CITY OF TAMARAC, FLORIDA
Z
RESOLUTION NO. R-93-1-7
3
A RESOLUTION ISSUING REVISED DEVELOPMENT
4 ORDER NO. 254-2 FOR TRENT PROJECT FOR A
REVISED SITE PLAN PURSUANT TO THE
S PROVISIONS OF SECTIONS 10-2 THROUGH 10-29
OF THE TAMARAC CODE; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, pursuant to the instructions of the City
Council of Tamarac, Florida, a public meeting has been advertised
in accordance with applicable law of the date, time and place of
the meeting regarding the review of the application for a revised
development order by the applicant for development approval; and
WHEREAS, the City Council has examined and investigated
the application, staff and Planning Commission recommendations, and
the attached Development Review Status Sheet dated January 28,
1993; and
WHEREAS, the City Council reviewed the revised develop-
ment order and accompanying documents at a public meeting; and
WHEREAS, the City Council has determined that the appli-
cation is in compliance with all elements of the Comprehensive
Plan, or will be in compliance prior to the issuance of a
Certificate of Occupancy for the development that is the subject of
the application.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
TAMARAC, FLORIDA:
SECTION 1:
That the application for approval of a
revised site plan for Trent, located east of NW 108 Terrace, south
of NW 80 Street,. prepared by Carnahan and Associates, Inc., revised
on November 25, 1992, reflecting: revising six buildings from
three-story to four story; changing the fire access lanes for the
four-story buildings; modifying the sidewalks to create a cohesive
pedestrian circulation system; add re -revising parking and altering
the required landscaping, is HEREBY APPROVED subject to the
following conditions:
A. Construction is to be in complete compliance with
the
plans and
specifications
submitted by
the developer to
the City
of
Tamarac
as described in
Section II
of the Development
Review
Status Sheet and approved engineering drawings.
Temp. Reso. # 6427
B. Commencement of construction shall be no longer
than one year from the date of this approval. If the development
does not commence construction within one year, this approval is
null and void unless an extension has been granted in accordance
with applicable regulations.
C. The revised development order is assignable, but an
assignment does not discharge any assignee from strict compliance
with the order unless the City Council consents to modify any of
the original requirements.
D. Additional conditions established in order to issue
the revised development order are set forth as follows:
1. If the County Commission does not approve the
proposed 368 units where only 305 units have been
approved by plat, this site plan will be null and
void.
SECTION 2: That the following documents are hereby
accepted and approved as a part of this revised development order:
1. Water and Sewer Developer Agreement
SECTION 3: Should any section or provision of this
revised development order be declared by a court of competent
jurisdiction to be invalid, the City Council shall determine if the
other portions of the order remain valid or whether the approval
shall be null and void.
SECTION 4: This revised development order as condi-
tioned shall become effective immediately upon its passage.
PASSED, ADOPTED AND APPROVED this A4"Ictay of � ,1993.
H. BENDER
ATTEST: MAYOR
CAROL A. E ANS
CITY CLERK
I HEREBY CERTIFY that I have
ap o d this Resolution as
t for . 7 /'
MITeHELL S. KRAFT
CITY ATTORNEY
RECORD OF tOJNCIL VOTE
MATVH
DISTRIC
DISTRIC
DSTRIC
D(STRIC-
7525 NORTHWEST 88TH AVENUE TAMARAC, FLORIDA 33321
TELEPHONE (305) 722-5900
DEVELOPMENT REVIEW STATUS SHEET
Date: January 28, 1993
254�Orig. Dev. Order
2 5 4 - 2 Revised Dev. Order
Project: Trent
Master File: 8-89
Location: East side of NW 108 Terr., South of NW 80 St.
Developer: Lennar Homes, Inc.
Owner: Lennar Homes, Inc.
Zoning: R-3U Acre: 19.8
Recommended Date for Council Action: 2/17/93
Future Land Use Designation: Residential
1. DEVELOPMENT ORDER FOR:
FINAL SITE PLAN FINAL PLAT REVISED SITE PLAN X
STAFF APPROVAL DATES: 1/12/93
FINAL SITE PLAN FINAL PLAT REVISED SITE PLAN X
City Planner 1 /1 2/93
City Engineer 1/ 1 2/ 9 3
Chief Bldg. Official 1/ 1 2/ 9 3
Fire Chief 1/ 1 2/ 9 3
Comments: subject to findings of fact and passing fire flow tests.
2. PLANNING COMMISSION RECOMMENDATION:
DENIAL 1/20193
Final Site Plan 1/20/93
Planning Commission findings of compliance with certified Plan: N/A
In
•
0
0
I2-53-I q
3. FINAL ENGINEERING DRAWING: TBD
APPROVAL AS REDLINE 1/12/93
Comments
4. LANDSCAPE PLAN
Approved 1/12/93
5. BROWARD COUNTY DEVELOPMENT REVIEW COMMITTEE REPORT: N/A
Comments:
6. DEVELOPERS AGREEMENTS/FEES (where applicable)
A. Water and Sewer Developer Agreement
City Engineer Approval/Date
City Attorney Approval/Date
B. Other Development Agreements (Covenants, Stipulations, etc.)
C. Drainage Retention: Fee Amount: per Stipulation
5% Required/Acres
Deficiency/Acres X $45,500/Acre
D. Drainage Improvement Fee Amount: per Stipulation
Project Acreage x $130.00/Acre
E. Water & Sewer Contribution Charges Fee Amount: N/A
number of ERCs x
F. ERC Review Fee, if more than 10 ERCs Fee Amount: N/A
G. Local Parks/Recreation Fee Amount: $95.00/unit"
per stipulation
H. Engineering Fees Fee Amount: TBD
I. Bonds Bond Amount: WA
Date:Approved by City Engineer
City Attorney
J. On Site Beautification Fee Amount: TBD
K. Future Traffic Needs Fee Fee Amount: per stipulation
f
•
7. DEVELOPMENT REVIEW REQUIREMENTS
A. Potable Water Service
Certification of City Engineer or Consulting City Engineer of Availability Service:
AVAILABLE WILL BE AVAILABLE NOTAVAILABLE
DATE COMMENTS
B. Waste Water Treatment and Disposal Service
Certification of City Engineer or Consulting City Engineer of Availability Service:
AVAILABLE X WILL BE AVAILABLE NOTAVAILABLE
DATE COMMENTS
C. Solid Waste Disposal Service `
Determination of Availability of Service:
AVAILABLE WILL BE AVAILABLE X NOTAVAILABLE
DATE COMMENTS
D. Drainage Adequately
Certification of City Engineer or Consulting City Engineer of Adequacy of Drainage
ADEQUATE WILL BE ADEQUATE X NOTADEOUATE
DATE COMMENTS
E. Regional Transportation Network
Compliance with Minimum Standards:
COMPLIES X WILL COMPLY DOESNOTCOMPLY
DATE COMMENTS
F. Local Streets and Roads
Compliance with Minimum Standards:
COMPLIESX WILL COMPLY DOESNOTCOMPLY
DATE COMMENTS
H. Police Protection Service
Compliance with Minimum Standards:
COMPLIES X WILL COMPLY DOESNOTCOMPLY
DATE COMMENT
I. Local Parks (Parks and Recreation Facilities) COMPLIES
J. School Sites
Compliance with the Standards of the Broward County School Board: Complies
• 8. PROCESSING FEES (PAID)
Revised Site Plan $ 600.00
Plat Review $ "
Schematic Eng $ 750.00
0 =