Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2019-026Temp. Reso. #13245 March 19, 2019 Page 1 of 5 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2019- A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, APPROVING TASK AUTHORIZATION NO. 19-14D AND AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE TASK AUTHORIZATION NO. 19-14D WITH ECKLER ENGINEERING, INC., TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF THE WATER TREATMENT PLANT FINISHED WATER METER REPLACEMENT PROJECT IN THE AMOUNT OF $68,100.00; INCLUDING PREPARATION OF DETAILED PLANS AND SPECIFICATIONS FOLLOWED BY BIDDING ASSISTANCE AND ENGINEERING SERVICES DURING CONSTRUCTION, IN ACCORDANCE WITH THE CITY'S CONSULTING ENGINEERING AGREEMENT AS AUTHORIZED BY RESOLUTION NO. R-2016-80, FOR AN AMOUNT NOT TO EXCEED $68,100.00; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO ADMINISTER THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE WHEREAS, the City of Tamarac owns, operates and maintains the water supply, treatment, and distribution systems; and WHEREAS, "finished water" is a term given to the water after it goes through all the required treatment processes and is ready for consumption; and WHEREAS, the finished water is routed through a meter, where it is measured for accounting purposes, prior to entering the distribution system; and WHEREAS, the existing finished water meter has lost its accuracy and is currently approaching the end of its useful life and is due to be replaced and upgraded, and Temp. Reso. #13245 March 19, 2019 Page 2 of 5 WHEREAS, this project will provide for a new Mag Flow Meter which is more advanced and possesses greater accuracy than the existing meter; and WHEREAS, the cost to replace the finished water meter will be provided as an Engineer's Estimate as part of this Task Authorization; and WHEREAS, Task Authorization No. 19-14D is allowable pursuantto Florida Statute 287.055 under the City's Consulting Engineering Agreement since the construction cost is less than $2,000,000; and WHEREAS, Task Authorization No. 19-14D with Eckler Engineering, Inc., will provide the design and bidding assistance along with engineering services during construction at a cost of $68,100.00 to design the Water Treatment Plant Finished Water Meter Replacement; and WHEREAS, the City requires the service of a consulting firm knowledgeable in this area and capable of providing professional services for the design and bidding assistance along with engineering services during construction of the Water Treatment Plant Finished Water Meter Replacement Project; and WHEREAS, Eckler Engineering, Inc., possesses the required knowledge and experience to provide the professional engineering services associated with the Water Treatment Plant Finished Water Meter Replacement Project; and L 1 Temp. Reso. #13245 March 19, 2019 Page 3 of 5 WHEREAS, Eckler Engineering, Inc., has been pre -qualified as an approved consultant for engineering services by the City of Tamarac as authorized by Resolution No. R-2016-80; and WHEREAS, it is the recommendation of the Director of Public Services, the Director of Financial Services and the Purchasing and Contracts Manager that Task Authorization No. 19-14D from Eckler Engineering, Inc., be approved and executed by the appropriate City Officials; and WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to accept and execute Task Authorization No. 19-14D (a copy of which is attached hereto as "Exhibit 1 ") with Eckler Engineering, Inc., to provide engineering services for the design and bidding assistance along with engineering services during construction of the Water Treatment Plant Finished Water Meter Replacement Project for a total amount not to exceed $68,100.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, THAT: SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. All exhibits attached hereto are incorporated herein and made a specific part hereof. Temp. Reso. #13245 March 19, 2019 Page 4 of 5 SECTION 2: The City Commission approves Task Authorization No. 19-14D and authorizes the appropriate City Officials to execute Task Authorization No. 19-14D with Eckler Engineering, Inc., to provide engineering services for the design and bidding assistance along with engineering services during construction of the Water Treatment Plant Finished Water Meter Replacement Project, in accordance with the City's Consulting Engineering Agreement as authorized by Resolution No. R-2016-80 on August 24, 2016, for an amount not to exceed $68,100.00. SECTION 3: The City Manager, or his designee, is hereby authorized to approve and initiate change orders not to exceed $65,000 per Section 6-147 of the City Code, and close the contract award including, but not limited to, making final payment within the terms and conditions of the contract and within the contract price. SECTION 4: All Resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 5: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. RFrTInN R passage and adoption. This Resolution shall become effective immediately upon its 1 1 1 Temp. Reso. #13245 March 19, 2019 Page 5 of 5 PASSED, ADOPTED AND APPROVED this / 0 day of 4'�'2019. n PATRICIA TEUFr=L, CITY CLERK I HEREBY CERTIFY THAT I HAVE APPROVED THIS RESOLUTION AS TO FORM S4US.G R NCEY MI HELLE J. GOM Z MAYOR RECORD OF COMMISSION VOTE MAYOR GOMEZ f. DIST 1: COMM. BOLTON DIST 2: COMM. GELIN DIST 3: COMM. FISHMAN DIST 4: V/M PLACKO A TR 13245 - EXHIBIT 1 TR 13245 Exhibit 1 ECKLER ENGINEERING, INC. March 27, 2019 442-000.13D Mr. East Henry, P.E., Utitity Engineer City of Tac Public Senrioss Department 10101 State street Tamarac, FL 33321 Dear Mr, Henry: Reference: Proposal for Engineering Services Task Authorization No. 19-14D WTP Finished Water Weriing ReptooemeM Preliminary and final design, of the anticipated Improvements described herein. Preparation of drawings and specifications for the Improvements. 01 Permitter Assistance. Bidding Phase Assistance. Traditional and special engineering services during construction. The proposedscope of work for this project is attached as Task Authorization 19-14D. Our proposed lump sum fee for the design phase services required for this scope is $34,000,00. A breakdown of the design engineering fee calculation is attached at the end of the enclosed Task Authorization. Our proposed not -to -exceed estimate for engineering services required during the construction phase of this; project is $34,100,00. A breakdown' of the fee calculation is attached at the end of the enclosed task authorization. The engineering services for the construction phase will be billed on an hourly rate plus direct expenses basis in accordance with the attached breakdown. Any unused portion of the construction services fee will not be billed to the City. If this proposal meets with your approval, please provide us with one signed copy of the enclosed task authorization along with a City PO for this work. to South. Florida Since 1W TR 13245 Exhibit 1 Mr. Earl Henry, RE; Mare 7, 2019 Page 2 Ender Engineering looks forward to working with the City of Tamarac on this potable water metering improvement project, If you have any questions or require additional information pertaining to the enclosed scope of services or the project in general, please do not hesitate to contact me. Sincerely, f) ;4 A ----�. Douglas K. Hammann, P.E. Y:Q=menMTsmwac1BDVT"k Autltorl sUm 19.140 WTP Finished We* McWft ReplsceMntkTv* Au#wtz tion%Task Auth 19440,apd TR 13245 Exhibit 1 TASK AUTHORIZATION NO. 19-14D SCOPE OF SERVICES WTP FINISHED WATER METERING REPLACEMENT INTRODUCTION City staff has requested that the existing WTP Finished Water Metering Replacement as follows: 1. Removal of existing underground yard piping no longer in service or as needed to provide space to facilitate finished water metering improvements. 2. New finished water meter installation complete with magnetic flow meter, precast concrete access vault, bypass piping, and applicable isolation valves (see attached sketch). 3. Newonsite potable water service piping connection from upstream of new meter installation to existing onsite process water distribution connection point. 4. Removal of existing finished water meter within existing meter vault. 5. Modifications to existing fluoride injection point to relocate the access point to a near grade level location for improvement of maintenance accessibility. 6. Coordinate connection of new meter to existing plant SCADA network. This Task Authorization covers the work associated with engineering design, preparation of detailed plans and specifications, permitting, bidding/contract award assistance, and engineering services during construction. The engineering tasks associated with this project are presented below: ARTICLE 1 - SCOPE OF SERVICES Design Phase Task D9 - Project Administration/Management This task focuses on the administration of the project including project setup, client interface and general project management and administration. Task D2 - Data Evaluation and Preliminary Design This task focuses on obtaining the necessary preliminary information required to prepare detailed engineering plans and specifications. A. Meet with CITY project staff to discuss and confirm project requirements and design criteria. B. Visit the site and review pertinent features that may impact design and/or construction. Page 1 of 16 TR 13245 Exhibit 1 C. Collect data available for the existing facilities, including field conditions, record drawings, connection locations, and other information that may potentially impact the project. D. Coordinate scope and completion of work by the electrical subconsultant(s). Task D3 - Preliminary Design Report (Memorandum) This task not required. Task D4 - Drawings and Engineering This task consists of the engineering and the development of plans necessary to construct this project. A. Prepare detailed drawings for the proposed work discussed previously within this Exhibit. A tentative list of final design drawings to be developed for this project is presented in Table 1. Drawings will be prepared using drafting standards and standard details as developed by Eckler Engineering, Inc. Task D5 - Specification Preparation This task consists of the preparation of specifications necessary to construct this project. A. ENGINEER shall prepare technical specifications required for this project. These specifications will be prepared and will consist of written technical descriptions and materials, equipment and construction systems, standards and workmanship required for this project as developed by Eckler Engineering. B. The City of Tamarac standard bidding requirements, contract forms and miscellaneous forms/information required for this project shall be utilized. Consultant shall provide the City of Tamarac with project specific information forthe preparation of bidding and contract documents required for this project. C. A tentative list of specification sections to be prepared for this project is presented in Table 2. Task D6 - Permit Preparation Assistance This task consists of preparing the following regulatory permit application submittals: A. Florida Department of Environmental Protection (FDEP) Application for Specific Permit to Construct PWS Components (DEP Form 62-555.900(1)). Any additional regulatory permits required beyond the above will be considered as outside the scope of this proposal. Building permits (where applicable) during construction are obtained by Contractor perthe contract documents. Page 2 of 16 TR 13245 Exhibit 1 Task D7 - Prepare Opinions of Probable Construction Cost Prepare the 90%, 100%, and final design levels of Opinion of Probable Construction Cost for new facilities and improvements proposed under this project. Task D8 - Bidding Assistance Services This task shall include work necessary to assist CITY with the bidding of this project. This work may include the following: A. Assist with the coordination of the bidding documents and the advertisement for bid and respond to communication from contractors and issue addenda information as required. Provide up to twenty (20) sets of bid documents (on CD) for distribution by the CITY to potential bidders. B. Attend the pre -bid meeting and assist City with preparation of and distribution of minutes. C. Respond to written questions by potential bidders and, if needed, assist the CITY in issuing addenda. D. Attend the bid opening and tabulate the bids as provided by interested contractors. Task D9 - Bid Evaluation and Recommendation of Award Assistance This task shall consist of the review and evaluation of the bids and the recommendation of a bidder for award of contract to the CITY. Task D10 - Submit and Review (Quality Control) The ENGINEER will make the following submittals at various completion levels of this project for the purpose of CITY's review and comment for coordination and quality control. A review meeting will be requested following each submittal to discuss and receive comments from CITY. The CITY's comments shall be incorporated into revisions prior to the next subsequent quality control submittal. Quality control submittals for this project are anticipated at the following completion levels: A. 90% Drawings and Specifications. B. 100% Drawings and Specifications The ENGINEER will incorporate the agreed -upon revisions made by the CITY. A total of two (2) meetings with the CITY is the level of effort for this Task. Construction Phase Task C1- Project Administration/Management This task focuses on the administration of the project including project setup, client interface and general project management and administration. Page 3 of 16 TR 13245 Exhibit 1 Task C2 - Preconstruction Activities Prior to Notice to Proceed After issuance of a Notice of Award by City, assistthe City in the preparation and signing of the Contract Documents by reviewing insurance certificates, incorporation of Addendum information to develop a conformed set of Contract Documents, distribution of documents to the City and Contractor. The ENGINEER will also undertake other preconstruction activities which include attending the preconstruction meeting, providing preconstruction meeting minutes to all attendees, and assisting the Contractor in finalizing any permit application issues or technical assistance with any building permit review issues or questions required for the construction of this project and by providing the required numberof signed/sealed drawing sets for building permits and the sets of Contract Documents required for construction. Task C3 - Consult and Advise Provide technical advise and assistance to City during the construction period and provide necessary interpretations and clarifications of the Contract Documents as required by City or Contractor. Review and respond to five (5) Requests for Information (RFI) is the level of effort basis for this task. Task C4 - Review Shop Drawings Review Shop Drawings and samples, the results of tests and inspections, and other data submitted by the Contractor in accordance with the Contract Documents shall then be sent to the City for review and comment, appropriately marked and then returned to the Contractor. A total of fifteen (15) submittals is the estimated level of effort basis for this item's budget. Task C5 - Review Pay Requests and Schedules Review monthly pay requests and make recommendations for payment to CITY. Monthly pay requests will be reviewed in the field and an agreement reached between the Contractor, CITY's project representative, and the ENGINEER prior to formal submittal to CITY for payment. Review the Contractor's preliminary and monthly progress schedules through completion. The estimated construction time is 150 calendar days requiring 5 pay request reviews Task C6 - Perform Periodic and Milestone Inspections Engineer will make periodic site visits at intervals appropriate to the various stages of construction to observe the work, determine conformity with the contract documents and compliance with the construction permits. It is anticipated that there will be four (4) site visits. Perform inspections to determine that the project has achieved Substantial Completion and readiness for Final Acceptance and that the Work has been completed in conformance with the Contract Documents to certify completion of construction to permitting agencies. Four (4) such site visits are anticipated. Task C7 - Progress Meetings Attend two (2) monthly construction related progress meetings. The ENGINEER shall schedule, preside over and generate and distribute minutes of these meetings. The purpose of these meetings is to formally coordinate the activities of the Contractor and CITY to resolve any conflicts and to review working procedures as required to satisfactorily complete the project. Page 4 of 16 TR 13245 Exhibit 1 Task C8 - Contract Modifications Develop the necessarydata, notes and clarification drawings required to prepare contract modifications to reflect adjustments to the construction project. Two (2) contract modifications incorporating a total of six items, is the estimate basis for this budget item. One of the contract modifications will be the final reconciliation contract modification prepared at the end of the project. When CITY requests additional contract modifications, the ENGINEER's fee may be adjusted accordingly based on a mutually agreed amount. Task C9 - Project Closeout Review the Contractor's record drawing information which shows the work as it was constructed. Prepare for CITY sets of record drawings showing those changes made during the construction progress based upon information provided by the Contractor. A. ENGINEER shall prepare signed and sealed record drawings based on Contractor's field data. B. ENGINEER shall submit final copies of record drawings to CITY. C. ENGINEER shall provide record drawings to CONTRACTOR for building permit closeout submittal. D. Attend the final project reconciliation meetings with CITY and the Contractor. Task C1 D - Regulatory Agency Documentation and Project Closeout Submittals This task covers preparation of regulatory agency permit closeout documentation for each regulatory permit obtained for the project as follows: A. FDEP B. City of Tamarac Building Department Task C11 - Special Services The ENGINEER shall, when requested, provide special services during construction consisting of the following items: A. Resident Services To monitor that project is constructed in complete conformance with the Contract Documents. Services which will be provided by the ENGINEER's resident project representative will consist of the following: 1. Make periodic on -site field observations of the Contractor's performance. The limits of the authority of the on -site representative are as defined within the Construction Contract Documents. Page 5 of 16 TR 13245 Exhibit 1 2. Observe any field tests and review the results of tests required of the Contractor by the Contract Documents. 3. Assist in the development of punch lists in conjunction with the milestone inspections to determine if the project has achieved Substantial and Final Completion and that the work has been completed in general conformance with the Contract Documents. In order to estimate the efforts of the ENGINEER's project representative, it is anticipated that a person would need to be at the project site 2 day(s) per week, approximately 3 hours per visit. Task C12 - Special Inspection This task not required, but can be added if requested by the City of Tamarac Building Department. ARTICLE 2 - DATA OR ASSISTANCE TO BE PROVIDED BY CITY A. Provide ENGINEER with assistance in locating existing facilities, when requested. B. Provide general project review, where required- C. Provide copies of existing facility record drawings. D. Provide existing facility operation data, as available- E. Attendance at project meetings. ARTICLE 3 - TIME OF COMPLETION Table 3 provides the preliminary project schedule based on days from the receipt of the Authorization to Proceed. ARTICLE 4 - PROJECT DELIVERABLES Project deliverables for the project design and construction phases shall be in accordance with Table 4, attached. ARTICLE 5 - PAYMENT AND COMPENSATION As consideration for providing the services enumerated in Article 1, the CITY shall pay the ENGINEER fees as described below: A. Design Phase For the services enumerated in Article 1, Tasks D1 through D10, the lump sum fee of 34,000.00. Page 6 of 16 TR 13245 Exhibit 1 B. Construction Phase For services enumerated in Article 1, Tasks C1 through C12, the estimated not to exceed fee of $34,100.00. Engineering services during construction will be billed on an hourly rate plus direct expenses in accordance with the attached scope of work breakdown. Eckler Engineering will submit monthly invoices payable by person, hours worked, and hourly rates, plus direct expenses for these engineering services. Any unused portion of this estimated not -to -exceed fee will not be billed to the City. These fees have been determined in accordance with the scope of work breakdown attached as Table 5 and 6. The fee does not include the provision of the following items: A. Preparation of permit submittal applications to the City of Tamarac Building Department. B. Easement acquisitions and legal work as required. C. Landscaping and irrigation system designs. D. Any expert witness or testimony services. E. Payment of permit fees. F. Services not specifically indicated in this Task Authorization. (Remainder of page left blank intentionally.) Page 7 of 16 TR 13245 Exhibit 1 ARTICLE 6 - AUTHORIZATION In WITNESS WMEREOF; the parties have made and executed this Agreement on the respective dates under each signature. CITY OF TAMARAC, signing by and through its City Manager, and CONSULTANT, signing by and through its President, duly authorized to execute same. CITY OF TAMARAC ATTEST. Michael C. Cernech, City Manager Pat Teufel City Cie* Date ATTEST: (Corporatii Secretary) *im =. - tI t - t Type/Print Name of Corporate Secy. (CORPORATE SEAL) Page 8 of 16 Date Eckler Engineering. Inc. Company ame Signature of President/Owner Doucalas If. Hammann, P.E. Type/Print Name of President/Owner 'g-z7- ig Date TR 13245 Exhibit 1 CORPORATE ACKNOWLEDGMENT STATE OF Ejgdda SS COUNTY OF Broward I HEREBY CERTIFY that on this day, before me, an Officer duly authorized in the State aforesaid and In the County aforesaid to take acknowledgments, personally appeared Douglas K. Hartmann, of Egkltr gMI0201W. Inc., a Florida Corporation, to me known to be the person(s) described in and who executed the foregoing instrument and acknowledged before me that he executed the WITNESS my hand and official seat this day of j!2:241*4'1 %I , 2019. U ' Signature of Notary Public utrcr►c, FRAcAseo State of Florida at Large RD —"PAkUftv*"W I W te®ci0" lowmilkylIZIM Linda C. Fracesso Print, Type or Stamp Name of Notary Public X_ Personally known to me or Produced Identification Type of I.D. Produced DID take an oath, or _ CX DID NOT take an oath Y:\DocumentMTamaradW\Task Authorization 18-XXDWTP Finished Water Meter Impmvemeriffask AuthorizationWask Auth 19-14D.wpd Page 9 of 16 TR 13245 Exhibit 1 TABLE 1 WTP FINISHED WATER METERING REPLACEMENT TENTATIVE LIST OF PROJECT DRAWINGS Drawing Sheet No. Title General Cover sheet G-1 Project Location Map and Index to Drawings G-2 General Notes and Abbreviations G-3 Mechanical Legends and Symbols G-4 Process and instrumentation Legends (Sheet 1) G-5 Process and instrumentation Legends (Sheet 2) G-6 Design Criteria (Sheet 1) Civil C-1 Overall Site Plan C-2 Site and Yard Piping Demolition Plan C-3 Demolition Details and Sections CA Paving and Grading Site Plan C-5 Civil Details - Specific CD-1 Standard Details - Civil Mechanical M-1 Piping Schedule and General Mechanical Notes M-2 Yard Piping Plan M-3 Yard Piping Details (Sheet 1) MD-1 Standard Details - Mechanical MD-2 Standard Details - Mechanical MD-3 Standard Details - Mechanical Instrumentation 1-1 Process and Instrumentation Diagram ID-1 Standard Details Instrumentation and Controls Electrical E-1 Electrical Notes and Legends E-2 Electrical Site Plan E-3 I&C One -Line Diagram E-4 Partial SCADA Network Diagram (Sheet 1) E-5 FIT Backplate Details E-6 Specific Electrical Details ED-1 Standard Details - Electrical Page 10 of 16 TR 13245 Exhibit 1 TABLE 2 WTP FINISHED WATER METERING UPGRADE TENTATIVE LIST OF PROJECT SPECIFICATIONS �3��L�1 TL•7�1i it �l PART 1 BIDDING REQUIREMENTS (These documents provided' by City Purchasing Division) PART 2 CONTRACT FORMS (These documents provided by City Purchasing Division) PART 3 MISCELLANEOUS FORMSIINFORMATION (These documents provided by City Purchasing Division) PART 4 SPECIFICATIONS Division 1 - General Requirements 01005 General Requirements 01010 Summary of Work 01060 Field Engineering 01200 Project Meetings 01300 Submittals 01400 Quality Control 01500 Construction Facilities and Temporary Controls 01 W5 Mobigzatlon/Demobilization 01700 Contract Closeout 01720 Project Record Documents 01730 Operation and Maintenance Data 01740 Warranties and Bonds Division 2 - Sitework 02020 Existing Utility L.ocationNerification 02072 Demolition 02200 Earthwork 02500 Restoration and Cleanup 02630 Concrete Sidewalks, Drives, and Curbs Division 3 - Concrete 03300 Concrete 03600 Grout Division 4 - Not Used Page 11 of 16 TR 13245 Exhibit 1 Division 5 - Metals 05500 Fabricated Metalwork and Castings Division 0 - 8 - Not Used Division 9 - Protective Coatings 09900 Protective Coatings Division 10 -12 - Not Used Section 13 - Special Construction 13XXX SCADA Modification Section 14 - Not Used Division 15 - Mechanical 15005 Ductile Iron Pipe (Water) 15029 Testing and Disinfection (Pipelines, Wells and Equipment) 15100 Manually Operated Valves Division 16 - Electrical 16000 Electrical General Requirements 15050 Basic Materials and Methods PART 5 APPENDICES Appendix A - FDEP Permit (Remainder of page left blank intentionally.) Page 12 of 16 TR 13245 Exhibit 1 TABLE 3 WTP FINISHED WATER METERING REPLACEMENT PRELIMINARY PROJECT SCHEDULE Time to Cumulative Time Activity Complete To Complete (Days) (Days) 1. Notice to Proceed 0 0 2. Site Visit/information Gathering 7 7 3. Submit 90% Drawings and Specifications 30 37 4. Receive CITY Review Comments 14 51 5. Submit 100% Drawings and Specifications 14 65 6. Receive CITY Review Comments 14 79 7. Submit Final Plans and Specifications along with 14 93 permit applications and final cost opinion 8. Permitting 45 138 9. Bidding coordination with Purchasing Division 7 145 10. Bidding and Award Phase 60 205 11, Construction Phase (Final) 150 355 12. Project Closeout 21 376 Detailed schedule will be provided upon receipt of authorization to proceed and will include specific submittal dates. (Remainder of page left blank intentionally.) Page 13 of 16 TR 13245 Exhibit 1 TABLE 4 WTP FINISHED WATER METERING REPLACEMENT LIST OF PROJECT DELIVERABLES DESIGN PHASE A. 90% Design Submittal ► One (1) set of 11" x 17" Drawings, 90% Complete ► One (1) set of Specifications, 90% Complete ► 90% Completion Estimate of Probable Construction Cost B. 100% Design Submittal ► One (1) set of 11" x 17" Drawings, 100% Complete ► One (1) set of Specifications, 100% Complete ► 100% Completion Estimate of Probable Construction Cost C. Final Design/Permit Application Submittal ► One (1) set of 11" x 17" Drawings, Final. ► One (1) set of Specifications, Final. ► Completed permit applications, exhibits, and three (3) sets of signed/sealed drawings and specifications for submittal to the regulatory agencies named herein. Final estimate of probable construction cost. BIDDING SERVICES (Part of Design Phase) A. Bidding Coordination Submittal ► One (1) set of 11" x 17" Drawings (Final). ► One (1) set of Specifications (Final). ► One (1) Final Completion Estimate of Probable Construction Cost. B. Pre -Bid. ► Twenty (20) CD's with final bid documents for CITY's use during bid phase. Each CD will contain: bid specifications, half-size bid drawings, and full-size bid drawings. All files will be in .pdf format. Page 14 of 16 TR 13245 Exhibit 1 ► Project Final Documents including drawings on 22" x 34" or 11" x 17" sheets and project specifications on 8-1/2" x 11" sheets for use by CITY ( City, Engineer). Two (2) sets of project documents, final completion. ► Addenda information as required to the CITY and/or Contractors. C. Post Bid. ► Bid Tabulation, 2 copies. ► Recommendation of Award Letter. The CITY will award contract and issue Notice of Award. CONSTRUCTION PHASE A. Pre -Construction ► Pre -Construction conference Meeting Agenda and Minutes. ► Electronic signed/sealed drawings for building permit submittal by CONTRACTOR. ► Three (3) Sets of half size (11" x 17") drawings and specification booklets for CONTRACTORS use through the construction phase. ► Three (3) sets of drawings (11" x 17") and specifications for CITY's use during construction. ► Three (3) sets of drawings (11" x 17") and specifications for sub -consultant's use during construction- B. Shop Drawings P. Copies of approved and final shop drawings. C. Construction Inspection ► Site visit reports will be provided for each site visit in accordance with Tasks C6 and C11 of this Task Authorization. D. Progress Meetings ► Copies of all project meeting minutes. E. Contract Modifications 01 Four (4) copies of all completed contract modifications. F. Pay Requests 01 Copies of reviewed and accepted partial and final pay request applications. Page 15 of 16 TR 13245 Exhibit 1 G. Record Drawings and Project Closeout ► One (1) half size, signed and sealed set of record drawing prints for submittal of permit certification documents to the Building Department. One (1) half size, signed and sealed set of prints, one (1) half size set of record drawings, and one (1) copy of AutoCad drawing files on CD for use by CITY. Four (4) copies of the certificate of substantial completion and punch lists. H. Special Inspection Not applicable. (Remainder of page left blank intentionally.) Y:\Documents\Tamarac\BD\Task Authorization 19-XXDWTP Finished Water Meter Improvement\Task Authorization\Task Auth 19-14D.wpd Page 16 of 16 TR 13245 Exhibit 1 CITY OF TAMARAC WTP FINISHED WATER METERING REPLACEMENT TASK AUTHORIZATION NO. 19-14D TABLE 6 I. DESIGN PHASE GATE: March 27, 2019 PERSONNEL TASK DESCRIPTION a m W m W s W s W Y Y s n W D1 Pmjacl Administration / Management e 8 D2 Data Evaluation and Preliminary Design 6 4 2 D3 Preliminary Design Memorandum D4 Drawings and Engineering 7 28 82 D5 Specif-lion Praparalion 16 18 18 06 Permit Preparation Assistance 2 8 z 07 Prepare Opinions of Probable Consinidim Cost 3 8 DB Bidding Assislance Services 8 8 7 Bid Evaluation and Recommendation of 2 D9 Awud Assi tence 2 010 Submit and Review (Quality Control) 6 4 D11 Not Used 012 Not Used Total Hours 8 50 0 0 0 72 0 82 0 0 43 Rate $225.00 $204.00 $130.00 $99.00 $85.00 $75.00 1 $100.00 $93.00 1 1178.00 $108.00 $78.50 Sub -Total labor $1,800.00 $10,200.00 s0.00 1 $0.00 SO.00 $5.400.00 $0.00 $7,626.00 $0.00 $0.00 $3,418.50 TOTAL LABOR $28,444.50 I/. REIMBURSABLE EXPENSES DESIGN PHASE EXPENSE ITEM EXPFNSE TYPE UNIT No. OF UNITS COSTPERUNIT TOTAL COST 1 REPRODUCTION Hall Size drawings(I IN17") EA 6 $14,00 $112.00 Full Size drawings (22'x34") EA 0 $58.00 $0.00 Specification Booklets EA 0 $50.00 $0.00 2 PHOTOCOPIES EA 300 $020 $60.00 PLOTTING 3 22 X 34 (SET UP) EA 28 $3 00 $84.00 11 X 17 (SETUP) EA 56 $3.00 $168.00 TRAVEL 4 MILEAGE MILE 0 $0.585 $0.00 TOLLS EA 0 $0.00 $0.00 SUBCONSULTANTS SURVEY LS 1 $0.00 $0.00 ELECTRICAUI6C LS 1 $5,500.00 $5,500-00 STRUCTURAL LS 0 3000 $0.00 5 GEOTECHNICAL LS 0 $0.00 $0.00 HYDROGEOLOGIC LS 0 $0.00 $0.00 RADIO SURVEY/LICENSING LS O $0.00 $0.00 HVAC LS 0 $0.00 $0.00 TOTAL EXPENSES $5,924.00 GRAND TOTAL $34,369.00 USE $34,000.00 Y. IOOCUMENTMT,,,, W42.Cl o.oa^Scapa TR 13245 Exhibit 1 CITY OF TAMARAC WTP FINISHED WATER METERING REPLACEMENT TASK AUTHORIZATION NO. 19-14D TABLE 6 I. CONSTRUCTION PHASE DATE. March 27, 2019 TASK DESCRIPTION PERSONNEL .$ m v L S r r r E E Cl Project AcimloistratonlManati-t 5 8 C2 Prewnst-don Aallvllies Prior tc NTP 6 4 2 C3 Consult and Advise 5 5 10 C4 Review Shop D.Wklgs 7.5 30 15 CS Pevlew Pry Requests and Schedules 2.5 10 10 C6 PeHorm Pedodk and Milestone Ins actions 6 12 6 C7 Progress meeting. 6 6 2 Ca Contract Modifications 2 2 2 C9 Project Closeout 7 7 6.75 2 C10 Regulatorty Agency Documentation and Project Closeout Submittals 4 6 3 C11 Special Services 32 17 C12 Special inspection - WA Total Hours Rala Sub -Total Labor 5 48 0 0 78 0 0 2075, 0 32 66 $225AO $20-4.00 $143.00 $11L00 $99.00 $65.00 $100.00 $93,00 $78.00 S108.00 $79.60 $1.125.00 $9,792.00 $0.00 $0.00 $7,722.00 $0.00 $0.00 $1,929.75 $0.00 $3,456.00 $5,167.60 TOTAL LABOR $29,192.25 IL REIMBURSABLE EXPENSES EXPENSE ITEM EXPENSE TYPE UNIT No. OF UNITS COST PER UNIT TOTAL COST 1 REPRODUCTION Half Slzs Onmings (11" x 17') EA 6 $14.00 $70.00 Full Size Drawings (22" x 34') EA 4 $32.48 $129.92 8pecl0caWn B.W.I. EA 5 $44.22 $221.10 2 PHOTOCOPIES EA 200 $0.20 $40.00 PLOTTING 3 22 X 34 (SET UP) EA 0 $15.00 $0.00 11 X 17 (SETUP) EA 0 $3,00 $GAO TRAVEL 4 MILEAGE MILE 0 $0.505 $0.00 TOLLS EA 0 $0.00 $000 SUBCONSULTANTS SURVEY LS 0 $0.00 $0.00 ELECTRICAL LS 1 $4,400.00 $4,400,00 5 STRUCTURAL LS 0 $0.00 $0.00 OEOTECHNICAL LS 0 $0.00 $0.00 HYDROGEOLOGIC LS 0 $0.00 $0.00 PERMIT FEES LS 0 $0.00 $0.00 TOTAL EXPENSES $4,861,02 GRAND TOTAL $34,053.00 USE $34,100.00 Y1DocumerwTamarac'WT.sk Authortr.H- 19-14D WTP Flni.hed Water Metering Repla--hTask Aulhod-OO lSDC SCOPEAS