HomeMy WebLinkAboutCity of Tamarac Resolution R-2017-068Temp Reso. No. 12943
May 10, 2017
Revision #1 June 2, 2017
Page 1
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. 2017-
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA, SETTING A NEW
SCHEDULE OF ENGINEERING DIVISION DEVELOPMENT
REVIEW FEES FOR THE PUBLIC SERVICES
DEPARTMENT, TO BECOME EFFECTIVE OCTOBER 1,
2017, ATTACHED HERETO AS EXHIBIT "1"; PROVIDING
FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Tamarac Code of Ordinances authorizes the City
Commission from time to time, to establish by resolution, the amount of fees, including but
not limited to Engineering Division Development Review Fees; and
WHEREAS, MGT of America, Inc. was retained by the City to perform a
comprehensive analysis of the departments where services are being offered to citizens
for which user fees can be collected; and
WHEREAS, the Public Services Department offers an array of permit and plan
review related services to citizens for which user fees can be collected; and
WHEREAS, MGT of America, Inc. has documented the cost of providing services
for which service fees are, or could be assessed for the Public Services Department,
which includes Engineering Division Development Review Fees, and has provided same
into a Proposed Fee Schedule; and
Temp Reso. No. 12943
May 10, 2017
Revision #1 June 2, 2017
Page 2
WHEREAS, MGT of America, Inc. recommended fee for each service is the
amount required to cover the full cost of providing the service; and
WHEREAS, the full cost fee as proposed by MGT of America, Inc. greatly exceeds
the industry standard for Engineering Division Development Review Fees assessed by
municipalities across Broward County; and
WHEREAS, the Public Services Director has reviewed MGT of America Inc.
proposed full cost community development and code compliance fees compared to fees
assessed for the same service across Broward County and recommends the approval of a
new Engineering Division Development Review Fee Schedule (attached hereto as Exhibit
"1"), which is consistent with industry standards as opposed to a full cost of service
recovery; and
WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in
the best interest of the citizens and residents of the City of Tamarac to establish a new
Engineering Division Development Review Fee Schedule to reflect new fee amounts that
are in line with industry standards for services and projects within the City.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA-
J
Temp Reso. No. 12943
May 10, 2017
Revision #1 June 2, 2017
Page 3
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct and are hereby made a specific part of this
Resolution upon adoption hereof. All Exhibits attached hereto are expressly
incorporated herein and made a part hereof.
SECTION 2: That the Engineering Division Public Services Department
Schedule of Plan Review & Permit Fees attached hereto as Exhibit 1" and made a part
hereof, is hereby approved to become effective October 1, 2017.
SECTION 3: That all Resolutions or parts of Resolutions in conflict herewith are
hereby repealed to the extent of such conflict.
SECTION 4: If any clause, section, or other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid,
in part or application, it shall not affect the validity of the remaining portions or
applications of this Resolution.
n
Temp Reso. No. 12943
May 10, 2017
Revision #1 June 2, 2017
Page 4
SECTION 5: This Resolution shall become effective immediately upon its passage and
adoption.
PASSED AND ADOPTED BY THE CITY COMMISSION OF THE CITY OF TAMARAC,
FLORIDA THIS DAY OF 2017.
1-3
CITY OF TAMARAC FLORIDA
4 1?44�
HA RY DRESSLER, MAYOR
ATTEST:
��PATRICIA TEUFEL, CMC
CITY CLERK
RECORD OF COMMISSION VOTE:
MAYOR DRESSLER
DIST 1: BOLTON �.eo
DIST 2: COMM. GOMEZ
DIST 3: COMM. FISHMAN X 1-n
DIST 4: V/M PLACKO �A :ko
I HEREBY CERTIFY that I have
Approved this RESOLUTION
As to FORM:
y6V'Vj1#_ A a 6 ;z
SAMU' L S. GOREN
CITY ATTORNEY
n
Temp. Reso. #12943
May 10, 2017
Revision #1 June 2, 2017
Exhibit 1
CITY OF TAMARAC
ENGINEERING DIVISION, PUBLIC_ SERVICES DEPARTMENT
SCHEDULE OF PLAN REVIEW & PERMIT FEES
As set forth in Section 10-157 of The Code of The City of Tamarac, Florida, following approval of the final site
development plan by the City Commission and posting of all required public improvement bonds and payment of fees,
the owner of the land being developed, or his bona fide agent, is required to take out an improvement permit with the
City for all land improvements occurring on public or private property. No improvement or alteration of any existing
public or private property or utility shall be allowed without a city improvement permit issued for such specific
improvements. The permit shall be visibly displayed at all times during construction.
As set forth in Section 20-41 of The Code of The City of Tamarac, Florida, no person shall open any street of median
or alter or cut any curb adjacent to any street or thoroughfare without first obtaining a permit from the City authorizing
such alteration or change of pavement or median cut.
The Schedule of Permit Fees shall apply to the following:
For any construction or improvements that are associated with land development or redevelopment as covered
by Chapter 10 or elsewhere in the Tamarac City Code, exclusive of that work covered through the required
Building Department Permit fees or required Community Development Department improvement fees, whether
on public or private property.
For any construction or improvements in roadway or medians, or within the City's roadway rights -of -way, water
and sewer easements, utility easements, or other public easements, as covered in Chapter 20 or elsewhere in
the Tamarac City Code.
A. EXPIRED PERMIT FEES
As set forth in Section 10-161 of The Code of The City of Tamarac, Florida, if work covered by a permit has not
commenced within three (3) months from the date of issuance of the permit, or has been commenced and then
suspended or abandoned for a period of sixty (60) days from the date of the most recent inspection, the permit
automatically is terminated and shall become null and void. When a permit has been terminated, all fees paid
shall be forfeited and any work started after such termination shall be subject to all applicable City Ordinances
in effect at the time a subsequent permit is issued.
Renewal -Expired Permits
• 10.00% of the construction cost for all remaining incomplete improvements
B. MISCELLANEOUS FEES
1. Copies (as per Section 6-35 of Tamarac City Code)
• Photocopies (legal or letter size) ................................................... $0.15 per page
• Photocopies (24" X 36").................................................................$4.00 per page
2. Building Permit Plan Review Fees (to be paid upon each building permit application)
Engineering Division, Public Service Department
Schedule of Plan Review & Permit Fees
Page 2 of 2
New Construction
• Residential Project —Single Family....................................................$50.00 per unit
• Residential Project — Multi-Family......................................................$50.00 per unit
• Non -Residential Projects...........................................................$50.00 per structure
Alteration/Additions
• Structural Commercial and Residential...........................................................$26.00
• Screen Enclosures......................................................................................$26.00
• Docks.........................................................................................................$25.00
• Sea Walls...................................................................................................$25.00
• Pools........................................................................................................$25.00
Driveways...................................................................................................�zS.UU
Fencing
• Commercial or Residential............................................................................$26.00
3. Development Plan Review Fees (to be paid upon each improvement submittal)
• Site Plan New — Major..............................................................................$1,000.00
• Site Plan Revision New — Minor...................................................................$600.00
• Site Plan Revision — Major........................................................................$1,000.00
• Site Plan Revision — Minor..........................................................................$500.00
• Plats Major................................................................................................$500.00
• Plats Minor................................................................................................$300.00
• Delegation Request....................................................................................$150.00
• Vacation of Easement/Right-of-Way.............................................................$350.00
B. ENGINEERING PERMIT FEES
The following permit fees shall be doubled if work commences before a permit is issued to
the applicant.
• Permit fees for Paving, Drainage, Water & Sewer Improvements, which includes initial
and follow-up plan review fee, shall be equal to 10.00% of the construction cost
• Permit fees for Clearing & Grubbing and Site Development, which includes initial and
follow-up plan review fee, shall be equal to 10.00% of the construction cost
• Asphalt Pavement Resurfacing, Restoration, or Repair (only), shall be equal to 5.00% of the
construction cost
• Engineering plan review (more than two (2) rounds) per review .......................$400.00
• Water and Sewer Developer's Agreement Preparation
• Agreement for 0 — 5 ERC's..............................................................$250.00
• Agreement for 6 —10 ERC's.............................................................$600.00
• Agreement for 11 or more ERC's.....................................................$750.00
• Sidewalk (only).......................................................................... up to 50 LF $60.00
each additional 10 LF or fraction thereof, $20.00
• Curbing (only).......................................................................... up to 50 LF $60.00
each additional 10 LF or fraction thereof, $20.00