Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2000-185Fil Temp. Reso. #9063 Page 1 June 19, 2000 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2000-185 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, APPROVING CERTAIN STREETS TO BE ADDED TO PHASE II -A OF THE SEVEN YEAR COMPREHENSIVE STREET IMPROVEMENT PROGRAM TO BE MILLED AND RESURFACED; APPROVING CHANGE ORDER #1 TO THE AGREEMENT WITH WEEKLEY ASPHALT PAVING INC. IN AN AMOUNT NOT TO EXCEED $174,812.00; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on July 22, 1998, the City Commission of the City of Tamarac approved the Seven Year Comprehensive Street Improvement Program through Resolution No. R97- 247: and WHEREAS, the City entered into an agreement with Weekley Asphalt Paving, Inc. to resurface approximately 30 miles of streets under Phase II -A of the Seven Year Comprehensive Street Improvement Program as authorized by Resolution # R 99-277; and WHEREAS, the recent completion of stormwater improvements in the Woodlands area allowed certain streets to be ready for resurfacing; and WHEREAS, the City is desirous of restoring local failures at the edge of pavement in certain streets with valley gutter prior to resurfacing, where appropriate; and WHEREAS, Weekley Asphalt Paving agreed to adding the said streets to the contract and to performing the additional gutter restoration at a cost not to exceed $174,812.00, as defined in Change Order #1, attached hereto as "Exhibit 1 "; and WHEREAS, available funds exist in the Road Resurfacing Program budget for said purpose; and WHEREAS, it is the recommendation of the Public Works Director, Temp. Reso. #9063 Page 2 June 19, 2000 Purchasing/Contracts Manager and Acting City Engineer to add additional streets and cexecute Change Order #1 with Weekley Asphalt Paving Inc, as described in "Exhibit 1 "; and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interest of the citizens and residents of the City of Tamarac to execute Change Order #1 with Weekley Asphalt Paving Inc in an amount not to exceed $174,812,00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA THAT: SECTION 1: The foregoing WHEREAS clauses are HEREBY ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. SECTION 2: The list of streets to be milled and resurfaced, identified in "Exhibit 1", is HEREBY APPROVED. SECTION 3: The appropriate City Officials are HEREBY AUTHORIZED to execute Change Order #1 with Weekley Asphalt Paving Inc for resurfacing additional streets and restoring valley gutter, a copy of said change order is being hereto attached as "Exhibit 1 ". SECTION 4: All Resolutions or parts of Resolutions in conflict herewith are HEREBY REPEALED to the extent of such conflict. SECTION 5: If any provision of this Resolution or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are declared to be severable. SECTION 0: This Resolution shall become effective immediately upon its Temp. Reso. #9063 1 Page 3 June 19, 2000 passage and adoption. PASSED, ADOPTED AND APPROVED this 28 th day of June 2000. ATTEST: MARIONISWENSON, CMC INTERIM CITY CLERK E Y CERTIFY that I qSL a this TION. as to form. MITCHELL AFT; CITY ATTORNEY L 2�9 �' J E SCHREIBER MAYOR AEWRD 4F commaim MAYOR 8"ElWR DIST 1: COMM. PORTNEA DIST Z: COMM. MISHIGN . DIST 3: COMM. SULTAN/O DIST 4: VIM ROBERTS 1 CHANGE ORDER Exhibit 1 Temp. Reso. #9063 DATE OF ISSUANCE: June 19, 2000 NO. 1 OWNER: CITY OF TAMARAC PROJECT NAME: Street Improvement Program Phase II -A Public Works Department 6011 Nob Hill Road Tamarac, FL 33321-2401 CONTRACTOR: Weekley Asphalt Paving BID NO. 99-27B IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL. MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS. UNLESS STATED OTHERWISE, ALL WORK SHALL BE PERFORMED ACORDING TO THE TERMS AND CONDITIONS OF CONTRACT BETWEEN THE CITY AND PAN AMERICAN CONSTRUCTION, LP. DESCRIPTION: 1- Include the list of streets in Table 1 in the contract. Please refer to attached map for a graphical presentation. Table 1. Streets to be included in Contract II -A STREET NAME FROM TO (refer to attach map for actual limits) = z = L o 3 OVERL AY AREA (SF) MILL AREA (SF) NW 80 ST NW 87 AV EAST END 957 24 22,969 8,613 AUSTRALN PN CI BANYAN LN BANYAN LN 848 20 16,970 16,970 BANYAN LN COMMERCIAL BV DOGWOOD CI 1,524 20 30,479 30,479 BAYBERRY LN WOODLANDS BV S BAYBERRY LN 1,153 20 23,064 23,064 BREADFRUIT CI BANYAN LN SOUTH END 201 20 4,015 4,015 CARIBBN PINE CI BANYAN CI SOUTH END 153 20 3,069 3,069 CEDAR CI YELLOW PINE LN EAST END 182 20 3,638 3,638 DOGWOOD CI BANYAN LN SOUTH END 119 20 2,374 2,374 GUAVA CI NW 56 ST SOUTH END 81 2 162 162 GUAVA DR NW 56 ST SOUTH END 3071 20 6,149 6,149 NW 56 ST GUAVA DR BANYAN LN 258 20 5,150 5,150 RYL PNCIANA LN WOODLANDS BV ORCHRD TREE LN 1,158 20 23,170 23,170 S BAYBERRY LN SOUTH END BAYBERRY LN 1,079 20 21,580 21,580 WALNUT CI YELLOW PINE LN EAST END 75 190 14,226 14,226 WHITE HICKRY EX WHITE HICKRY CI NORTH END 898 40 35,929 35,929 WHITE HICKRY EX WHITE HICKRY CI WEST END 377 20 7,535 7,535 WHITE HICKRY LN WOODLANDS BV WHITE HICKRY CI 369 20 7,390 7,390 YELLOW PINE LN WOODLANDS BV NORTH END 1,476 20 29,520 29,520 ORCHRD TREE LN RYL PNCIANA LN RYL PNCIANA LN 1,155 20 23,095 23,095 NW 67 CT NW 90 AV PINE ISLAND RD 732 24 17,557 - NW 103 AV SOUTHGATE BV NW 80 ST 1,519 241 36,459 NW 83 ST NW 100 TE NW 107 AV 2,079 23.71 49,283 - NW 93 AV SOUTHGATE BV NW 80 ST 1,497 21.7 32,484 - NW 96 AV NW 80 ST NW 81 ST 759 24 18,2261- Total SY 48,2771 29,570 Table 2: Resurfacing Quantities Estimated Resurfaced Area (SY) 48,277 Asphalt Tonnage 3,355 Tack coat (Gal) 1,751 Milling (SY) 29,570 Number of Milled Manholes - Number of Milled Driveways - Number of Manhole Risers 53 Number of Water valve Risers 10 Grass Edging (LF) 748 4" Wide Double Yellow Solid - 6" Wide Double Yellow Solid 3,729 12" Wide White Solid 684 6" Wide Yellow Solid 315 Symbol Pavement Marking - Messages 1 4" Wide temporary Paint - Reflective Pavement Markers - Total Expenditure (based on contract unit costs) $146,812 2- As directed by the City, repair approximately 700 lineal foot of Concrete valley Gutter in various locations in the City. The repair shall include: • Removing existing damaged gutter, • Grading and leveling of the gutter base as necessary to adjust to new asphalt level • Compaction of the gutter base to a density of at least 95% of the maximum density, as determined by the Modified Proctor Test, • Disposal of excavated material, • Placement of Class I concrete valley gutter (24" wide) in accordance with FDOT Specifications 520 (FDOT Standard Specifications for Road and Bridge Construction). The finished surface shall be flush with the existing asphalt. It shall be placed and finished in a manner that provides for continuity of the longitudinal and cross slopes of the existing roads. Table 3: Gutter Restoration Quantities and Prices Item Unit Cost ($/LF) Quantity LF Cost $ Remove valley gutter and Construct 40.00 700 28,000 New Valley gutter, including any necessary grading and adjustment Total 28,000 Table 4. Total Change Order Cost Item Cost Resurfacing 146,812 Gutter Restoration 28,000 Total 174,812 I n P, VALLEY GUTTER' A/C SURFACE: COURSE PURPOSE OF CHANGE ORDER: The recent completion of stormwater improvements in the Woodlands area allows certain streets to be ready for resurfacing. Such streets could not be paved before the stormwater improvements are completed. Those streets, identified in Table 1, are being added to the open- ended contract with Weekely Asphalt Paving. The City is desirous of restoring local failures at the edge of pavement in certain streets with valley gutter. CHANGE IN CONTRACT PRICE Original Contract Price $1,223,172.79 CHANGE IN CONTRACT TIME Original Contract Time 240 days Previous Change Order No. to No. $ N/A Net change from previous change orders N/A Contract Price prior to this Change Order $1,223,172.79 Contract Time Prior to this Change Order 240 days Net (Increase) of this Change Order $ 174,812,00 Net (Increase) of this Change Order 60 Contract Price with all approved Change Orders $ 1,397,984.79 Contract Time with all approved Change Orders 300 calendar days A'BY Raj Vermin, Direct ub By Weekley Asphalt Pa DAN1EL D. WEEK PRESIDENT m zz a^H OL MN end oL MN -_ . ._ _ -. -4Q A>lsaanrun a m z PU puelsl auld i v n m. m. �U E E 0 i P2l IM qON v G lO