Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
City of Tamarac Resolution R-2021-077
Temp. Reso. #13644 July 14, 2021 Page 1 of 5 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2021- 077 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AWARDING A CONTRACT TO MURPHY PIPELINE CONTRACTORS, INC. UTILIZING PRICING FROM AN AGREEMENT OBTAINED THROUGH A FORMAL COMPETITIVE PROCESS BY THE PURCHASING COOPERATIVE OF AMERICA, PER CONTRACT NUMBER OD-307-20, FOR THE REPLACEMENT OF 3,600 LINEAR FEET OF WATER PIPE TOGETHER ALONG WITH 10 EXISTING FIRE HYDRANTS ALONG NW 70TH STREET BETWEEN THE INTERSECTION OF PINE ISLAND ROAD ON NW 70TH STREET TO NW 80TH AVENUE; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE A PURCHASE ORDER AGREEMENT WITH MURPHY PIPELINE CONTRACTORS, INC. FOR A PROJECT COST OF $684,283.64, A CONTINGENCY OF 10% OR $68,428.36 WILL BE ADDED TO THE PROJECT ACCOUNT FOR A TOTAL PROJECT BUDGET OF $752,712.00; PROJECT WILL BE FUNDED BY CIAC FEES; AUTHORIZING A BUDGET AMENDMENT IN AN AMOUNT NOT TO EXCEED THE TOTAL PROJECT COST OF $752,712.00 PURSUANT TO F.S. 166.241(2); AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO ADMINISTER THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the area along NW 70th Street is between the intersection of Pine Island Road on NW 70th Street to NW 80th Avenue is serviced with 8-inch Cast Iron water lines and is insufficient to provide the required fire flowrate and for personal use for current and future develop in this area; and WHEREAS, the City has successfully replaced over 20,000 Linear Feet of water mains using pipe bursting technology utilizing Murphy Pipeline Contractors, Inc. since Temp. Reso. #13644 July 14, 2021 Page 2 of 5 2014 in Shaker Village, Spyglass, NW 47th Terrace, and University Drive; and WHEREAS, pre -chlorinated pipe bursting has become the preferred water main replacement method in Europe with over 100 million feet replaced in the past 26 years. In the U.S., Murphy Pipeline Contractors, Inc. has completed over 500,000 Linear Feet of static pipe bursting over the past decade; and WHEREAS, the City has decided to complete the NW 70t' Street Water Main Upgrade Project utilizing Pipe Bursting Technology quoted by Murphy Pipeline Contractors, Inc., to correct the fire flow deficiencies. The cost to complete the Pipe Bursting Project without contingency is quoted at $684,283.64; and WHEREAS, the pipe bursting work is to be completed on NW 77th Street between the intersection of Pine Island Road on NW 70th Street to NW 80th Avenue as shown on the project location map attached hereto as "Exhibit 1 "; and WHEREAS, the Purchasing Cooperative of America (PCA), per Contract Number OD-307-20 with Murphy Pipeline Contractors, Inc. for Pipe Bursting has favorable pricing, terms, and conditions, which was awarded on January 31, 2019 and has been renewed twice for two (2) one-year periods, and is valid through February 1, 2022 (a copy of which is attached hereto as "Exhibit 2"); and WHEREAS, the City of Tamarac is a member in good standing of the PCA; and WHEREAS, the vendor has agreed to honor the terms, conditions, and pricing of PCA Contract Number OD-307-20, Inc. and has prepared a project proposal in the amount of $684,283.64, attached hereto as "Exhibit 3", and Temp. Reso. #13644 July 14, 2021 Page 3 of 5 WHEREAS, the Director of Public Services and the Purchasing Contracts Manager chose to utilize available contracts awarded by other governmental entities for Water Pipe Replacement utilizing Pipe Bursting, as provided by City Code Section 6-148 (f), which states that the purchasing officer may utilize contracts with other governmental agencies, and WHEREAS, CIAC Fees will be used to fund the NW 70th Street Main Replacement and will require a Budget Amendment in an amount not to exceed the total project cost of $752,712.00 PURSUANT TO F.S. 166.241(2); and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interest of the citizens and residents of the City of Tamarac to accept and execute an Agreement Amendment with Murphy Pipeline Contractors, Inc. utilizing PCA Contract Number OD-307-20, in an amount not to exceed A PROJECT COST OF $684,283.64, a contingency of 10% or $68,428.36 will be added to the Project Account for a total project budget of $752,712.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, THAT: SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. All exhibits attached hereto are incorporated herein and made a specific part hereof. SECTION 2: The City Commission hereby awards the pipe bursting Temp. Reso. #13644 July 14, 2021 Page 4 of 5 contract to Murphy Pipeline Contractors, Inc. utilizing Purchasing Cooperative of America Contract Number OD-307-20 for the replacement of 3,600 LF of undersized Water Main Pipe with 10-inch HDPE along with the replacement of 9 existing fire hydrants and numerous inline valves to isolate the area. The appropriate City Officials are hereby authorized to execute a Purchase Order Agreement in an amount not to exceed a project cost OF $684,283.64, a contingency of 10% or $68,428.36 will be added to the Project Account for a total project budget of $752,712.00. SECTION 3: The Director of Public Services is authorized to approve Work Tasks in accordance with the schedule of prices under said contract in an amount not to exceed a project cost of $684,283.64, a contingency of 10% or $68,428.36 will be added to the Project Account for a total project budget of $752,712.00. SECTION 4: The project will be funded by CIAC Funds and will be included in a future budget amendment not to exceed the project total cost $752,712.00of pursuant to F.S. 166.241(2). SECTION 5: The City Manager, or his designee, is hereby authorized to approve and initiate Change Orders in amounts not to exceed $65,000.00 per Section 6- 147 of the City Code, and close the contract award, which includes but is not limited to making final payment and releasing bonds per Section 6-149 of the City Code, when the work has been successfully completed within the terms, conditions and pricing of the ag reement. SECTION 6: All Resolutions or parts of Resolutions in conflict herewith are Temp. Reso. #13644 July 14, 2021 Page 5 of 5 hereby repealed to the extent of such conflict. SECTION 7: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 8: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this ?q day of ��-�� 2021. MIC ELLE J. GO Z MAYOR ATTEST: JE-NN FER J HNSO�I L, CMC CITY CLERK RECORD OF COMMISSION VOTE: MAYOR GOMEZ DES DIST 1: COMM. BOLTON Yes DIST 2: COMM. GELIN �5 DIST 3: V/M VILLALOBOS ES DIST 4: COMM. PLACKO �5-S I HEREBY CERTIFY that I have approve this, RESOLUTIOI)as to form. JOHT" R i 1F JR. CITY A T RNE J' �� W 2 m:f z Jua�aj!lonp _. }u co I mb 08 OAl90dVOS dl JsgLL s R �• l m w 2ua II � <V i lO ?3 CO , �. l r= c LL J n D ¢ \ r �o `od 13 U ` 9 Sri O � li ox o t c s co 00 • .§ O ` z M yes; V jr Q M a C7 tL U) o - a Tj s i1==F to � \ •., iy '�, } u W = a o a U ^ c�i > > o d �t > ° 1 (6 _ X r ox > poo��g \' to 3AF/'p }E8' m } ° 3 ° u x a ro co CN 7 U p ` od N U `f it LL C � Z W r d " cr AV 4U,9 MN z f m{ Am � ' coil,__ I O 3n al s o' � 9 C I' tt i _T W04~ I N 11��,,rFy4l .. _ 00 Y - �--7 X i� i �� n E • I � uoi� s�ilonp� 0) LU uj cr 46 -2 o c 'p, cU `t d o > ''VV\e�+� ' O e' lY U V Y- O> p cl! _ .O O ` Iron .' tO � � � o � 16 ucdls�ro � q' DUclll@ f o > t10i _ -3 - B' c (5 r N t 2 a° —Oy Z. LL 2J O 1 3NI MN MN ¢ C gl \tOn C a5 r ] yp _ ° N / E c 8311NOVIOOCIA�I ° } Lail lseo „g TR 13644 EXHIBIT 2 CzA ;Vawl�� e4meveea, Home Vendors Contracts/Vendors List Members Solicitations FAQs Forms Contact Us Current Contracts Murphy Pipeline Contractors, Inc. Awarded Contracts: • PCA OD-307- 20 Trenchless Rehabilitation & Related Items and Services • PCA 3-206-18 Trenchless Rehabilitation & Related Items and Services Contacts: Todd Grafenauer PH: 904-764-6887 Email: toddg@murphypipelines.com PCA Members "PCA OD-307- 20 Trenchless" or "PCA 3-206-18 Trenchless" on your Purchase Order. NU!Curphy Pipeline Contractors, Inc. Please click on the logo to go directly to company's site. Murphy Pipeline Contractors, Inc. 1876 Everlee Road Jacksonville, FL 32216 Phone: (904) 764-6887 Fax: (904) 379-6193 Murphy Pipeline Contractors, Inc. - Trenchless Technology Solutions with the mission of reducing community impact during construction of water and force main replacement projects. Murphy Murphy Pipeline Contractors, Inc. Oipelines is a trenchless utility contractor, established to bring the trenchless technologies of Europe PO Box 14366 .o the United States. The main focus is on pre -chlorinated pipe bursting, sliplining and Milwaukee, WI 53214 Compression Fit HDPE pipe lining (Swagelining) for water and force main replacement from 2" Phone: (414) 321-2247 through 78". Fax: (414) 321-2297 © Purchasing Cooperative Of Sitemap America 2021 Disclaimer The Woodlands, Texas 77380 1 844-722-6374 1 http://www.pcamerica.org Website development and hosting by Siriad Solutions Privacy Policy TR 13644 EXHIBIT 2 PCA RFP OD-307-20 Trenchless Technology Rehabilitation and Related Items & Services Awarded Vendor: Murphy Pipeline Contractors TY Unit Unit Price Extension Coefficient 111'e'v"i's"e" mt Price A) Cured -in -place pipe (CIPP) reconstruction of gravity sewers 1 6"x4.5mm 1 LF $40.50 $40.50 0.94 $ 38.07 2 8"x4.5mm 1 LF $31.00 $31.00 0.94 $ 29.14 3 10" x 6.Omm 1 LF $41.50 $41.50 0.94 $ 39.01 4 12" x 6.Omm 1 LF $57.50 $57.50 0.94 $ 54.05 5 15"x7.5mm 1 LF $66.00 $66.00 0.94 $ 62.04 6 18"x9.Omm 1 LF $81.50 $81.50 0.94 $ 76.61 7 21"x9.Omm 1 LF $109.50 $109.50 0.94 $ 102.93 8 24" x 10.5mm 1 LF $131.50 $131.50 0.94 $ 123.61 9 27"x 10.5mm 1 LF 1 $155.00 $155.00 0.94 $ 145.70 10 30" x 12.Omm 1 LF $182.50 $182.50 0.94 $ 171.55 11 33" x 12.0mm 1 LF $204.00 $204.00 0.94 $ 191.76 12 36" x 12.Omm 1 LF $244.00 $244.00 0.94 $ 229.36 13 42" x 13.5mm 1 LF $285.00 $285.00 0.94 $ 267.90 14 48" x 15.Omm 1 LF $408.00 $408.00 0.94 $ 383.52 15 54" x 18.Omm 1 LF $538.00 $538.00 0.94 $ 505.72 16 6" & 8" Additional 1.5mm 1 1 LF $1.00 $1.00 0.94 $ 0.94 17 10" & 12" Additional 1.5mm 1 LF $2.00 $2.00 0.94 $ 1.88 18 15" & 18" Additional 1.5mm 1 LF $10.00 $10.00 0.94 $ 9.40 19 21" & 24" Additional 1.5mm 1 LF $15.00 $15.00 0.94 $ 14.10 20 27" Additional 1.5mm 1 LF $25.00 $25.00 0.94 $ 23.50 21 30" Additional 1.5mm 1 LF $25.00 $25.00 0.94 $ 23.50 22 33" Additional 1.5mm 1 LF $30.00 $30.00 0.94 $ 28.20 23 36" Additional 1.5mm 1 LF $30.00 $30.00 0.94 $ 28.20 24 42" Additional 1.5mm 1 1 LF $40.001 $40.00 0.94 $ 37.60 25 48" Additional 1.5mm 1 LF $50.00 $50.00 0.94 $ 47.00 26 54" Additional 1.5mm 1 LF $60.00 $60.00 0.94 $ 56.40 27 6" - 10" Backyard Easement Setup Per Install Length 1 LF $4.00 $4.00 0.94 $ 3.76 28 12" - 18" Backyard Easement Setup Per Install Length 1 LF $10.00 $10.00 0.94 $ 9.40 29 Timber Matting for Large Diameter Setup 1 SY $20.00 $20.00 0.94 $ 18.80 30 Internal Reconnection of service connection by robotic cutter 1 EA $235.00 $235.00 0.94 $ 220.90 Note: Any CIPP over 54" will be on an individual quote basis. Clean/TV & Evaluation for Gravity Sewers 31 6" - 12" Clean & TV sewer 1 LF $5.50 $S.50 0.94 $ 5.17 32 15" - 21" Clean & TV sewer 1 LF $11.00 $11.00 0.94 $ 10.34 33 24" - 33" Clean & TV sewer 1 LF $19.50 $19.50 0.94 $ 18.33 34 36" & 42" Clean & TV sewer 1 LF $30.00 $30.00 0.94 $ 28.20 35 48" & 54" Clean & TV sewer 1 1 LF $50.001 $50.00 0.94 $ 47.00 36 6" - 15" Post TV Inspection after Rehabilitation 1 LF $2.50 $2.50 0.94 $ 2.35 37 18"-27" Post TV Inspection after Rehabilitation 1 LF $4.00 $4.00 0.94 $ 3.76 38 30" or Larger Post TV Inspection after Rehabilitation 1 LF $5.50 $5.50 0.94 $ 5.17 39 Re -setup for clean & TV Inspection Due to Point Repairs 1 EA $1S0.00 $150.00 0.94 $ 141.00 40 Root Removal 1 LF $3.00 $3.00 0.94 $ 2.82 41 Grease Removal 1 LF $3.00 $3.00 0.94 $ 2.82 42 Other Remote Obstruction Removal (max. 10 LF) 1 EA $1,350.00 $1,350.00 0.94 $ 1,269.00 43 Above Ground Physical Inspection 1 1 LF $4.001 $4.00 0.941 $ 3.76 Bypass for sewers and associated items 44 Set Up 4" Pump (Per Pump) 1 EA $450.00 $450.00 0.94 $ 423.00 45 Set Up 6" Pump (Per Pump) 1 EA $1,050.00 $1,050.00 0.94 $ 987.00 46 Set Up 8" Pump (Per Pump) 1 EA $1,500.00 $1,500.00 0.94 $ 1,410.00 47 Set Up 12" Pump (Per Pump) 1 EA $2,650.00 $2,650.00 0.94 $ 2,491.00 48 Set Up 4" Piping 1 LF $37.50 $37.50 0.94 $ 35.25 49 Set Up 6" Piping 1 I LF $46.501 $46.50 0.94 $ 43.71 50 Set Up 8" Piping 1 LF $80.00 $80.00 0.94 $ 75.20 51 jSet up 12" Piping 1 LF $110.00 $110.00 0.94 $ 103.40 52 Set up 18" Piping 1 LF $135.00 $135.00 0.94 $ 126.90 53 Operate 4" Pumping System 1 DAY $94.00 $94.00 0.94 $ 88.36 OD-307-20 CITY I Unit Unit Price Extension Coefficient Revised Unit Price 54 Operate 6" Pumping System 1 DAY $710.00 $710.00 0.94 $ 667.40 55 Operate 8" Pumping System 1 DAY $1,135.00 $1,135.00 0.94 $ 1,066.90 56 Operate 12" Pumping System 1 DAY $1,825.00 $1,825.00 0.94 $ 1,715.50 57 Bypass - Driveway Ramp (Setup, Operate, Maintain) 1 EA $460.00 $460.00 0.94 $ 432.40 58 Bypass -Street Ramp (Setup, Operate, Maintain) 1 EA $460.00 $460.00 0.94 $ 432.40 59 Bypass - Street Trenching for 8" Pipe (Setup, Operate, Maintain) 1 LF $67.50 $67.50 0.94 $ 63.45 60 Bypass- Street Trenching for 12" Pipe (Setup, Operate, Maintain) 1 LF $90.001 $90.00 0.94 $ 84.60 61 Bypass -Street Trenching for 18" Pipe (Setup, Operate, Maintain) 1 LF $112.50 $112.50 0.94 $ 105.75 62 Bypass Plan (3rd Party Certified) 1 EA $2,150.00 $2,150.00 0.94 $ 2,021.00 CIPP reconstruction of water mains 63 6" diameter liner 1 LF $80.00 $80.00 0.94 $ 75.20 TR 13644 EXHIBIT 2 64 8" diameter liner 1 LF $91.00 $91.00 0.94 $ 85.54 65 10"diameter liner 1 LF $110.00 $110.00 0.94 $ 103.40 12"diameter liner 1 LF $120.00 $120.00 0.94 $ 112.80 Re -opening of service connections internally 1 EA $350.00 $350.00 0.94 $ 329.00 The following items apply as applicable to sections B thru O and as needed in section A items 1-67: 68 Mobilization 1 Day 1 $200.00 $200.00 0.94 $ 188.00 69 Pre -Construction Video 1 LF $4.00 $4.00 0.94 $ 3.76 a)Survey/As-builts 1 LF $1.65 $1.65 0.94 $ 1.55 70 Erosion Control 1 LF $5.00 $5.00 0.94 $ 4.70 71 MOT a) Signage 1 Day $250.00 $250.00 0.94 $ 235.00 b) Flagmen 1 HR $45.00 $45.00 0.94 $ 42.30 c) Message Board, Delineators 1 Day $144.00 $144.00 0.94 $ 135.36 72 Excavation/Backfill a) 0-4 feet deep 1 Cuft $2.00 $2.00 0.94 $ 1.88 b) 4-6 feet deep 1 CA $3.00 $3.00 0.94 $ 2.82 c) 6-10 feet deep 1 CA $4.00 $4.00 0.94 $ 3.76 d) Dewatering to include wellpoint system or drawdown pump per pit 1 Day $155.00 $155.00 0.94 $ 145.70 e) On Site Dump Truck (Per Truck) 1 HR $80.00 $80.00 0.94 $ 75.20 f) Dump Truck Haul Off (Excavated Material) 1 EA $213.00 $213-00 0.94 $ 200.22 g) Steel Plates 1 LS $3,543.00 $3,543.00 0.94 $ 3,330.42 73 Trench Shoring a) 4-6feet deep 1 FTrench $25.00 $25.00 0.94 $ 23.50 b) 6-10 feet deep 1 LF Trench $35.00 $35.00 0.94 $ 32.90 74 Surface Restoration a) Sod 1 SF $2.00 $2.00 0.94 $ 1.88 b) 4-inch concrete 1 1 SF $8.50 $8.50 0.94 $ 7.99 c) 6-inch concrete 1 SF $10.50 $10.50 0.94 $ 9.87 d) 2-inch asphalt 1 SF $5.00 $5.00 0.94 $ 4.70 e) 3-inch asphalt 1 SF $7.00 $7.00 0.94 $ 6.58 f) Curb 1 LF $35.00 $35.00 0.94 $ 32.90 75 Material extras a) Lime Rock 1 SY $50.00 $50.00 0.94 $ 47.00 b)57/Washed Stone 1 SY $50.00 $50.00 0.94 $ 47.00 c)Imported Sand 1 I SY $40.001 $40.00 0.94 $ 37.60 Id Gravel 1 SY $45.00 $45.00 0.94 $ 42.30 e) Geo Grid 1 SY $7.75 $7.75 0.941 $ 7.29 i Bursting with HDPE for Gravity Sewer Lines HDPE DR 17 io 6-inch diameter 1 LF $35.00 $35.00 0.94 $ 32.90 77 8-inch diameter 1 LF $40.00 $40.00 0.94 $ 37.60 78 10-inch diameter 1 I LF $4S.001 $45.00 0.94 $ 42.30 79 12-inch diameter 1 LF $50.00 $50.00 0.94 $ 47.00 80 14-inch diameter 1 LF $72.00 $72.00 0.94 1 $ 67.68 81 16-inch diameter 1 LF $92.00 $92.00 0.94 $ 86.48 82 18-inch diameter 1 LF $114.00 $114.00 0.94 $ 107.16 83 20-inch diameter 1 LF $137.00 $137.00 0.94 $ 128.78 Manhole Connections 84 nnch 1 I EA $150.001 $150.00 0.94 $ 141.00 PCA RFP OD-307-208 Unit Unit Price Extension Coefficient Revised Unit 85 8-inch 1 EA $200.00 $200.00 0.94 $ 188.00 86 10-inch 1 EA $250.00 $250.00 0.94 $ 235.00 87 12-inch 1 EA $300.00 $300.00 0.94 $ 282.00 88 14-inch 1 EA $350.00 $350.00 0.94 $ 329.00 89 16-inch 1 EA $400.00 $400.00 0.94 $ 376.00 90 18-inch 1 EA $450.00 $450.00 0.94 $ 423.00 91 20-inch 1 EA $500.00 $500.00 0.94 $ 470.00 Sewer Later Connections 92 4-inch connection a) 0-4 feet deep 1 EA $950.00 $950.00 0.94 $ 893.00 b) 4-6feetdeep 1 EA $1,500.00 $1,500.00 0.94 $ 1,410.00 c) 6-10 feet deep 1 1 EA $2,500.001 $2,500.00 0.94 $ 2,350.00 93 6-inch connection a) 0-4 feet deep 1 EA $1,200.00 $1,200.00 0.94 $ 1,128.00 b) 4-6feetdeep 1 EA $1,900.00 $1,900.00 0.94 $ 1,786.00 c) 6-10 feet deep 1 EA $2,900.00 $2,900.00 0.94 $ 2,726.00 Clean -out Installation 94 4-inch 1 EA $375.00 $375.00 0.94 $ 352.50 95 6-inch 1 EA 1 $475.001 $475.001 0.94 $ 446.50 Sewer Lateral Pipe Bursting 1 4-inch 1 LF $31.00 $31.00 0.94 $ 29.14 yi 6-inch 1 LF $35.00 535.00 0,94 $ 32.90 TR 13644 EXHIBIT 2 C) Pipe Bursting with Pre -Chlorination for Water Main Replacement Procedure HOPE DR 11 98 3-inch diameter 1 LF $27.00 $27.00 0.94 $ 25.38 99 4-inch diameter 1 LF $31.00 $31.00 0.94 $ 29.14 100 6-inch diameter 1 LF $40.00 $40.00 0.94 $ 37.60 101 8-inch diameter 1 LF $45.00 $45.00 0.94 $ 42.30 102 10-inch diameter 1 LF $50.00 $50.001 0.94 $ 47.00 103 12-inch diameter 1 LF $55.00 $55.00 0.94 $ 51.70 104 14-inch diameter 1 LF $94.00 $94.00 0.94 $ 88.36 105 16-inch diameter 1 LF $120.00 $120.00 0.94 $ 112.80 106 18-inch diameter 1 LF $135.00 $135.00 0.94 $ 126.90 107 20-inch diameter 1 LF $170.00 $170.00 0.94 $ 159.80 108 24-inch diameter 1 LF $220.00 $220.00 0.94 $ 206.80 Note: Installation with HOPE, Fusible PVC/Ductile Iron available at market price Fittings a) Bends and sleeves, DI 109 6-inch 1 EA $375.00 $375.00 0.94 $ 352.50 110 8-inch 1 EA $425.00 $425.00 0.94 $ 399.50 111 10-inch 1 EA $500.00 $500.00 0.94 $ 470.00 112 12-inch 1 EA $800.00 $800.00 0.94 $ 752.00 113 14-inch 1 EA $1,200.00 $1,200.00 0.94 $ 1,128.00 114 16-inch 1 EA $1,475.001 $1,475.00 0.941 $ 1,386.50 115 18-inch 1 EA $1,750.00 $1,750.00 0.94 $ 1,645.00 116 20-inch 1 1 EA $2,250.00 $2,250.00 0.94 $ 2,115.00 117 24-inch 1 EA $3,000.00 $3,000.00 0.94 $ 2,820.00 b) Tees, DI 118 6x6x4 1 EA $425.00 $425.00 0.94 $ 399.50 119 6x6x6 1 EA $475.00 $475.00 0.94 $ 446.50 120 8x8x4 1 EA $575.001 $575.00 0.94 $ 540.50 121 8x8x6 1 EAM$7 $600.00 0.94 $ 564.00 122 8x8x8 1 EA $700.00 0.94 $ 658.00 123 1Ox10x4 1 EA $625.00 0.94 $ 587.50 124 1Ox10x6 1 EA$750.00 0.94 $ 705.00 125 1Ox10x8 1 EA $825.00 0.94 $ 775.50 126 1Ox10x10 1 EA $900.00 0.94 $ 846.00 127 12x12x6 1 EA $1,100.00 0.94 $ 1,034.00 128 12x12x8 1 EA $1,150.001 $1,150.00 0.941 $ 1,081.00 129 12x12x10 1 EA $1,200.00 $1,200.00 0.94 $ 1,128.00 130 12x12x12 1 EA $1,275.00 $1,275.00 0.94 $ 1,198.50 131 114xl4xl4 1 EA $1,600.00 $1,600.00 0.94 $ 1,504-00 16x4 tee 1 EA $2,750.00 $2,750.00 0.94 $ 2,585.00 16x6x6cross 1 EA $3,750.00 $3,750.00 0.94 $ 3,525.00 16x6 tee 1 EA $2,950.00 $2,950.00 0.94 $ 2,773.00 K 16x6 tee blowoff 1 EA $3,500.00 $3,500.00 0.94 $ 3,290.00 16x8x8 cross 1 EA $3,950.00 $3,950.00 0.94 $ 3,713.00 16x20 reducer 1 EA $1,250.00 $1,250.00 0.94 $ 1,175.00 18x18x18 1 EA $2,200.00 $2,200.00 0.94 $ 2,068.00 139 120 tee 1 EA $4,250.00 $4,250.00 0.94 $ 3,995.00 140 20 cross 1 EA $5,000.00 $5,000.00 0.94 $ 4,700.00 141 24 tee 1 EA $5,250.00 $5,250.00 0.94 $ 4,935.00 142 24 cross 1 EA $6,000.00 $6,000.00 0.94 $ 5,640.00 a) Fittings available per Pound 1 LB $4.65 $4.65 0.94 $ 4.37 Gate Valves 143 4-inch 1 EA $400.00 $400.00 0.94 $ 376.00 144 6-inch 1 EA $900.00 $900.00 0.94 $ 846.00 145 8-inch 1 EA $1,375.00 $1,375.00 0.94 $ 1,292-50 PCA RFP OD-307-20 Unit Unit Price Extension Coefficient Revised Unit Price 146 10-inch 1 EA $1,750.00 $1,750.00 0.941 $ 1,645.00 147 12-inch 1 EA $2,500.00 $2,500.00 0.94 $ 2,350.00 148 14-inch 1 EA $5,500.00 $5,500.00 0.94 $ 5,170.00 149 16-inch 1 EA $6,150.00 $6,150.00 0.94 $ 5,781.00 150 18-inch 1 EA $9,100.00 $9,100.00 0.94 $ 8,554.00 151 20-inch 1 EA $11,250.00 $11,250.00 0.94 $ 10,575.00 152 24-inch 1 EA $14,750.00 $14,750.00 0.94 $ 13,865.00 153 Remove valve only 1 EA $250.00 $250.00 0.94 $ 235.00 154 Install new valve vault 1 EA $6,000.00 $6,000.00 0.94 $ 5,640.00 155 Fire Hydrants 1 EA $3,250.00 $3,250.00 0.94 $ 3,055.00 Connection at Services a) Up to 1" service, short side up to 5-feet 156 4-inch main 1 EA $400.00 $400.00 0.94 $ 376.00 157 6-inch main 1 EA $450.02 $450.02 0.94 $ 423.00 158 8-inch main 1 EA $475.00 $475.00 0.94 $ 446.50 159 10-inch main 1 EA $500.00 $500.00 0.94 $ 470.00 TR 13644 EXHIBIT 2 160 12-inch main 1 EA $550.00 $550.00 0.94 $ 517.00 1F;1 16-inch main 1 EA $700.00 $700.00 0.94 $ 658.00 18-inch main 1 EA $850.00 $850.00 0.94 $ 799.00 20-inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 lbw 24-inch main 1 EA $1,400.00 $1,400.00 0.94 $ 1,316.00 b) Up to 2" service, short side up to 5-feet 165 4-inch main 1 EA $600.00 $600.00 0.94 $ 564.00 166 6-inch main 1 EA $650.001 $650.00 0.94 $ 611.00 167 8-inch main 1 EA $675.00 $675.00 0.94 $ 634.50 168 30-inch main 1 EA $700.00 $700.00 0.94 $ 658.00 169 12-inch main 1 EA $750-00 $750.00 0.94 $ 705.00 170 16-inch main 1 EA $900.00 $900.00 0.94 $ 846.00 171 18-inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 172 20-inch main 1 EA $1,350.00 $1,350.00 0.94 $ 1,269.00 173 24-inch main 1 EA $1,550.00 $1,550.00 0.94 $ 1,457.00 c) Up to 1" service, long side up to 25-feet 174 4-inch main 1 EA $775.00 $775.00 0.94 $ 728.50 175 6-inch main 1 EA $850.00 $850.00 0.94 $ 799.00 176 8-inch main 1 EA $875.00 $875.00 0.94 $ 822.50 177 10-inch main 1 EA $900.00 $900.00 0.94 $ 846.00 178 12-inch main 1 EA $950.00 $950.00 0.94 $ 893.00 179 16-inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 180 18-inch main 1 EA $1,250.00 $1,250.00 0.94 $ 1,175.00 181 20-inch main 1 EA $1,650.00 $1,650.00 0.94 $ 1,551.00 182 24-inch main 1 EA $1,800.00 $1,800.00 0.94 $ 1,692.00 d) Up to 2" service, long side up to 25-feet 183 4-inch main 1 EA $1,000.00 $1,000.00 0.94 $ 940.00 184 6-inch main 1 EA $1,050.00 $1,050.00 0.94 $ 987.00 185 8-inch main 1 EA $1,075.00 $1,075.00 0.94 $ 1,010.50 186 10-inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 187 12-inch main 1 1 EA $1,150.001 $1,150.00 0.941 $ 1,081.00 188 16-inch main 1 EA $1,450.00 $1,450.00 0.94 $ 1,363.00 189 18-inch main 1 EA $1,650.00 $1,650.00 0.94 $ 1,551.00 190 20-inch main 1 EA $1,950.00 $1,950.00 0.94 $ 1,833.00 191 24-inch main 1 EA $2,200.00 $2,200.00 0.94 $ 2,068.00 e) Additional service length 192 Over 30-feet x 1" 1 LF $12.00 $12.00 0.94 $ 11.28 193 Over 30-feet x 2" 1 LF $15.00 $15.00 0.94 $ 14.10 Note: Service pipe HOPE, Copper available at market price Line Stops 4-inch 1 EA $3,500.00 $3,500.00 0.94 $ 3,290.00 6-inch 1 EA $4,SOO.00 $4,500.00 0.94 $ 4,230.00 Syb 8-inch 1 EA $5,000.00 $5,000.00 0.94 $ 4,700.00 197 10-inch 1 EA $5,000.00 $5,000.00 0.94 $ 4,700.00 198 12-inch 1 EA $7,000.00 $7,000.00 0.94 $ 6,580.00 199 16-inch 1 EA $15,000.00 $15,000.00 0.94 $ 14,100.00 200 18-inch 1 I EA $18,000.001 $18,000.00 0.94 $ 16,920.00 201 20-inch 1 EA $19,000.00 $19,000.00 0.94 $ 17,860.00 202 24-inch 1 EA $21,000.00 $21,000.00 0.94 $ 19,740.00 Bypass for water main pipe bursting or CIPP lining 203 2-inch temporary 1 LF $23.00 $23.00 0.94 $ 21.62 204 4-inch temporary 1 LF $26.00 $26.00 0.94 $ 24.44 205 6-inch temporary 1 LF $31.00 $31.00 0.94 $ 29.14 Temporary service connections for water main bypass 206 2-inch short side 1 EA $275.00 $275.00 0.94 $ 258.50 207 2-inch long side 1 EA $375.00 $375.00 0.94 $ 352.SO 208 4-inch short side 1 EA $300.00 $300.00 0.94 $ 282.00 209 4-inch long side 1 EA $400.00 $400.00 0.94 $ 376.00 210 6-inch short side 1 EA $325.00 $325.00 0.94 $ 305.50 211 6-inch long side 1 1 EA $425.001 $425.00 0.94 $ 399.50 D) Polyethylene (PE) Sewer Pipe Sliplining PE Pipe DR 22.5 212 4-inch 1 LF $25.00 $25.00 0.94 $ 23.50 213 6-inch 1 LF $30.00 $30.00 0.94 $ 28.20 214 8-inch 1 LF $35.00 $35.00 0.94 $ 32.90 215 10-inch 1 LF $40.00 $40.00 0.94 $ 37.60 216 12-inch 1 LF $45.00 $45.00 0.94 $ 42.30 217 Annular Space - Grouting 1 CY $300.001 $300.00 0.94 $ 282.00 PCA RFP OD-307-20 Unit Unit Price Extension Coefficient Revised Unit Price E) Procedures for Rehabilitation of Existing Pipelines Pipe String Fusion 4-inch 1 LF $30.00 $30.00 0.94 $ 28.20 6-inch 1 I LF $31.001 $35.001 0.94 $ 32.90 220 8-inch 1 I LF 1 $40.001 $40.001 0.94 $ 37.60 TR 13644 EXHIBIT 2 221 10-inch 1 LF $45.00 $45.00 0.94 $ 42.30 222 124ch 1 LF $50.00 $50.00 0.94 $ 47.00 Pressure Testing 223 4-12 inch 1 LF $2.00 $2.00 0.94 $ 1.88 224 Charge Water 1 K-Gals $1.00 $1.00 0.94 $ 0.94 Chlorination 225 4-inch 1 LF $1.00 $1.00 0.94 $ 0.94 226 6-inch 1 LF $1.50 $1.50 0.94 $ 1.41 227 8-inch 1 LF $2.00 $2.00 0.94 $ 1.88 228 10-inch 1 LF $2.50 $2.50 0.94 $ 2.35 229 12-inch 1 LF $3.00 $3.00 0.94 $ 2.82 230 BT Test 1 EA $250-00 $250.00 0.94 $ 235.00 Flushing 231 4-12 inch 1 LF $0.50 $0.50 0.94 $ 0.47 232 Charge Water 1 K-Gals $0.50 $0.50 0.94 $ 0.47 Dechlorination 233 4-12 inch 1 K-Gals $1.00 $1.00 0.94 $ 0.94 PCA RFP OD-307-20 TY Unit Unit Price Extension Coefficient Revised Unit Price F) Trenchless Rehabilitation/Reconstruction of Pipelines and Conduits Compression Fit HDPE Pipe Lining a) Camera 234 0-10 inch 1 I LF $1.001 $1.00 0.94 $ 0.94 235 10-24 inch 1 LF $1.50 $1.50 0.94 $ 1.41 236 25-36 inch 1 LF $2.00 $2.00 0.94 $ 1.88 237 37-48 inch 1 LF $2.50 $2.50 0.94 $ 2.3S 238 Over 48 inch 1 LF $3.00 $3.00 0.94 $ 2.82 b) Clean 239 0-10 inch 1 LF $2.50 $2.50 0.94 $ 2.35 240 10-24 inch 1 LF 1 $3.00 $3.00 0.94 $ 2.82 241 25-36 inch 1 LF $3.50 $3.50 0.94 $ 3.29 242 37-48 inch 1 LF $4.00 $4.00 0.94 $ 3.76 243 Over 48 inch 1 LF $4.50 $4.50 0.94 $ 4.23 c) Pigging See item G) Pig Cleaning d) Gauging 244 0-10 inch 1 LF $5.00 $5.00 0.94 $ 4.70 245 10-24 inch 1 LF $8.00 $8.00 0.94 $ 7.52 246 25-36 inch 1 LF $11.00 $11.00 0.94 $ 10.34 247 37-48 inch 1 LF $14.00 $14.00 0.94 $ 13.16 248 Over 48 inch 1 Per -inch $1.00 $1.00 0.941 $ 0.94 249 e) Obstruction Removal 1 EA $600.00 $600.00 0.94 $ 564.00 Q Pipe Liner Insertion 1)PE 4710 OR 41 250 4-inch 1 LF $10.00 $10.00 0.94 $ 9.40 251 6-inch 1 LF $20.00 $20.00 0.94 $ 18.80 252 8-inch 1 I LF $25.001 $25.00 0.941 $ 23.50 253 10-inch 1 LF $35.00 $35.00 0.94 $ 32.90 254 12-inch 1 LF $50.00 $50.00 0.94 $ 47.00 255 16-inch 1 LF $75.00 $75.00 0.94 $ 70.50 256 18-inch 1 LF $95.00 $95.00 0.94 $ 89.30 257 20-inch 1 LF $130.00 $130.00 0.94 $ 122.20 258 24-inch 1 LF $180.00 $180.00 0.94 $ 169.20 259 30-inch 1 LF $240.00 $240.00 0.94 $ 225.60 260 36-inch 1 I LF $280.001 $280.00 0.94 $ 263.20 261 42-inch 1 LF $340.00 $340.00 0.94 $ 319.60 262 48-inch 1 LF $400.00 $400.00 0.94 $ 376.00 263 54-inch 1 LF $475.00 $475.00 0.94 $ 446.50 2) PE 4710 DR 32.5 264 4-inch 1 LF $20.00 $20.00 0.94 $ 18.80 26S 6-inch 1 LF $25.00 $25.00 0.94 $ 23.50 266 8-inch 1 I LF $30.001 $30.00 0.94 $ 28.20 267 10-inch 1 LF $40.00 $40.00 0.94 $ 37.60 268 12-inch 1 LF $55.00 $55.00 0.94 $ 51.70 269 16-inch 1 LF $80.00 $80.00 0.94 $ 75.20 270 18-inch 1 LF $105.00 $105.00 0.94 $ 98.70 271 20-inch 1 LF $150.00 $150.00 0.94 $ 141.00 272 24-inch 1 LF $200.00 $200.00 0.94 $ 188.00 273 30-inch 1 LF $260.00 $260.00 0.94 $ 244.40 TR 13644 EXHIBIT 2 274 36-inch 1 LF $300.00 $300.00 0.94 $ 282.00 217; 42-inch 1 LF $360.00 $360.00 0.94 $ 338.40 48-inch 1 LF $420.00 $420.00 0.94 $ 394.80 54-inch 1 LF $475.00 $475.00 0.94 $ 446.50 3) PE 4710 DR 26 PCA RFP OD-307-20 (�N Unit Unit Price Extension Coefficient Revised Unit Price 278 4-inch 1 LF $25.00 $25.00 0.94 $ 23.50 279 6-inch 1 LF $30.00 $30.00 0.94 $ 28.20 280 8-inch 1 LF $35.00 $35.00 0.94 $ 32.90 281 10-inch 1 LF $45.00 $45.00 0.94 $ 42.30 282 12-inch 1 LF $60.00 $60.00 0.94 $ 56.40 283 16-inch 1 LF $90.00 $90.00 0.94 $ 84.60 284 18-inch 1 LF $120.00 $120.00 0.94 $ 112.80 285 20-inch 1 LF $175.00 $175.00 0.94 $ 164.50 286 24-inch 1 LF $220.00 $220.00 0.94 $ 206.80 287 30-inch 1 LF $280.00 $280.00 0.94 $ 263.20 288 36-inch 1 LF $300.00 $300.00 0.94 $ 282.00 289 42-inch 1 LF $380.00 $380.00 0.94 $ 357.20 290 48-inch 1 1 LF $440.001 $440.00 0.94 $ 413.60 291 54-inch 1 LF $505.00 $505.00 0.94 $ 474.70 4)PE 4710 DR 21 292 4-inch 1 LF $30.00 $30.00 0.94 $ 28.20 293 6-inch 1 LF $35.00 $35.00 0.94 $ 32.90 294 8-inch 1 LF $40.00 $40.00 0.94 $ 37.60 295 10-inch 1 1 LF $50.001 $50.00 0.94 $ 47.00 296 12-inch 1 LF $65.00 $65.00 0.94 $ 61.10 297 16-inch 1 LF $100.00 $100.00 0.94 $ 94.00 298 18-inch 1 LF $130.00 $130.00 0.94 $ 122.20 299 20-inch 1 LF $190.00 $190.00 0.94 $ 178.60 300 24-inch 1 LF $240.00 $240.00 0.94 $ 225.60 301 30-inch 1 LF $310.00 $310.00 0.94 $ 291.40 302 36-inch 1 LF $330.00 $330.00 0.94 $ 310.20 303 42-inch 1 1 LF $400.001 $400.00 0.94 $ 376.00 304 48-inch 1 LF $460.00 $460.00 0.94 $ 432.40 ans 54-inch 1 LF $535.00 $535.00 0.94 $ 502.90 5) PE 4710 DR 17 3Ub 4-inch 1 LF $35.00 $35.00 0.94 $ 32.90 307 6-inch 1 LF $40.00 $40.00 0.94 $ 37.60 308 8-inch 1 LF $45.00 $45.00 0.94 $ 42.30 309 10-inch 1 I LF $55.001 $55.00 0.94 $ 51.70 310 12-inch 1 LF $70.00 $70.00 0.94 $ 65.80 311 16-inch 1 LF $110.00 $110.00 0.94 $ 103.40 312 18-inch 1 LF $140.00 $140.001 0.94 $ 131.60 313 20-inch 1 LF $205.00 $205.00 0.94 $ 192.70 314 24-inch 1 LF $260.00 $260.00 0.94 $ 244.40 315 30-inch 1 LF $340.00 $340.00 0.94 $ 319.60 316 36-inch 1 LF $360.00 $360.00 0.94 $ 338.40 317 42-inch 1 1 LF $430.00 $430.00 0.94 $ 404.20 318 48-inch 1 LF $485.00 $485.00 0.94 $ 455.90 319 54-inch 1 LF $585.001 $555.00 0.94 $ 521.70 G) Pig Cleaning Foam Pig 320 0-12 inch 1 LF $0.50 $0.50 0.94 $ 0.47 321 13-24 inch 1 LF $1.50 $1.50 0.94 $ 1.41 322 25-36 inch 1 1 LF $2.50 $2.50 0.94 $ 2.35 323 37-48 inch 1 LF $3.50 $3.50 0.94 $ 3.29 324 Over 48 inch 1 LF $5.001 $5.00 0.94 $ 4.70 Wire Bullet Pig 325 0-12 inch 1 LF $3.00 $3.00 0.94 $ 2.82 326 13-24 inch 1 LF $4.00 $4.00 0.94 $ 3.76 327 25-36 inch 1 LF $6.00 $6.00 0.94 $ 5.64 328 37-48 inch 1 1 LF $9.00 $9.00 0.94 $ 8.46 329 Over 48 inch 1 LF $12.00 $12.00 0.94 $ 11.28 Blade Scraper Pig 330 0-12 inch 1 LF $0.50 $0.50 0.94 $ 0.47 331 13-24 inch 1 LF $1.50 $1.50 0.94 $ 1.41 332 25-36 inch 1 LF $2.50 $2.50 0.94 $ 2.35 333 37-48 inch 1 LF $3.50 $3.50 0.94 $ 3.29 114 Over 48 inch 1 1 1 LF $5.00 $5.00 0.94 $ 4.70 ne and Material Unit Rates for Change Orders TR 13644 EXHIBIT 2 Materials, Subcontractors and Rentals 335 Markup = 15% 336 Sales Taxes= Per Jurisdiction Labor 337 Executive Supervisor 1 HR $85.00 $85.00 0.94 $ 79.90 a) Project Management 1 HR $75.00 $75.00 0.94 $ 70.50 338 ISuperintendent 1 HR 1 $45.00 $45.001 0.94 $ 42.30 PCA RFP OD-307.20 TY Unit Unit Price Extension Coefficient Revised Unit Price 339 Administrator 1 HR $25.00 $25.00 0.94 $ 23.50 340 Crew Chief 1 HR $40.00 $40.00 0.94 $ 37.60 341 Equipment Operator 1 1 HR $35.001 $35.00 0.94 $ 32.90 342 Pipelayer-Skilled 1 HR $30.00 $30.00 0.94 $ 28.20 343 1 Pipelayer-Helper 1 HR $28.00 $28.00 0.94 $ 26.32 344 1 Laborer -Unskilled 1 HR $25.00 $25.00 0.94 $ 23.50 1) Directional Drilling & Pipe Installation 345 2-inch 1 LF $19.00 $19.00 0.94 $ 17.86 346 4-inch 1 LF $26.00 $26.00 0.94 $ 24.44 347 6-inch 1 I LF $35.001 $35.00 0.94 $ 32.90 348 8-inch 1 LF $40.00 $40.00 0.94 $ 37.60 349 30-inch 1 LF $55.00 $55.00 0.94 $ 51.70 350 12-inch 1 LF $72.00 $72.00 0.94 $ 67.68 351 14-inch 1 LF $89.00 $89.00 0.94 $ 83.66 352 16-inch 1 LF $100.00 $100.00 0.94 $ 94.00 353 18-inch 1 LF $115.00 $115.00 0.94 $ 108.10 354 20-inch 1 LF $180.00 $180.00 0.94 $ 169.20 355 24-inch 1 LF $240.00 $240.00 0.94 $ 225.60 J) Gravity Sewer CIPP Lateral Renewal Systems 356 4 inch lateral up to 251f 1 EA $1,500.00 $1,500.00 0.94 $ 1,410.00 357 6 inch lateral up to 251f 1 EA $1,750.00 $1,750.00 0.94 $ 1,645.00 358 4 inch tophat installation 1 EA $700.00 $700.00 0.94 $ 658.00 359 6 inch tophat installation 1 EA $900.00 $900.00 0.94 $ 846.00 K) Manhole Rehabilitation 360 4 foot diameter a) Mud Interior Coating 1 1 VF $250.00 $250.00 0.94 $ 235.00 b) Epoxy sprayed Interior Coating 1 VF $373.00 $373.00 0.94 $ 350.62 c) New manhole installation 1 VF $1,171.00 $1,171.00 0.94 $ 1,100.74 361 6 foot diameter 1 VF $266.00 $260.00 0.94 $ 244.40 362 Lift station rehabilitation 1 SF $18.00 $18.00 0.94 $ 16.92 363 Existing coating removal 1 SF $5.001 $5.00 0.94 $ 4.70 364 jAdjust existing manhole cover and ring (grass) 1 EA $400.00 $400.00 0.94 $ 376.00 365 Adjust existing manhole cover and ring (Asphalt) 1 EA $600.00 $600.00 0.94 $ 564.00 366 Install new manhole ring and cover (grass) 1 1 EA $700.00 $700.00 0.94 $ 658.00 367 Install new manhole ring and cover (Asphalt) 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 368 Furnish and install manhole chimney seal 1 EA $500.00 $520.00 0.94 $ 470.00 369 Re -construct manhole bench and channel flow 1 EA $500.00 $500.00 0.94 $ 470.00 L) Slip -lining down to DR 11 370 4-inch 1 EA $30.00 $30.00 0.94 $ 28.20 371 6-inch 1 EA $35.00 $35.00 0.94 $ 32.90 372 8-inch 1 EA $40.00 $40.00 0.94 $ 37.60 373 10-inch 1 EA $50.00 $50.00 0.94 $ 47.00 374 12-inch 1 EA $70.00 $70.00 0.94 $ 65.80 375 16-inch 1 EA $100.00 $100.00 0.94 $ 94.00 376 18-inch 1 EA $115.00 $115.00 0.94 $ 108.10 377 24-inch 1 EA 1 $240.00 $240.00 0.94 $ 225.60 378 30-inch 1 EA $320.00 $320.00 0.94 $ 300.80 379 36-inch 1 EA $380.00 $380.00 0.94 $ 357.20 380 42-inch 1 EA $420.00 $420.00 0.94 $ 394.80 381 48-inch 1 EA $480.00 $480.00 0.94 $ 451.20 382 54-inch 1 EA $640.00 $640.00 0.94 $ 601.60 383 63-inch 1 EA $750.00 $750.00 0.94 $ 705.00 Diameter HDPE Pipe String Fusion 14-inch 1 LF $55.00 $55.00 0.94 $ 51.70 16-inch 1 LF $65.00 $65.00 0.94 $ 61.10 k 18-inch 1 LF $7S.00 $75.00 0.94 $ 70.50 20-inch 1 LF $85.00 $85.00 0.94 $ 79.90 24-inch 1 LF $105.00 $105.00 0.94 $ 98.70 30-inch 1 1 LF $135.00 $135.00 0.94 $ 126.90 390 36-inch 1 LF $170.00 $170.00 0.94 $ 159.80 391 48-inch 1 LF $220.00 $220.00 0.94 $ 206.80 Pressure Testing TR 13644 EXHIBIT 2 392 14-48 inch 1 LF $4.00 $4.00 0.94 $ 3.76 393 Charge Water 1 K-Gals $1.00 $1.00 0.94 $ 0.94 Bursting for Force Main Replacement Procedure HDPE DR 11 394 3-inch diameter 1 LF $48.00 $48.00 0.94 $ 45.12 395 4-inch diameter 1 LF $57.00 $57.00 0.94 $ 53.58 396 6-inch diameter 1 I LF $74.001 $74.00 0.94 1 $ 69.56 397 8-inch diameter 1 LF $96.00 $96.00 0.94 $ 90.24 398 10-inch diameter 1 LF $108.00 $108.00 0.94 $ 101.52 399 12-inch diameter 1 LF $135.00 $135.00 0.94 $ 126.90 400 14-inch diameter 1 LF $150.00 $150.00 0.94 $ 141.00 401 16-inch diameter 1 LF $185.00 $185.00 0.94 $ 173.90 402 18-inch diameter 1 LF $210.00 $210.00 0.94 $ 197.40 403 20-inch diameter 1 LF $245.00 $245.00 0.94 $ 230.30 404 24-inch diameter 1 LF $275.00 $275.00 0.94 1 $ 258.50 405 30-inch diameter 1 LF $350.00 $350.00 0.94 $ 329.00 406 36-inch diameter 1 LF $385.00 $385.00 0.94 $ 361.90 407 42-inch diameter 1 LF $425.00 $425.00 0.94 $ 399.50 408 48-inch diameter 1 LF $500.00 $500.00 0.94 $ 470.00 409 54-inch diameter 1 LF $600.00 $600.00 0.94 $ 564.00 Plug Valves 410 4-inch 1 EA $1,062.00 $1,062.00 0.94 $ 998.28 411 6-inch 1 EA $1,700.00 $1,700.00 0.94 $ 1,598.00 412 8-inch 1 EA $2,233.00 $2,233.00 0.94 $ 2,099.02 413 10-inch 1 EA $3,064.00 $3,064.00 0.94 $ 2,880.16 414 12-inch 1 EA $3,543.00 $3,543.00 0.94 $ 3,330.42 415 16-inch 1 EA $5,103.00 $5,103.00 0.94 $ 4,796.82 416 18-inch 1 EA $8,546.00 $8,546.00 0.94 $ 8,033.24 417 20-inch 1 1 EA $13,387.001 $13,387.00 0.94 $ 12,583.78 418 24-inch 1 EA $18,238.00 $18,238.00 0.94 $ 17,143.72 419 30-inch 1 EA $31,455.00 $31,455.00 0.94 $ 29,567.70 420 36-inch 1 EA $45,054.00 $45,054.00 0.94 $ 42,350.76 421 42-inch 1 EA $54,764.00 $54,764.00 0.94 $ 51,478.16 422 48-inch 1 EA $61,924.00 $61,924.00 0.94 $ 58,208.56 423 54-inch 1 EA $69,814.00 $69,814.00 0.94 $ 65,625.16 ARV Vacuum/Air/With structure 424 2-inch 1 EA $4,572.00 $4,572.00 0.941 $ 4,297.68 4-inch 1 EA $11,543.00 $11,543.00 0.94 $ 10,850.42 6-inch 1 EA $14,622.00 $14,622.00 0.94 $ 13,744.68 Blow Off/With box 427 2-inch 1 EA $2,544.00 $2,544.00 0.94 $ 2,391.36 428 4-inch 1 EA $4,599.00 $4,599.00 0.94 $ 4,323.06 429 6-inch 1 I EA $7,815.001 $7,815.00 0.94 $ 7,346.10 430 Tracer Wire 1 LF $1.63 $1.63 0.941 $ 1.53 0) Modular Pipe Bursting $ 431 Manhole set up fee 1 EA $24,750.00 $24,750.00 0.94 $ 23,265 00 432 8-inch 1 LF $156.00 $156.00 0.94 $ 146.64 433 10-inch 1 LF $170.00 $170.00 0.94 $ 159.80 434 12-inch 1 I LF $186.001 $186.00 0.94 $ 174.84 435 14-Inch 1 LF $201.00 $201.00 0.94 $ 188.94 436 16-inch 1 LF $226.00 $226.00 0.94 $ 212.44 437 18-inch 1 LF $268.00 $268.00 0.94 $ 251.92 P) Extended Warranty 438 jPast 1 year, extended warranty offered at 1.93%of contract value per year Q) On Grade Horizontal Gravity Sewer Directional Drill 439 8-inch 1 LF $213.00 $213.00 0.94 $ 200.22 440 10-inch 1 LF $239.00 $239.00 0.94 $ 224.66 441 12-inch 1 LF $266.00 $266.00 0.94 $ 250.04 TR 13644 EXHIBIT 3 Corporate Headquarters OFFICE: 904.764.6887 FAX: 904.379.6193 ADDRESS: 12235 New Berlin Road, Jacksonville FL 32226 Feasibility Support Office MJ!MLU�RRPHtY PIPELINE OFFICE: 414.321.2247 FAX: 414.321.2297 CONTRRCTORS ADDRESS: 1973 S 91"Street Milwaukee WI 53227 An IRR Company murphypipelines.com July 07, 2021 SENT VIA E-MAIL(John.DohertyCaD-tamarac.org) John E. Doherty, P.E. Assistant Director of Public Services/Capital Projects Manager City of Tamarac, Public Services Department 6011 Nob Hill Road, Second Floor, Tamarac, FL 33321 Tel: 954.597.3706 Subject: NW 701h Street Water Main Improvement Project Dear Mr. Doherty: Murphy Pipeline Contractors (MPC) is pleased to submit the attached unit price proposal for professional services to your team for the City of Tamarac NW 70th Street Water Main Improvements Project. MPC agrees to allow and extend its prices per the contract document of the PCA RFP OD-307-20, Trenchless Technology Rehabilitation and Related Items & Services Agreement to the City of Tamarac, Florida. PROJECT INTRODUCTION MPC proposes to perform rehabilitation/replacement of Tamarac's existing 8-inch water main with 10-inch HDPE DR 11 pipe replacement via Pre -Chlorinated Pipe Bursting; including all water main and service lines connections, valves and fittings, fire hydrant assemblies and services outlined in the conceptual design Exhibit 1. The area of work is defined as follows; along NW 70th Street between N Pine Island Road & NW 801h Ave SCOPE OF SERVICES The MPC proposal is defined by the conceptual plan and unit prices, created in conjunction with the City of Tamarac. City of Tamarac construction details and right-of-way requirements are to be strictly followed by MPC personnel for the successful completion of this project. TR 13644 EXHIBIT 3 Corporate Headquarters MLA OFFICE: 904.764.6887 FAX: 904.379.6193 ADDRESS: 12235 New Berlin Road, Jacksonville FL 32226 NVUC Feasibility Support Office MURPHY PIPELINE OFFICE: 414.321.2247 FAX: 414.321.2297 CONTRRCTORS ADDRESS: 1973 S 911tStreet Milwaukee WI 53227 An IPFR Company murphypipelines.com The scope of services MPC shall provide are as follows: • Project Mobilization • Preconstruction Video • Maintenance of Traffic o Plan submission for City of Tamarac review and approval o Furnish and install approved traffic control devices Existing Utility Verification • MPC to provide all necessary materials for water main installation, excluding meters and meter boxes • Water Service By-pass for the pipe bursting • 8" Existing WM to 10" Pipe Bursting w/ HDPE DR 11 (DIPS) • Pipe Bursting shall strictly follow Pre -Chlorinated Pipe Bursting Specifications • All necessary regulatory agency notifications • MPC to install all water services and replace existing meter with box, provided by the City of Tamarac. • Backfilling and Compaction; densities submitted with project closeout, including bursting pit restorations in accordance with City of Tamarac Standard Details • Restoration to like new or better • Demobilization • Standard Insurance Coverage to comply with project requirements. • Standard 1 Year Warranty. We have noted, assumed, or excluded the following: 1. During the conceptual design creation MPC had no knowledge of existing utilities in the area. Field adjustments will be proposed and made with City of Tamarac approval. 2. Permits are excluded for this project; MPC shall assist the City of Tamarac with permit procurement; if necessary. MPC to complete all necessary regulatory agency (e.g. DEP) notification to complete pipe bursting. 3. MPC to assist City of Tamarac with community notification. Included but not limited to site meetings, community presentations, project signs and door hanger notification. 4. Shop drawings to be submitted to the City of Tamarac and approved prior to ordering, precast and/or manufacture. 5. MPC shall not take liability of drawings used for construction. They are intended for conceptual layouts. Engineering and design is not in MPC scope of work. Information to be Provided by Client Copies of all relevant data, including correspondence, reports, plans, permits, or information in its possession which may be beneficial to the work effort performed by MPC. SCHEDULE AND FEES MPC shall coordinate and submit a project schedule for review. Schedule based on a mutually agreed Notice to Proceed between City of Tamarac and MPC. We are proposing 60 days for pre -construction activities, mobilization, water main installation, restoration and project closeout; excluding material procurement. TR 13644 EXHIBIT 3 Mfm!uq!3F��Y PIPELINE CONTRRCTORS An IPR Company The total unit price fee for this project will be as follows: Corporate Headquarters OFFICE: 904.764.6887 FAX: 904.379.6193 ADDRESS: 12235 New Berlin Road, Jacksonville FL 32226 Feasibility Support Office OFFICE: 414.321.2247 FAX: 414.321.2297 ADDRESS: 1973 S 91"Street Milwaukee WI 53227 murphypipelines.com Tasks Task Description Unit Price Fees Total Fees 1 Pipe Bursting and Associated Items listed in Unit Price Proposal $684,283.64 $684,283.64 PROJECT TOTAL $684,283.64 Should you have any questions, please do not hesitate to contact me at my office at (954) 842-4771, my cell phone at (954) 254-7898 or send me an electronic message at rcrow(a)-teamipr.com Respectfully submitted, Richard Crow Murphy Pipeline Contractor Regional Manager cc. Andy Mayer, President of Murphy Pipelines Enclosed attachments 1. PCA RFP OD-307-20, Trenchless Technology Rehabilitation and Related Items & Services Agreement 2. NW 70`h Street Conceptual Design (Exhibit 1) TR 13644 EXHIBIT 3 TAMARAC The City For Your Life TR 13644 EXHIBIT 3 LIU �� MMEMOMMIMMMM o©Nmmwm Bosom � �glmmml= TAMARAC ,.O-LO-00�- -A-.- The City For Your Life TR 13644 EXHIBIT 3 �WME������ NM MIUMM NOMMM OM OM . EM� TAMARA The City For Your Life TR 13644 EXHIBIT 3 a������� ® HOME MM OMMMM � om m WE! I ®. MM MM _ ooNEW mm MMMM • om � �� MM MMMM om � O® ® ®MM OEM". ® mo MM oo ® O= oo M= MM IMMMEoo . .. ������WEI �� �_. om��MMEMMM NIMMME MMM oo� MWO om� � oomff mK;rrl",". �MM �� MM MM MM MM EW������ TAMARAC The City For Your Life TR 13644 EXHIBIT 3 ® o©�MM��� MEN TAMARAC The City For Your Life TR 13644 EXHIBIT 3 omMEMO ® MEMO � o® NORM o® MEN= ®� oms�mmar3m, �Kmmmmm�� TAMARAC The City For Your Life TR 13644 EXHIBIT 3 oammmm, ommmw=I . Imm �: om MEN= TAMARAC The City For Your Life TR 13644 EXHIBIT 3 COME, Dim om MUM TAMARAC The City For Your Life