CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-88-c,2-3�
A RESOLUTION ISSUING DEVELOPMENT ORDER
NO. 245 FOR MOBIL OIL SERVICE STATION
PROJECT FOR A REVISED SITE PLAN PURSUANT
TO THE PROVISIONS OF SECTIONS 7-2
THROUGH 7-11 OF THE TAMARAC CODE; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, pursuant to the instructions of the City
Council of Tamarac, Florida, a public meeting has been
advertised in accordance with applicable law of the date,
time and -place of the meeting regarding the review of the
application for a development order by the applicant for
development approval; and
WHEREAS, the City Council has examined and investigated
the application, staff and Planning Commission recommenda-
tions, and the attached Development Review Status Sheet dated
September 8, 1988; and
WHEREAS, the City Council reviewed the development order
and accompanying documents at a public meeting; and
WHEREAS, the City Council has determined that the
application is in compliance with all elements of the Compre-
hensive Plan, or will be in compliance prior to the issuance
of a Certificate of Occupancy for the development that is the
subject of the application.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
TAMARAC, FLORIDA:
SECTION 1: That the application for approval of a
revised site plan for Mobil Oil Service Station (located at
northwest corner of Northwest 88th Avenue and Northwest 77th
Street), prepared by Heller, Weaver and Cato, Incorporated,
revised on July 26, 1988, reflecting replacement of existing
gas pumps and canopies is HEREBY APPROVED subject to the
following conditions%
A. Construction is to be in complete compliance with
the plans and specifications submitted by the developer to
the City of Tamarac as described in Section II of the
Development Review Status Sheet and approved engineering
drawings.
1
Ru
2
3
4
5
�i
8
9
10
11
12
13
14
RVE
16
17
18
21
22
23
24
��72
26
27
28
29
30
33
34
35
Temp. Reso. #5156
B. Commencement of construction shall be no longer
than one year from the date of this approval. If the
development does not commence construction within one year,
this approval is null and void unless an extension has been
granted in accordance with applicable regulations.
C. The development order is assignable, but an assign-
ment does not discharge any assignee from strict compliance
with'the order unless the City Council consents to modify any
of the original requirements.
D. Additional conditions established in order to issue
the development order are set forth as follows:
/vom�
SECTION 2: Should any section or provision of this
development order be declared by a court of competent juris-
diction to be invalid, the City Council shall determine if
the other portions of the order remain valid or whether the
approval shall be null and void.
SECTION 3: This development order as conditioned shall
become effective immediately upon its passage.
r�
PASSED, ADOPTED AND APPROVED this /,(/' day of ,
1988.
ATTEST: fflvl�_16
NORMAN ABRAMOWITZ
MAYOR
CAROL A. EVANS
CITY CLERK - -
I HEREBY CERTIFY that I have
approved this RESOLUTION as to
form.
RICHARD DOODY v
CITY ATTORNEY
RECORD OF COUNCIL VOTE
MAYOR _ _. ABRAMOWITZ 11'./A e_..
DISTRICT 1:
C/M ROHR
DISTRICT 2:
V/M STELZER
DISTRICT 3:
C/M HOFFMAN
DISTRICT 4:
C/M BANDER
F
1
5811 NORTHWEST BETH AVENUE a TAMARAC. FLORIDA 33321
TELEPHONE (305) 722.5900 /,
DEVELOPMENT REVIEW STATUS SHEET
MEMO 0
DATE 9/8/88
245 Orig. Dev. Order
—Revised Dev. Order
oject MOBIL OIL SERVICE STATION REVISED SITE PLAN Master File M 3-77
REPLACING EXISTING GAS PUMPS AND CANOPM
Location ,J` Corner NW $8 Ave and NW 77 St.
Developer
Owner w
Zoning - B-3 Acres 0.99 Recommended Dbte for Council Action 9/14/88
Future Land Use Designation commercial Proposed Use service station
DEVELOPMENT ORDER FOR:
Final Site Plan
I. STAFF APPROVAL DATES:
City Planner
City Engineer
Chief Building Official
Fire Chief
Comments
0,.
Final
Plat
Revised Site
Plan xx
Final
Site Plan
Final Plat,,,.
Revised Site Plan
II. PLA14NING COMMISSION REC0:T4ENDATIONS:
APPROVAL or APPROVAL WITH CONDITIONS/Date DENIAL/Date
Final Site Plan dated Rev
Final Plat dated Rev
Revised Site Plan dated Rev
Planning Commission finding of compliance with Certified Plan:
u
I. FINAL ENGINEERING DRAWINGS:
APPROVAL/Date APPROVAL AS REDLINED/Date DENIAL/Date
Comments
cont'd
Page 2
IV. LANDSCAPE PLAN:
Staff Action
DEVELOPMENT REVIEW STATUS SHEET
APPROVAL."APPROVAL WITH CONDITIONS,,,,.„_ DENIAL
Date
V. BROWARD COUNTY DEVELOPMENT REVIEW CM-4ITTEE REPORT:
If applicable
Comments
VI. DEVELOPERS AGREEMENTS/FEES (Where aoalicablel: SUMMARY
A. Water and Sewer Plyeloper Agreemint
City Engineer Approval/Date
City Attorney Approval/Date
B. Other Development Agreements (Covenants, Stipulations, etc.)
It
C. Drainage Retention Fee Amount $
5% Required/Acres Provided
Deficiency/Acres X $35,000/Acre
D. Drainage Inrpro�,t Fee Amount $
Project Acreage X $130/Acre
E.
Water S Sewer ContritUtigg Charges
Fee Amount
Number of ERCs X $1000
F.
ERC Review Fee, if more than 10 ERCs
Fee Amount
S
G.
Local Parks/Recreation
Fee Amount
S
Acres Required Provided
S/Acre X, Deficiency/Acres
H.
Engineering Fees
Fee Amount
Z
I.
Jonds
Bond Amount
S
Date: Approved by City Engineer
City Attorney
J.
On Site Beautification
(Fees to be paid at time of building
permit issuance)
•
.
Pepe 3 Mnp •
DrVrt0PMCA1 RfVIrV STATUS SwtrT
VELOP11FNT REV)EW RE UItEMEh'T5: 1
A. Potalle k'ster Service
Certification of City Engineer or Consulting City Engineer of
Availability of Service:
AVAILABLE WILL WILL •E AVAILABLE MDT AVAILABLE..._.,._`
Date Covnents
S. Wastewater Trestment and Disposal Service
Certification of City Engineer or Consulting City Engineer of
Availability of Service:
AVAILABLE _..,..� WILL BE AVAILABLE MDT AVAILABLE
Date Comments
C. Solid waste Disposal Service
Dettmination f Availability of Service:
AVAILABLE WILL BE AVAILABLE MDT AVAILABLE �....�
Date Coanents
r r
D, Drainage Adequacy
Certification of City. Engineer or Consulting City Engineer of
Adequacy of=Drainage:
ADEQUATE 0 WILL BE ADEQUATE ,. MDT ADEQUATE
Date Com.ents
E. A nional Transportation Network
Compliance wit Minimum Standards:
COMPLIES �,.,..,� WILL COMPLY...^. ODES NOT COMPLY
Date Comments
F. local Streets and Roads
Compliance wi h FJinimo Standards:
CCR-IPLIES WILL COIIPLY!.._.r,. DOES NOT COMPLY
Date Com.+ents
i. fire Protection Service
Compliance wip Minim;mm Standards:
COM,PLIES„ A -- WILL C04PLY ODES NOT CV&,PLY �.—
Date Convents
N. Police Protection Service
Compliance wi Minimum Standards:
COMPLIES WILL COMPLY DOES NOT COMPLY
Date Comments
I,Level Paris (Parks and Recreation Facilities)
Lane :icatton Required/Atres Provided
Cash in Lieu of land _..-.� Cross Acres Max. _ 5, /AC « S -
Ac%ul siux
1/-
arpliAnce with the Standards of the Brovrrd County school Board:ard••
SCHDDL SITES NEEDED FOR ELEMENTARY SCHOOL W t WEEDED
r « MIDDLE SCHOOL NOT WEEDED
« r « « NISH SCHOOL WOT WEEDED
Letter from School Board Dated
rage 4 W,-
DEVELOPMEN7 REVIEW STATUS SHEET •
V11I. MCESSING FEES (PAID):
Site Plan Review: ;
Revised Site Plan: ; 175.00
Plat Review: S
Schematic EnS.: ;
Other: :
STAFF CLMENTS: •
Proposed development is/i4we" in general Confore►ance with Tamarac's lend
Use Plan Element and recommends:
Adoption of Development Order d 245 Master File / 3-77 For:
JAT
Project Subject to the requirements included in the Report end the following
Conditions:
Staff recommends approval of the revised site plan.