Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2019-045 Temp. Reso. #13263 June 12, 2019 Page 1 of 5 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2019- Yt A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, APPROVING TASK AUTHORIZATION NO. 19-17D AND AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE TASK AUTHORIZATION NO. 19-17D WITH ECKLER ENGINEERING, INC., TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF THE TRACT 27 BOOSTER STATION UPGRADE PROJECT IN THE AMOUNT OF $250,100.00; INCLUDING PREPARATION OF DETAILED PLANS AND SPECIFICATIONS FOLLOWED BY BIDDING ASSISTANCE AND ENGINEERING SERVICES DURING CONSTRUCTION, IN ACCORDANCE WITH THE CITY'S CONSULTING ENGINEERING AGREEMENT AS AUTHORIZED BY RESOLUTION NO. R-2016-80, FOR AN AMOUNT NOT TO EXCEED $250,100.00; AUTHORIZING AN 111 ADDITIONAL APPROPRIATION IN THE AMOUNT NOT TO EXCEED $100,100.00 TO BE INCLUDED IN A FUTURE BUDGET AMENDMENT PURSUANT TO F.S. 166.241(2); AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO ADMINISTER THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Tract 27 Booster Station was constructed in 1986; and WHEREAS, the Tract 27 Booster Station assists in providing additional water pressure and chemicals to the distribution system and ensures that the communities to the extremities of the system receives adequate water flows and clean water; and WHEREAS, the existing generator and pumps are all original items and are now past their useful life; and WHEREAS, the existing pump station building is presently out of compliance with the current building codes including hurricane wind resistance; and Temp. Reso. #13263 June 12, 2019 Page 2 of 5 WHEREAS, this project will provide for a new standby generator, new service pumps and associated piping, improvements to the existing pump station building to comply with new building codes, new HVAC system for the updated pump station building and new primary power distribution system for the Tract 27 Booster Station; and WHEREAS, the cost to upgrade the Tract 27 Booster Station will be provided as an Engineer's Estimate as part of this Task Authorization; and WHEREAS, Task Authorization No. 19-17D is allowable pursuant to Florida Statute 287.055 under the City's Consulting Engineering Agreement since the construction cost is less than $2,000,000; and WHEREAS, Task Authorization No. 19-17D with Eckler Engineering, Inc., will provide the design and bidding assistance along with engineering services during construction at a cost of $250,100.00; and WHEREAS, the City requires the service of a consulting firm knowledgeable in this area and capable of providing professional services for the design and bidding assistance along with engineering services during construction of the Tract 27 Booster Station Upgrade Project; and WHEREAS, Eckler Engineering, Inc., possesses the required knowledge and experience to provide the Professional Engineering Services associated with the Tract 27 Booster Station Upgrade; and WHEREAS, Eckler Engineering, Inc., has been pre-qualified as an approved consultant for engineering services by the City of Tamarac as authorized by Resolution No. R-2016-80; and Temp. Reso. #13263 June 12, 2019 Page 3 of 5 WHEREAS, it is the recommendation of the Director of Public Services, the Director of Financial Services and the Purchasing and Contracts Manager that Task Authorization No. 19-17D from Eckler Engineering, Inc., be approved and executed by the appropriate City Officials; and WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to accept and execute Task Authorization No. 19-17D (a copy of which is attached hereto as "Exhibit 1") with Eckler Engineering, Inc., to provide engineering services for the design and bidding assistance along with engineering services during construction of the Tract 27 Booster Station Upgrade Project for a total amount not to exceed $250,100.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, THAT: SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. All exhibits attached hereto are incorporated herein and made a specific part hereof. SECTION 2: The City Commission approves Task Authorization No. 19-17D and authorizes the appropriate City Officials to execute Task Authorization No. 19-17D with Eckler Engineering, Inc., to provide engineering services for the design and bidding assistance along with engineering services during construction of the Tract 27 Booster Station Upgrade Project, in accordance with the City's Consulting Engineering Agreement as authorized by Resolution No. R-2016-80 on August 24, 2016, for an amount not to exceed $250,100.00. SECTION 3: An expenditure not to exceed $250,100.00 is hereby approved. Temp. Reso. #13263 June 12, 2019 Page 4 of 5 SECTION 4: There is a current available appropriation in Project Number UT19C (Replace Tract 27 Pumps) and UT19D (Tract 27 Generator and ATS Replacement) in the Utility Renewal & Replacement Fund; and will require an additional appropriation of $100,100 that will be included in a budget amendment by November 30, 2019 pursuant to F.S. 166.241(2). SECTION 5: The City Manager, or his designee, is hereby authorized to approve and initiate change orders not to exceed $65,000 per Section 6-147 of the City Code, and close the contract award including, but not limited to, making final payment within the terms and conditions of the contract and within the contracted price. SECTION 6: All Resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 7: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. "The remainder of this page is left blank intentionally" Temp. Reso. #13263 June 12, 2019 Page 5 of 5 SECTION 8: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this i<fr day of yi_4-i-Li< 2019. A' id' '(-7:' '16- MI HELLE J. GOMEZ' MAYOR ATTEST: PA�RICIA TEUFEL, MC CITY CLERK RECORD OF COMMISSION VOTE: MAYOR GOMEZ c'i" .!' DIST 1: COMM. BOLTON DIST 2: COMM. GELIN t -I DIST 3: COMM. FISHMAN DIST 4: V/M PLACKO I HEREBY CERTIFY THAT I HAVE APPROVED THIS RESOLUTION AS TO FORM 0Yrifi; !A-, Gi cl/7 SA EL S. GOREN CITY ATTORNEY ECKLER ENGINEERING, INC. April 19, 2019 442-000.BD Mr. Earl Henry, P.E., Utility Engineer City of Tamarac Public Services Department 10101 State Street Tamarac, FL 33321 Dear Mr. Henry: Reference: Proposal for Engineering Services Task Authorization No. 19-17D Tract 27 Booster Station Upgrade In accordance with your request, we are pleased to submit this proposal for providing engineering services for the proposed Tract 27 Booster Station Upgrade. The scope of services proposal includes: ► Preliminary and final design of the anticipated improvements described herein. ► Preparation of drawings and specifications for the improvements. ► Permitting Assistance. ► Bidding Phase Assistance. ► Traditional and special engineering services during construction. The proposed scope of work for this project is attached as Task Authorization 19-27D. Our proposed lump sum fee for the design phase services required for this scope is $136,000. A breakdown of the design engineering fee calculation is attached at the end of the enclosed Task Authorization. Our proposed not-to-exceed estimate for engineering services required during the construction phase of this project is $114,100. A breakdown of the fee calculation is attached at the end of the enclosed task authorization. The engineering services for the construction phase will be billed on an hourly rate plus direct expenses basis in accordance with the attached breakdown. Any unused portion of the construction services fee will not be billed to the City. If this proposal meets with your approval, please provide us with one signed copy of the enclosed task authorization along with a City PO for this work. "Celebrating Service to South Florida Since 1985" 4700 RIVERSIDE DRIVE,SUITE 110 954/510-4700 CORAL SPRINGS.FL 33067 FAX 954/755-2741 Mr. Earl Henry, P.E. April 19, 2019 Page 2 Eckler Engineering looks forward to working with the City of Tamarac on this potable water booster system project. If you have any questions or require additional information pertaining to the enclosed scope of services or the project in general, please do not hesitate to contact me. Si erely, Douglas K. Hammann, P.E. Encl. Y:\Documents\Tamarac\BD\Task Authorization 19-17D Tract 27 Booster Station Upgrade\Task Authorization\Task Auth 19-17D.wpd TASK AUTHORIZATION NO. 19-17D SCOPE OF SERVICES TRACT 27 BOOSTER STATION UPGRADE INTRODUCTION City staff has requested that the existing Tract 27 booster station be upgraded as follows: 1. Removal of existing standby diesel generator system, evaluation of replacement generator size required, and design of replacement generator. The existing main fuel tank shall remain. Existing day tank and fuel management system shall be removed. It is planned that no external day tank will be required or provided. If determined during design that a day tank and fuel management system is required for generator operation, this system will be added to the design. 2. Removal and replacement of existing horizontal split case high service pumps. Three new pumps shall be provided for meeting the domestic and fire flow demands provided by this facility. It is anticipated that the design conditions for these pumps will be 2500 GPM at 180 feet of head. These conditions will be finalized during the design process. 3. The new high service pumps will be operated under variable speed conditions with new VFD's. The existing motor control center shall be replaced with new VFD's to operate the pumping systems. 4. A new HVAC system shall be provided for the updated pump room. 5. New primary power distribution for the facility. This improvement will also include stepdown transformer and lighting panel for lights, convenience outlets, and similar items. Existing ATS shall remain and be incorporated into the new design. 6. Upgrade the control system, RTU, and SCADA requirements for the upgraded facility and for compatibility of operation with the proposed VFD's. 7. Design replacement piping and valves for the new horizontal split case pump(s) configuration. 8. Architectural and structural improvements to the pump station building, inclusive of the following: a. Removal of existing glass storefront and replacement with reinforced masonry wall. b. Removal/replacement of overhead maintenance access door with new door meeting current Building Code. c. Removal and replacement of exterior doors and windows with new hurricane- resistant doors and windows in accordance with current building codes. Page 1 of 19 d. Painting the interior and exterior of the entire booster station facility including equipment and piping. e. Painting the exterior of the existing chlorine building. f. Removal of all exhaust fans from pump room. g. Block up all intake ventilation openings of the pump room. This Task Authorization covers the work associated with engineering design, preparation of detailed plans and specifications, permitting, bidding/contract award assistance, and engineering services during construction. The engineering tasks associated with this project are presented below: ARTICLE 1 - SCOPE OF SERVICES Design Phase Task D1 - Project Administration/Management This task focuses on the administration of the project including project setup, client interface and general project management and administration. Task D2- Data Evaluation and Preliminary Design This task focuses on obtaining the necessary preliminary information required to prepare detailed engineering plans and specifications. A. Meet with CITY project staff to discuss and confirm project requirements and design criteria. B. Visit the site and review pertinent features that may impact design and/or construction. C. Collect data available for the existing facilities, including field conditions, record drawings, connection locations, and other information that may potentially impact the project. D. Coordinate scope and completion of work by the structural and electrical subconsultant(s). Task D3 - Preliminary Design Report(Memorandum) This task not required. Task D4- Drawings and Engineering This task consists of the engineering and the development of plans necessary to construct this project. Page 2 of 19 A. Prepare detailed drawings for the proposed work discussed previously within this Exhibit. A tentative list of final design drawings to be developed for this project is presented in Table 1. Drawings will be prepared using drafting standards and standard details as developed by Eckler Engineering, Inc. Task D5- Specification Preparation This task consists of the preparation of specifications necessary to construct this project. A. ENGINEER shall prepare technical specifications required for this project. These specifications will be prepared and will consist of written technical descriptions and materials, equipment and construction systems, standards and workmanship required for this project as developed by Eckler Engineering. B. The City of Tamarac standard bidding requirements, contract forms and miscellaneous forms/information required for this project shall be utilized. Consultant shall provide the City of Tamarac with project specific information for the preparation of bidding and contract documents required for this project. C. A tentative list of specification sections to be prepared for this project is presented in Table 2. Task D6 - Permit Preparation Assistance This task consists of preparing the following regulatory permit application submittals: A. Florida Department of Environmental Protection (FDEP) Application for Specific Permit to Construct PWS Components (DEP Form 62-555.900(1)). B. Broward County Environmental Protection and Growth Management Department modifications to existing permit associated with the onsite diesel fuel storage tank and generator system. Any additional regulatory permits required beyond the above will be considered as outside the scope of this proposal. Building permits(where applicable)during construction are obtained by Contractor per the contract documents. Task D7- Prepare Opinions of Probable Construction Cost Prepare the 90%, 100%, and final design levels of Opinion of Probable Construction Cost for new facilities and improvements proposed under this project. Task D8- Bidding Assistance Services This task shall include work necessary to assist CITY with the bidding of this project. This work may include the following: Page 3 of 19 A. Assist with the coordination of the bidding documents and the advertisement for bid and respond to communication from contractors and issue addenda information as required. Provide up to twenty (20) sets of bid documents (on CD) for distribution by the CITY to potential bidders. B. Attend the pre-bid meeting and assist City with preparation of and distribution of minutes. C. Respond to written questions by potential bidders and, if needed, assist the CITY in issuing addenda. D. Attend the bid opening and tabulate the bids as provided by interested contractors. Task D9- Bid Evaluation and Recommendation of Award Assistance This task shall consist of the review and evaluation of the bids and the recommendation of a bidder for award of contract to the CITY. Task D10- Submit and Review(Quality Control) The ENGINEER will make the following submittals at various completion levels of this project for the purpose of CITY's review and comment for coordination and quality control. A review meeting will be requested following each submittal to discuss and receive comments from CITY. The CITY's comments shall be incorporated into revisions prior to the next subsequent quality control submittal. Quality control submittals for this project are anticipated at the following completion levels: A. 90% Drawings and Specifications. B. 100% Drawings and Specifications. The ENGINEER will incorporate the agreed-upon revisions made by the CITY. A total of two (2) meetings with the CITY is the level of effort for this Task. Construction Phase Task C1 - Project Administration/Management This task focuses on the administration of the project including project setup, client interface and general project management and administration. Task C2-Preconstruction Activities Prior to Notice to Proceed After issuance of a Notice of Award by City,assist the City in the preparation and signing of the Contract Documents by reviewing insurance certificates, incorporation of Addendum information to develop a conformed set of Contract Documents, distribution of documents to the City and Contractor. The ENGINEER will also undertake other preconstruction activities which include attending the preconstruction meeting, providing preconstruction meeting minutes to all attendees,and assisting the Contractor in finalizing any permit application issues or technical assistance with any building permit review issues or questions required for the construction of this project and by providing the required Page 4 of 19 number of signed/sealed drawing sets for building permits and the sets of Contract Documents required for construction. Task C3- Consult and Advise Provide technical advise and assistance to City during the construction period and provide necessary interpretations and clarifications of the Contract Documents as required by City or Contractor. Review and respond to ten (10) Requests for Information (RFI) is the level of effort basis for this task. Task C4-Review Shop Drawings Review Shop Drawings and samples,the results of tests and inspections, and other data submitted by the Contractor in accordance with the Contract Documents shall then be sent to the City for review and comment, appropriately marked and then returned to the Contractor. A total of forty(40) submittals is the estimated level of effort basis for this item's budget. Task C5-Review Pay Requests and Schedules Review monthly pay requests and make recommendations for payment to CITY. Monthly pay requests will be reviewed in the field and an agreement reached between the Contractor, CITY's project representative, and the ENGINEER prior to formal submittal to CITY for payment. Review the Contractor's preliminary and monthly progress schedules through completion. The estimated construction time is 300 calendar days requiring 12 pay request reviews. Task C6-Perform Periodic and Milestone Inspections Engineer will make periodic site visits at intervals appropriate to the various stages of construction to observe the work, determine conformity with the contract documents and compliance with the construction permits. It is anticipated that there will be eight(8) site visits. Perform inspections to determine that the project has achieved Substantial Completion and readiness for Final Acceptance and that the Work has been completed in conformance with the Contract Documents to certify completion of construction to permitting agencies. Four (4) such site visits are anticipated. Task C7-Progress Meetings Attend nine (9) monthly construction related progress meetings. The ENGINEER shall schedule, preside over and generate and distribute minutes of these meetings. The purpose of these meetings is to formally coordinate the activities of the Contractor and CITY to resolve any conflicts and to review working procedures as required to satisfactorily complete the project. Task C8- Contract Modifications Develop the necessary data,notes and clarification drawings required to prepare contract modifications to reflect adjustments to the construction project. Three(3)contract modifications incorporating a total of six items, is the estimate basis for this budget item. One of the contract modifications will be the final reconciliation contract modification prepared at the end of the project. Page 5 of 19 When CITY requests additional contract modifications, the ENGINEER's fee may be adjusted accordingly based on a mutually agreed amount. Task C9-Project Closeout Review the Contractor's record drawing information which shows the work as it was constructed. Prepare for CITY sets of record drawings showing those changes made during the construction progress based upon information provided by the Contractor. A. ENGINEER shall prepare signed and sealed record drawings based on Contractor's field data. B. ENGINEER shall submit final copies of record drawings to CITY. C. ENGINEER shall provide record drawings to CONTRACTOR for building permit closeout submittal. D. Attend the final project reconciliation meetings with CITY and the Contractor. Task C10-Regulatory Agency Documentation and Project Closeout Submittals This task covers preparation of regulatory agency permit closeout documentation for each regulatory permit obtained for the project as follows: A. FDEP B. BCEP&GMD C. City of Tamarac Building Department Task C11 - Special Services The ENGINEER shall, when requested, provide special services during construction consisting of the following items: A. Resident Services To monitor that project is constructed in complete conformance with the Contract Documents. Services which will be provided by the ENGINEER's resident project representative will consist of the following: 1. Make periodic on-site field observations of the Contractor's performance. The limits of the authority of the on-site representative are as defined within the Construction Contract Documents. 2. Observe any field tests and review the results of tests required of the Contractor by the Contract Documents. 3. Assist in the development of punch lists in conjunction with the milestone inspections to determine if the project has achieved Substantial and Final Page 6 of 19 Completion and that the work has been completed in general conformance with the Contract Documents. In order to estimate the efforts of the ENGINEER's project representative, it is anticipated that a person would need to be at the project site 2 day(s) per week, approximately 4 hours per visit. Task C12- Special Inspection This task not required, but can be added if requested by the City of Tamarac Building Department. ARTICLE 2 - DATA OR ASSISTANCE TO BE PROVIDED BY CITY A. Provide ENGINEER with assistance in locating existing facilities, when requested. B. Provide general project review, where required. C. Provide copies of existing facility record drawings. D. Provide copies of existing BCEP&GMD permits for diesel fuel system. E. Provide existing facility operation data, as available. F. Attendance at project meetings. ARTICLE 3 -TIME OF COMPLETION Table 3 provides the preliminary project schedule based on days from the receipt of the Authorization to Proceed. ARTICLE 4 - PROJECT DELIVERABLES Project deliverables for the project design and construction phases shall be in accordance with Table 4, attached. ARTICLE 5 - PAYMENT AND COMPENSATION As consideration for providing the services enumerated in Article 1, the CITY shall pay the ENGINEER fees as described below: A. Design Phase For the services enumerated in Article 1, Tasks D1 through D10, the lump sum fee of 136,000.00. B. Construction Phase For services enumerated in Article 1, Tasks C1 through C12, the estimated not to exceed fee of$114,100.00. Page 7 of 19 Engineering services during construction will be billed on an hourly rate plus direct expenses in accordance with the attached scope of work breakdown. Eckler Engineering will submit monthly invoices payable by person, hours worked, and hourly rates, plus direct expenses for these engineering services. Any unused portion of this estimated not-to-exceed fee will not be billed to the City. These fees have been determined in accordance with the scope of work breakdown attached as Table 5 and 6. The fee does not include the provision of the following items: A. Preparation of permit submittal applications to the City of Tamarac Building Department. B. Easement acquisitions and legal work as required. C. Landscaping and irrigation system designs. D. Any expert witness or testimony services. E. Payment of permit fees. F. Services not specifically indicated in this Task Authorization. (Remainder of page left blank intentionally.) Page 8 of 19 ARTICLE 6 -AUTHORIZATION In WITNESS WHEREOF, the parties have made and executed this Agreement on the respective dates under each signature. CITY OF TAMARAC, signing by and through its City Manager, and CONSULTANT, signing by and through its President, duly authorized to execute same. \\‘‘‘Iiiiiirrrri ��\\ PRAC � CITY OF TAMARAC • EAti brb ATT = —•• .�P • � =3 v ' _ Michael C. Cernech, City Manager WY& % • Pa Teufel 77c ,A,ROoO ' Date City Clerk ``��, 6/7/V) r Date ATTEST: Eckler Engineering, Inc. Co pang dame (Corporate Secretary) Signature of President/Owner Douglas K. Hammann Douglas K. Hammann, P.E. Type/Print Name of Corporate Secy. Type/Print Name of President/Owner 4 - (5 -!y (CORPORATE SEAL) Date Page 9 of 19 CORPORATE ACKNOWLEDGMENT STATE OF Florida : : SS COUNTY OF Broward : I HEREBY CERTIFY that on this day, before me, an Officer duly authorized in the State aforesaid and in the County aforesaid to take acknowledgments, personally appeared Douglas K. Hammann, of Eckler Engineering, Inc., a Florida Corporation, to me known to be the person(s) described in and who executed the foregoing instrument and acknowledged before me that he executed the same. WITNESS my hand and official seal this day of gf(]rl 6 /6t , 2019. . &Liddi-e-A.dati— Signature of Notary Public State of Florida at Large •'.'Y LINDA C.FRACASSO ., •, ?i; MY COMMISSION#GG 073496 Linda C. Fracasso -�.�PQ EXPIRES:May 1,2021 Print, Type or Stamp F of o• Bonded Thfu NWny Pudic Underwflters . Name of Notary Public w w.w.eC --+�ww X Personally known to me or Produced Identification Type of I.D. Produced DID take an oath, or X DID NOT take an oath Y:\Documents\Tamarac\BD\Task Authorization 19-17D Tract 27 Booster Station Upgrade\Task Authorization\Task Auth 19-27D.wpd Page 10 of 19 TABLE 1 TRACT 27 BOOSTER STATION UPGRADE TENTATIVE LIST OF PROJECT DRAWINGS Drawing Sheet No. Title General Cover sheet G-1 Project Location Map and Index to Drawings G-2 General Notes and Abbreviations G-3 Mechanical Legends and Symbols G-4 Architectural and HVAC Legends G-5 Process and instrumentation Legends (Sheet 1) G-6 Process and instrumentation Legends (Sheet 2) G-7 Design Criteria (Sheet 1) G-8 Design Criteria (Sheet 2) G-9 Sequence of Construction Coordination Civil C-1 Overall Site Plan C-2 Site and Yard Piping Demolition Plan C-3 Existing Booster Building Demolition Plan C-4 Demolition Details and Sections C-5 Paving and Grading Site Plan C-6 Civil Details - Specific CD-1 Standard Details - Civil Architectural A-1 Booster Station Building Modification Floor Plan A-2 Electrical Area Enlarged Floor Plan A-3 Interior Elevations, Schedules, and Details A-4 Existing Facilities Painting Plan A-5 Finish Schedules A-6 Door and Hardware and Louver Schedules AD-1 Standard Details -Architectural Structural S-1 Booster Station Building Modification Floor Plan S-2 Miscellaneous Structural Details SD-1 Standard Details - Structural Page 11 of 19 Mechanical M-1 Piping Schedule and General Mechanical Notes M-2 Yard Piping Plan M-3 Yard Piping Details (Sheet 1) M-4 Booster Pump Station Rehabilitation Plan and Section M-5 Booster Pump Station Miscellaneous Details (Sheet 1) M-6 Booster Pump Station Miscellaneous Details (Sheet 2) M-7 Booster Pump Station Domestic Plumbing Modifications M-8 Booster Pump Station HVAC Modifications M-9 Booster Pump Station HVAC Notes and Details MD-1 Standard Details - Mechanical MD-2 Standard Details - Mechanical MD-3 Standard Details - Mechanical MD-4 Standard Details - Mechanical Instrumentation I-1 Process and Instrumentation Diagram ID-1 Standard Details Instrumentation and Controls Electrical E-1 Electrical Notes and Legends E-2 Electrical Site Demolition Plan E-3 Booster Station Electrical Demolition Plan E-4 Electrical Site Plan E-5 Booster Pump Station Electrical Equipment Plan E-6 Booster Pump Station Lighting and Receptacle Plan E-7 Booster Pump Station Grounding and Lightning Protection Plan E-8 Existing MCC One-Line Diagram E-9 Proposed One-Line Power Diagram E-10 Booster Pump VFD Details E-11 I&C One-Line Diagram E-12 Partial SCADA Network Diagram (Sheet 1) E-13 New Booster Station MCP (Sheet 1) E-14 New Booster Station MCP (Sheet 2) E-15 PIT-FIT Backplate Details E-16 AE-AIT Backplate Details E-17 Panelboard Schedules E-18 Specific Electrical Details ED-1 Standard Details - Electrical ED-2 Standard Details - Electrical ED-3 Standard Details - Electrical (Remainder of page left blank intentionally) Page 12 of 19 TABLE 2 TRACT 27 BOOSTER STATION UPGRADE TENTATIVE LIST OF PROJECT SPECIFICATIONS SECTION NO. TITLE PART 1 BIDDING REQUIREMENTS (These documents provided by City Purchasing Division) PART 2 CONTRACT FORMS (These documents provided by City Purchasing Division) PART 3 MISCELLANEOUS FORMS/INFORMATION (These documents provided by City Purchasing Division) PART 4 SPECIFICATIONS Division 1 - General Requirements 01005 General Requirements 01010 Summary of Work 01050 Field Engineering 01200 Project Meetings 01300 Submittals 01400 Quality Control 01500 Construction Facilities and Temporary Controls 01505 Mobilization/Demobilization 01700 Contract Closeout 01720 Project Record Documents 01730 Operation and Maintenance Data 01740 Warranties and Bonds Division 2 - Sitework 02020 Existing Utility Location/Verification 02072 Demolition 02200 Earthwork 02500 Restoration and Cleanup 02510 Asphaltic Pavement and Base 02630 Concrete Sidewalks, Drives, and Curbs 02831 Chain Link Fences and Gates Division 3 - Concrete 03100 Formwork 03200 Concrete Reinforcement Page 13 of 19 03251 Expansion and Construction Joints 03300 Concrete 03600 Grout Division 4 - Masonry 04100 Mortar 04220 Concrete Unit Masonry Division 5 - Metals 05500 Fabricated Metalwork and Castings Division 6 - Not Used Division 7 -Thermal and Moisture Protection 07900 Sealants Division 8 -Windows and Doors 08120 Aluminum Doors and Frames 08330 Steel Rollup Doors 08710 Finish Hardware Division 9 - Protective Coatings 09201 Portland Cement Plaster (Stucco) 09900 Protective Coatings Division 10 - Specialties 10200 Aluminum Louvers 10999 Miscellaneous Building Specialties Division 11 - Equipment 11028 Horizontal Split Case Centrifugal Pumps - General 11028-1 Horizontal Split Case Centrifugal Pumps - Specific Section 12 - Not Used Section 13 - Special Construction 13700 Process Instrumentation and Controls 13720 Variable Frequency Drive 13751 RTU Subsystem Section 14 - Not Used Page 14 of 19 Division 15 - Mechanical 15005 Ductile Iron Pipe (Water) 15007 Stainless Steel Pipe and Fittings 15029 Testing and Disinfection (Pipelines, Wells and Equipment) 15100 Manually Operated Valves 15105 Self-Contained Automatic Process Valves 15400 Plumbing 15800 Air Conditioning Division 16 - Electrical 16000 Electrical General Requirements 16001 Electrical Demolition 16050 Basic Materials and Methods 16110 Lightning Protection 16160 Panelboards 16426 Switchboards 16460 Dry Type Transformers PART 5 APPENDICES Appendix A - FDEP Permit Appendix B - BCEP&GMD Permit (Remainder of page left blank intentionally.) Page 15 of 19 TABLE 3 TRACT 27 BOOSTER STATION UPGRADE PRELIMINARY PROJECT SCHEDULE Time to Cumulative Time Activity Complete To Complete (Days) (Days) 1. Notice to Proceed 0 0 2. Site Visit/Information Gathering 30 30 3. Submit 90% Drawings and Specifications 130 160 4. Receive CITY Review Comments 14 174 5. Submit 100% Drawings and Specifications 45 219 6. Receive CITY Review Comments 14 233 7. Submit Final Plans and Specifications along with 21 254 permit applications and final cost opinion 8. Permitting 45 299 9. Bidding coordination with Purchasing Division 7 306 10. Bidding and Contract Award Phase 60 366 11. Construction Phase (Final) 300 666 12. Project Closeout 21 687 Detailed schedule will be provided upon receipt of authorization to proceed and will include specific submittal dates. (Remainder of page left blank intentionally.) Page 16 of 19 TABLE 4 TRACT 27 BOOSTER STATION UPGRADE LIST OF PROJECT DELIVERABLES DESIGN PHASE A. 90% Design Submittal ► One (1) set of 11" x 17" Drawings, 90% Complete ► One (1) set of Specifications, 90% Complete ► 90% Completion Estimate of Probable Construction Cost B. 100% Design Submittal ► One (1) set of 11" x 17" Drawings, 100% Complete ► One (1) set of Specifications, 100% Complete ► 100% Completion Estimate of Probable Construction Cost C. Final Design/Permit Application Submittal ► One (1) set of 11" x 17" Drawings, Final. ► One (1) set of Specifications, Final. ► Completed permit applications, exhibits, and three (3) sets of signed/sealed drawings and specifications for submittal to the regulatory agencies named herein. ► Final estimate of probable construction cost. BIDDING SERVICES (Part of Design Phase) A. Bidding Coordination Submittal ► One (1) set of 11" x 17" Drawings (Final). ► One (1) set of Specifications (Final). ► One (1) Final Completion Estimate of Probable Construction Cost. B. Pre-Bid. ► Twenty(20) CD's with final bid documents for CITY's use during bid phase. Each CD will contain: bid specifications, half-size bid drawings, and full-size bid drawings. All files will be in .pdf format. Page 17 of 19 ► Project Final Documents including drawings on 22"x 34" or 11"x 17"sheets and project specifications on 8-1/2" x 11" sheets for use by CITY ( City, Engineer). Two (2) sets of project documents, final completion. ► Addenda information as required to the CITY and/or Contractors. C. Post Bid. ► Bid Tabulation, 2 copies. ► Recommendation of Award Letter. The CITY will award contract and issue Notice of Award. CONSTRUCTION PHASE A. Pre-Construction ► Pre-Construction conference Meeting Agenda and Minutes. ► Electronic signed/sealed drawings for building permit submittal by CONTRACTOR. ► Three (3) Sets of half size (11" x 17") drawings and specification booklets for CONTRACTORS use through the construction phase. ► Three(3) sets of drawings (11"x 17") and specifications for CITY's use during construction. ► Three (3) sets of drawings (11" x 17") and specifications for sub-consultant's use during construction. B. Shop Drawings ► Copies of approved and final shop drawings. C. Construction Inspection ► Site visit reports will be provided for each site visit in accordance with Tasks C6 and C11 of this Task Authorization. D. Progress Meetings ► Copies of all project meeting minutes. E. Contract Modifications ► Four(4) copies of all completed contract modifications. F. Pay Requests ► Copies of reviewed and accepted partial and final pay request applications. Page 18 of 19 G. Record Drawings and Project Closeout ► One (1) half size, signed and sealed set of record drawing prints for submittal of permit certification documents to the Building Department. ► One(1)half size,signed and sealed set of prints,one(1)half size set of record drawings, and one (1) copy of AutoCad drawing files on CD for use by CITY. • Four(4) copies of the certificate of substantial completion and punch lists. H. Special Inspection • Not applicable. (Remainder of page left blank intentionally.) Y:\Documents\Tamarac\BD\Task Authorization 19-17D Tract 27 Booster Station Upgrade\Task Authorization\Task Auth 19-27D.wpd Page 19 of 19 • CITY OF TAMARAC TRACT 27 BOOSTER STATION UPGRADE TASK AUTHORIZATION NO.19-17D TABLE 5 DATE: April 19,2019 I. DESIGN PHASE LABOR PERSONNEL COCD N C) N < lh N TASK DESCRIPTION Tiu u m `o d c `m `m `m .� o 0 0 '� 0u a to w` we w if, F E Ti D1 Project Administration/Management 11 34 D2 Data Evaluation and Preliminary Design 15 15 4 2 D3 Preliminary Design Memorandum D4 Drawings and Engineering 15.75 63 63 262 126 D5 Specification Preparation 27 27 13.5 18 D6 Permit Preparation Assistance 8 4 16 4 8 D7 Prepare Opinions of Probable 3 12 Construction Cost D8 Bidding Assistance Services 6 7 D9 Bid Evaluation and Recommendation of 2 2 Award Assistance D10 Submit and Review(Quality Control) 6 4 D11 Not Used D12 Not Used Total Hours 11 82.75 109 0 4 108.5 262 270 0 0 71 Rate $225.00 $204.00 $130.00 $99.00 $85.00 $75.00 $100.00 $93.00 $78.00 $108.00 $79.50 Sub-Total Labor $2,475.00 $16,881.00 $14,170.00 $0.00 $340.00 $8,137.50 $26,200.00 $25,110.00 $0.00 $0.00 $5,644.50 TOTAL LABOR $98,958.00 II. REIMBURSABLE EXPENSES DESIGN PHASE EXPENSE EXPENSE TYPE UNIT No.OF UNITS COST PER UNIT TOTAL COST ITEM 1 REPRODUCTION Half Size drawings(11"x17") EA 8 $31.50 $252.00 Full Size drawings(22"x34") EA 0 $73.08 $0.00 Specification Booklets EA 4 $50.00 $200.00 2 PHOTOCOPIES EA 300 $0.20 $60.00 PLOTTING 3 22 X 34(SET UP) EA 63 $3.00 $189.00 11 X 17(SET UP) EA 126 $3.00 $378.00 TRAVEL 4 MILEAGE MILE 0 $0.545 $0.00 TOLLS EA 0 $0.00 $0.00 SUBCONSULTANTS SURVEY LS 0 $0.00 $0.00 ELECTRICAUI&C LS 1 $33,000.00 $33,000.00 STRUCTURAL LS 1 $2,750.00 $2,750.00 5 GEOTECHNICAL LS 0 $0.00 $0.00 HYDROGEOLOGIC LS 0 $0.00 $0.00 RADIO SURVEY/LICENSING LS 0 $0.00 $0.00 HVAC LS 0 $0.00 $0.00 TOTAL EXPENSES $36,829.00 GRAND TOTAL $135,787.00 USE $136,000.00 Y:\DOCUMENTS\Tamarac%44?C1 Design Scope CITY OF TAMARAC TRACT 27 BOOSTER STATION UPGRADE TASK AUTHORIZATION NO. 19-170 TABLE 6 I. ENGINEERING SDC LABOR DATE: April 19,2019 PERSONNEL N CO ui O M CV TASK DESCRIPTION To _ v d m _ `m m u _ a15 a rn 'rn rn _ rn c c K .S c u W we we W we F a C1 Project Administration/Management 11 14 C2 Preconstruction Activities Prior to NTP 12 4 2 C3 Consult and Advise 10 10 20 C4 Review Shop Drawings 20 80 20 C5 Peview Pay Requests and Schedules 6 24 10 C6 Perform Periodic and Milestone 8 18 6 Inspections C7 Progress meetings 36 36 C8 Contract Modifications 2 8 8 2 C9 Project Closeout 7 7 31.5 2 C10 Regulatorty Agency Documentation 4 16 8 8 and Project Closeout Submittals C11 Special Services 343 17 C12 Special Inspection-N/A Total Hours 11 103 0 0 153 10 0 71.5 0 379 81 Rate $225.00 $204.00 $148.00 $111.00 $99.00 $85.00 5100.00 $93.00 $78.00 $108.00 $79.50 Sub-Total Labor , $2,475.00 $21,012.00 $0.00 $0.00 $15,147.00 $850.00 $0.00 56,649.50 $0.00 $40,932.00 $6,439.50 TOTAL LABOR $93,505.00 II. REIMBURSABLE EXPENSES EXPENSE EXPENSE TYPE UNIT No.OF UNITS COST PER UNIT TOTAL COST ITEM 1 REPRODUCTION Half Size Drawings(11"x 17') EA 5 $31.50 $157.50 ' Full Size Drawings(22"x 34') EA 4 $79.38 $317.52 Specification Booklets EA 5 $50.00 $250.00 2 PHOTOCOPIES EA 200 $0.20 $40.00 PLOTTING 3 22 X 34(SET UP) EA 63 $15.00 $945.00 11 X 17(SET UP) EA 63 $3.00 $189.00 TRAVEL 4 MILEAGE MILE 0 $0.535 $0.00 TOLLS EA 0 $0.00 $0.00 SUBCONSULTANTS SURVEY LS 0 $0.00 $0.00 ELECTRICAL LS 1 $16,500.00 $16,500.00 I 5 STRUCTURAL LS 1 $2,200.00 $2,200.00 GEOTECHNICAL LS 0 $0.00 $0.00 HYDROGEOLOGIC LS 0 $0.00 $0.00 PERMIT FEES LS 0 $0.00 $0.00 , TOTAL EXPENSES $20,599.02 GRAND TOTAL $114,104.00 USE $114,100.00 Y:\Documents\Tamarac\BD\Task Authorization 19-17D Tract 27 Booster Station Upgrade\Task Authorization\SDC SCOPE xis