HomeMy WebLinkAboutCity of Tamarac Resolution R-2023-081Temp. Reso. No. 13977
July 12, 2023
Page 1 of 5
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-2023 -
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF TAMARAC, FLORIDA, APPROVING CHANGE ORDER
NO. 2 TO RFP BID NO. 20-15R, APPROVED BY CITY
COMMISSION OF THE CITY OF TAMARAC VIA
RESOLUTION NUMBER R-2021-127 ON OCTOBER 27,
2021 AND AUTHORIZING THE APPROPRIATE CITY
OFFICIALS TO AUTHORIZE AND EXECUTE CHANGE
ORDER #2 WITH MBR CONSTRUCTION, INC., TO
PROVIDE PROJECT SCOPE MODIFICATIONS TO THE
CAPORELLA PARK ENHANCEMENTS PROJECT IN
ACCORDANCE WITH MBR CONSTRUCTION, INC.'S
CONTRACT AGREEMENT FOR AN AMOUNT NOT TO
EXCEED $149,585.04, AS AUTHORIZED BY RESOLUTION
NO. R-2021-127; AUTHORIZING THE APPROPRIATE CITY
OFFICIALS TO EXECUTE SAID CHANGE ORDER;
AUTHORIZING AN EXPENDITURE FROM APPROPRIATE
ACCOUNTS; PROVIDING FOR SEVERABILITY; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Tamarac's request to upgrade Caporella Park's site lighting
with a more vibrant colored light system, would offer its residents an enhanced and visual
experience, while elevating services provided by the City within the local community; and
WHEREAS, the proposed colored lights would create an attractive atmosphere
and include options for a variety of visual light displays that would be consistent with the
park's overall aesthetics, commensurate with the City's strategic goal for a more vibrant
community; and
WHEREAS, the proposed scope change to MBR Construction Inc.'s contract
agreement, would allow for original light fixtures on 17 pedestrian light poles and 12 soffit
hi -hats (recessed lighting) at the restroom facility to be replaced with new LED, colored
Temp. Reso. No. 13977
July 12, 2023
Page 2 of 5
changing light fixtures; and
WHEREAS, the proposed modifications shall include the furnishing and installation
of a 3-inch conduit from the electrical room to the edge of the existing lake, as a provision
for potential future lighting within the existing lake; and
WHEREAS, via Resolution Number R-2021-127, dated October 27, 2021, the City
Commission of the City of Tamarac awarded RFP Bid No. 20-15R and authorized the
appropriate City officials to execute an agreement with MBR Construction, Inc., to provide
design/build services of the Caporella Park Enhancements Project, at a cost not to
exceed $4,438,830.94; a project contingency in the amount of $443,830.94, for a total
project budget of $4,882,714.03, a copy of Resolution Number R-2021-127 is
incorporated herein by reference and is on file in the City Clerk's Office; and
WHEREAS, the proposed scope modifications included in Change Order No. 2
were not part of the original RFP Bid, therefore the added scope of work will require a
Change Order in the amount not to exceed $149,585.04. A copy of the proposed Change
Order No. 2 is included herein as "Exhibit 1 "; and
WHEREAS, the approved project, Resolution R-2021-127, included a contingency
in the amount of $443,883.09 with sufficient funds available to fund the proposed scope
changes; and
WHEREAS, it is the recommendation of the Director of Public Services, Director
of Parks and Recreation, and the Purchasing and Contracts Manager that proposed
Change Order No. 2 for MBR Construction, Inc., be approved by the City Commission
and executed by the appropriate City Officials, for the Caporella Park Enhancements
Project; and
Temp. Reso. No. 13977
July 12, 2023
Page 3 of 5
WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be
in the best interest of the citizens and residents of the City of Tamarac to approve Change
Order No. 2 and authorize the appropriate City Officials to execute said Change Order
with MBR Construction, Inc., to provide additional scope modifications services as listed
herein, during construction of the Caporella Park Enhancements Project for a total
amount not to exceed $149,585.04.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
THE CITY OF TAMARAC, FLORIDA, THAT:
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct and are hereby made a specific part of this Resolution
upon adoption hereof. All exhibits attached hereto are incorporated herein and made a
specific part hereof.
SECTION 2: The City Commission approves Change Order No. 2 and
authorizes the appropriate City Officials to execute Change Order No. 2 with MBR
Construction, Inc., to provide proposed scope modification services (colored lights) during
construction of the Caporella Park Enhancements Project, for an amount not to exceed
$149,585.04, a copy of Change Order No. 2 is attached hereto as "Exhibit 1".
SECTION 3: An expenditure not to exceed $149,585.04 is hereby
approved and any necessary budget transfer or appropriation for said purpose is hereby
Temp. Reso. No. 13977
July 12, 2023
Page 4 of 5
approved and will be included in a future Budget Amendment pursuant to F.S. 166.241(2).
SECTION 4: The City Manager, or his designee, is hereby authorized to
approve and initiate change orders not to exceed $65,000 per Section 6-147 of the City
Code, and close the contract award including, but not limited to, making final payment
within the terms and conditions of the contract and within the contracted price.
SECTION 5: All Resolutions or parts of Resolutions in conflict herewith are
hereby repealed to the extent of such conflict.
SECTION 6: If any clause, section, other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid,
in part or application, it shall not affect the validity of the remaining portions or applications
of this Resolution.
[The remainder of this page intentionally left blank]
Temp. Reso. No. 13977
July 12, 2023
Page 5 of 5
SECTION 7: This Resolution shall become effective immediately upon its passage
and adoption.
�
PASSED, ADOPTED AND APPROVED this day of 12023.
ATTEST:
I """" ' .._-
IMBERLY bILLON, CMC
CITY CLERK
— _9��
ICHELLE J. Gbmtz
MAYOR
RECORD OF COMMISSION VOTE:
MAYOR GOMEZ
DIST 1: V/M COMM. BOLTON `
DIST 2: COMM. WRIGHT, JR 5
DIST 3: COMM. VILLALOBOS
DIST 4: COMM. DANIEL
APPROVED AS TO FORM AND LEGAL SUFFICIENCY FOR THE USE AND RELIANCE
OF THE CITY -OF TAMARAC ONLY.
HANS OTTINOT
CITY ATTORNEY
CHANGE ORDER
DATE OF ISSUANCE: June 26, 2023
OWNER: CITY OF TAMARAC
Public Services Dept.
6011 Nob Hill Road, 2"d Floor
Tamarac, FL 33321- 2401
CONSULTANT: MBR Construction, Inc.
1020 NW 51"Street
Ft. Lauderdale, FL 33309
CHANGE ORDER NO.: 002
PROJECT NAME:
Caporella Park Enhancements Project
P.O. No.: 250339
Project No.: PW20D
IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND
THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES,
ADDITIONS OR DELETIONS TO THE SCOPE OF WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS.
DESCRIPTION:
A. Provide project scope modifications to site lighting resulting from the City's request for a more vibrant, visual
experience in the amount not to exceed $149,585.04. Scope modification includes:
1. MBR Construction, Inc., shall provide and install colored light fixtures on seventeen (17) pedestrian light poles
and twelve (12) hi -hats in the restroom building soffit. Proposed work shall include separate feed for colored
light fixtures, (i.e., conduits, wiring, terminations, etc.), new fixtures, control system, design, general conditions,
all 1=ols, equipment, and materials as necessary for a complete, funct.'--ning system to service the park.
2. Provide and install additional three-inch (3") conduit from electrical room to edge of lake as provisional
measure for future lighting (fountains) to feed existing lake.
PURPOSE OF CHANGE ORDER:
The purpose of this change order is to document the contract scope modification listed here -in, regarding
proposed colored lights at restroom soffits and pedestrian light poles as requested by the City for the
Caporella Park Enhancements Project. The work as described above, shall include all labor, equipment &
materials as required to complete the work.
CHANGE IN CONTRACT PRICE
Original Contract Price
$4,438,830.94
CHANGE IN CONTRACT TIME
Original Contract Time (calendar days)
570 Days
Previous Change Orders and/or Amendments Net change from previous change orders
$23,331.00 110 Days
Contract Price prior to this Change Order Contract Time Prior to this Change Order
$4,462,161.94 680 Days
Net Increase of this Change Order not to exceed Net (Increase) of this Change Order
$149,585.04 0 Days
Contract Price with all approved Change Orders Contract Time with all approved Change Orders
$4,611,746.98 680 Days
RECOMMENDED
B,�
`John-W Doherty, P.E.,
Public Services Director
Date L � ' -
> % 1 APPROVED
BY
Sucuoglu Mi B
inager BR Construction, Inc.
1
Date i/ �� Date 6 26 ZdZ