HomeMy WebLinkAboutCity of Tamarac Resolution R-2018-018Temp. Reso. No. 13057
February 14, 2018
Page 1 of 8
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-2018-
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA, AUTHORIZING THE
APPROPRIATE CITY OFFICIALS TO ACCEPT AND
EXECUTE A PURCHASE ORDER AGREEMENT
BETWEEN THE CITY OF TAMARAC AND MURPHY
PIPELINE CONTRACTORS INC., UTILIZING PRICING
FROM AN AGREEMENT OBTAINED THROUGH A
FORMAL COMPETITIVE PROCESS BY THE ALLIED
STATES COOPERATIVE, EDUCATION SERVICE CENTER
(ESC) REGION 19, RFP NUMBER 17-7250 FOR AN
AMOUNT NOT TO EXCEED $1,507,447.40 FOR THE
REPLACEMENT OF 2,511 LINEAR FEET OF 30"
DRAINAGE MAIN PIPE LOCATED ALONG NW 54T"
STREET, TOGETHER WITH OUTFALLS LOCATED
ALONG PROSPECT ROAD AND NW 28TH AVENUE; A
CONTINGENCY OF 10.0% OR $150,744.74 WILL BE
ADDED TO THE PROJECT ACCOUNT FOR A TOTAL
AMOUNT OF $1,658,192.14; AUTHORIZING AN
APPROPRIATION UP TO THE TOTAL AMOUNT OF
$1,658,192.14; AUTHORIZING AN EXPENDITURE FROM
THE APPROPRIATE ACCOUNTS; PROVIDING FOR
CONFLICTS; PROVIDING FOR SEVERABILITY; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the drainage system along NW 54th Street, NW 28th Avenue, and
Crossing Prospect Road (Collectively known as Tamarac Lakes North: a.k.a. The
Boulevards Community) currently is serviced with 30-inch Corrugated Metal Pipes
(CMP), which are over 50 years old, failing and, due to pipe depth and soil conditions,
are difficult to repair and subject to more frequent failures due to the brittleness of the
corroded pipe walls; and
Temp. Reso. No. 13057
February 14, 2018
Page 2 of 8
WHEREAS, the project area has experienced many pipe failures over the past 2
years and after Public Services' consultant surveyed the pipe with sonar equipment,
multiple areas of pipe failure and potential failures have been identified throughout the
drainage system; and
WHEREAS, in order to prevent future pipe failures and to repair existing pipe
failures in an expedited time frame, it is necessary to replace the pipes now; and
WHEREAS, the drainage system in the Boulevards Community is part of a
surface water recharge system between the two (2) lakes located south of Prospect
Road (Tamarac Lakes North Community) and an overall Broward County surface water
recharge system for surrounding raw water well fields; and
WHEREAS, the depth of the pipe must be maintained under existing permitting
at depths between ten (10) and fourteen (14) feet below existing grades; and
WHEREAS, typical replacement of the existing 30-inch CMP would create
extensive impacts to the community, including, but not limited to, excavating outside
City of Tamarac Right -of -Way (ROW) on private property and within residents' private
property; and
WHEREAS, complete replacement of the drainage system to relocate drainage
pipe structures into the ROW would entail complete removal of the roadway, installation
of a new system, and replacement of the roadway, and
Temp. Reso. No. 13057
February 14, 2018
Page 3 of 8
WHEREAS, to avoid higher costs of construction and increased inconvenience to
the residents, longer construction time, and the high potential for residential property
damage, Public Services staff explored alternative construction methods best suited for
this project; and
WHEREAS, the City has utilized "in -place" pipe replacements and lining in many
other situations throughout the City to maintain and replace failing utilities that have
surpassed their life expectancy, City Staff in the Public Services Department identified
that an "in -place" pipe replacement would be the least invasive and most cost-effective
method for this project; and
WHEREAS, Murphy Pipeline Contractors, Inc. successfully completed multiple
projects (Shaker Village Community complete watermain replacement project, Spyglass
Community complete watermain replacement project, watermain replacement along NW
47th Terrace in the Mainlands Community and more than 4,000 feet of watermain
replacement along University Drive) utilizing the pipe bursting technique throughout the
City for watermain replacement, and all above mentioned projects were approved by
City Commission via Resolution; and
WHEREAS, pipe bursting has become the preferred pipe replacement method in
Europe with over 100 million feet replaced in the past 26 years. In the U.S., Murphy
Pipeline Contractors has completed over 500,000 LF of static pipe bursting over the
past decade; and
Temp. Reso. No. 13057
February 14, 2018
Page 4 of 8
WHEREAS, the project site is located along NW 54th Street, NW 28th Avenue,
and Crossing Prospect Road to connect to the lakes (Collectively known as Tamarac
Lakes North: a.k.a. The Boulevards Community) as shown in (Exhibit "1"); and
WHEREAS, the Allied States Cooperative, Education Service Center (ESC)
Region 19, RFP Number 17-7250 with Murphy Pipeline Contractors, Inc., for Pipe
Bursting has favorable pricing, terms, and conditions, which was awarded on July 20,
2017, valid through July 31, 2020 with the option to extend another three (3) years, not
to exceed 72 months in aggregate; (a copy of RFP 17-7250 is attached hereto as
Exhibit "2"); and
WHEREAS, the City of Tamarac is a member in good standing of the Education
Service Center Region 19 Allied States Cooperative (ASC) and is, therefore, eligible to
utilize Allied States Cooperative, Education Service Center (ESC) Region 19 RFP
Number 17-7250; and
WHEREAS, the vendor has agreed to honor the terms, conditions, and pricing of
Allied States Cooperative, Education Service Center (ESC) Region 19, RFP Number
17-7250 with Murphy Pipeline Contractors, Inc., and has prepared a project proposal in
the amount of $1,507,447.40, hereto attached as Exhibit "Y; and
Temp. Reso. No. 13057
February 14, 2018
Page 5 of 8
WHEREAS, the Director of Public Services, Director of Financial Services, and
the Purchasing and Contracts Manager chose to utilize available contracts awarded by
other governmental entities for Water Pipe Replacement utilizing Pipe Bursting, as
provided by City Code Section 6-148 (f), which states that the Purchasing Officer may
utilize contracts with other governmental agencies; and
WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be
in the best interest of the citizens and residents of the City of Tamarac to accept and
execute a Purchase Order Agreement with Murphy Pipeline Contractors, Inc., utilizing
Allied States Cooperative, Education Service Center (ESC) Region 19 RFP Number 17-
7250, in an amount not to exceed $1,507,447.40 for the project cost, and a contingency
of 10% or $150,744.74 will be added to the project account for a project total of
$1,658,192.14.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA, THAT:
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct and are hereby made a specific part of this
Resolution upon adoption hereof. All exhibits attached hereto are incorporated herein
and made a specific part of this resolution.
Temp. Reso. No. 13057
February 14, 2018
Page 6 of 8
SECTION 2: The appropriate City officials are hereby authorized to
accept and execute a Purchase Order Agreement for the Replacement of 2,511 LF of
water main pipe together with associated service line pipes along NW 54th Street, NW
28' Avenue, and Crossing Prospect Road utilizing Pipe Bursting with Murphy Pipeline
Contractors, Inc., utilizing Allied States Cooperative, Education Service Center (ESC)
Region 19 RFP Number 17-7250 not to exceed $1,507,447.40 for project cost and a
contingency of 10% or $150,744.74 will be added to the project account for a project
total of $1,658,192.14 (a copy of the proposal is attached hereto as "Exhibit 3").
SECTION 3: The Director of Public Services is authorized to approve
Work Tasks in accordance with the schedule of prices under said contract in an amount
not to exceed $1,507,447.40 for project cost and a contingency of 10% or $150,744.74
will be added to the project account for a project total of $1,658,192.14.
SECTION 4: The City Manager or his designee is hereby authorized to
approve and initiate Change Orders in amounts not to exceed $65,000.00 per Section
6-147 of the City Code, and close the contract award, which includes but is not limited
to making final payment and releasing bonds per Section 6-149 of the City Code, when
the work has been successfully completed within the terms, conditions and pricing of
the agreement.
SECTION 5: An appropriation of an amount up to $1,658,192.14 is hereby
authorized and will be included in a budget amendment prior to November 30, 2018.
SECTION 6: All Resolutions or parts of Resolutions in conflict herewith
E
Temp. Reso. No. 13057
February 14, 2018
Page 7 of 8
are hereby repealed to the extent of such conflict.
SECTION 7: If any clause, section, other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid,
in part or application, it shall not affect the validity of the remaining portions or
applications of this Resolution.
"The remainder of this r)aae is intentionallv left blank."
Temp. Reso. No. 13057
February 14, 2018
Page 8 of 8
SECTION 8: This Resolution shall become effective immediately upon its
passage and adoption.
PASSED, ADOPTED AND APPROVED this �, day of"'awt,2018.
/ X��Jow�'
HARRY D ESSLER
MAYOR
ATTEST:
CITY CLERK (l
RECORD OF COMMISSION VOTE:
MAYOR DRESSLER
DIST 1: COMM. BOLTON
DIST 2: V/M GOMEZ i!
DIST 3: COMM. FISHMAN
DIST 4: COMM. PLACKO �-
I HEREBY CERTIFY THAT I HAVE
APPROVED THIS RESOLUTION
AS TO FORM
SAMU L S. GOREN
CITY ATTORNEY
NW 28THEVE
v a
EIT, T,
NW 28TH AVE
— — — — --- — — — —
'0" D1
NW2 H WAY 4+0
r
;u Z 0
> 0 -n
0 00 (n --j
m >
-n
< >
0 �u
m >
F�l
NW 21TH
rl
TER
C/)
i
i
I
I NW 27TH AVE
NW 2.
m m
><
z
3:
0 26TH TER
N�r� l
z
ITH
WAY
>
G) M
m m CD
-00
m m
M
Cl)
m D
C
;o ;o
6
0
0
.
4t
cn 0
--I Cl)
CAi
z
G)
0
m
9 m
W 26TH TER
a
0
AW 26TH RE)
NW 26TH AVE
'4W25THTER---Jlp
NW 25TH AVE
EDUCATION SERVICE CENTER REGION 19
RFP AWARD SUMMARY TR 13057 - Exhibit 2
RFP TITLE: Trenchless Technology Rehabilitation & Related Items &
Services — ESC Region 19 Allied States Cooperative
RFP NUMBER: 17-7250
RFP OPENING DATE: June 27, 2017
CONTRACT TERM: Date of award until July 31, 2020 with the option to extend another three
(3) years annually, not to exceed 72 months in the aggregate.
FUNDING SOURCE: Various
RFP's ISSUED: 33
RESPONSES: 1
ADVERTISEMENT DATES: El Paso Times- May 12th & 19th, 2017
Washington Post- May 12th & 19t', 2017
BOARD MEETING DATE: July 20, 2017
RECOMMENDED FOR AWARD Murphy Pipeline Contractors, Inc.
TOTAL (estimated) $15,000,000.00 / year
EXPLANATIONS:
Award of this contract will enable ESC Region 19 Purchasing Cooperative members to procure all
aspects of trenchless technology including reconstruction of sewers, renewal of potable water mains,
pipe bursting for all type pipe lines, water main replacement, sewer pipe slip lining, rehabilitation of
existing water lines, renewal of pressure pipe lines, manhole rehabilitation, gravity sewer lateral renewal
systems, and related. Murphy Pipeline Contractors was the sole bid on this solicitation, and in
accordance with EDGAR requirements, ASC has done its due diligence of negotiating pricing and
obtaining this company's profit percentage which is on file.
SPECIFICATIONS PROVIDED BY:
EVALUATION COMMITTEE:
Royce Cleveland
ESC Region 19
Royce Cleveland
ESC Region 19
Rebecca Hernandez
ESC Region 19
Renae Lawrence
ESC Region 19
• - C=41• [ •
TR 13057 - Exhibit 2
Murphy Pipeline Contractors, Inc.
Attn: Todd Grafenauer
1876 Everlee Road
Jacksonville, FL 32216
Phone: 904-764-6887
Fax: 904-379-6193
toddg(a)-murphypipelines.com
www.murphypipelines.com
Services in all states and all US Territories
Price List
*price list update on December 6, 2017
Trenchless Technology Rehabilitation and Related Items &
Services
1 Bid Coefficient
National Contract
Regular Time
Premium Time
0.94
0.94
**Coefficients of 1.0 or higher will be deemed non -responsive and will not be
considered for award. All coefficients should be 2 decimal places only.
Approved by: Date:
(Armando Aguirre — Executive Director)
(July 26, 2017)
Murphy Pipelina
Contractors, Inc.
TR 13057 - EXhVJW2018
Allied States R19 Price List 17-7250
Trenchless Technology Rehabilitation and Related Items & Services
Awarded Vendor: Murphy Pipeline Contractors
CITY
Unit
Unit Price
Extension
Coefficient
Revised n
Price
A) Cured -in -place pipe (CIPP) reconstruction of gravity sewers
1
6"x4.5mm
1
LF
$40.50
$40.50
0.94
$ 38.07
2
8"x4.5mm
1
LF
$31.00
$31.00
0.94
$ 29.14
3
10" x 6.Omm
1
LF
$41.501
$41.50
0.94
$ 39.01
4
12" x 6.Omm
1
LF
$57.50
$57.50
0.94
$ 54.05
5
15" x 7.5mm
1
LF
$66.00
$66.00
0.94
$ 62.04
6
18"x9.Omm
1
LF
$81.50
$81.50
0.94
$ 76.61
7
21"x9.0mm
1
LF
$109.50
$109.50
0.94
$ 102.93
8
24" x 10.5mm
1
LF
$131.50
$131.50
0.94
$ 123.61
9
27"x 10.5mm
1
LF
$155.00
$155.00
0.94
$ 145.70
10
30" x 12.0mm
1
LF
$182.50
$182.50
0.94
$ 171.55
11
33" x 12.Omm
1
LF
$204.00
$204.00
0.94
$ 191.76
12
36" x 12.Omm
1 I
LF
$244.001
$244.00
0.94
$ 229.36
13
42" x 13.5mm
1
LF
$285.00
$285.00
0.94
$ 267.90
14
48" x 15.Omm
1
LF
$408.00
$408.00
0.94
$ 383.52
15
54" x 18.Omm
1
LF
$538.00
$538.00
0.94
$ 505.72
16
6" & 8" Additional 1.5mm
1
LF
$1.00
$1.00
0.94
$ 0.94
17
10" & 12" Additional 1.5mm
1
LF
$2.00
$2.00
0.94
$ 1.88
18
15" & 18" Additional 1.5mm
1
LF
$10.00
$10.00
0.94
$ 9.40
19
21" & 24" Additional 1.5mm
1
LF
$15.00
$15.00
0.94
$ 14.10
20
27" Additional 1.5mm
1
LF
$25.00
$25.00
0.94
$ 23.50
21
30" Additional 1.5mm
1
LF
$25.00
$25.00
0.94
$ 23.50
22
33" Additional 1.5mm
1
LF
$30.00
$30.00
0.94
$ 28.20
23
36" Additional 1.5mm
1
LF
$30.00
$30.00
0.94
$ 28.20
24
42" Additional 1.5mm
1
LF
$40.00
$40.00
0.94
$ 37.60
25
48" Additional 1.5mm
1
LF
$50.00
$50.00
0.94
$ 47.00
26
54" Additional 1.5mm
1
LF
$60.00
$60.00
0.94
$ 56.40
27
6" -10" Backyard Easement Setup Per Install Length
1
LF
$4.00
$4.00
0.94
$ 3.76
28
12" -18" Backyard Easement Setup Per Install Length
1
LF
$10.00
$10.00
0.94
$ 9.40
29
Timber Matting for Large Diameter Setup
1
SY
$20.00
$20.00
0.94
$ 18.80
30
linternal Reconnection of service connection by robotic cutter
1
EA
$235.001
$235.00
0.94
220.90
Note: Any CIPP over 54" will be on an individual quote basis.
-$
Clean/TV & Evaluation for Gravity Sewers
31
6" -12" Clean & TV sewer
1
LF
$5.50
$5.50
0.94
$ 5.17
32
15" - 21" Clean & TV sewer
1
LF
$11.00
$11.00
0.94
$ 10.34
33
24" - 33" Clean & TV sewer
1
LF
$19.50
$19.50
0.94
$ 18.33
34
36" & 42" Clean & TV sewer
1
LF
$30.00
$30.00
0.94
$ 28.20
35
48" & 54" Clean & TV sewer
1
LF
$50.00
$50.00
0.94
$ 47.00
36
6" -15" Post TV Inspection after Rehabilitation
1
LF
$2.50
$2.50
0.94
$ 2.35
37
18" - 27" Post TV Inspection after Rehabilitation
1
LF
$4.001
$4.00
0.94
$ 3.76
38
30" or Larger Post TV Inspection after Rehabilitation
1
LF
$5.50
$5.50
0.94
$ 5.17
39
Re -setup for clean & TV Inspection Due to Point Repairs
1
EA
$150.00
$150.00
0.94
$ 141.00
40
Root Removal
1
LF
$3.00
$3.00
0.94
$ 2.82
41
Grease Removal
1
LF
$3.00
$3.00
0.94
$ 2.82
42
Other Remote Obstruction Removal (max. 10 LF)
1
EA
$1,350.00
$1,350.00
0.94
$ 1,269.00
10 $ 12,690.00
43
Above Ground Physical Inspection
1
LF
$4.00
$4.00
0.94
$ 3.76
Bypass for sewers and associated items
44
Set Up 4" Pump (Per Pump)
1
EA
$450.00
$450.00
0.94
$ 423.00
45
Set Up 6" Pump (Per Pump)
1
EA
$1,050.00
$1,050.00
0.94
$ 987.00
46
Set Up 8" Pump (Per Pump)
1
EA
$1,500.00
$1,S00.00
0.941
$ 1,410.00
47
Set Up 12" Pump (Per Pump)
1
EA
$2,650.00
$2,650.00
0.941
$ 2,491.00
48
Set Up 4" Piping
1
LF
$37.50
$37.50
0.94
$ 35.25
49
Set Up 6" Piping
1
LF
$46.50
$46.50
0.94
$ 43.71
50
Set Up 8" Piping
1
LF
$80.00
$80.00
0.94
$ 75.20
51
Set up 12" Piping
1
$110.00
$110.00
0.94
$ 103.40
52
ISet up 18" Piping
I 1
LFLF
$-135.001
$135.00
0.94
$ 126.90
53
1 Operate 4" Pumping System
1 1
1 DAY
1 $94.001
$94.00
0.94
$ 88.36
4Murphy Pipelirw
Contractors, Inc.
TR 13057 - EXhiyiJ 3 2018
Allied States R19 Price List 17-7 5
Q CITY
Unit
Unit Price
Extension
Coefficient
Revised Unit
Price
54
Operate 6" Pumping System
1
DAY
$710.00
$710.00
0.94
$ 667.40
55
Operate 8" Pumping System
1
DAY
$1,135.00
$1,135.00
0.94
$ 1,066.90
56
Operate 12" Pumping System
1
DAY
$1,825.00
$1,825.00
0.94
$ 1,715.50
57
Bypass - Driveway Ramp (Setup, Operate, Maintain)
1
EA
$460.00
$460.00
0.94
$ 432.40
58
Bypass - Street Ramp (Setup, Operate, Maintain)
1 1
EA
$460.001
$460.00
0.94
$ 432.40
59
Bypass - Street Trenching for 8" Pipe (Setup, Operate, Maintain)
1
LF
$67.501
$67.50
0.94
$ 63.45
60
Bypass - Street Trenching for 12" Pipe (Setup, Operate, Maintain)
1
LFK$110.00
$90.00
0.94
$ 84.60
61
Bypass - Street Trenching for 18" Pipe (Setup, Operate, Maintain)
1
LF
$112.50
0.94
$ 105.75
62
Bypass Plan (3rd Party Certified)
1
EA
$2,150.00
0.94
$ 2,021.00
CIPP reconstruction
of water mains
63
6"diameter liner
1
LF
$80.00
0.94
$ 75.20
64
8" diameter liner
1
LF
$91.00
0.94
$ 85.54
65
10" diameter liner
1
LF
$110.00
0.94
$ 103.40
66
12" diameter liner
1
LF
$120.00
$120.00
0.94
$ 112.80
67
Re -opening of service connections internally
1
EA
$350.00
$350.00
0.94
$ 329.00
Note: For
any required temporary bypass of water service refer to items 86 and 87.
The following items apply as applicable to sections B thru K and as needed in section A items 1-67:
68
Mobilization
1
Day
$200.00
$200.00
0.94
$ 188.00
60 $ 11,280.00
69
Pre -Construction Video
1
LF
$4.00
$4.00
0.94
$ 3.76
2511 $ 9,441.36
a) Survey/As-builts
1
LF
$1.65
$1.65
0.94
$ 1.55
2511 $ 3,894.56
70
Erosion Control
I
LF
$5.00
$5.00
0.94
$ 4.70
100 $ 470.00
71
MOT
a) Signage
1
Day
$250.00
$250.00
0.94
$ 235.00
60 $ 14,100.00
b) Flagmen
1
HR
$45.00
$45.00
0.94
$ 42.30
72
Excavation/Backfill
a) 0-4 feet deep
1
Cuft
$2.00
$2.00
0.94
$ 1.88
b) 4-6feetdeep
1
Cuft
$3.001
$3.00
0.94
$ 2.82
c) 6-10 feet deep
1
Cuft
$4.00
$4.00
0.94
$ 3.76
62400 $ 234,624.00
d) Dewatering to include wellpoint system or drawdown pump per pit
1
Day
$155.00
$155.00
0.94
$ 145.70
55 $ 8,013.50
73
Trench Shoring
a) 4-6 feet deep
1
LF Trench
$25.00
$25.00
0.94
$ 23.50
610 $ 14,335.00
b) 6-10feetdeep
1
LF Trench
$35.00
$35.00
0.94
$ 32.90
610 $ 20,069.00
74
Surface Restoration
a) Sod
1
SF
$2.00
$2.00
0.94
$ 1.88
5500 $ 10,340.00
b) 4-inch concrete
1
SF
$8.50
$8.50
0.94
$ 7.99
2155 $ 17,218.45
c) 6-inch concrete
1
SF
$10.501
$10.50
0.94
$ 9.87
d) 2-inch asphalt
1
SF
$5.00
$5.00
0.94
$ 4.70
2475 $ 11,632.50
e) 3-inch asphalt
1
SF
$7.00
$7.00
0.94
$ 6.58
f) Curb
1
LF
$35.00
$35.00
0.94
$ 32.90
125 $ 4,112.50
75
Material extras
a) Lime Rock
1
SY
$50.00
$50.00
0.94
$ 47.00
198 $ 9,306.00
b)57/Washed Stone
1
SY
$50.00
$50.00
0.94
$ 47.00
0 Imported Sand
1
SY
$40.00
$40.00
0.94
$ 37.60
d) Gravel
1
SY
$45.00
$45.00
0.94
$ 42.30
e) Geo Grid
1
SY
$7.75
$7.75
0.94
$ 7.29
B) Pipe Bursting with HDPE for Gravity Sewer Lines
HDPE DR 17
76
6-inch diameter
1
LF
$35.00
$35.00
0.94
$ 32.90
77
8-inch diameter
1
LF
$40.00
$40.00
0.94
$ 37.60
78
10-inch diameter
1
LF
$45.00
$45.00
0.94
$ 42.30
79
12-inch diameter
1
LF
$50.00
$50.00
0.94
$ 47.00
80
14-inch diameter
1
LF
$72.00
$72.00
0.94
$ 67.68
81
16-inch diameter
1
LF
$92.00
$92.00
0.94
$ 86.48
82
18-inch diameter
1
LF
114.00
$114.00
0.94
107.16
83
20-inch diameter
1
LF
$137.00
$137.001
0.94
$ 128.78
Manhole Connections
�14..
84
6-inch
1
EA
$150.00
$150.001
0.94
$
MPO
Murphy Pipeline
Contractors, Inc
TR 13057 - EXh(DIL 3 2018
Allied States R19 Price List 17-7250
CITY
Unit
Unit Price
Extension
Coefficient
Revised Unit
85
8-inch
1
EA
$200.00
$200.00
0.94
$ 188.00
86
10-inch
1
EA
$250.00
$250M
0.94
$ 235.00
87
12-inch
1
EA
$300.00
$300.00
0.94
$ 282.00
88
14-inch
1
EA
$350.00
$350.00
0.94
$ 329.00
89
16-inch
1
EA
$400.00
$400.00
0.94
$ 376.00
90
18-inch
1
EA
$450.00
$450.00
0.94
$ 423.00
91
20-inch
1
EA
$500.00
$500,00
0.94
$ 470.00
Sewer Later Connections
92
4-inch connection
a) 0-4feetdeep
1
EA
$950.00
$950-00
0.94
$ 893.00
b) 4-6feetdeep
1
EA
$1,500.00
$1,500.00
0.94
$ 1,410.00
c) 6-10 feet deep
1
EA
$2,500.00
$2,500.00
0.94
$ 2,350.00
93
6-inch connection
a) 0-4feetdeep
1
EA
$1,200.00
$1,200.00
0.94
$ 1,128.00
b) 4-6 feet deep
1
EA
$1,900.00
$1,900.00
0.94
$ 1,786.00
c) 6-10 feet deep
1
EA
$2,900.00
$2,900.00
0.94
$ 2,726.00
Clean -out Installation
94
4-inch
1
EA
$375.00
$375.00
0.94
$ 352.50
95
6-inch
1
EA
$475.00
$475.00
0.94
$ 446.50
Sewer Lateral Pipe Bursting
96
4-inch
1 1
LF
$31.00
$31.00
0.94
$ 29.14
97
6-inch
1
LF
1 $35.00
$35.00
0.94
$ 32.90
C) Pipe Bursting
with Pre -Chlorination for Water Main Replacement Procedure
HDPE DR 11
3-inch diameter
1
LF
$27.00
$27.00
0.94
$ 25.38
4-inch diameter
1
LF
$31.00
$31.00
0.94
$ 29.14
V104
6-inch diameter
1
LF
$40.00
$40.00
0.94
$ 37.60
8-inch diameter
1
LF
$45.00
$45.00
0.94
$ 42.30
10-inch diameter
1
LF
$50.00
$50.00
0.94
$ 47.00
12-inch diameter
1
LF
$55.00
$55.00
0.94
$ 51.70
14-inch diameter
1
LF
$94.00
$94.00
0.94
$ 88.36
105
164nch diameter
1
LF
$120.00
$120.00
0.94
$ 112.80
106
18-inch diameter
1
LF
$135.00
$135.00
0.94
$ 126.90
107
20-inch diameter
1
LF
$170.00
$170.00
0.94
$ 159.80
108
24-inch diameter
1
LF
$220.00
$220.00
0.94
$ 206.80
Note: Installation with HDPE, Fusible PVC/Ductile Iron available at market price
Fittings
a) Bends and sleeves, DI
109
6-inch
1
EA
$375.00
$375.00
0.94
$ 352.50
110
8-inch
1
EA
$425.00
$425.00
0.94
$ 399.50
10-inch
1
EA
$500.00
$500.00
0.94
$ 470.00
12-inch
1EA
$800.00
$800.00
0.94
$ 752.00
14-inch
1
EA
$1,200.00
$1,200.00
0.94
$ 1,128.00
V
16-inch
1
EA
$1,475.00
$1,475.00
0.94
$ 1,386.50
18-inch
1
EA
$1,750.00
$1,750.00
0.94
$ 1,645.00
20-inch
1
EA
$2,250.00
$2,250.00
0.94
$ 2,115.00
24-inch
1
EA
$3,000.00
$3,000.00
0.94
$ 2,820.00
b) Tees, DI
118
6x6x4
1
EA
$425.00
$425M
0.94
$ 399.50
119
6x6x6
1
EA
$475.00
$475.00
0.94
$ 446.50
120
8x8x4
1
EA
$575M
$575M
0.94
$ 540.50
121
8x8x6
1
EA
$600.00
$600.00
0.94
$ 564.00
122
8x8x8
1
EA
$700.00
$700.00
0.94
$ 658.00
123
lOxlOx4
1
EA
$625.00
$625.00
0.94
$ 587.50
124
10x1Ox6
1
EA
$750.00
$750.00
0.94
$ 705.00
125
jlOxlcx8
1
1 EA
$825.00
$825.00
0.94
$ 775.50
126
1Ox10x10
1
EA
$900.00
$900.00
0.94
$ 946.00
127
12x12x6
1
EA
$1,100.00
$1,300.00
0.94
$ 1,034.00
128
12x12x8
1
EA
$1,150.00
71,150M
0.94
$ 1,081.00
129
12x12x1O
1
EA
$1,200.00
$1,200.00
0.94
$ 1,128.00
130
12x12x12
1
EA
$1,275.00
$1,275.00
0.94
$ 1,198.50
131
14x14x14
1
EA
$1,600.00
$1,600.00
0.94
$ 1,504.00
132
16x4tee
1
EA
$2,750.00
$2,750.00
0.94
$ 2,585.00
133
16xfix(Scross
1
EA
$3,750.00
$3,750.00
0.94
$ 3,525.00
134
16x6 tee
1
EA
$2,950.00
$2,950.00
0.94
$ 2,773.00
135
16x6 tee blowoff
1
EA
$3,500.00
$3,500.00
0.94
$ 3,290.00
136
16x8x8 cross
1
EA
$3,950.00
$3,950.00
0.94
$ 3,713.00
137
16x20 reducer
1
EA
$1,250.00
$1,250.00
0.94
$ 1,175.00
138
18x18x18
1
EA
$2,200.00
$2,200.00
0.94
$ 2,068.00
139
20 tee
1
EA
$4,250.00
$4,250.00
0.94
$ 3,995.00
140
20 cross
1
EA
$5,000.001
$5,000.00
0.94
$ 4,700.00
141
24 tee
1
EA
$5,250.001
$5,250.00
0.94
$ 4,935.00
142
124 cross
1
1 EA
$6,000.001
$6,000.00
0.941
$ 5,640wOO
a) Fittings available per Pound
1
LB
$4.65
$4.65
0.94
$ 4.37
Gate Valves
143
4-inch
1
EA
$400.00
$400.00
0.94
$ 376.00
144
6-inch
1
EA
$900.00
$900.00
0.94
$ 846.00
145
8-inch
1
EA
$1,375.00
$1,375.00
0.94
$ 1,292.50
Mr-C
rphy Pipetlrw
contractors, Inc.
TR 13057 - EXhiii1J 32018
Allied States R19 Price List 17-7250
QTY
Unit
Unit Price
Extension
Coefficient
Revised Unit
Price
146
10-inch
1
EA
$1,750.00
$1,750.00
0.94
$ 1,645.00
147
12 inch
1
EA
$2,500.00
$2,500.00
0.94
$ 2,350.00
148
14-inch
1
EA
$5,500.00
$5,500.00
0.94
$ 5,170.00
149
16-inch
1
EA
$6,150.00
$6,150.00
0.94
$ 5,781.00
150
18-inch
1
EA
$9,10o.001
$9,100.00
0.94
$ 8,554.00
151
20-inch
1
EA
$11,250.00
$11,250.00
0.94
$ 10,575.00
152
24-inch
1
EA
$14,750.00
$14,750.00
0.94
$ 13,865.00
153
Remove valve only
1
EA
$250.00
$250.00
0.94
$ 235.00
154
Install new valve vault
1
EA
$6,000.00
$6,000.00
0.94
$ 5,640.00
155
Fire Hydrants
1
EA
$31250.00
$3,250.00
0.94
$ 3,055.00
Connection at Services
a) Up to 1" service, short side up to 5-feet
156
4-inch main
1
EA
$400.00
$400.00
0.94
$ 376.00
157
6-inch main
1
EA
$450.00
$450.00
0.94
$ 423.00
158
8-inch main
1
EA
$475.00
$475.00
0.94
$ 446.50
159
10-inch main
1
EA
$500.00
$500.00
0.94
$ 470.00
160
12-inch main
1
EA
$550.00
$550.00
0.94
$ 517.00
161
16-inch main
1
EA
$700.00
$700.001
0.94
$ 658.00
162
18-inch main
1
EA
$850.00
$850.00
0.94
$ 799.00
163
20-inch main
1
EA
$1,100.00
$1,100.00
0.94
$ 1,034.00
164
24-inch main
1
EA
$1,400.00
$1,400.00
0.94
$ 1,316.00
b) Up to 2" service, short side up to 5-feet
16S
4-inch main
1
EA
$600.00
$600.00
0.94
$ 564.00
166
6-inch main
1
EA
$650.00
$650.00
0.94
$ 611.00
167
8-inch main
1
EA
$675.00
$675.00
0.94
$ 634.50
168
10-inch main
1
EA
$700.00
$700.00
0.94
$ 658.00
169
12-inch main
1
EA
$750.00
$750.00
0.94
$ 705.00
170
16-inch main
1
EA
$900.00
$900.00
0.94
$ 846.00
171
18-inch main
1
EA
$1,100.00
$1,100.00
0.94
$ 1,034.00
172
20-inch main
1
EA
$1,350.00
$1,350.00
0.94
$ 1,269.00
173
24-inch main
1
EA
$1,550.00
$1,550.00
0.94
$ 1,457.00
c) Up to 1" service, long side up to 25-feet
174
4-inch main
1
EA
$775.00
$775.00
0.94
$ 728.50
175
6-inch main
1
EA
$850.00
$850.00
0.94
$ 799.00
176
8-inch main
1
EA
$875.00
$875.00
0.94
$ 822.50
177
10-inch main
1
EA
$900.00
$900.00
0.94
$ 846.00
178
12-inch main
1
EA
$950.00
$950.00
0.94
$ 893.00
17
116-inch main
1
EA
$1,100.00
$1,100.00
0.94
$ 1,034.00
180
18-inch main
1
EA
$1,250.00
$1,250.00
0.94
$ 1,175.00
181
20-inch main
1
EA
$1,650.00
$1,650.00
0.94
$ 1,551.00
182
24-inch main
1
EA
$1,800.00
$1,800.00
0.94
$ 1,692.00
d) Up to 2" service, long side up to 25-feet
183
4-inch main
1
EA
$1,000.00
$1,000.00
0.94
$ 940.00
184
6-inch main
1
EA
$1,050.00
$1,050.00
0.94
$ 987.00
135
8-inch main
1
EA
$1,075.00
$1,075.00
0.94
$ 1,010.50
186
10 inch main
1
EA
$1,100.00
$1,100.00
0.94
$ 1,034.00
187
12-inch main
1
EA
$1,150.00
$1,150.00
0.94
$ 1,081.00
188
16-inch main
1
EA
$1,450.00
$1,450.00
0.94
$ 1,363.00
_
189
18-inch main
1
EA
$1,650.00
$1,650.00
0,94
$ 1,551.00
190
20-inch main
1
EA
$1,950.00
$1,950.00
0.94
$ 1,833.00
191
24-inch main
1
EA
$2,200.00
$2,200.00
0.94
$ 2,068.00
e) Additional service length
192
Over 30-feetx 1"
1
LF
$12.00
$12.00
0.94
$ 11.28
193
Over 30-feet x 2"
1
LF
$15.00
$15.00
0.94
$ 14.10
Note: Service pipe HDPE, Copper available at market price
Line Stops
194
4-inch
1
EA
$3,500.00
$3,500.00
0.94
$ 3,290.00
195
6-inch
1
EA
$4,500.00
$4,500.00
0.94
$ 4,230.00
196
8-inch
1
EA
$5,000.00
$5,000.00
0.94
$ 4,700.00
197
10-inch
1
EA
$5,000.00
$5,000.00
0.94
$ 4,700.00
198
12-inch
1
EA
$7,000.00
$7,000.00
0.94
$ 6,580.00
199
16-inch
1
EA
$15,000.00
$15,000.00
0.94
$ 14,100.00
200
18-inch
1
EA
$18,000.00
$18,000.00
0.94
$ 16,920.00
_
201
20-inch
1
EA
$19,000.00
$19,000.00
0.94
$ 17,860.00
202
24-inch
1
EA
$21,000.00
$21,000.00
0.94
$ 19,740.00
Bypass for water main pipe bursting or CIPP lining
203
2-inch temporary
1
LF
$23.00
$23.00
0.94
$ 21.62
204
4-inch temporary
1
LF
$26.00
$26.00
0.94
$ 24.44
205
6-inch temporary
1
LF
$31.00
$31.00
0.94
$ 29.14
Temporary service connections for water main bypass
206
2-inch short side
1
EA
$275.00
$275.00
0.94
$ 258.50
207
2-inch long side
1
EA
$375.00
$375.00
0.94
$ 352.50
208
4-inch short side
1
EAJ$425.00
$300.00
0.94
$ 282.00
209
4-inch long side
1
EA
$400.00
0.94
$ 376.00
210
6-inch short side
1
EA
$325.00
0.94
$ 305.50
211
6-inch long side
1
EA
$425.00
0.94
$ 399.50
D) Polyethylene
(PE) Sewer Pipe Sliplining
PE Pipe DR 22.5
212
4-inch
1
LF
$25.00
0.94
$ 23.50
TAMARAC
CYLife
MPC
Murphy Pipeline
Contractors, Inc.
TR 13057 - EXhi6/,J32018
213
6-inch
1
1 LF
1 $30.001
$30.001
0.94
$ 28.20
214
8-inch
1
1 LF
1 $35.001
$35.00
0.94
$ 32.90
215
10-inch
1
1 LF
$40.00
$40.00
0.94
216
12-inch
1
LF
$45.00
$45.00
0.94
217
Annular Space - Grouting
1
CY
$300.00
$300.00
0.94
$ 282.00
157 $ 44,274.00
y Pipeline
Contractors, Inc.
TR 13057 - EXhiyiJ 3 2018
Allied States R19 Price List 17-7250
CITY
Unit
Unit Price
Extension
Coefficient
Revised Unit
Price
E) Procedures for Rehabilitation of Existing Pipelines
Pipe String Fusion
218
4-inch
1
LF
$30.00
$30.00
0.94
$ 28.20
219
6-inch
1
LF
$35.00
$35.00
0.94
$ 32.90
220
8-inch
1
LF
$40.00
$40.00
0.94
$ 37.60
221
10-inch
1
LF
$45.00
$45.00
0.94
$ 42.30
222
12-inch
1
LF
$50.00
$50.00
0.94
$ 47.00
Pressure Testing
223
4-12 inch
1
LF
$2.00
$2.00
0.94
$ 1.88
224
Charge Water
1
K-Gals
$1.00
$1.00
0.94
$ 0.94
Chlorination
225
4-inch
1
LF
$1.00
$1.00
0.94
$ 0.94
226
6-inch
1
LF
$1.50
$1.50
0.94
$ 1.41
227
8-inch
1
LF
$2.00
$2.00
0.94
$ 1.88
228
10-inch
1
LF
$2.50
$2.50
0.94
$ 2.35
229
12-inch
1
LF
$3.00
$3.00
0.94
$ 2.82
230
ST Test
1
EA
$250.00
$250.00
0.94
$ 235.00
Flushing
231
4-12 inch
1
LF
$0.50
$0.50
0.94
$ 0.47
232
Charge Water
1
K-Gals
$0.50
$0.50
0.94
$ 0.47
Dechlorination
233
4-12 inch
1
K-Gals
$1.00
$1.00
0.94
$ 0.94
MM
Murphy Pipeline
Contractors, Inc.
TR 13057 - EXhg3 2018
Allied States R29 Price List 17-7250
TY
Unit
Unit Price
Extension
Coefficient
Revised Unit
Price
F) Trenchless Rehabilitation/Reconstruction of Pipelines and Conduits
Swagelining
a) Camera
234
0-10 inch
1
LF
$1.00
$1.00
0.94
$ 0.94
235
10-24 inch
1
LF
$1.50
$1.50
0.94
$ 1.41
236
25-36 inch
1
LF
$2.00
$2.00
0.94
$ 1.88
237
37-48 inch
1
LF
$2.50
$2.50
0.94
$ 2.35
23
Over 48 inch
1
LF
$3.00
$3.00
0.94
$ 2.82
b) Clean
239
0-10 inch
1
LF
$2.50
$2.50
0.94
$ 2.35
240
10-24 inch
1
LF
$3.00
$3.00
0.94
$ 2.82
241
25-36 inch
1
LF
1 $3.50
$3.50
0.94
$ 3.29
242
3748 inch
1
LF
$4.00
$4.00
" 0.94
$ 3.76
243
Over 48 inch
1
LF
$4.50
$4.50
0.94
$ 4.23
c) Pigging
See item G) Pig Cleaning
d) Gauging
244
0-10 inch
1
LF
$5.001
$5.00
0.941
$ 4.70
245
10-24 inch
1
LF
$8.00
$8.00
0.94
$ 7.52
246
25-36 inch
1
LF
$11.00
$11.00
0.94
$ 10.34
247
37-48 inch
1
LF
$14.00
$14.00
0.94
$ 13.16
248
Over 48 inch
1
Per -inch
$1.00
$1.00
0.94
$ 0.94
249
e) Obstruction Removal
1
EA
$600.00
$600.00
0.94
$ 564.00
f) Pipe Liner Insertion
1) PE 4710 DR 41
250
4-inch
1
LF
$10.00
$10M
0.94
$ 9.40
251
6-inch
1
LF
$20.00
$20.00
0.94
$ 18.80
252
8-inch
1
LF
$25.00
$25M
0.94
$ 23.50
253
10-inch
1
LF
$35.00
$35.00
0.94
$ 32.90
254
12-inch
1
LF
$50.00
$50.00
0.94
$ 47.00
255
16-inch
1
LF
$75.00
$75.00
0.94
$ 70.50
256
18-inch
1
LF
$95.00
$95.00
0.94
$ 89.30
257
20-inch
1
LF
$130.00
$130.00
0.94
$ 122.20
258
24-inch
1
LF
$180.00
$180.00
0.94
$ 169.20
259
30-inch
1
LF
$240.00
$240.00
0.94
$ 225.60
260
36-inch
1
LF
$280.00
$280.00
0.94
$ 263.20
261
42-inch
1
LF
$340.00
$340.00
0.94
$ 319.60
262
48-inch
1
LF
$400.00
$400.00
0.94
$ 376.00
263
54-inch
1
LF
$475.00
$475.00
0.94
$ 446.50
2) PE 4710 DR 32.5
264
4-inch
1
LF
1 $20.00
$20.00
0.94
$ 18.80
265
6-inch
1
LF
$25.00
$25.00
0.94
$ 23.50
266
8-inch
1
LF
$30.00
$30.00
0.94
$ 28.20
267
10-inch
1
LF
$40.00
$40.00
0.94
$ 37.60
268
12-inch
1
LF
$55.00
$55.00
0.94
$ 51.70
269
16-inch
1
LF
$80.00
$80.00
0.94
$ 75.20
270
18-inch
1
LF
$105.00
$105-00
0.94
$ 98.70
271
20-inch
1
LF
$150.00
$150.00
0.94
$ 141.00
272
24-inch
1
LF
$200.00
$200.00
0.94
$ 188.00
273
30-inch
1
LF
$260.00
$260.00
0.94
$ 244.40
274
36-inch
1
LF
$300.00
$300.00
0.94
$ 282.00
275
42-inch
1
LF
$360.00
$360.00
0.94
$ 338.40
276
48-inch
1
LF
$420.00
$420.00
0.94
$ 394.80
277
54-inch
1
LF
$475.00
$475.00
0.94
$ 446.50
3) PE 4710 DR 26
mPC
Murphy Pipeline
Contractors, Inc.
TR 13057 - EXhgiJ 32018
Allied States R19 Price List 17-7250
CITY
Unit
Unit Price
Extension
Coefficient
Revised Unit
Price
278
4-inch
1
LF
$25.00
$25.00
0.94
$ 23.50
279
6-inch
1
LF
$30.00
$30A0
0.94
$ 28.20
280
8-inch
1
LF
$35.00
$35.00
0.94
$ 32.90
281
10-inch
1
LF
$45.00
$45.00
0.94
$ 42.30
282
12-inch
1
LF
$60.001
$60.00
0.94
$ 56.40
283
16-inch
1
LF
$90.00
$90.00
0.94
$ 84.60
284
18-inch
1
LF
$120.00
$120.00
0.94
$ 112.80
285
20-inch
1
LF
$175.00
$175.00
0.94
$ 164.50
286
24-inch
1
LF
$220.00
$220.00
0.94
$ 206.80
287
30-inch
1
LF
$280.00
$280.00
0.94
$ 263.20
288
36-inch
1
LF
$300.00
$300.00
0.94
$ 282.00
289
42-inch
1
LF
$380.00
$380.00
0.94
$ 357.20
290
48-inch
1
LF
$440.00
$440.00
0.94
$ 413.60
291
54-inch
1
LF
$505.00
$505.00
0.94
$ 474.70
4) PE 4710 DR 21
292
4-inch
1
LF
$30.00
$30.00
0.94
$ 28.20
293
6-inch
1
LF
$35.00
$35.00
0.94
$ 32.90
294
8-inch
1
LF
$40.00
$40.00
0.94
$ 37.60
295
10-inch
1 I
LF
$50.00
$50.00
0.94
$ 47.00
296
12-inch
1
LF
$65.00
$65.00
0.94
$ 61.10
297
16-inch
1
LF
$100.00
$100.00
0.94
$ 94.00
298
18-inch
1
LF
$130.00
$130.00
0.94
$ 122.20
299
20-inch
1
LF
$190.00
$190.00
0.94
$ 178.60
300
24-inch
1
LF
$240.00
$240.00
0.94
$ 225.60
301
30-inch
1
LF
$310.00
$310.00
0.94
$ 291.40
302
36-inch
1
LF
$330.00
$330.00
0.94
$ 310.20
303
42-inch
1
LF
$400.00
$400.00
0.94
$ 376.00
304
48-inch
1
LF
$460.00
$460.00
0.94
$ 432.40
305
54-inch
1
LF
$535.00
$535.00
0.94
$ 50190
5)PE 4710 DR 17
306
4-inch
1
LF
$35.00
$35.00
0.94
$ 32.90
307
6-inch
1
LF
$40.00
$40.00
0.94
$ 37.60
308
8-inch
1
LF
$45.00
$45.00
0.94
$ 42.30
309
10-inch
1
LF
$55.00
$55.00
0.94
$ 51.70
310
12-inch
1
LF
$70.00
$70.00
0.94
$ 65.80
311
16-inch
1
LF
$110.00
$110.00
0.94
$ 103.40
312
18-inch
1
LF
$140.00
$140.00
0.94
$ 131.60
313
20-inch
1
LF
$205.00
$205.00
0.94
$ 192.70
314
24-inch
1
LF
$260.00
$260.00
0.94
$ 244.40
315
30-inch
1
LF
$340.00
$340.00
0.94
$ 319.60
316
36-inch
1
LF
$360.00
$360.00
0.94
$ 338.40
317
42-inch
1
LF
$430.00
$430.00
0.94
$ 404.20
31
48-inch
1
LF
$485.00
$485.00
0.94
$ 455.90
319
54-inch
1
LF
$585.00
$555.00
0.94
$ 521.70
G) Pig Cleaning
Foam Pig
320
0-12 inch
1
LF
$0.50
$0.50
0.94
$ 0.47
_
321
13-24 inch
1
LF
$1.50
$1.50
0.94
$ 1.41
322
25-36 inch
1
LF
$2.50
$2.50
0.94
$ 2.35
323
37-48 inch
1
LF
$3.50
$3.50
0.94
$ 3.29
324
Over 48 inch
1
LF
$5.00
$5.00
0.94
$ 4.70
Wire Bullet Pig
325
0-12 inch
1
LF
1 $3.00
$100
0.94
$ 2.82
13-24 inch
1
LF
$4.00
$4.00
0.94
$ 3.76
25-36inch
1
LF
$6.00
$6.00
0.94
$ 5.64
37-48 inch
1
LF
$9.00
$9.00
0.94
$ 8.46
Over 48 inch
1
LF
$12.00
$12.00
0.94
$ 11.28
k
Blade Scraper Pig
0-12inch
1
LF
$0.50
$0.50
0.94
$ 0.47
13-24 inch
1
LF
$1.50
$1.50
O.941
$ 1.41
332
25-36 inch
1
LF
$2.50
$2.50
0.94
$ 2.35
333
37-48 inch
1
LF
$3.50
$3.50
0.94
$ 3.29
334
Over 48 inch
1
LF
$5.00
$5.00
0.94
$ 4.70
H) Time and
Material Unit Rates for Change Orders
Materials, Subcontractors and Rentals
335
Markup =15%
336
Sales Taxes= Per Jurisdiction
Labor
337
Executive Supervisor
1
HR
$85.00
$85.00
0.94
$ 79.90
a) Project Management
1
HR
$75.00
$75.00
0.94
$ 70.50
35 $ 2,467.50
338
ISuperintendent
1
HR
$45.00
$45.00
0.94
$ 42.30
Allied States R19 Price List 17-7250
CITY
Unit
Unit Price
Extension
Coefficient
Revised Unit
Price
339
lAdministrator
1
HR
$25.00
$25MI
0.94
$ 23.50
TAMARACI
The City For Your Life
TR 13057 - EXhiViJ 3 2018
PAurp y Pipeline
Contractors, inc.
340
Crew Chief
1
HR
$40.00
$40.00
0.94
$ 37.60
341
Equipment Operator
1
HR
$35.00
$35.00
0.94
$ 32.90
342
Pipelayer- Skilled
1
HR
$30.00
$30.00
0.94
$ 2&20
343
Pipelayer- Helper
1
HR
$28.00
$28.00
0.94
$ 26.32
344
Laborer - Unskilled
1
HR
$25.00
$25.00
0.94
$ 23.50
1) Directional
Drilling & Pipe Installation
345
2-inch
1
LF
$19.00
$19.00
0.94
$ 17.86
346
4-inch
1
LF
$26.00
$26.00
0.94
$ 24.44
347
6-inch
1
LF
$35.00
$35.00
0.94
$ 32.90
348
8-inch
1
LF
$40.00
$40.00
0.94
$ 37.60
349
10-inch
1
LF
$55.00
$55.00
0.94
$ 51.70
350
12-inch
1
LF
$72.00
$72.00
0.94
$ 67.68
351
14-inch
1
LF
$89.00
$89.00
0.94
$ 83.66
_
352
16-inch
1
LF
$100.00
$100.00
0.94
$ 94.00
353
18-inch
1
LF
$115.00
$115.00
0.94
$ 108.10
314
20-inch
1
LF
$180.00
$180.00
0.94
$ 169.20
355
24-inch
1
LF
$240.00
$240.001
0.94
$ 225.60
J) Gravity Sewer CIPP Lateral Renewal Systems
356
4 inch lateral up to 251f
1
EA
$1,500.00
$1,500.00
0.94
$ 1,410.00
357
6 inch lateral up to 25 If
1
EA
$1,750.00
$1,750.00
0.94
$ 1,645.00
358
4 inch tophat installation
1
EA
$700.00
$700.00
0.94
$ 658.00
359
6 inch tophat installation
1
EA
$900.00
$900.00
0.94
$ 846.00
K) Manhole
Rehabilitation
360
4foot diameter
1
VF
$250.00
$250.00
0.94
$ 235.00
361
6 foot diameter
1
VF
$266.00
$260-00
0.94
$ 244.40
362
Lift station rehabilitation
1
SF
$18.00
$18.00
0.94
$ 16.92
363
Existing coating removal
1
SF
$5.00
$5.00
0.94
$ 4.70
364
Adjust existing manhole cover and ring (grass)
1
EA
$400.00
$400.00
0.94
$ 376.00
365
Adjust existing manhole cover and ring (Asphalt)
1
EA
$600.00
$600.00
0.94
$ 564.00
366
Install new manhole ring and cover (grass)
1
EA
$700.00
$700.00
0.94
$ 658.00
367
Install new manhole ring and cover (Asphalt)
1
EA
$1,100.00
$1,100.00
0.94
$ 1,034.00
368
Furnisand install manhole chimney seal
h
1
EA
$500.00
$500.00
0.94
$ 470.00
369
Re -construct manhole bench and channel flow
1
EA
$500.00
$500.00
0.94
$ 470.00
20 $ 9,400.00
L) Slip -lining down to DR 11
4-inch
1
EA
$30.00
$30.00
0.94
$ 28.20
6-inch
1
EA
$35.00
$35.00
0.94
$ 32.90
8-inch
1
EA
$40.00
$40.00
0.94
$ 37.60
10-inch
1
EA
$50.00
$50.00
0.94
$ 47.00
k
12-inch
1
EA
$70.00
$70.00
0.94
$ 65.80
16-inch
1EA
$100.00
$100.00
0.94
$ 94.00
18-inch
1
EA
$115.00
$115.00
0.94
$ 108.10
24-inch
1
EA
$240.00
$240.00
0.94
$ 225.60
378
30-inch
1
EA
$320.00
$320.00
0.94
$ 300.80
379
36-inch
1
EA
$380.00
$380.00
0.94
$ 357.20
380
42-inch
1
EA
$420.00
$420.00
0.94
$ 394.80
381
48-inch
1
EA
$480.00
$480.00
0.94
$ 451.20
382
54-inch
1
EA
$640.001
$640.00
0.94
$ 601.60
383
63-inch
1
EA
$750.00
$750.00
0-94
$ 705.00
M) Large Diameter HDPE
Pipe String Fusion
394
14-inch
1
LF
$55.00
$55.00
0.94
$ 51.70
385
16-inch
1
LF
$65.00
$65.00
0.94
$ 61.10
386
18-inch
1
LF
$75.00
$75.00
0.94
$ 70.50
38
220-inch
1
LF
$85.00
$85.00
0.94
$ 79.90
388
24-inch
1
LF
$105.00
$105.00
0.94
$ 98.70
2511 $ 247,835.70
389
30-inch
1
LF
$135.00
$135.00
0.94
$ 126.90
390
36-inch
1
LF
$170.00
$170.00
0.94
$ 159.80
391
48-inch
1
LF
$220.00
$220.00
0.94
$ 206.80
Pressure Testing
392
14-48 inch
1
LF
$4.00
$4.00
0.94
$ 3.76
393
Charge Water
1
K-Gals
$1.00
$1.00
0.94
$ 0.94
N) Pipe Bursting for Force Main Replacement Procedure
HDPE DR 11
394
3-inch diameter
1
LF
$48.00
$48.00
0.94
$ 45.12
395
4-inch diameter
1
LF
$57.00
$57.00
0.94
$ 53.58
396
6-inch diameter
1
LF
$74.00
$74.00
0.94
$ 69.56
397
8-inch diameter
1
LF
$96.00
$96.00
0.94
$ 90.24
398
10-inch diameter
1
LF
$108.00
$108.00
0t
$ 101.52
399
12-inch diameter
1
LF
$135.00
$135.00
0.94
$ 126.90
400
14-inch diameter
1
LF
$150.00
$150.00
0.94
$ 141.00
401
16-inch diameter
1
LF
$185.00
$185.00
0.94
$ 173.90
402
184nch diameter
1
LF
$210.00
$210.00
0.94
$ 197.40
403
20-inch diameter
1
LF
$245.00
$245.00
0.94
$ 230.30
404
24-inch diameter
1
LF
$275.00
$275.00
0.94
$ 258.50
2511 $ 649,093.50
405
30-inch diameter
1
LF
$350.00
$350.00
0.94
$ 329.00
406
36-inch diameter
1
LF
$385.00
$385.00
0.94
$ 361.90
407
42-inch diameter
1
LF
$425.00
$425.00
0.94
$ 399.50
408
48-inch diameter
1
LF
$500.00
$500.00
0.94
$ 470.00
409
54-inch diameter
1
LF
$5121t
$600.00
0.941
$ 564.00
Plug Valves
Murphy Pipeline
Contractors, one
TR 13057 - EXhgJW2018
410
4-inch
1
EA
$1,062.00
$1,062.00
0.94
$ 998.28
411
6-inch
1
EA
$1,700.00
$1,700.00
0.94
$ 1,598.00
412
8-inch
1
EA
$2,233.00
$2,233.00
0.94
$ 2,099.02
413
10-inch
1
EA
$3,064.00
$3,064.00
0.94
$ 2,880.16
414
12 inch
1
EA
$3,543.00
$3,543.00
0.94
$ 3,330.42
415
16-inch
1
EA
$5,103.00
$5,103.00
0.94
$ 4,796.82
416
18-inch
1
EA
$8,546.00
$8,546.00
0.94
$ 8,033.24
417
20-inch
1
EA
$13,387.00
$13,387.00
0.94
$ 12,583.78
418
24-inch
1
EA
$18,238.00
$18,238.00
0.94
$ 17,143.72
419
30-inch
I
EA
$31,45SM
$31,455.00
0.94
$ 29,567.70
420
36-inch
1
EA
$45,054.00
$45,054.00
0.94
$ 42,350.76
421
42-inch
1
EA
$54,764.00
$54,764M
0.94
$ 51,478.16
422
48-inch
1
EA
$61,924.00
$61,924.00
0.94
$ 58,208.56
423
54-inch
1
EA
$69,814.00
$69,814.00
0.94
$ 65,625.16
ARV Vacuum/Air/With structure
424
12minch
1
1 EA
$4,572.00
$4,571001
0.94
$ 4,297.68
425
4-inch
1
EA
$11,543.00
$11,543.001
0.94
$ 10,850A2
426
6-inch
1
EA
$14,622.00
$14,622.00
0.94
$ 13,744.68
Blow Off/With box
427
2-inch
1
EA
$21544.00
$2,544.00
0.94
$ 2,391.36
428
4-inch
1
EA
$47599.00
$4,599.00
0.94
$ 4,323.06
429
6-inch
1
EA
$7,815.00
$7,815.00
0.94
$ 7,346.10
430
ITracer Wire
1
LF
$1.63
$1.63
0.94
$ 1.53
Remove and Replace Struture
1
EA
$13,550M
$13,550M
0.94
$ 12,737.00
8 $ 101,896.00
57 Stone
1
CY
$26.84
$26.84
0.94
$ 25.23
1772 $ 44,708.52
ROW Landscaping Replacement (along W. Prospect Rd.)
1
LS
$6,200.00
$6,200.00
0.94
$ 5,828.00
1 $ 5,828.00
Project Sign
1
EA
$1,550.00
$1,550.00
Om941
$ 1,457.00
1 1 $ 1,457.00
Fence Removal and Replacement
1
LF
$12.75
$12.75
0.94
$ 11.99
200 $ 2,397.00
Payment and Performance Bond
1
EA
$17,620.55
$17,620.55
0.94
$ 16,563.32
1 $ 16,563.32
1,507,447.40
10