) Residential Sin le Family .......................................................... No add7 charge (c) Multi Family..........................................................................Plus per unit $ 3.00 9. Temporary Certificate of Occupancy 50.00 10. Certificate of Completion _ .$50.00 11. Chan a of Contractor....................................................................................... 50.00 12. Contractor Records Maintenance Annual Re_gistration..........................................$50.00 C. BUILDING PERMIT FEES 1. New Construction -Residential Fees SINGLE FEE FOR ALL DISCIPLINES Square footage x Factor of 60 80 x 1.272% 2. New Construction -Commercial Fees SINGLE FEE FOR ALL DISCIPLINES Square footage x Factor of 40 60 x 1.092% PARKING GARAGE ONLY Square footage x Factor of 28 50 x 1.092% 3. Residential Additions TOTAL CONSTRUCTION VALUE shall be calculated as square footage x Factor of 60 65 (a) Structural .......................................................... 2.15% of Total Construction Value or minimum fee of $45 00 60.00, whichever is greater (b) Electrical .......................................................... 0.60% of Total Construction Value or minimum fee of $46.00 60.00, whichever is greater (c) Plumbing ........................................................... 0.92% of Total Construction Value or minimum fee of $45 Oil 60.00, whichever is greater (d) Mechanical ....................................................... 0.50% of Total Construction Value or minimum fee of $.dfi 130 60-00, whichever is greater 4. Residential Alterations (a) Structural .......................................................... 2.74% of Total Construction Value or minimum fee of $46% 00 60.00, whichever is greater (b) Electrical ......................................................... 1.68% of Total Construction Value or minimum fee of $45.00 60.00, whichever is greater (c) Plumbing .......................................................... 2.64% of Total Construction Value or minimum fee of $46.00 60.00, whichever is greater (d) Mechanical ....................................................... 1.32% of Total Construction Value or minimum fee of $46% 00 60.00, whichever is greater 5. Commercial -Alterations, Additions, Tenant Improvements (a) Structural ............................................... 1.90% 2.74% of Total Construction Value or minimum fee of $46.00 60.00, whichever is greater (b) Electrical ................................................ 1.08% 1.68% of Total Construction Value or minimum fee of $45 00 60.00, whichever is greater (c) Plumbing ................................................ 0.60% 2.64% of Total Construction Value or minimum fee of $45 00 60.00, whichever is greater (d) Mechanical ............................................. 0.84% 1.32% of Total Construction Value or minimum fee of $46.00 60.00, whichever is greater 6. Pre -inspection -All Disciplines .................................................................... $46.00 $60.0 7. Reinspection-All Disciplines ...................................................................... $36.00 $50.0 8. Lost Plan Replacement (single family, multi -family, commercial) .............................. $60.00 Per discipline $ 50.0 Maximum $200.0 9. Plan Resubmittal (prior to permit issuance) All Disciplines ......................................................... 0.30% Cost of Construction minimum $30.00 $50.0 , maximum $100.00 L300.0 10. Up front fee for plan processing ........................................................... 50% of permit fee Analied to permit fee at time of issuance 11. Canvas Awnings ..................................................................... up to 40 LF $45.00 $60. each additional 40 LF, $10-00 L40. 12. MetallCanvas Carports & Canopies ........................................ up to 200 SF $45.00 $60.0 each additional 200 SF, $10.00 $40.0 13. Hurricane Shutters ................................................................ first shutter. $46.00 $75.0 Plus per shutter $3-.00 110. 14. Wood Decks ....................................................................... up to 200 SF $70.00 $100.0 each additional 100 SF, $10.00 125.0 16. Demolition ................................................................................ up te 1,600 SF $120- eaeh additional 1,000 SF $ 10-00 Demolition of Entire Building ....................................................................... _$500.0 Interior Alteration Demo Only Structural...................................................................................... u. $60-00 Plumbing................................................................................ $46.00 $60.0 Electrical ................................................................................ $46-00 160.0 Mechanical ............................................................................. $46.00 160.0 Demolition In CopLunction With Build -Out Permit ................................. No Addl Charge 16. Fence ................................................................................... up to 50 LF. $36-.00 $60.0 plus $0.20 POF LF each additional 50 LF $ 10-00 17. Roofing& Re -roofing ....................................................... up to 1,000 SF $106-00 $150.0 each additional 500 SF or fraction thereof, $10.00 $ 20.0 18. Siding .................................................................................. up to 50 SF $35-00 $60.0 PIUS $0.06 POF SF each add -'I 100 SF , per SF $ 10-00 19. House moving into the city ................................................................... $260.00 $500.0 24.- 20. Mono Plan Revision up to 2 dlSGiplines (per discipline) .......................... $70.00 $60.0 Plus per Page $10.00 21. Masonry Walls & Precast concrete walls ........................... $70-00 yp to 50 LF $120-00 plus per LF $0-.20 $10. 23-. 22. Permit Card Replacement (no recorded inspections) ........................................ $10.00 $5.00 for each additional recorded inspection 4 I 4jrr9 77rrz ZT3 23. Safe!y Determination for Above Ground Portable Pools/Spas Not Attached to Swimming i Pools ...................................................................... $30.00 24.- 24. Commercial &Residential Swimming Pools (a) Structural ............................................... 2.75% of Total Construction Value or minimum fee of $60.00, whichever is greate b) Electrical ................................................ 1.68% of Total Construction Value or minimum fee of $60.00, whichever is c 1reate (W Plumb�qa ................................................ 2.64% of Total Construction Value or minimum fee of $60.00, whichever is -greate (dj Mechanical .............................................. 1.32% of Total Construction Value or minimum fee of $60.00, whichever is -greate 27-. 25. Satellite dish (I motor or greater) ...................................................... $76;00 $150.0 (includes both Structural & Electrical Permits) 22, 26.1 Screen Enclosure (pool) ............................... 2.74% 3.0% of Total Construction Value or minimum fee of $45.00 $60.0 , whichever is greater W. 27. Screen Enclosure (patio / porch) ..................... 2.74% 3.0% of Total Construction Value or minimum fee of $45.00 $60.0 , whichever is greater 30-. 28. Slab (porch / patio -monolithic) ........................................... up to 100 SF $46.00 $80.0 each additional 100 SF or fraction thereof, $6.00 $20.0 34-. 29. Blacktop / Concrete pavinA & parking ...................... up to 4-,M �LOO SIF $60-00 $80.0 each additional 600 100 SF, $10.00 R0.0 30. Paver Driveway ................................................................................................ $60.00 32,31. rUdauralka WalkwaVS .......................................... m ............... up to 60 LF $60.00 $60.0 each additional 40 50 LF or fraction thereof, $0.60 $20.0 33-. 32. Signs (a) All Wall Signs .......................................................................................... $ 75-00 (b) All Monument Signs ................................................................................. $125.00 (c) All Temporary Signs ................................................................................. $ 75.00 (d) Banners (30 days once per year) ................................................................. $ 15.00 (e) Directional Signs .............................................................................. each$ 15.00 34-. 33. Docks ............................................................................ up to 30 LF $70.00 $125.0 each additional 10 LF or fraction thereof, $6.00 $ 10.0 345-. 34. Utility Shed Only............................................................................... $46.00 $60.00 36. 35. Fireplace (when not part of original plans)......................................................$70.00 3-7-- 36. Sea Walls (see ordinance #74-75) W. 37. Sea Wall Repairs......................................................... ..3.0% Cost of Construction 3-9: 38. Ga0ge Door . ;160.00 39. Trailer Tie Down Construction or Sales.............................................................. $60.00 D. ELECTRICAL PERMIT FEES 1. Residential Burglar Alarm Oncludinq 10 Dros ............................... $40.00-peF fIGG $60.00 For each add'! drop $ 2.00 2. Commercial Burglar Alarm pre -wire (Including 10 Drops)..............Per system $46.00 60.00 for each additional drop $ 2.00 3. Commercial Site Lighting 4-3 Up to Standards...........................................$30.00 $60.00 each additional standard $10.00 4. Electrical Sign.......................................................................................... $46.00 60.00 5. Fire Alarm (Including 10 devices) ................................................. P 120.00 Each add'i device $ 2.00 6. Heat Pump..........................................................................................................$60.00 7, Low Voltage -individual systems (as applicable) (a) Computer Lines ..$60.00 60.00 (b) Intercom (c) Phone .$60.00 (d) Speakers _. . _ 60.00 (e) T.V. _ . ........ 60.00 ..................................................................................... (d) Vacuumall$46.00 $60.00 4Z 8. Service Change (a) Residential .................................................................................. $60.00 L80. N Commercial .................................................................... per main $80.00 $ 80.0 1-3-. 9. Sprinkler Pump ............................................................................................. $60.00 44-. 10. Temporary Electric ............................................................................. $4&00 $60.0 30 day Temporary Electric Testing .................. $35-00 $60.0 4& 11. Construction or Sales Trailer ......................................................................... $60.00 46-.12. Utilization Equipment (motors, x-ray, generatew, etc.) ............................ $46.00 $60.0 13. Generator .......................................................... ............................ yR to 50 KW$ 60.0 Over 50 KIN $120. 0 E. MECHANICAL PERMIT FEES I. A/C Change Out... ­� ............ ....... ........ *"*"* .......... $60-00 $75.0 ....... .... A/C S-tands. for'& mercial an ult! Family .......................... ' .......... $7.50 each 2. Pool Heater / Heat Pump ............................................................................ $46.00 $60.0 4;-3. Smoke Duct Detector Lot inconiunction with AIC c�"n eout) ............ each $40.00 $60.0 F. PLUMBING PERMIT FEES 1. Mlnmmum PeFM't Fee PeF Inspeetmen ... m .................. m ... m ............ mmm-m ........ ___ $46.00 $6&.00 -2 1. Fire Sprinkler System ............... m ............ m ............... m ................. m .............. m .... m ... $135.00 Plus $1.60 per head Plus $25.00 per floor above 3 rd floor 3 2. Site Work, Drainage, Water Mains, Fire Mains, Sewer Mains.. .... mm ............................. ............ ..2.0% Cost of Construction 4 3. Water Heater / Solar Pool Heater...... ..... m ........... _ .............. m ........ ...... _$100.00 6. Solar Sy8tOFR fGF -r001.M­.MM ... a ...... m ..... m .................... m ......................... _.m ....... $200.00 7 6-6. Water Heater (domestic water)................................................................. $46.00 60.00 5. Water Well.....................................................................................................$60.00 9 6. LP Gas Tank(s) and system..............................................................................$150.00 4-0 7. Irrigation Systems Residential 0.92 Of tOtal CORStFUG OR VaIUG With .w.i.lirM..r1i of $50.00 .... ..$120.00 Commercial a Commercial. _ .minimum_$180.00 or 1 / of the cost of construction, whichever is greater 8