Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2018-018Temp. Reso. No. 13057 February 14, 2018 Page 1 of 8 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2018- A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO ACCEPT AND EXECUTE A PURCHASE ORDER AGREEMENT BETWEEN THE CITY OF TAMARAC AND MURPHY PIPELINE CONTRACTORS INC., UTILIZING PRICING FROM AN AGREEMENT OBTAINED THROUGH A FORMAL COMPETITIVE PROCESS BY THE ALLIED STATES COOPERATIVE, EDUCATION SERVICE CENTER (ESC) REGION 19, RFP NUMBER 17-7250 FOR AN AMOUNT NOT TO EXCEED $1,507,447.40 FOR THE REPLACEMENT OF 2,511 LINEAR FEET OF 30" DRAINAGE MAIN PIPE LOCATED ALONG NW 54T" STREET, TOGETHER WITH OUTFALLS LOCATED ALONG PROSPECT ROAD AND NW 28TH AVENUE; A CONTINGENCY OF 10.0% OR $150,744.74 WILL BE ADDED TO THE PROJECT ACCOUNT FOR A TOTAL AMOUNT OF $1,658,192.14; AUTHORIZING AN APPROPRIATION UP TO THE TOTAL AMOUNT OF $1,658,192.14; AUTHORIZING AN EXPENDITURE FROM THE APPROPRIATE ACCOUNTS; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the drainage system along NW 54th Street, NW 28th Avenue, and Crossing Prospect Road (Collectively known as Tamarac Lakes North: a.k.a. The Boulevards Community) currently is serviced with 30-inch Corrugated Metal Pipes (CMP), which are over 50 years old, failing and, due to pipe depth and soil conditions, are difficult to repair and subject to more frequent failures due to the brittleness of the corroded pipe walls; and Temp. Reso. No. 13057 February 14, 2018 Page 2 of 8 WHEREAS, the project area has experienced many pipe failures over the past 2 years and after Public Services' consultant surveyed the pipe with sonar equipment, multiple areas of pipe failure and potential failures have been identified throughout the drainage system; and WHEREAS, in order to prevent future pipe failures and to repair existing pipe failures in an expedited time frame, it is necessary to replace the pipes now; and WHEREAS, the drainage system in the Boulevards Community is part of a surface water recharge system between the two (2) lakes located south of Prospect Road (Tamarac Lakes North Community) and an overall Broward County surface water recharge system for surrounding raw water well fields; and WHEREAS, the depth of the pipe must be maintained under existing permitting at depths between ten (10) and fourteen (14) feet below existing grades; and WHEREAS, typical replacement of the existing 30-inch CMP would create extensive impacts to the community, including, but not limited to, excavating outside City of Tamarac Right -of -Way (ROW) on private property and within residents' private property; and WHEREAS, complete replacement of the drainage system to relocate drainage pipe structures into the ROW would entail complete removal of the roadway, installation of a new system, and replacement of the roadway, and Temp. Reso. No. 13057 February 14, 2018 Page 3 of 8 WHEREAS, to avoid higher costs of construction and increased inconvenience to the residents, longer construction time, and the high potential for residential property damage, Public Services staff explored alternative construction methods best suited for this project; and WHEREAS, the City has utilized "in -place" pipe replacements and lining in many other situations throughout the City to maintain and replace failing utilities that have surpassed their life expectancy, City Staff in the Public Services Department identified that an "in -place" pipe replacement would be the least invasive and most cost-effective method for this project; and WHEREAS, Murphy Pipeline Contractors, Inc. successfully completed multiple projects (Shaker Village Community complete watermain replacement project, Spyglass Community complete watermain replacement project, watermain replacement along NW 47th Terrace in the Mainlands Community and more than 4,000 feet of watermain replacement along University Drive) utilizing the pipe bursting technique throughout the City for watermain replacement, and all above mentioned projects were approved by City Commission via Resolution; and WHEREAS, pipe bursting has become the preferred pipe replacement method in Europe with over 100 million feet replaced in the past 26 years. In the U.S., Murphy Pipeline Contractors has completed over 500,000 LF of static pipe bursting over the past decade; and Temp. Reso. No. 13057 February 14, 2018 Page 4 of 8 WHEREAS, the project site is located along NW 54th Street, NW 28th Avenue, and Crossing Prospect Road to connect to the lakes (Collectively known as Tamarac Lakes North: a.k.a. The Boulevards Community) as shown in (Exhibit "1"); and WHEREAS, the Allied States Cooperative, Education Service Center (ESC) Region 19, RFP Number 17-7250 with Murphy Pipeline Contractors, Inc., for Pipe Bursting has favorable pricing, terms, and conditions, which was awarded on July 20, 2017, valid through July 31, 2020 with the option to extend another three (3) years, not to exceed 72 months in aggregate; (a copy of RFP 17-7250 is attached hereto as Exhibit "2"); and WHEREAS, the City of Tamarac is a member in good standing of the Education Service Center Region 19 Allied States Cooperative (ASC) and is, therefore, eligible to utilize Allied States Cooperative, Education Service Center (ESC) Region 19 RFP Number 17-7250; and WHEREAS, the vendor has agreed to honor the terms, conditions, and pricing of Allied States Cooperative, Education Service Center (ESC) Region 19, RFP Number 17-7250 with Murphy Pipeline Contractors, Inc., and has prepared a project proposal in the amount of $1,507,447.40, hereto attached as Exhibit "Y; and Temp. Reso. No. 13057 February 14, 2018 Page 5 of 8 WHEREAS, the Director of Public Services, Director of Financial Services, and the Purchasing and Contracts Manager chose to utilize available contracts awarded by other governmental entities for Water Pipe Replacement utilizing Pipe Bursting, as provided by City Code Section 6-148 (f), which states that the Purchasing Officer may utilize contracts with other governmental agencies; and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interest of the citizens and residents of the City of Tamarac to accept and execute a Purchase Order Agreement with Murphy Pipeline Contractors, Inc., utilizing Allied States Cooperative, Education Service Center (ESC) Region 19 RFP Number 17- 7250, in an amount not to exceed $1,507,447.40 for the project cost, and a contingency of 10% or $150,744.74 will be added to the project account for a project total of $1,658,192.14. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, THAT: SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. All exhibits attached hereto are incorporated herein and made a specific part of this resolution. Temp. Reso. No. 13057 February 14, 2018 Page 6 of 8 SECTION 2: The appropriate City officials are hereby authorized to accept and execute a Purchase Order Agreement for the Replacement of 2,511 LF of water main pipe together with associated service line pipes along NW 54th Street, NW 28' Avenue, and Crossing Prospect Road utilizing Pipe Bursting with Murphy Pipeline Contractors, Inc., utilizing Allied States Cooperative, Education Service Center (ESC) Region 19 RFP Number 17-7250 not to exceed $1,507,447.40 for project cost and a contingency of 10% or $150,744.74 will be added to the project account for a project total of $1,658,192.14 (a copy of the proposal is attached hereto as "Exhibit 3"). SECTION 3: The Director of Public Services is authorized to approve Work Tasks in accordance with the schedule of prices under said contract in an amount not to exceed $1,507,447.40 for project cost and a contingency of 10% or $150,744.74 will be added to the project account for a project total of $1,658,192.14. SECTION 4: The City Manager or his designee is hereby authorized to approve and initiate Change Orders in amounts not to exceed $65,000.00 per Section 6-147 of the City Code, and close the contract award, which includes but is not limited to making final payment and releasing bonds per Section 6-149 of the City Code, when the work has been successfully completed within the terms, conditions and pricing of the agreement. SECTION 5: An appropriation of an amount up to $1,658,192.14 is hereby authorized and will be included in a budget amendment prior to November 30, 2018. SECTION 6: All Resolutions or parts of Resolutions in conflict herewith E Temp. Reso. No. 13057 February 14, 2018 Page 7 of 8 are hereby repealed to the extent of such conflict. SECTION 7: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. "The remainder of this r)aae is intentionallv left blank." Temp. Reso. No. 13057 February 14, 2018 Page 8 of 8 SECTION 8: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this �, day of"'awt,2018. / X��Jow�' HARRY D ESSLER MAYOR ATTEST: CITY CLERK (l RECORD OF COMMISSION VOTE: MAYOR DRESSLER DIST 1: COMM. BOLTON DIST 2: V/M GOMEZ i! DIST 3: COMM. FISHMAN DIST 4: COMM. PLACKO �- I HEREBY CERTIFY THAT I HAVE APPROVED THIS RESOLUTION AS TO FORM SAMU L S. GOREN CITY ATTORNEY NW 28THEVE v a EIT, T, NW 28TH AVE — — — — --- — — — — '0" D1 NW2 H WAY 4+0 r ;u Z 0 > 0 -n 0 00 (n --j m > -n < > 0 �u m > F�l NW 21TH rl TER C/) i i I I NW 27TH AVE NW 2. m m >< z 3: 0 26TH TER N�r� l z ITH WAY > G) M m m CD -00 m m M Cl) m D C ;o ;o 6 0 0 . 4t cn 0 --I Cl) CAi z G) 0 m 9 m W 26TH TER a 0 AW 26TH RE) NW 26TH AVE '4W25THTER---Jlp NW 25TH AVE EDUCATION SERVICE CENTER REGION 19 RFP AWARD SUMMARY TR 13057 - Exhibit 2 RFP TITLE: Trenchless Technology Rehabilitation & Related Items & Services — ESC Region 19 Allied States Cooperative RFP NUMBER: 17-7250 RFP OPENING DATE: June 27, 2017 CONTRACT TERM: Date of award until July 31, 2020 with the option to extend another three (3) years annually, not to exceed 72 months in the aggregate. FUNDING SOURCE: Various RFP's ISSUED: 33 RESPONSES: 1 ADVERTISEMENT DATES: El Paso Times- May 12th & 19th, 2017 Washington Post- May 12th & 19t', 2017 BOARD MEETING DATE: July 20, 2017 RECOMMENDED FOR AWARD Murphy Pipeline Contractors, Inc. TOTAL (estimated) $15,000,000.00 / year EXPLANATIONS: Award of this contract will enable ESC Region 19 Purchasing Cooperative members to procure all aspects of trenchless technology including reconstruction of sewers, renewal of potable water mains, pipe bursting for all type pipe lines, water main replacement, sewer pipe slip lining, rehabilitation of existing water lines, renewal of pressure pipe lines, manhole rehabilitation, gravity sewer lateral renewal systems, and related. Murphy Pipeline Contractors was the sole bid on this solicitation, and in accordance with EDGAR requirements, ASC has done its due diligence of negotiating pricing and obtaining this company's profit percentage which is on file. SPECIFICATIONS PROVIDED BY: EVALUATION COMMITTEE: Royce Cleveland ESC Region 19 Royce Cleveland ESC Region 19 Rebecca Hernandez ESC Region 19 Renae Lawrence ESC Region 19 • - C=41• [ • TR 13057 - Exhibit 2 Murphy Pipeline Contractors, Inc. Attn: Todd Grafenauer 1876 Everlee Road Jacksonville, FL 32216 Phone: 904-764-6887 Fax: 904-379-6193 toddg(a)-murphypipelines.com www.murphypipelines.com Services in all states and all US Territories Price List *price list update on December 6, 2017 Trenchless Technology Rehabilitation and Related Items & Services 1 Bid Coefficient National Contract Regular Time Premium Time 0.94 0.94 **Coefficients of 1.0 or higher will be deemed non -responsive and will not be considered for award. All coefficients should be 2 decimal places only. Approved by: Date: (Armando Aguirre — Executive Director) (July 26, 2017) Murphy Pipelina Contractors, Inc. TR 13057 - EXhVJW2018 Allied States R19 Price List 17-7250 Trenchless Technology Rehabilitation and Related Items & Services Awarded Vendor: Murphy Pipeline Contractors CITY Unit Unit Price Extension Coefficient Revised n Price A) Cured -in -place pipe (CIPP) reconstruction of gravity sewers 1 6"x4.5mm 1 LF $40.50 $40.50 0.94 $ 38.07 2 8"x4.5mm 1 LF $31.00 $31.00 0.94 $ 29.14 3 10" x 6.Omm 1 LF $41.501 $41.50 0.94 $ 39.01 4 12" x 6.Omm 1 LF $57.50 $57.50 0.94 $ 54.05 5 15" x 7.5mm 1 LF $66.00 $66.00 0.94 $ 62.04 6 18"x9.Omm 1 LF $81.50 $81.50 0.94 $ 76.61 7 21"x9.0mm 1 LF $109.50 $109.50 0.94 $ 102.93 8 24" x 10.5mm 1 LF $131.50 $131.50 0.94 $ 123.61 9 27"x 10.5mm 1 LF $155.00 $155.00 0.94 $ 145.70 10 30" x 12.0mm 1 LF $182.50 $182.50 0.94 $ 171.55 11 33" x 12.Omm 1 LF $204.00 $204.00 0.94 $ 191.76 12 36" x 12.Omm 1 I LF $244.001 $244.00 0.94 $ 229.36 13 42" x 13.5mm 1 LF $285.00 $285.00 0.94 $ 267.90 14 48" x 15.Omm 1 LF $408.00 $408.00 0.94 $ 383.52 15 54" x 18.Omm 1 LF $538.00 $538.00 0.94 $ 505.72 16 6" & 8" Additional 1.5mm 1 LF $1.00 $1.00 0.94 $ 0.94 17 10" & 12" Additional 1.5mm 1 LF $2.00 $2.00 0.94 $ 1.88 18 15" & 18" Additional 1.5mm 1 LF $10.00 $10.00 0.94 $ 9.40 19 21" & 24" Additional 1.5mm 1 LF $15.00 $15.00 0.94 $ 14.10 20 27" Additional 1.5mm 1 LF $25.00 $25.00 0.94 $ 23.50 21 30" Additional 1.5mm 1 LF $25.00 $25.00 0.94 $ 23.50 22 33" Additional 1.5mm 1 LF $30.00 $30.00 0.94 $ 28.20 23 36" Additional 1.5mm 1 LF $30.00 $30.00 0.94 $ 28.20 24 42" Additional 1.5mm 1 LF $40.00 $40.00 0.94 $ 37.60 25 48" Additional 1.5mm 1 LF $50.00 $50.00 0.94 $ 47.00 26 54" Additional 1.5mm 1 LF $60.00 $60.00 0.94 $ 56.40 27 6" -10" Backyard Easement Setup Per Install Length 1 LF $4.00 $4.00 0.94 $ 3.76 28 12" -18" Backyard Easement Setup Per Install Length 1 LF $10.00 $10.00 0.94 $ 9.40 29 Timber Matting for Large Diameter Setup 1 SY $20.00 $20.00 0.94 $ 18.80 30 linternal Reconnection of service connection by robotic cutter 1 EA $235.001 $235.00 0.94 220.90 Note: Any CIPP over 54" will be on an individual quote basis. -$ Clean/TV & Evaluation for Gravity Sewers 31 6" -12" Clean & TV sewer 1 LF $5.50 $5.50 0.94 $ 5.17 32 15" - 21" Clean & TV sewer 1 LF $11.00 $11.00 0.94 $ 10.34 33 24" - 33" Clean & TV sewer 1 LF $19.50 $19.50 0.94 $ 18.33 34 36" & 42" Clean & TV sewer 1 LF $30.00 $30.00 0.94 $ 28.20 35 48" & 54" Clean & TV sewer 1 LF $50.00 $50.00 0.94 $ 47.00 36 6" -15" Post TV Inspection after Rehabilitation 1 LF $2.50 $2.50 0.94 $ 2.35 37 18" - 27" Post TV Inspection after Rehabilitation 1 LF $4.001 $4.00 0.94 $ 3.76 38 30" or Larger Post TV Inspection after Rehabilitation 1 LF $5.50 $5.50 0.94 $ 5.17 39 Re -setup for clean & TV Inspection Due to Point Repairs 1 EA $150.00 $150.00 0.94 $ 141.00 40 Root Removal 1 LF $3.00 $3.00 0.94 $ 2.82 41 Grease Removal 1 LF $3.00 $3.00 0.94 $ 2.82 42 Other Remote Obstruction Removal (max. 10 LF) 1 EA $1,350.00 $1,350.00 0.94 $ 1,269.00 10 $ 12,690.00 43 Above Ground Physical Inspection 1 LF $4.00 $4.00 0.94 $ 3.76 Bypass for sewers and associated items 44 Set Up 4" Pump (Per Pump) 1 EA $450.00 $450.00 0.94 $ 423.00 45 Set Up 6" Pump (Per Pump) 1 EA $1,050.00 $1,050.00 0.94 $ 987.00 46 Set Up 8" Pump (Per Pump) 1 EA $1,500.00 $1,S00.00 0.941 $ 1,410.00 47 Set Up 12" Pump (Per Pump) 1 EA $2,650.00 $2,650.00 0.941 $ 2,491.00 48 Set Up 4" Piping 1 LF $37.50 $37.50 0.94 $ 35.25 49 Set Up 6" Piping 1 LF $46.50 $46.50 0.94 $ 43.71 50 Set Up 8" Piping 1 LF $80.00 $80.00 0.94 $ 75.20 51 Set up 12" Piping 1 $110.00 $110.00 0.94 $ 103.40 52 ISet up 18" Piping I 1 LFLF $-135.001 $135.00 0.94 $ 126.90 53 1 Operate 4" Pumping System 1 1 1 DAY 1 $94.001 $94.00 0.94 $ 88.36 4Murphy Pipelirw Contractors, Inc. TR 13057 - EXhiyiJ 3 2018 Allied States R19 Price List 17-7 5 Q CITY Unit Unit Price Extension Coefficient Revised Unit Price 54 Operate 6" Pumping System 1 DAY $710.00 $710.00 0.94 $ 667.40 55 Operate 8" Pumping System 1 DAY $1,135.00 $1,135.00 0.94 $ 1,066.90 56 Operate 12" Pumping System 1 DAY $1,825.00 $1,825.00 0.94 $ 1,715.50 57 Bypass - Driveway Ramp (Setup, Operate, Maintain) 1 EA $460.00 $460.00 0.94 $ 432.40 58 Bypass - Street Ramp (Setup, Operate, Maintain) 1 1 EA $460.001 $460.00 0.94 $ 432.40 59 Bypass - Street Trenching for 8" Pipe (Setup, Operate, Maintain) 1 LF $67.501 $67.50 0.94 $ 63.45 60 Bypass - Street Trenching for 12" Pipe (Setup, Operate, Maintain) 1 LFK$110.00 $90.00 0.94 $ 84.60 61 Bypass - Street Trenching for 18" Pipe (Setup, Operate, Maintain) 1 LF $112.50 0.94 $ 105.75 62 Bypass Plan (3rd Party Certified) 1 EA $2,150.00 0.94 $ 2,021.00 CIPP reconstruction of water mains 63 6"diameter liner 1 LF $80.00 0.94 $ 75.20 64 8" diameter liner 1 LF $91.00 0.94 $ 85.54 65 10" diameter liner 1 LF $110.00 0.94 $ 103.40 66 12" diameter liner 1 LF $120.00 $120.00 0.94 $ 112.80 67 Re -opening of service connections internally 1 EA $350.00 $350.00 0.94 $ 329.00 Note: For any required temporary bypass of water service refer to items 86 and 87. The following items apply as applicable to sections B thru K and as needed in section A items 1-67: 68 Mobilization 1 Day $200.00 $200.00 0.94 $ 188.00 60 $ 11,280.00 69 Pre -Construction Video 1 LF $4.00 $4.00 0.94 $ 3.76 2511 $ 9,441.36 a) Survey/As-builts 1 LF $1.65 $1.65 0.94 $ 1.55 2511 $ 3,894.56 70 Erosion Control I LF $5.00 $5.00 0.94 $ 4.70 100 $ 470.00 71 MOT a) Signage 1 Day $250.00 $250.00 0.94 $ 235.00 60 $ 14,100.00 b) Flagmen 1 HR $45.00 $45.00 0.94 $ 42.30 72 Excavation/Backfill a) 0-4 feet deep 1 Cuft $2.00 $2.00 0.94 $ 1.88 b) 4-6feetdeep 1 Cuft $3.001 $3.00 0.94 $ 2.82 c) 6-10 feet deep 1 Cuft $4.00 $4.00 0.94 $ 3.76 62400 $ 234,624.00 d) Dewatering to include wellpoint system or drawdown pump per pit 1 Day $155.00 $155.00 0.94 $ 145.70 55 $ 8,013.50 73 Trench Shoring a) 4-6 feet deep 1 LF Trench $25.00 $25.00 0.94 $ 23.50 610 $ 14,335.00 b) 6-10feetdeep 1 LF Trench $35.00 $35.00 0.94 $ 32.90 610 $ 20,069.00 74 Surface Restoration a) Sod 1 SF $2.00 $2.00 0.94 $ 1.88 5500 $ 10,340.00 b) 4-inch concrete 1 SF $8.50 $8.50 0.94 $ 7.99 2155 $ 17,218.45 c) 6-inch concrete 1 SF $10.501 $10.50 0.94 $ 9.87 d) 2-inch asphalt 1 SF $5.00 $5.00 0.94 $ 4.70 2475 $ 11,632.50 e) 3-inch asphalt 1 SF $7.00 $7.00 0.94 $ 6.58 f) Curb 1 LF $35.00 $35.00 0.94 $ 32.90 125 $ 4,112.50 75 Material extras a) Lime Rock 1 SY $50.00 $50.00 0.94 $ 47.00 198 $ 9,306.00 b)57/Washed Stone 1 SY $50.00 $50.00 0.94 $ 47.00 0 Imported Sand 1 SY $40.00 $40.00 0.94 $ 37.60 d) Gravel 1 SY $45.00 $45.00 0.94 $ 42.30 e) Geo Grid 1 SY $7.75 $7.75 0.94 $ 7.29 B) Pipe Bursting with HDPE for Gravity Sewer Lines HDPE DR 17 76 6-inch diameter 1 LF $35.00 $35.00 0.94 $ 32.90 77 8-inch diameter 1 LF $40.00 $40.00 0.94 $ 37.60 78 10-inch diameter 1 LF $45.00 $45.00 0.94 $ 42.30 79 12-inch diameter 1 LF $50.00 $50.00 0.94 $ 47.00 80 14-inch diameter 1 LF $72.00 $72.00 0.94 $ 67.68 81 16-inch diameter 1 LF $92.00 $92.00 0.94 $ 86.48 82 18-inch diameter 1 LF 114.00 $114.00 0.94 107.16 83 20-inch diameter 1 LF $137.00 $137.001 0.94 $ 128.78 Manhole Connections �14.. 84 6-inch 1 EA $150.00 $150.001 0.94 $ MPO Murphy Pipeline Contractors, Inc TR 13057 - EXh(DIL 3 2018 Allied States R19 Price List 17-7250 CITY Unit Unit Price Extension Coefficient Revised Unit 85 8-inch 1 EA $200.00 $200.00 0.94 $ 188.00 86 10-inch 1 EA $250.00 $250M 0.94 $ 235.00 87 12-inch 1 EA $300.00 $300.00 0.94 $ 282.00 88 14-inch 1 EA $350.00 $350.00 0.94 $ 329.00 89 16-inch 1 EA $400.00 $400.00 0.94 $ 376.00 90 18-inch 1 EA $450.00 $450.00 0.94 $ 423.00 91 20-inch 1 EA $500.00 $500,00 0.94 $ 470.00 Sewer Later Connections 92 4-inch connection a) 0-4feetdeep 1 EA $950.00 $950-00 0.94 $ 893.00 b) 4-6feetdeep 1 EA $1,500.00 $1,500.00 0.94 $ 1,410.00 c) 6-10 feet deep 1 EA $2,500.00 $2,500.00 0.94 $ 2,350.00 93 6-inch connection a) 0-4feetdeep 1 EA $1,200.00 $1,200.00 0.94 $ 1,128.00 b) 4-6 feet deep 1 EA $1,900.00 $1,900.00 0.94 $ 1,786.00 c) 6-10 feet deep 1 EA $2,900.00 $2,900.00 0.94 $ 2,726.00 Clean -out Installation 94 4-inch 1 EA $375.00 $375.00 0.94 $ 352.50 95 6-inch 1 EA $475.00 $475.00 0.94 $ 446.50 Sewer Lateral Pipe Bursting 96 4-inch 1 1 LF $31.00 $31.00 0.94 $ 29.14 97 6-inch 1 LF 1 $35.00 $35.00 0.94 $ 32.90 C) Pipe Bursting with Pre -Chlorination for Water Main Replacement Procedure HDPE DR 11 3-inch diameter 1 LF $27.00 $27.00 0.94 $ 25.38 4-inch diameter 1 LF $31.00 $31.00 0.94 $ 29.14 V104 6-inch diameter 1 LF $40.00 $40.00 0.94 $ 37.60 8-inch diameter 1 LF $45.00 $45.00 0.94 $ 42.30 10-inch diameter 1 LF $50.00 $50.00 0.94 $ 47.00 12-inch diameter 1 LF $55.00 $55.00 0.94 $ 51.70 14-inch diameter 1 LF $94.00 $94.00 0.94 $ 88.36 105 164nch diameter 1 LF $120.00 $120.00 0.94 $ 112.80 106 18-inch diameter 1 LF $135.00 $135.00 0.94 $ 126.90 107 20-inch diameter 1 LF $170.00 $170.00 0.94 $ 159.80 108 24-inch diameter 1 LF $220.00 $220.00 0.94 $ 206.80 Note: Installation with HDPE, Fusible PVC/Ductile Iron available at market price Fittings a) Bends and sleeves, DI 109 6-inch 1 EA $375.00 $375.00 0.94 $ 352.50 110 8-inch 1 EA $425.00 $425.00 0.94 $ 399.50 10-inch 1 EA $500.00 $500.00 0.94 $ 470.00 12-inch 1EA $800.00 $800.00 0.94 $ 752.00 14-inch 1 EA $1,200.00 $1,200.00 0.94 $ 1,128.00 V 16-inch 1 EA $1,475.00 $1,475.00 0.94 $ 1,386.50 18-inch 1 EA $1,750.00 $1,750.00 0.94 $ 1,645.00 20-inch 1 EA $2,250.00 $2,250.00 0.94 $ 2,115.00 24-inch 1 EA $3,000.00 $3,000.00 0.94 $ 2,820.00 b) Tees, DI 118 6x6x4 1 EA $425.00 $425M 0.94 $ 399.50 119 6x6x6 1 EA $475.00 $475.00 0.94 $ 446.50 120 8x8x4 1 EA $575M $575M 0.94 $ 540.50 121 8x8x6 1 EA $600.00 $600.00 0.94 $ 564.00 122 8x8x8 1 EA $700.00 $700.00 0.94 $ 658.00 123 lOxlOx4 1 EA $625.00 $625.00 0.94 $ 587.50 124 10x1Ox6 1 EA $750.00 $750.00 0.94 $ 705.00 125 jlOxlcx8 1 1 EA $825.00 $825.00 0.94 $ 775.50 126 1Ox10x10 1 EA $900.00 $900.00 0.94 $ 946.00 127 12x12x6 1 EA $1,100.00 $1,300.00 0.94 $ 1,034.00 128 12x12x8 1 EA $1,150.00 71,150M 0.94 $ 1,081.00 129 12x12x1O 1 EA $1,200.00 $1,200.00 0.94 $ 1,128.00 130 12x12x12 1 EA $1,275.00 $1,275.00 0.94 $ 1,198.50 131 14x14x14 1 EA $1,600.00 $1,600.00 0.94 $ 1,504.00 132 16x4tee 1 EA $2,750.00 $2,750.00 0.94 $ 2,585.00 133 16xfix(Scross 1 EA $3,750.00 $3,750.00 0.94 $ 3,525.00 134 16x6 tee 1 EA $2,950.00 $2,950.00 0.94 $ 2,773.00 135 16x6 tee blowoff 1 EA $3,500.00 $3,500.00 0.94 $ 3,290.00 136 16x8x8 cross 1 EA $3,950.00 $3,950.00 0.94 $ 3,713.00 137 16x20 reducer 1 EA $1,250.00 $1,250.00 0.94 $ 1,175.00 138 18x18x18 1 EA $2,200.00 $2,200.00 0.94 $ 2,068.00 139 20 tee 1 EA $4,250.00 $4,250.00 0.94 $ 3,995.00 140 20 cross 1 EA $5,000.001 $5,000.00 0.94 $ 4,700.00 141 24 tee 1 EA $5,250.001 $5,250.00 0.94 $ 4,935.00 142 124 cross 1 1 EA $6,000.001 $6,000.00 0.941 $ 5,640wOO a) Fittings available per Pound 1 LB $4.65 $4.65 0.94 $ 4.37 Gate Valves 143 4-inch 1 EA $400.00 $400.00 0.94 $ 376.00 144 6-inch 1 EA $900.00 $900.00 0.94 $ 846.00 145 8-inch 1 EA $1,375.00 $1,375.00 0.94 $ 1,292.50 Mr-C rphy Pipetlrw contractors, Inc. TR 13057 - EXhiii1J 32018 Allied States R19 Price List 17-7250 QTY Unit Unit Price Extension Coefficient Revised Unit Price 146 10-inch 1 EA $1,750.00 $1,750.00 0.94 $ 1,645.00 147 12 inch 1 EA $2,500.00 $2,500.00 0.94 $ 2,350.00 148 14-inch 1 EA $5,500.00 $5,500.00 0.94 $ 5,170.00 149 16-inch 1 EA $6,150.00 $6,150.00 0.94 $ 5,781.00 150 18-inch 1 EA $9,10o.001 $9,100.00 0.94 $ 8,554.00 151 20-inch 1 EA $11,250.00 $11,250.00 0.94 $ 10,575.00 152 24-inch 1 EA $14,750.00 $14,750.00 0.94 $ 13,865.00 153 Remove valve only 1 EA $250.00 $250.00 0.94 $ 235.00 154 Install new valve vault 1 EA $6,000.00 $6,000.00 0.94 $ 5,640.00 155 Fire Hydrants 1 EA $31250.00 $3,250.00 0.94 $ 3,055.00 Connection at Services a) Up to 1" service, short side up to 5-feet 156 4-inch main 1 EA $400.00 $400.00 0.94 $ 376.00 157 6-inch main 1 EA $450.00 $450.00 0.94 $ 423.00 158 8-inch main 1 EA $475.00 $475.00 0.94 $ 446.50 159 10-inch main 1 EA $500.00 $500.00 0.94 $ 470.00 160 12-inch main 1 EA $550.00 $550.00 0.94 $ 517.00 161 16-inch main 1 EA $700.00 $700.001 0.94 $ 658.00 162 18-inch main 1 EA $850.00 $850.00 0.94 $ 799.00 163 20-inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 164 24-inch main 1 EA $1,400.00 $1,400.00 0.94 $ 1,316.00 b) Up to 2" service, short side up to 5-feet 16S 4-inch main 1 EA $600.00 $600.00 0.94 $ 564.00 166 6-inch main 1 EA $650.00 $650.00 0.94 $ 611.00 167 8-inch main 1 EA $675.00 $675.00 0.94 $ 634.50 168 10-inch main 1 EA $700.00 $700.00 0.94 $ 658.00 169 12-inch main 1 EA $750.00 $750.00 0.94 $ 705.00 170 16-inch main 1 EA $900.00 $900.00 0.94 $ 846.00 171 18-inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 172 20-inch main 1 EA $1,350.00 $1,350.00 0.94 $ 1,269.00 173 24-inch main 1 EA $1,550.00 $1,550.00 0.94 $ 1,457.00 c) Up to 1" service, long side up to 25-feet 174 4-inch main 1 EA $775.00 $775.00 0.94 $ 728.50 175 6-inch main 1 EA $850.00 $850.00 0.94 $ 799.00 176 8-inch main 1 EA $875.00 $875.00 0.94 $ 822.50 177 10-inch main 1 EA $900.00 $900.00 0.94 $ 846.00 178 12-inch main 1 EA $950.00 $950.00 0.94 $ 893.00 17 116-inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 180 18-inch main 1 EA $1,250.00 $1,250.00 0.94 $ 1,175.00 181 20-inch main 1 EA $1,650.00 $1,650.00 0.94 $ 1,551.00 182 24-inch main 1 EA $1,800.00 $1,800.00 0.94 $ 1,692.00 d) Up to 2" service, long side up to 25-feet 183 4-inch main 1 EA $1,000.00 $1,000.00 0.94 $ 940.00 184 6-inch main 1 EA $1,050.00 $1,050.00 0.94 $ 987.00 135 8-inch main 1 EA $1,075.00 $1,075.00 0.94 $ 1,010.50 186 10 inch main 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 187 12-inch main 1 EA $1,150.00 $1,150.00 0.94 $ 1,081.00 188 16-inch main 1 EA $1,450.00 $1,450.00 0.94 $ 1,363.00 _ 189 18-inch main 1 EA $1,650.00 $1,650.00 0,94 $ 1,551.00 190 20-inch main 1 EA $1,950.00 $1,950.00 0.94 $ 1,833.00 191 24-inch main 1 EA $2,200.00 $2,200.00 0.94 $ 2,068.00 e) Additional service length 192 Over 30-feetx 1" 1 LF $12.00 $12.00 0.94 $ 11.28 193 Over 30-feet x 2" 1 LF $15.00 $15.00 0.94 $ 14.10 Note: Service pipe HDPE, Copper available at market price Line Stops 194 4-inch 1 EA $3,500.00 $3,500.00 0.94 $ 3,290.00 195 6-inch 1 EA $4,500.00 $4,500.00 0.94 $ 4,230.00 196 8-inch 1 EA $5,000.00 $5,000.00 0.94 $ 4,700.00 197 10-inch 1 EA $5,000.00 $5,000.00 0.94 $ 4,700.00 198 12-inch 1 EA $7,000.00 $7,000.00 0.94 $ 6,580.00 199 16-inch 1 EA $15,000.00 $15,000.00 0.94 $ 14,100.00 200 18-inch 1 EA $18,000.00 $18,000.00 0.94 $ 16,920.00 _ 201 20-inch 1 EA $19,000.00 $19,000.00 0.94 $ 17,860.00 202 24-inch 1 EA $21,000.00 $21,000.00 0.94 $ 19,740.00 Bypass for water main pipe bursting or CIPP lining 203 2-inch temporary 1 LF $23.00 $23.00 0.94 $ 21.62 204 4-inch temporary 1 LF $26.00 $26.00 0.94 $ 24.44 205 6-inch temporary 1 LF $31.00 $31.00 0.94 $ 29.14 Temporary service connections for water main bypass 206 2-inch short side 1 EA $275.00 $275.00 0.94 $ 258.50 207 2-inch long side 1 EA $375.00 $375.00 0.94 $ 352.50 208 4-inch short side 1 EAJ$425.00 $300.00 0.94 $ 282.00 209 4-inch long side 1 EA $400.00 0.94 $ 376.00 210 6-inch short side 1 EA $325.00 0.94 $ 305.50 211 6-inch long side 1 EA $425.00 0.94 $ 399.50 D) Polyethylene (PE) Sewer Pipe Sliplining PE Pipe DR 22.5 212 4-inch 1 LF $25.00 0.94 $ 23.50 TAMARAC CYLife MPC Murphy Pipeline Contractors, Inc. TR 13057 - EXhi6/,J32018 213 6-inch 1 1 LF 1 $30.001 $30.001 0.94 $ 28.20 214 8-inch 1 1 LF 1 $35.001 $35.00 0.94 $ 32.90 215 10-inch 1 1 LF $40.00 $40.00 0.94 216 12-inch 1 LF $45.00 $45.00 0.94 217 Annular Space - Grouting 1 CY $300.00 $300.00 0.94 $ 282.00 157 $ 44,274.00 y Pipeline Contractors, Inc. TR 13057 - EXhiyiJ 3 2018 Allied States R19 Price List 17-7250 CITY Unit Unit Price Extension Coefficient Revised Unit Price E) Procedures for Rehabilitation of Existing Pipelines Pipe String Fusion 218 4-inch 1 LF $30.00 $30.00 0.94 $ 28.20 219 6-inch 1 LF $35.00 $35.00 0.94 $ 32.90 220 8-inch 1 LF $40.00 $40.00 0.94 $ 37.60 221 10-inch 1 LF $45.00 $45.00 0.94 $ 42.30 222 12-inch 1 LF $50.00 $50.00 0.94 $ 47.00 Pressure Testing 223 4-12 inch 1 LF $2.00 $2.00 0.94 $ 1.88 224 Charge Water 1 K-Gals $1.00 $1.00 0.94 $ 0.94 Chlorination 225 4-inch 1 LF $1.00 $1.00 0.94 $ 0.94 226 6-inch 1 LF $1.50 $1.50 0.94 $ 1.41 227 8-inch 1 LF $2.00 $2.00 0.94 $ 1.88 228 10-inch 1 LF $2.50 $2.50 0.94 $ 2.35 229 12-inch 1 LF $3.00 $3.00 0.94 $ 2.82 230 ST Test 1 EA $250.00 $250.00 0.94 $ 235.00 Flushing 231 4-12 inch 1 LF $0.50 $0.50 0.94 $ 0.47 232 Charge Water 1 K-Gals $0.50 $0.50 0.94 $ 0.47 Dechlorination 233 4-12 inch 1 K-Gals $1.00 $1.00 0.94 $ 0.94 MM Murphy Pipeline Contractors, Inc. TR 13057 - EXhg3 2018 Allied States R29 Price List 17-7250 TY Unit Unit Price Extension Coefficient Revised Unit Price F) Trenchless Rehabilitation/Reconstruction of Pipelines and Conduits Swagelining a) Camera 234 0-10 inch 1 LF $1.00 $1.00 0.94 $ 0.94 235 10-24 inch 1 LF $1.50 $1.50 0.94 $ 1.41 236 25-36 inch 1 LF $2.00 $2.00 0.94 $ 1.88 237 37-48 inch 1 LF $2.50 $2.50 0.94 $ 2.35 23 Over 48 inch 1 LF $3.00 $3.00 0.94 $ 2.82 b) Clean 239 0-10 inch 1 LF $2.50 $2.50 0.94 $ 2.35 240 10-24 inch 1 LF $3.00 $3.00 0.94 $ 2.82 241 25-36 inch 1 LF 1 $3.50 $3.50 0.94 $ 3.29 242 3748 inch 1 LF $4.00 $4.00 " 0.94 $ 3.76 243 Over 48 inch 1 LF $4.50 $4.50 0.94 $ 4.23 c) Pigging See item G) Pig Cleaning d) Gauging 244 0-10 inch 1 LF $5.001 $5.00 0.941 $ 4.70 245 10-24 inch 1 LF $8.00 $8.00 0.94 $ 7.52 246 25-36 inch 1 LF $11.00 $11.00 0.94 $ 10.34 247 37-48 inch 1 LF $14.00 $14.00 0.94 $ 13.16 248 Over 48 inch 1 Per -inch $1.00 $1.00 0.94 $ 0.94 249 e) Obstruction Removal 1 EA $600.00 $600.00 0.94 $ 564.00 f) Pipe Liner Insertion 1) PE 4710 DR 41 250 4-inch 1 LF $10.00 $10M 0.94 $ 9.40 251 6-inch 1 LF $20.00 $20.00 0.94 $ 18.80 252 8-inch 1 LF $25.00 $25M 0.94 $ 23.50 253 10-inch 1 LF $35.00 $35.00 0.94 $ 32.90 254 12-inch 1 LF $50.00 $50.00 0.94 $ 47.00 255 16-inch 1 LF $75.00 $75.00 0.94 $ 70.50 256 18-inch 1 LF $95.00 $95.00 0.94 $ 89.30 257 20-inch 1 LF $130.00 $130.00 0.94 $ 122.20 258 24-inch 1 LF $180.00 $180.00 0.94 $ 169.20 259 30-inch 1 LF $240.00 $240.00 0.94 $ 225.60 260 36-inch 1 LF $280.00 $280.00 0.94 $ 263.20 261 42-inch 1 LF $340.00 $340.00 0.94 $ 319.60 262 48-inch 1 LF $400.00 $400.00 0.94 $ 376.00 263 54-inch 1 LF $475.00 $475.00 0.94 $ 446.50 2) PE 4710 DR 32.5 264 4-inch 1 LF 1 $20.00 $20.00 0.94 $ 18.80 265 6-inch 1 LF $25.00 $25.00 0.94 $ 23.50 266 8-inch 1 LF $30.00 $30.00 0.94 $ 28.20 267 10-inch 1 LF $40.00 $40.00 0.94 $ 37.60 268 12-inch 1 LF $55.00 $55.00 0.94 $ 51.70 269 16-inch 1 LF $80.00 $80.00 0.94 $ 75.20 270 18-inch 1 LF $105.00 $105-00 0.94 $ 98.70 271 20-inch 1 LF $150.00 $150.00 0.94 $ 141.00 272 24-inch 1 LF $200.00 $200.00 0.94 $ 188.00 273 30-inch 1 LF $260.00 $260.00 0.94 $ 244.40 274 36-inch 1 LF $300.00 $300.00 0.94 $ 282.00 275 42-inch 1 LF $360.00 $360.00 0.94 $ 338.40 276 48-inch 1 LF $420.00 $420.00 0.94 $ 394.80 277 54-inch 1 LF $475.00 $475.00 0.94 $ 446.50 3) PE 4710 DR 26 mPC Murphy Pipeline Contractors, Inc. TR 13057 - EXhgiJ 32018 Allied States R19 Price List 17-7250 CITY Unit Unit Price Extension Coefficient Revised Unit Price 278 4-inch 1 LF $25.00 $25.00 0.94 $ 23.50 279 6-inch 1 LF $30.00 $30A0 0.94 $ 28.20 280 8-inch 1 LF $35.00 $35.00 0.94 $ 32.90 281 10-inch 1 LF $45.00 $45.00 0.94 $ 42.30 282 12-inch 1 LF $60.001 $60.00 0.94 $ 56.40 283 16-inch 1 LF $90.00 $90.00 0.94 $ 84.60 284 18-inch 1 LF $120.00 $120.00 0.94 $ 112.80 285 20-inch 1 LF $175.00 $175.00 0.94 $ 164.50 286 24-inch 1 LF $220.00 $220.00 0.94 $ 206.80 287 30-inch 1 LF $280.00 $280.00 0.94 $ 263.20 288 36-inch 1 LF $300.00 $300.00 0.94 $ 282.00 289 42-inch 1 LF $380.00 $380.00 0.94 $ 357.20 290 48-inch 1 LF $440.00 $440.00 0.94 $ 413.60 291 54-inch 1 LF $505.00 $505.00 0.94 $ 474.70 4) PE 4710 DR 21 292 4-inch 1 LF $30.00 $30.00 0.94 $ 28.20 293 6-inch 1 LF $35.00 $35.00 0.94 $ 32.90 294 8-inch 1 LF $40.00 $40.00 0.94 $ 37.60 295 10-inch 1 I LF $50.00 $50.00 0.94 $ 47.00 296 12-inch 1 LF $65.00 $65.00 0.94 $ 61.10 297 16-inch 1 LF $100.00 $100.00 0.94 $ 94.00 298 18-inch 1 LF $130.00 $130.00 0.94 $ 122.20 299 20-inch 1 LF $190.00 $190.00 0.94 $ 178.60 300 24-inch 1 LF $240.00 $240.00 0.94 $ 225.60 301 30-inch 1 LF $310.00 $310.00 0.94 $ 291.40 302 36-inch 1 LF $330.00 $330.00 0.94 $ 310.20 303 42-inch 1 LF $400.00 $400.00 0.94 $ 376.00 304 48-inch 1 LF $460.00 $460.00 0.94 $ 432.40 305 54-inch 1 LF $535.00 $535.00 0.94 $ 50190 5)PE 4710 DR 17 306 4-inch 1 LF $35.00 $35.00 0.94 $ 32.90 307 6-inch 1 LF $40.00 $40.00 0.94 $ 37.60 308 8-inch 1 LF $45.00 $45.00 0.94 $ 42.30 309 10-inch 1 LF $55.00 $55.00 0.94 $ 51.70 310 12-inch 1 LF $70.00 $70.00 0.94 $ 65.80 311 16-inch 1 LF $110.00 $110.00 0.94 $ 103.40 312 18-inch 1 LF $140.00 $140.00 0.94 $ 131.60 313 20-inch 1 LF $205.00 $205.00 0.94 $ 192.70 314 24-inch 1 LF $260.00 $260.00 0.94 $ 244.40 315 30-inch 1 LF $340.00 $340.00 0.94 $ 319.60 316 36-inch 1 LF $360.00 $360.00 0.94 $ 338.40 317 42-inch 1 LF $430.00 $430.00 0.94 $ 404.20 31 48-inch 1 LF $485.00 $485.00 0.94 $ 455.90 319 54-inch 1 LF $585.00 $555.00 0.94 $ 521.70 G) Pig Cleaning Foam Pig 320 0-12 inch 1 LF $0.50 $0.50 0.94 $ 0.47 _ 321 13-24 inch 1 LF $1.50 $1.50 0.94 $ 1.41 322 25-36 inch 1 LF $2.50 $2.50 0.94 $ 2.35 323 37-48 inch 1 LF $3.50 $3.50 0.94 $ 3.29 324 Over 48 inch 1 LF $5.00 $5.00 0.94 $ 4.70 Wire Bullet Pig 325 0-12 inch 1 LF 1 $3.00 $100 0.94 $ 2.82 13-24 inch 1 LF $4.00 $4.00 0.94 $ 3.76 25-36inch 1 LF $6.00 $6.00 0.94 $ 5.64 37-48 inch 1 LF $9.00 $9.00 0.94 $ 8.46 Over 48 inch 1 LF $12.00 $12.00 0.94 $ 11.28 k Blade Scraper Pig 0-12inch 1 LF $0.50 $0.50 0.94 $ 0.47 13-24 inch 1 LF $1.50 $1.50 O.941 $ 1.41 332 25-36 inch 1 LF $2.50 $2.50 0.94 $ 2.35 333 37-48 inch 1 LF $3.50 $3.50 0.94 $ 3.29 334 Over 48 inch 1 LF $5.00 $5.00 0.94 $ 4.70 H) Time and Material Unit Rates for Change Orders Materials, Subcontractors and Rentals 335 Markup =15% 336 Sales Taxes= Per Jurisdiction Labor 337 Executive Supervisor 1 HR $85.00 $85.00 0.94 $ 79.90 a) Project Management 1 HR $75.00 $75.00 0.94 $ 70.50 35 $ 2,467.50 338 ISuperintendent 1 HR $45.00 $45.00 0.94 $ 42.30 Allied States R19 Price List 17-7250 CITY Unit Unit Price Extension Coefficient Revised Unit Price 339 lAdministrator 1 HR $25.00 $25MI 0.94 $ 23.50 TAMARACI The City For Your Life TR 13057 - EXhiViJ 3 2018 PAurp y Pipeline Contractors, inc. 340 Crew Chief 1 HR $40.00 $40.00 0.94 $ 37.60 341 Equipment Operator 1 HR $35.00 $35.00 0.94 $ 32.90 342 Pipelayer- Skilled 1 HR $30.00 $30.00 0.94 $ 2&20 343 Pipelayer- Helper 1 HR $28.00 $28.00 0.94 $ 26.32 344 Laborer - Unskilled 1 HR $25.00 $25.00 0.94 $ 23.50 1) Directional Drilling & Pipe Installation 345 2-inch 1 LF $19.00 $19.00 0.94 $ 17.86 346 4-inch 1 LF $26.00 $26.00 0.94 $ 24.44 347 6-inch 1 LF $35.00 $35.00 0.94 $ 32.90 348 8-inch 1 LF $40.00 $40.00 0.94 $ 37.60 349 10-inch 1 LF $55.00 $55.00 0.94 $ 51.70 350 12-inch 1 LF $72.00 $72.00 0.94 $ 67.68 351 14-inch 1 LF $89.00 $89.00 0.94 $ 83.66 _ 352 16-inch 1 LF $100.00 $100.00 0.94 $ 94.00 353 18-inch 1 LF $115.00 $115.00 0.94 $ 108.10 314 20-inch 1 LF $180.00 $180.00 0.94 $ 169.20 355 24-inch 1 LF $240.00 $240.001 0.94 $ 225.60 J) Gravity Sewer CIPP Lateral Renewal Systems 356 4 inch lateral up to 251f 1 EA $1,500.00 $1,500.00 0.94 $ 1,410.00 357 6 inch lateral up to 25 If 1 EA $1,750.00 $1,750.00 0.94 $ 1,645.00 358 4 inch tophat installation 1 EA $700.00 $700.00 0.94 $ 658.00 359 6 inch tophat installation 1 EA $900.00 $900.00 0.94 $ 846.00 K) Manhole Rehabilitation 360 4foot diameter 1 VF $250.00 $250.00 0.94 $ 235.00 361 6 foot diameter 1 VF $266.00 $260-00 0.94 $ 244.40 362 Lift station rehabilitation 1 SF $18.00 $18.00 0.94 $ 16.92 363 Existing coating removal 1 SF $5.00 $5.00 0.94 $ 4.70 364 Adjust existing manhole cover and ring (grass) 1 EA $400.00 $400.00 0.94 $ 376.00 365 Adjust existing manhole cover and ring (Asphalt) 1 EA $600.00 $600.00 0.94 $ 564.00 366 Install new manhole ring and cover (grass) 1 EA $700.00 $700.00 0.94 $ 658.00 367 Install new manhole ring and cover (Asphalt) 1 EA $1,100.00 $1,100.00 0.94 $ 1,034.00 368 Furnisand install manhole chimney seal h 1 EA $500.00 $500.00 0.94 $ 470.00 369 Re -construct manhole bench and channel flow 1 EA $500.00 $500.00 0.94 $ 470.00 20 $ 9,400.00 L) Slip -lining down to DR 11 4-inch 1 EA $30.00 $30.00 0.94 $ 28.20 6-inch 1 EA $35.00 $35.00 0.94 $ 32.90 8-inch 1 EA $40.00 $40.00 0.94 $ 37.60 10-inch 1 EA $50.00 $50.00 0.94 $ 47.00 k 12-inch 1 EA $70.00 $70.00 0.94 $ 65.80 16-inch 1EA $100.00 $100.00 0.94 $ 94.00 18-inch 1 EA $115.00 $115.00 0.94 $ 108.10 24-inch 1 EA $240.00 $240.00 0.94 $ 225.60 378 30-inch 1 EA $320.00 $320.00 0.94 $ 300.80 379 36-inch 1 EA $380.00 $380.00 0.94 $ 357.20 380 42-inch 1 EA $420.00 $420.00 0.94 $ 394.80 381 48-inch 1 EA $480.00 $480.00 0.94 $ 451.20 382 54-inch 1 EA $640.001 $640.00 0.94 $ 601.60 383 63-inch 1 EA $750.00 $750.00 0-94 $ 705.00 M) Large Diameter HDPE Pipe String Fusion 394 14-inch 1 LF $55.00 $55.00 0.94 $ 51.70 385 16-inch 1 LF $65.00 $65.00 0.94 $ 61.10 386 18-inch 1 LF $75.00 $75.00 0.94 $ 70.50 38 220-inch 1 LF $85.00 $85.00 0.94 $ 79.90 388 24-inch 1 LF $105.00 $105.00 0.94 $ 98.70 2511 $ 247,835.70 389 30-inch 1 LF $135.00 $135.00 0.94 $ 126.90 390 36-inch 1 LF $170.00 $170.00 0.94 $ 159.80 391 48-inch 1 LF $220.00 $220.00 0.94 $ 206.80 Pressure Testing 392 14-48 inch 1 LF $4.00 $4.00 0.94 $ 3.76 393 Charge Water 1 K-Gals $1.00 $1.00 0.94 $ 0.94 N) Pipe Bursting for Force Main Replacement Procedure HDPE DR 11 394 3-inch diameter 1 LF $48.00 $48.00 0.94 $ 45.12 395 4-inch diameter 1 LF $57.00 $57.00 0.94 $ 53.58 396 6-inch diameter 1 LF $74.00 $74.00 0.94 $ 69.56 397 8-inch diameter 1 LF $96.00 $96.00 0.94 $ 90.24 398 10-inch diameter 1 LF $108.00 $108.00 0t $ 101.52 399 12-inch diameter 1 LF $135.00 $135.00 0.94 $ 126.90 400 14-inch diameter 1 LF $150.00 $150.00 0.94 $ 141.00 401 16-inch diameter 1 LF $185.00 $185.00 0.94 $ 173.90 402 184nch diameter 1 LF $210.00 $210.00 0.94 $ 197.40 403 20-inch diameter 1 LF $245.00 $245.00 0.94 $ 230.30 404 24-inch diameter 1 LF $275.00 $275.00 0.94 $ 258.50 2511 $ 649,093.50 405 30-inch diameter 1 LF $350.00 $350.00 0.94 $ 329.00 406 36-inch diameter 1 LF $385.00 $385.00 0.94 $ 361.90 407 42-inch diameter 1 LF $425.00 $425.00 0.94 $ 399.50 408 48-inch diameter 1 LF $500.00 $500.00 0.94 $ 470.00 409 54-inch diameter 1 LF $5121t $600.00 0.941 $ 564.00 Plug Valves Murphy Pipeline Contractors, one TR 13057 - EXhgJW2018 410 4-inch 1 EA $1,062.00 $1,062.00 0.94 $ 998.28 411 6-inch 1 EA $1,700.00 $1,700.00 0.94 $ 1,598.00 412 8-inch 1 EA $2,233.00 $2,233.00 0.94 $ 2,099.02 413 10-inch 1 EA $3,064.00 $3,064.00 0.94 $ 2,880.16 414 12 inch 1 EA $3,543.00 $3,543.00 0.94 $ 3,330.42 415 16-inch 1 EA $5,103.00 $5,103.00 0.94 $ 4,796.82 416 18-inch 1 EA $8,546.00 $8,546.00 0.94 $ 8,033.24 417 20-inch 1 EA $13,387.00 $13,387.00 0.94 $ 12,583.78 418 24-inch 1 EA $18,238.00 $18,238.00 0.94 $ 17,143.72 419 30-inch I EA $31,45SM $31,455.00 0.94 $ 29,567.70 420 36-inch 1 EA $45,054.00 $45,054.00 0.94 $ 42,350.76 421 42-inch 1 EA $54,764.00 $54,764M 0.94 $ 51,478.16 422 48-inch 1 EA $61,924.00 $61,924.00 0.94 $ 58,208.56 423 54-inch 1 EA $69,814.00 $69,814.00 0.94 $ 65,625.16 ARV Vacuum/Air/With structure 424 12minch 1 1 EA $4,572.00 $4,571001 0.94 $ 4,297.68 425 4-inch 1 EA $11,543.00 $11,543.001 0.94 $ 10,850A2 426 6-inch 1 EA $14,622.00 $14,622.00 0.94 $ 13,744.68 Blow Off/With box 427 2-inch 1 EA $21544.00 $2,544.00 0.94 $ 2,391.36 428 4-inch 1 EA $47599.00 $4,599.00 0.94 $ 4,323.06 429 6-inch 1 EA $7,815.00 $7,815.00 0.94 $ 7,346.10 430 ITracer Wire 1 LF $1.63 $1.63 0.94 $ 1.53 Remove and Replace Struture 1 EA $13,550M $13,550M 0.94 $ 12,737.00 8 $ 101,896.00 57 Stone 1 CY $26.84 $26.84 0.94 $ 25.23 1772 $ 44,708.52 ROW Landscaping Replacement (along W. Prospect Rd.) 1 LS $6,200.00 $6,200.00 0.94 $ 5,828.00 1 $ 5,828.00 Project Sign 1 EA $1,550.00 $1,550.00 Om941 $ 1,457.00 1 1 $ 1,457.00 Fence Removal and Replacement 1 LF $12.75 $12.75 0.94 $ 11.99 200 $ 2,397.00 Payment and Performance Bond 1 EA $17,620.55 $17,620.55 0.94 $ 16,563.32 1 $ 16,563.32 1,507,447.40 10