A RESOLUTION ISSUING A DEVELOPMENT ORDER FOR
THE SWANSON WEST PROJECT. DEVELOPMENT ORDER
NO. 049 AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, pursuant to the instructions of the City Council of the
City of Tamarac, Florida, a public meeting has been advertised in
accordance with applicable law of the date, time and place of the
meeting regarding the review of the application for a development
order by the applicant for development approval; and
WHEREAS, the City Council has examined and investigated the
application, staff and Planning Commission recommendations, and the
attached Development Review Status Sheet dated 9/9/82; and
WHEREAS, the City Council reviewed the development order and
accompanying documents at a public meeting; and
WHEREAS, the City Council has determined that the application is
in compliance with all elements of its Comprehensive Plan, or will be
in compliance prior to the issuance of a Certificate of Occupancy for
the development that is the subject of the application.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
TAMARAC, FLORIDA:
SECTION 1: That the development described on the attached
development review status sheet dated 9/9/82 is granted a development
order to proceed subject to the following conditions:
A. Construction is to be in complete compliance with the plans
and specifications submitted by the developer to the City of Tamarac
as described in Section II of the Development Review Status Sheet and
approved engineering drawings.
B. Commencement of construction shall be no longer than one year
from the date of this approval. If the development does not commence
construction within one year, this approval is null and void unless an
extension has been granted in accordance with applicable regulations.
C. The development order is assignable, but an assignment does
not discharge any assignee from strict compliance with the order unless
the City Council consents to modify any of the original requirements.
Temp. Reso. #2512
1
2
3
4
5
'il
9
10
11
12
13
14
15
16
17
2t
23
22
23
24
25
26
27
28
29
,2
33
34
35
36
D. Additional conditions established in order to issue the
development order are set forth as follows:
1. A catch basin to be installed on 57th Street and a positive lin(
being installed to the system on Commercial Boulevard.
2. Failing to get proper -permission for this from Broward County,
the drainage system will have to be reevaluated by the engineer!
and approved by the City Engineer.
3. The median to be backfilled and sodded with bahia grass.
SECTION 2: Should any section or provision of this development
order be declared by a court of competent jurisdiction to be invalid,
the City Council shall determine if the other portions of the order
.remain valid or whether the approval shall be null and void.
SECTION 3: This development order as conditioned shall become
effective immediately upon its passage.
j
PASSED, APPROVED AND ADOPTED this J,"'-day of `�% ,1982.
ATTEST:
ASSISTANT CITY CLERK
I HEREBY CERTIFY that I have
approved the form and correct-
ness of this RESO, UTION.
MAYOR:
DISTRICT
DISTRICT
DISTRICT
DISTRICT
MAYOR
RECORD OF COUNCIL VOTE
5811 NORTHWEST 88TH AVENUE 0 TAMAAAC. FLORIDA 33321
TELEPHONE (305) 722-5900
DEVELOPMENT REVIEW STATUS SHEET
MEMO # 1
DATE 9/9/82
#049 Orig. Dev. Order
Revised Dev. Order
Project SWANSON WEST Master File #e34-82
Location Lot 8, Block 7, Lyons Commercial Sub. NE corner Commercial Blvd and NW 84 T
Developer Trans -American Corp.
Owner Howard R. Swanson
Zoning _ Acres 1.34 Recommended Date for Council Action 11/10/82
Future Land Use Designation Commercial Proposed Use Commercial
DEVELOPMENT ORDER FOR:
Final Site Plan x
I. STAFF APPROVAL DATES:
City Planner
City Engineer
Chief Building Official
Fire Chief
Finance Director
Final Plat N/A Revised Site Plan
Final Site Plan Final Plat Revised Site Plan
II..PLANNING C0,111tISSION RECO; i; IENDATIONS:
APPROVAL or APPROVAL WITH CONDITIONS/Date 10/7/82 DENIAL/Date
Final Site Plan dated 8/6/82 Rev 10/12/82
Final Plat dated Rev
Revised Site Plan dated Rev
Planning Commission finding of compliance with Certified Plan:
See page 4 of this report
III. FINAL ENGINEERING DRAWINGS:
APPROVAL/Date . APPROVAL AS REDLINED/Date 10/20/82 DENIAL/Date
Comments See attached memo from City Engineer dated 10/22/82
lrracf
cont'd
Page 2
• DEVELOPMENT REVIEW STATUS SHEET
IV. LANDSCAPE PLAN:
Staff Action APPROVAL X APPROVAL WITH CONDITIONS DENIAL
Date 8/31/82
Beautification Committee Recommendation -Date: 9/13/82
APPROVAL APPROVAL WITH CONDITIONS DENIAL
V. BROWARD COUNTY DEVELOPMENT REVIEW COMMITTEE REPORT: I Date
If app ica e
Comments Already platted (Lot 8, Block 7, LYONS COMMERCIAL SUB., PB 69, P.4
VI. DEVELOPERS AGREEMENTS/FEES (Where applicable): SUMMARY
A. Water and Sewer Developer Agreement
City Engineer Approval/Date
City Attorney Approval/Date
B. Other Development Agreements (Covenants, Stipulations, etc.)
1)Easement for fire hydrant
2)Public ingress/egress easement
C. Drainage Retention Fee Amount $ 2,345.00
5% Required/Acres 1.34 Provided -0-
Deficiency/Acres .067 X $35,000/Acre
D. Drainage Improvement
Project Acreage 1.34 X $130/Acre
E. Water & Sewer Contribution Charges
Number of ERCs 2-1, X $1000
Fee Amount $ 174,20
Fee Amount $ 3-8 7 50. C 0
F. ERC Review Fee, if more than 10 ERCs Fee Amount $ N/A
G. Local Parks/Recreation Fee Amount $ N/A
Acres Required Provided
$/Acre X Deficiency/Acres
H. Engineering Fees Fee Amount $ 4,473.27
I. Bonds Bond Amount $ 4,993.25
Date: Approved by City Engineer _ City Attorney
J. On Site Beautification gCO5.1
(Fees to be paid at time of building permit issuance)
1
cont'd
1
L�
Page 3
VELOPMENT REVIEW STATUS
Memo #
DEVELOPMENT REVIEW REQUIREMENTS:
A. Potable Water Service
Certification of City Engineer or Consulting City Engineer of
Availability of Service:
AVAILABLE X WILL BE AVAILABLE NOT AVAILABLE
Date Comments
B. Wastewater Treatment and Disposal Service
Certification of City Engineer o; Consulting City Engineer of
Availability of Service:
AVAILABLE ---X WILL BE AVAILABLE NOT AVAILABLE _.._—
Dote Comments
C. Solid Waste Disposal Service
Determination of Availability of Service: _
AVAILABLE ___._._.. WILL BE AVAILABLE ._.X __ NOT AVAILABLE
Date Comments
D. Drainage Adequacy
Certification of City Engineer or Consulting
City Engineer of
Adequacy of Drainage:
ADEQUATE ____—. WILL BE ADEQUATE
NOT ADEQAUTE
Date Comments
E. Regional Transportation Network
Compliance with Minimum Standards:
COMPLIES _ WILL COMPLY X
DOES NOT COMPLY
Date Comments
F. Local Streets and Roads
Compliance with Minimum Standards:
COMPLIES____ X— WILL COMPLY
DOES N07 COMPLY
Date Comments
G. Fire Protection Service
Compliance with Minimum Standards:
COMPLIES WILL COMPLY X DOES NOT COMPLY
Date Comments
H. Police Protection Service
Compliance with Minimum Standards:
COMPLIES X WILL COMPLY DOES NOT COMPLY
Date Comments
I. Local Parks (Parks and Recreation Facilities) N/A
rand Dedicition Required/Acres Provided
Cash in Lieu of Land _Gross Acres Max. X $ /AC = $
J. ,5choolr Sites N/A
Compliance with the Standards of the Broward County School Board:
SCHOOL SITES NEEDED FOR ELEMENTARY SCHOOL NOT NEEDED
It
to it It
M1 DOLE SCHOOL NOT NEEDED
HIGH SCHOOL NOT NEEDED
Letter from School Board Dated _ —
Page 4
DEVELOPMENT REVIEW STATUS SHEET
VIII. PROCESSING FEES (PAID):
Site Plan Review: $ 600.00
Revised Site Plan: $
Plat Review: $
Schematic Eng.: $ 450.00
Other: $
STAFF COMMENTS:
Proposed development is/t in general conformance with Tamarac's Land
Use Plan Element and recommends:
Adoption of Development Order # 049 Master File # 34-82For:
SWANSON WEST .
Project subject to the requirements included in the Report and the following
conditions:
i 1. City to approve dedication of public ingress/egress easement
2. City to accept easement for fire hydrant.
3. Developer to be reminded that there is a limited number of
parking spaces and it could create future problems With occupancy.
* NOTE
PLEASE NOTE THAT THE CITY'S CONSULTANT ENGINEERS ARE REVIEWING THE
RATE SCHEDULE AND, IF APPROVED BY CITY COUNCIL PRIOR TO REVIEW OF
THIS PROJECT, REVISED WATER AND SEWER FEES COULD RESULT.