HomeMy WebLinkAboutCity of Tamarac Resolution R-2017-095Temp. Reso. #12990 August 2, 2017 Page 1 of 4 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2017-:r A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, APPROVING CHANGE ORDER NO. 3 TO THE AGREEMENT BETWEEN THE CITY OF TAMARAC AND RF ENVIRONMENTAL SERVICES, INC. AND AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO ACCEPT AND EXECUTE CHANGE ORDER NO. 3 TO THE CONTRACT BETWEEN THE CITY OF TAMARAC AND RF ENVIRONMENTAL SERVICES, INC., FOR AN AMOUNT OF $32,430.32 FOR FUNDING THE GREENLEAF FILTER FLOOR LEVELING IN ALL FOUR CELLS AND METAL REPAIRS IN THE GREENLEAF CLEARWELL; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on December 14, 2016, through Resolution #R-2016-140, the City Officials executed an agreement between the City of Tamarac and RF Environmental Services, Inc., for an amount of $529,000.00 for the Greenleaf Filter Media Replacement Project at the Water Treatment Plant site (incorporated by reference and on file in the City Clerk's Office); and WHEREAS, Purchase Order Number 200506 was issued to RF Environmental Services, Inc., on January 25, 2017 and a Notice to Proceed was issued on March 13, 2017. The Contract requires Substantial Completion in 90 days or by June 11, 2017 and Final Completion in 105 Days or by June 26, 2017; and WHEREAS, Change Order #1 was approved by the City and Contractor on April 19, 2017 in the amount of $62,326.31 for a Scope of Work that included sandblasting the bottom seven feet (7') of the Greenleaf Filter and the inside of the Clearwell Box to white Temp. Reso. #12990 August 2, 2017 Page 2 of 4 metal and installation of a primer, intermediate and Final Coating. Change Order #1 increased the Contract Price from $529,000.00 to $591,326.31 and the amount of time from 105 to 126 days (a copy of which is attached hereto as "Exhibit A"); and WHEREAS, Change Order #2 was approved by the City and Contractor on August 8, 2017 in the amount of $38,834.54 for a Scope of Work that includes exterior wall mending plates and upper trough steel replacement on all four cells and removal of several cubic yards of backwash sediment from the center column. Change Order #2 increased the Contract Price from $591,326.31 to $630,160.85 leaving only $4,639.15 in project contingency funds. Change Order #2 also increased the Contract Time from 126 days to 201 days with Final Project Completion by September 30, 2017 (a copy of which is attached hereto as "Exhibit B"); and WHEREAS, due to unforeseen field conditions, the Greenleaf Filter floor requires floor leveling in all four cells and metal repairs in the Greenleaf Clearwell, and WHEREAS, the Greenleaf Filter Media Replacement Project for the Water Plant was included in FY 2017 Budget in the amount of $750,000. This project with all approved Change Orders will be closed out at a cost not to exceed $662,591.17, and WHEREAS, it is the recommendation of the Director of Public Services that Change Order No. 3 to the agreement between the City of Tamarac and RF Environmental Services, Inc. dated December 14, 2016, be approved, executed by the appropriate officials; and WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to accept and execute C E Temp. Reso. #12990 August 2, 2017 Page 3 of 4 Change Order No. 3 in the amount of $32,430.32 to the agreement between the City of Tamarac and RF Environmental Services, Inc., dated December 14, 2016. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, THAT. - SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this resolution upon adoption hereof. All exhibits attached hereto are incorporated herein and made a specific part hereof. SECTION 2: The appropriate City Officials are hereby authorized to accept and execute Change Order No. 3 in the amount of $32,430.32 to the agreement between the City of Tamarac and RF Environmental Services, Inc. for the Greenleaf Filter Media Replacement Project (a copy of which is attached hereto as "Exhibit C") SECTION 3: All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application; it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 5: passage and adoption. 2017. Temp. Reso. #12990 August 2, 2017 Page 4 of 4 This Resolution shall become effective immediately upon its PASSED, ADOPTED AND APPROVED this 13 ATTEST: PATRICIA TEUFE MC CITY CLERK I HEREBY CERTIFY THAT I HAVE APPROVED THIS RESOLUTION AS TO FORM SAMUEL S. GOREN CITY ATTORNEY day of� ,r A, RECORD OF COMMISSION VOTE: MAYOR DRESSLER y4 DIST 1: COMM. BOLTON DIST 2: COMM. GOMEZ DIST 3: COMM. FISHMAN DIST 4: VICE MAYOR PLACKO 1 "Exhibit A" TR #12990 City of Tamarac purchasing & Contracts Division CHANGE ORDER DATE OF ISSUANCE: 4-07-17 OWNER: CITY OF TAMARAC 7525 NW 88th Avenue Tamarac, FL 33321-2401 CHANGE ORDER NO. 1 PROJECT NAME: Greenleaf Filter Media Replacement at the Water Plant BID NO. 16-20B PROJECT NO. UT17A CONTRACTOR: RF Environmental Services, Inc. P.O. NUMBER 200506 IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS: DESCRIPTION: The Greenleaf Filter has extensive corrosion below the top of the Media and in the Overflow Clearwell Box. These areas could not be seen during the Prebid inspection and 20% was added as Contingency instead of 10% to cover this. The Scope of work will be to sand blast the bottom 7 feet of the Greenleaf and the inside of the Clearwell Box to White metal and install a Primer, Intermediate and Final Coating, The Cost of this work will amount to $62,326.31. PURPOSE OF CHANGE ORDER: Complete Coating Work required inside the Greenleaf Filter. •TI1 A ^mm flC r_uaNt;F iN CONTRACT TIME CHANUM IN GUN 1 KAU 1 rr-.IVL-- -- - - - - - Original Contract Price Original Contract Time $ 529 000.00 105 Days Change Order No. 1 Net Change From Previous Change Orders $ 62 326.31 None Contract Price Prior To This Change Order Contract Time Prior To This Change Order $ 529 000.00 105 Days Net (Increase) Of This Change Order Net (Increase) Of This Change Order $ 62,326.31 21 da s Contract Price With All Approved Change Orders Contract Time With All Approved Change Orders $ 591 326.31 126 Da s Account No(s) Affected: 441-6030-533-6330 Amount Affected 62� ,326.31 ROUTING: Dept. Director, Contractor, Purchasing Manager, City Manager, Purchasing Manager C M DED APPR ED P V D BY BY P b ery Director a �,�,� o ctor Date Date 1 (� Date RF Environmental Services, Inc. Job Name: Tamarac Greenleaf Filter Media & Coatijs Proposal No. CO# 01 Job No. 16011 Task/PCO No. CO# 01 Date: 04110/17 RECAPITULATION Sheet No. Sheet Identification Material Base Labor Eq & Tools $ Additional Surface Preparation & Coatings for 0.00 8,840.70 1,200.00 1 Existing Greenleaf Filter & Clearweli Notes & clarifications: 1 City to Isolate and Drain Clearwell. 2 Over -time work Is excluded. 3) All coating and surface preparation work in accordance with the attached proposal from Titans Coatings, 4) Any & all metal repair work, which we know will be required, is excluded from this proposal until the full extent of the required repair work is determined after the initial surface preparation work is completed. Totals: Material Cost - Labor Hours 0.00 8,840.70 1,200.00 ATEGORY LABOR RATE SUBTOTALS _ General Construction Labor $35.00 Labor Cost 8,840.00 0.00 Carpenter $45.00 Material Cost Tools & Constr. Equipment 1,200.00 Operator $45.00 $45.00 $u bcon tractors: Titans Coatings 42,100.00 Journeyman Working Foreman $55.00 $7.9.00 Sales Tax 6% 7100 Superintendent Assitant Project Manager $65.00 Gen. Administration 0.00 Project Manager $90.00 SubTotal 52,212.70 Included Labor Burden 0.00 OH - Fee/Profit 15% 7,831.91 SubTotal 60,044.61 Bond 2.8% 1,681.25 Thad Buckle -V.P. Insurance 1% 600.45 Credit Card Fee 0.00% 0,00 Total $62,326.31 RF Environmental Services, Inc MATERIAL AND LABOR COST ESTIMATE SHEET Sheet Identification: Additional Surface Preparation & Coatings for Existing Greenleaf Plater & Gies-oll Sheet No. QTY DESCRIPTION MATERIAL UNIT TOTAL LABOR UNIT MHS , RATE 5 TOTAL JUn tArr-No WIT TOTAL Labor, Materials, Rigging & E ul ment _ 108 Hrs - Working Foreman -112 Time Supervision --- Based on Titans Schedule of 216 Hrs See Attached 0.00 0.00 1.00 55.00 5 940.00 0.00 24 Hrs - Labor Keep Tanks Drained & Pumps 0.00 1,00 45.00 1.080.00 1 32 2 --• Set -Up & Move Sump Pumps ... etc... Sum Pumps & Pieinglliose Hrs - Remove & Replace all Non-Ferrious Metals at Clear -Well ••. Incl. Alum, Cover Plates, Beanls & Hardware West Side & Flexile Covey and Associated Hardware East Side Durn ster to Dispose of Filter Media 0.00 0.00 0.00 0,0D 0.00 0.00 0.00 1.00 45.00 0.00 0.000 1 440.00 0.00 0.00 0.00 0.00 300.00 450.00 _300.00 0.00 0.00 900.00 0.00 0.00 0.00 0.00 0.00 Ho 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.00 U.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL MATERIALS, JE, LABOR HRS AND $ _ 3% Materials Consumables 2% Labor Clean U 1.0% Labor Safel 1.5% labor Small Tools SHEET TOTALS 0.00 00 :• S0.00 r:• '. .,•. ;' 8,460.00 i69,20 84.80 126.80: 8,840.70 '::'.:•..:..': + 1,200.00 ^•' $i•200.00 TITANS PROTEC MM , tL NE COA7itiGS,1.0 To: RF Environmental Services fllarcll 31, 2017 Quotc#1128 A'rl'N: mr,'fhad ilucldey RE: GRFI?,NLEAF FILTER MEDIA RrI'LACEMENT ADI)ITIONAL WOIZIC CITY OF TAMARAC, FLORIDA Our price includes supplying of all labor, materials and equipment to complete the tvork Its described below, with the exclusion mentioned below. Our price does NOT Include: Prevailing wages if applicable Exterior surface prep and coatings of the filter Our price Includes: interior of Greenleaf Filler tank lower 7 0 Sandblasting of the interior of Greenleaf filter lower 7 Ft of entire tank to SSPC SP I 0 near white metal cleaning Supply and application ol': Two additional coats of NSF approved coatings at 4.0 to 6.0 MDFI' per coat TOTAL additional price for Greenleaf Fillet': S 24,280.00 0-1 1 co- 15o Evemia Street Ste. B Jupiter FL 33458 Phone 561.370-2085 email: denis@litansprotectivecoatings.com TITANS mn GOATINGATINGs, LlG •interior of the side box: Sandblasting of the interior of side box to SSPC SF 10 near white metal cleaning Supply and application of.. 3 coats of NSF approved coatings at 4.0 to 6.0 B1DFT per coat Clean up and dispose of the used media TOTAL additional price far Greenleaf filter: S 17,820.00 Note: For tine additional work we will need three additional weeks (15 working days) for Greenleaf filter and 11 working days for side box. Hoping to he favored with your order Sincerely rYours 'UUP.GLCd / 7GadGGt/ & TITANS Protective Coatings, LLC 150 Evernia Street Ste, B Jupiter FL 33458 Phone 661-370-2085 email: denis«?i litansprotectivecoolings,com "Exhibit B" TR #12990 City of Tamarac ` Purchasing & Contracts Division CHANGE ORDER DATE OF ISSUANCE: 8-01-17 OWNER: CITY OF TAMARAC 7525 NW 8811 Avenue Tamarac, FL 33321-2401 CHANGE ORDER NO, 2 PROJECT NAME: Greenleaf Filter Media Replacement at Water Plant BID NO. 16-20B PROJECT NO. UT17A CONTRACTOR: RF Environmental Services, Inc. P.O. NUMBER 200506 IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED .CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS: DESCRIPTION: The Greenleaf Filter has extensive corrosion on structural Steel components that have required extensive metal repairs. In addition, there were several Cubic Yards of Back -Wash Sediment that had to be removed from the Center Column. These areas could not be seen during the Prebid inspection and 20% was added as Contingency instead of 10% to cover this. The Scope of Work will include exterior wall mending plates and Upper Trough Support Steel Replacement in all four Cells plus p sediment removal in the Center Column, The Cost of this work will amount to $38,8 54. , 10.5 Gol ��� PURPOSE OF CHANGE ORDER: Complete Structural Steel Repairs inside the Jeen�eaf Filter and Remove Backwash Sediment from Center Column. -� °1 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Time $ 529,000.00 105 Days Change Orde No. "� ( Net Change From Previous Change Orders $ 38,84 7 �s' Il�t 21 Days Contract Price Prior To This Change Order Contract Time Prior To This Change Order $ 591,326.31 126 Days Net (Increas f Change Order Net (Increase) Of This Change Order tT�h7is $ 38, .54 I, ( 75 days Contract Price With All Approved Change Orders Contract Time With All Approved Change Orders $ 630,&226.85 rV 201 Days zp- Utt Account No(s) Affected: Amount Affected ry 441-6030-533-6330 $388889 54_p�� ROUTING: Dept. Director, Contractor, Purchasing Manager, Ctt M "Y Purchasing Man er MENDED B D BY '11� V(� Y ., •rl e �� Pftb c ervices Director City Manager __NV C n rac or Date Z ) % Date_ _� �? Date r�7' Z- , a �, RF Environlr,r?riL: ,i Service , Inc. i tex . V_ , Job Name: City of Tamarac Greenleaf Filter Underdrains Proposal No. --- Job No. 16012 Task/PCO No. PCO#2 Rev #1 Date: 08101/17 RECAPITULATION Sheet No. Sheet Identification Material Base Labor Eq & Tools $ 1 Metal Repair Work Under Water Level & Influent Trough 1,000.00 6,000.00 20,175.12 2 Removal of Back -Wash Waste Sediment in Center Column 0.00 2,040.00 3,308.05 Totals: Material Cost - Labor Hours 1,000.00 8,040.00 23,483.17 CATEGORY LABOR RATE SUBTOTALS General Construction Labor $35.00 Labor Cost . 8,040.00 Carpenter $45.00 Material Cost 1,000.00 Operator $45.00 Tools & Constr. Equipment 23,483.17 Journeyman $45.00 Subcontractors Working Foreman $55.00 Superintendent $75.00 ax o `646 Assitant Project Manager $65.00 Gen. Administration 0.00 Project Manager $80.00 SubTotai 32,583.17 Burden Included OH - Fee/Profit 15% 41887,48 0.00 SubTotal 37,470.65 Bond 2.8% 1,049,18 Insurance 1 % 374.71 Total $38 894,54 V�� MATERIAL AND LABOR COST ESTIMATE SHEET Sheet Identification: Metal Repair Work Under Water Level & Influent Trough Sheet No. 1 OTY DESCRIPTION MATERIAL LABOR JOB EXPENSE UNIT TOTAL UNiT HS RATE 5 TOTAL UNIT TOTAL i j 24 15 j 1 1 1 1 Labor, Rigging & Equipment Hrs - Superintendent Hrs Days to Assist Welder - Setting Plant, Ladders & Access to Upper Filter Walls Under Upper Trough Cell#4 - Welding Repairs in Filter- Including Exterior Wall Mending Plates & Replacement of Upper Trough Support Steel on West Wall wl 1/2" Stagered Plates (2) Days Welder Cell#1 - Welding Repairs in Filter - Including Exterior Wall Mending Plates & Replacement of Upper Trough Support Steel on South & West Wails w/ 1/2" Stagered Plates 6 Days Welder Cell#2 - Welding Repairs in Filter - Including Exterior Wall Mending Plates & Replacement of Upper Trough Support Steel on South Wall wl 1/2" Stagered Plates (3) Days Welder. Cell#3 - Welding Repairs in Filter - Including Exterior Wall Mending Plates & Replacement of Upper Trough Support Steel on North & West Walls w/ 1/2" Stagered Plates (2) Days Welder. 0.00 0.00 0.00 0.00 I 0.00 0.00 1.00 8.00 -- 76.00 35.00 -T 1,800.00 4,200.00 0.00 0.00 0.00 0.00 2,970.32 7,960.00 5,392.80 3,852.00 I 0.00 2,970.32 1 j 7,960.00 5,392.80 i 3,852.00 I 1 Lot Rental Planks & Shoring 1,000.00 1000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0-00 0.00 0.00 0.00 i i I I I I I I I I I i I I l SUBTOTAL MATERIALS, JE, LABOR HRS AND $ 1,000.00 6,000.00 0.00 0.00 W$200.J75.12 0.0% Materials Consumables 0,00 0.0% Labor Clean U 0.0% Labor Safe 0,00 0.0% Labor Small Tools x $1,000.00 6,000.00 SHEET TOTALS MATERIAL AND LABOR COST ESTIMATE SHEET Sheet Identification: Removal of Back -Wash Waste Sediment in Center Column Sheet No. 2 DESCRIPTION EXPENSE Man-HoursJOB Removal of Back -Wash Waste R111 LaborEnvironmenfal Labor Operator 11 11 •1/1 111 1 11 -_ 1 •! � 1 11 111 _� !11 /•1 • : • - Ilk i&13.isiZJ 1 /!iE�.dii€e. } sti q rim .9�t t • 1 / t g l � lk� i 1 gEi7 f6q g d 3}t$s l�fW.rp�{�'J�`�sa�}iq;t IYSa�ia,�l�9FS�I�j�Lid:Lt t a'[I t 7za .d1 —0.06/0-- materials • :• - yy pEp^^ssi���3gw�a lzii fii.ii"f�,F.�EtESit;�+F`Si'47L�A�'r7� I t► -!.2.L�.�li:�.ir,.%.1 '1 1 1 {�T�".1A���rk!!�`tgk.7�fe7i-St�.`;!�} 1 /I 1 1'. ... . t , p� �G3 3EE�e.`�.k 9 +r 0.1. it i'(v rrsr, x rrx?F13' ! 1'. Labor i2z A .cur�1� »c•.. 1 1 ' . Labor- Tools 3�-ab1.14 77 sask)b "'4k$�i 1 ' ! ! 1 ti,. 1i .ti:.P.�.l+s 4s' ! ' !' ! TOTALSEYj•� ryry ys`'kf7 Metal Supply & Machining INVOICE 1304 Gwenzell Ave Invoice Number: 40138 Delray Beach FL 33444 Invoice Date: 05/09/17 Tel (800)577-9530 Page: 1 B RF ENVIRONMENTAL SERVICS INC S RF ENVIRONMENTAL SERVICS INC 4324 NE 21 AVE 4324 NE 21 AVE I FT LAUDERDALE, FL 33308 FT LAUDERDALE, FL 33308 L 1 L ATTN: THAD P ATTN: THAD Sales Ord No: 37173 Taxable: Y Purchase Order: TAMARAC WWTP TANK Order Date: D4124/17 Pmt Terms: COD Ship Via: BEST WAY Account Cd: RFENVIRONM Shipper No:38732 FOB: PLANT Salesperson: 0 Ship Date: 04/24/17 Job Number: Line Oty Shipped Backordered Part Number/Description Price UM Extended Price 1 2.00 0.00 WELDING $1,200.0000 EA $2,400.00 WELDING WELDING 1200.00 PER DAY 2 1.00 0.00 HRPL.18 $376.0000 LBS $376.00 HRS PLATE .18 THICK MISCELLANEOUS METAL PLATES 3116 THK / 1/2 THK Thank you for the order. Subtotal: $2,776.00 We now accept Visa, Mastercard Sales Tax: $194.32 and American Express for your Freight: $0.00 convience. Total: $2,970.32 Metal Supply & Machining 1304 Gwenzell Ave Delray Beach FL 33444 Tel (800)577-9530 INVOICE Invoice Number: 40197 Invoice Date: 06/02/17 Page: 1 B RF ENVIRONMENTAL SERVICS INC S RF ENVIRONMENTAL SERVICS INC 4324 NE 21 AVE H 4324 NE 21 AVE FT LAUDERDALE, FL 33308 FT LAUDERDALE, FL 33308 L � L ATTN: THAD P ATTN: THAD Sales Ord No: 37239 Taxable: Y Purchase Order: TAMARAC WTP Order Date: 05/16/17 Pmt Terms: COD Ship Via: BEST WAY Account Cd: RFENVIRONM Shipper No:38795 FOB: PLANT Salesperson: 0 Ship Date: 05/16/17 Job Number: Line Qty Shipped Backordered Part Number/Description Price UM Extended Price 2 6.00 0.00 WELDING $1,200,0000 EA $7,200.00 WELDING 6 DAYS FIELD WELDING TUESDAY 5/23 WEDNESDAY 5/25 FRIDAY 5/26 TUESDAY 5130 WEDNESDAY 5/31 THURSDAY 6/1 3 12,00 0.00 HRF.5X6 $20.0000 LBS $240.00 HRS FLAT BAR .50 X 6.0 X 20' 12 PCS X 12 Thank you for the order. Subtotal: $7,440.00 We now accept Visa, Mastercard Sales Tax: $520.80 and American Express for your Freight: $0.00 convience, Total: $7,960.80 Metal Supply & Machining 1304 Gwenzell Ave Delray Beach FL 33444 Tel (800)577-9530 INVOICE Invoice Number: 40285 Invoice Date: 07/05/17 Page: 1 B RF ENVIRONMENTAL SERVICS INC S RF ENVIRONMENTAL SERVICS INC 4324 NE 21 AVE H 4324 NE 21 AVE FT LAUDERDALE, FL 33308 FT LAUDERDALE, FL 33308 L I L ATTN:THAD P ATTN:THAD Sales Ord No: 37329 Taxable: Y Purchase Order: TAMARAC Order Date: 06/28/17 Pmt Terms: COD Ship Via: BEST WAY Account Cd: RFENVIRONM Shipper No:38883 FOB: PLANT - Salesperson: 0 Ship Date: 06/28/17 Job Number: Line Oty Shipped Backordered Part Number/Description Price UM Extended Price 1 4.00 0.00 WELDING $1,200.0000 EA $4,800.00 WELDING 4 DAYS 6/26, 6/27, 6/28, 6129 2 12.00 0.00 HRPL.37 $20.0000 LBS $240.00 HRS PLATE .37 THICK 3/8 ASTM A-36 12PCSX6X12 2 PCS 3/16 X 10 X 36 Thank you for the order, Subtotal: $5,040.00 We now accept Visa, Mastercard and American Express for your Sales Tax: $352.80 convience. Freight: $0.00 Total: $5,392.80 Metal Supply & Machining 1304 Gwenzell Ave Delray Beach FL 33444 Tel (800)577.9530 INVOICE Invoice Number: 40326 Invoice Date: 07/18/17 Page; 1 B RF ENVIRONMENTAL SERVICS INC S RF ENVIRONMENTAL SERVICS INC 4324 NE 21 AVE H 4324 NE 21 AVE FT LAUDERDALE, FL 33308 FT LAUDERDALE, FL 33308 L I L. ATTN:THAD P ATTN:THAD Sales Ord No: 37362 Taxable: Y Purchase Order: TAMARAC Order Date: 07/12/17 Pmt Terms: COD Ship Via: BEST WAY Account Cd: RFENVIRONM Shipper No:38914 FOB: PLANT Salesperson: 0 Ship Date: 07/12/17 Job Number: Line City Shipped Backordered Part NumberlDescription Price UM Extended Price 1 3.00 0,00 WELDING $1,200.0000 EA $3,600.00 WELDING THURSDAY 7/13 FRIDAY 7/14 MONDAY 7/17 Thank you for the order, Subtotal: $3,600.00 We now accept Visa, Mastercard and American Express for your Sales Tax: $252,00 convience, Freight: $0.00 Total: $3,852.00 e'i Gene Contracting Demolition Inc ww�:4980 SW 52" d Street, 4110, Davie, Florida 33314 Office: 954-587-3956 Fax: 954-587-6678 CHANGE ORDER WORK Date: 5/11/2017 To: RF Enviromental Services, Inc, 4324 NE 21th Avenue Fort -Lauderdale, FL 33308 Attn: Thad Buckley — (954)605-6711 RE: Additional Sand Removal a Tamarac Greenleaf Filter April 26, 2017 - (1) Supervisor — 5hrs - (4) Labor — 51irs each total = 20hrs April 27, 2017 - (1) Supervisor — 5hrs - (4) Labor — 5hrs each total = 20hrs May 1, 2017 - (1) Supervisor — 4hrs - (3) Labor — 4hrs each total = 12hrs May 2, 2017 (1) Supervisor— 8hrs (3) Labor — 8hrs each total = 241irs May 3, 2017 - (1) Supervisor— 4hrs - (3) Labor — 4hrs each total = 12hrs Supervisor Total Hours ; 26hrs @ $20.32 $ 528.32 Labors Total Hours ; 88hrs @ $17.78 $ 1,564.64 Overhead 27% $ 565.09 Total Due: 1 $ 2,658.05 of Tamarac "Exhibit C" TR #12990 Purchasing & Contracts Division CHANGE ORDER DATE OF ISSUANCE: 8-01-17 OWNER: CITY OF TAMARAC 7525 NW 88"' Avenue Tamarac, FL 33321-2401 BID NO. 16-20B CHANGE ORDER NO. 3 PROJECT NAME: Greenleaf Filter Media Replacement at Water Plant PROJECT NO. UT17A CONTRACTOR: RF Environmental Service, Inc. P.O. NUMBER 200506 IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS: DESCRIPTION: The Greenleaf Filter has required floor leveling in all four cells to properly align the Media Support structure plates supplied by INFILCO. In addition, there was extensive corrosion in the Greenleaf Clearwell which will require Metal Repairs before the coatings are applied. These areas could not be seen during the Prebid inspection and 20% was added as Contingency instead of 10% to cover this, but it has not been enough. The Scope of Work will include leveling the floor in all 4 cells, plus mental repairs to the Greenleaf Clearwell. The Cost of this work will amount to $32,430.32. PURPOSE OF CHANGE ORDER: Complete Structural Steel Repairs inside the Greenleaf Filter and Remove Backwash Sediment from Center Column. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contact Time $ 529,000.00 105 Davs Change Order No. 3 Net Change From Previous Change Orders $ 32,430.32 96 Davs Contract Price Prior To This Change Order Contract Time Prior To This Change Order $ 630,160.85 201 DaVs Net (Increase) Of This Change Order Net (Increase) Of This Change Order $ 32,430.32 0 Days Contract Price With All Approved Change Orders Contract Time With All Approved Change Orders $ 662,591.17 201 Davs Account No(s) Affected: Amount Affected 441-6030-533-6330 $ 32,430.32 ROUTING: Dept. Director, Contractor, Purchasing Manager, City Manager, Purchasing M nager -Director City Manager Cot � Date g14 1 Date