HomeMy WebLinkAboutCity of Tamarac Resolution R-2016-007Temp. Reso. # 12736 January 13, 2016 Page 1 of 6 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R- 2016 07 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, TO AUTHORIZE AND APPROVE AMENDING TASK AUTHORIZATION NO. 16- 02E IN THE AMOUNT OF $19,870.00 TO PROVIDE ADDITIONAL PROFESSIONAL ENGINEERING SERVICES FOR THE DESIGN AND PERMITTING OF THE CITYWIDE BUFFER WALL PROJECT, PHASE IIB EXPANDED AREAS, WHICH IS GENERALLY LOCATED ALONG COMMERCIAL BOULEVARD BETWEEN ROCK ISLAND ROAD AND NW 64TH AVENUE, IN ACCORDANCE WITH THE CITY'S CONTINUING SERVICE AGREEMENT AS AUTHORIZED BY RESOLUTION R-2011-871 AUTHORIZING AN EXPENDITURE FOR SAID PURPOSE IN AN AMOUNT NOT TO EXCEED $165,467.50; PROVIDING FOR CONFLICT; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, as part of the recently completed Major Arterial Corridor Study it was determined that the City will move forward with the Buffer Wall component of the Study, which includes the design and construction of neighborhood buffer wall treatments for various parts of the City, and WHEREAS, the Citywide Buffer Wall Project along Commercial Boulevard between Rock Island Road and NW 64th Avenue is considered Phase 1113 of this program; and Temp. Reso. # 12736 January 13, 2016 Page 2 of 6 WHEREAS, the City of Tamarac desires to develop detailed engineering plans for the Citywide Buffer Wall Project, Phase IIB which is generally located along Commercial Boulevard between Rock Island Road and NW 64th Avenue -,and WHEREAS, after City Commission has approved Citywide Buffer Wall, Phase IIB Project on October 28, 2015 under Resolution No. R-2015-104, incorporated herein by reference and on file in the office of the City Clerk; and WHEREAS, the City has added approximately 1,100 Linear Feet of a precast system buffer wall, together with associated landscaping and irrigation improvements, and the revised location map attached hereto as Exhibit "1"; and WHEREAS, the design element for Task Authorization No. 16-02E include; concrete foundations, retaining walls, concrete columns and precast wall panels, together with associated landscaping, hardscape and irrigation improvements; and WHEREAS, the City requires the services of a consulting firm knowledgeable in buffer wall and landscaping design and permitting; and r� Temp. Reso. # 12736 January 13, 2016 Page 3 of 6 WHEREAS, Stantec Consulting Services, Inc. has submitted a detailed proposal in an amount not to exceed $19,870.00, attached hereto as Exhibit "2", incorporated herein and made a specific part of this Resolution; and WHEREAS, the proposal for this work describes all tasks to be performed in accordance with Article I, "Scope of Work", of the City of Tamarac Continuing Engineering Services Agreement as authorized by Resolution R-2011-87 dated August 24, 2011, incorporated herein by reference and on file in the office of the City Clerk; and WHEREAS, Stantec Consulting Services, Inc. has been pre -qualified to provide professional engineering services by the City of Tamarac as authorized by Resolution R-2011-87 and the associated Continuing Engineering Services Agreement dated August 24, 2011; and WHEREAS, it is the recommendation of the Director of Public Services, the Director of Financial Services and the Purchasing and Contracts Manager that the Amendment to Task Authorization No. 16-02E from Stantec Consulting Services, Inc. be authorized and approved; and C Temp. Reso. # 12736 January 13, 2016 Page 4 of 6 WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to amend Task Authorization No. 16-02E with Stantec Consulting Services, Inc. in the amount of $19,870.00 to provide additional professional engineering services for the design and permitting of the Citywide Buffer Wall Project, Phase 1113 expanded areas which increases the Task Authorization No. 16-02E from $145,597.50 to $165,467.50. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, SECTION 1: The foregoing "WHEREAS" clauses are HEREBY ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof and all exhibits referenced and attached hereto are incorporated herein and made a specific part of this Resolution. SECTION 2: The City Commission HEREBY authorizes City Staff to amend Task Authorization 16-02E by $19,870.00 for a total Task Authorization No. 16- 02E not to exceed amount of $165,467.50 for additional engineering and permitting services for the City Wide Buffer Wall Project, Phase IIB for expanded areas per the Proposal attached hereto as Exhibit "2", incorporated herein and made a specific part of 1 1 Temp. Reso. # 12736 January 13, 2016 Page 5 of 6 this Resolution. SECTION 3: All Resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 5: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this ATTEST: Q ATRICIA TEUF CMC CITY CLERK I HEREBY CERTIFY THAT I HAVE APPROVED THIS RESOLUTION AS TO FORM SAMUEL S. G REhC CITY ATTORNEY Temp. Reso. # 12736 January 13, 2016 Page 6 of 6 11 l day of Qd4uta,uj2016. HARRY DRESSLER MAYOR RECORD OF COMMISSION VOTE: MAYOR DRESSLER DIST 1: COMM. BUSHNELL DIST 2: COMM. GOMEZ DIST 3: VICE MAYOR GLASSER DIST 4: COMM. PLACKO V�9� 1 Ll m F a TR 12736 Exhibit 2 Stantec November 20, 2015 Stantec Consulting Services Inc. 21301 Powerline Road Suite 311, Boca Raton FL 33433-2305 Mr. John E. Doherty, P.E. Assistant Director of Public Works/City Engineer Public Services Department 6011 Nob Hill Road, Second Floor Tamarac, FL 33321 Re: Commercial Boulevard Buffer Walls — Phase IIB Additional Services City's Task Authorization Number: 16-02E Dear John: In accordance with the terms and conditions of the consulting agreement between the City of Tamarac (hereinafter referred to as the "City" or `Client") and Stantec Consulting Services, Inc., (hereinafter referred to as "Consultant", "We" or "Stantec"), dated August 24, 2011, we are pleased to provide this proposal in support of the Commercial Boulevard Buffer Walls —Phase IIB Additional Services project. I have attached a scope and fee for your review and approval. We look forward to the opportunity of working with you on this important project. Cordially, Stantec Consulting Services, Inc. Enclosures Design with community in mind Re: Commercial Boulevard Buffer Walls — Phase 1113 Additional Services City's Task Authorization Number: 16-02E TR 12736 Exhibit 2 Page 2 Exhibit "A" Commercial Boulevard Buffer Walls — Phase IIB Additional Services Task Authorization No.16-02E GENERAL DESCRIPTION OF PROJECT Services are required for the design and construction of a buffer wall along the north and south side of Commercial Blvd. On the North Side, the proposed wall will be located between NW 64th Avenue and Rock Island Road. The initial phase of the wall was intended to be located on the north side of Commercial Boulevard from Rock Island Road west to 300' west of Woodlands Boulevard and on the south side from NW 64th Avenue east to just past Guava Drive. On the south side of Commercial Boulevard, the wall will generally run along the separator between Commercial Blvd and the frontage road with openings for the intersecting cross streets. Due to public feedback, the City now desires to add some additional wall features at specific locations along the north side of Commercial Blvd. and the west side of Rock island Road. The following scope of services outlines these services. SCOPE OF SERVICES This Proposal provides for professional engineering services for the preparation of contract documents for the additional segments of Precast Concrete Wall along the corridor. Those additional segments include the following: Commercial Blvd. North Side — one residence west of NW 581h Way Commercial Blvd. North Side — NW 58 h Way to NW 571h Way Commercial Blvd. North Side — one residence east of NW 57'h Way Rock Island Road West Side — Commercial Blvd north approximately 600' This proposal provides the outline of the Consultants scope of services as well as the fee structure for providing services The proposed scope of services and fees follow. Task 1 — Data Collection 1. Same as previous but with minor additions 2. The Consultant will work with the additional surveys to establish base sheets for roadway corridors. 3. The Consultant will Conduct Utility Sunshine Onecall design tickets for potential utility conflicts for the new wall segments 4. The Consultant will provide site visits as necessary to verify existing conditions, identify conflicting elements and potential layouts. 5. Geotechnical data shall be reviewed as supplied by the City 6. Traffic Data and existing geometry shall be reviewed for the frontage road segment between NW 58�h Way and NW 57th Way. The intention is for that frontage road to become a one way facility. Re: Commercial Boulevard Buffer Walls — Phase IIB Additional Services City's Task Authorization Number: 16-02E TR 12736 Exhibit 2 Page 3 Task 2 — Project Concept Design A concept design will be developed for these wall segments that will be included in the overall phase 213 buffer wall plans illustrating how and where the wall can be installed. Therefore, this concept phase is intended to establish the geometry to allow the City to determine the best schematic design to move forward with the project. Task 3 — Project Design and Construction Documents It is assumed that three new plan sheets shall be needed to contain the design data for the new wall segments. Once the concept deign is completed, the Consultant will prepare construction plans, calculations and specifications for the project consisting o£ 1. Concrete foundations, retaining walls, precast wall columns, precast wall panels as necessary for a complete wall design at the subject location. 2. Technical Specifications in Construction Specification Institute (CSI) Division through 16, S tfi" x 11" format as applicable. 3. Opinion of Probable Costs (OPQ organized by pay item. The Consultant will submit documents for review to the City at the following stages: • 60% plans and specification outline « 90%plans, specifications and OPC • Final plans,.. specifications and OPC The consultant will meet once with City staff after each submittal to review and discuss City comments The purpose of the meeting will be to review the comments, discuss revisions and design decisions associated with the project concluding the meeting with an approved set of percent complete deliverables for the project The Consultant will address comments and revise the work as alicable to the following phase of development for the work. Any significant redesign will be provided as an additional service. The drawings will be developed in a 24" x 36" format and also printed in I x 17" format. Final drawings and documents shall also be submitted in electronic format (PDF files). Task 4 — Government Agency Approval Assistance Included in Original Scope Task 5 — Bidding Assistance — Included in Original Scope Task 6 - Construction Phase Services — Included in Original Scope Task 7 — Reimbursable Expenses Not Anticipated ADDITIONAL SERVICES Any services not specifically provided for in the services and can be performed at our then current provide include, but are not limited to, the following: 1. Attendance at public hearings. above scope will be considered additional hourly rates. Additional services we can Re: Commercial Boulevard Buffer Walls — Phase IIB Additional Services City's Task Authorization Number: 16-02E TR 12736 Exhibit 2 Page 4 2. Permit applications, processing or expedition except as noted herein. 3. Services required by additional governmental regulations, which might be put into effect after the date of this agreement. 4. Construction documents for elements outside of the identified project limits. 5. Structural design beyond those identified. 6. Environmental services beyond those identified. 7. Landscape and Irrigation Design 8. Responses to agency comments beyond those outlined in this scope. 9. Threatened or Endangered species coordination or specific protected species surveys. 10. Any services not specifically identified and described in the above Scope of Services. 11. Irrigation services for wells, meters or timer clocks if irrigation systems are not existing or adequate. TO BE PROVIDED BY CLIENT The following items are to be provided to Stantec by the Client or the Client's Consultants: 1) As -built (record) drawings of all existing utilities within the project limits. 2) Underground utility location services to verify locations and depths of underground utilities. 3) All required geotechnical reports and recommendations. 4) All survey work, easement work and title searches, etc. will be performed by the City's Surveyors. Permit work other than that mentioned in the Scope of Services is not included. Additional work to relocate utilities or miscellaneous structures is not included in this proposal. This proposal assumes that a field survey will be provided to us in AutoCad format to utilize as a base sheet for the construction documents. 5) Coordination with residents and approvals for property rights (ie easements) will be handled by the City. 6) Authorization to represent the Client on permit applications. 7) Access to the site. 8) Proof of Ownership documentation needed for permitting. 9) Permit application fees and plan review fees. 10) Any other existing information related to the project that may influence the scope of services noted above including but not limited to, budget, aesthetics and associated modifications or revisions. SCHEDULE Stantec will provide its services in conjunction with the original schedule agreed upon for the Phase 2B project FEE AND BILLING Stantec will accomplish the services outlined in Tasks 1 through 3 for the Total Project Not -To - Exceed Budget of $19,870.00. Invoicing and payment will be in accordance with the terms and conditions of the consulting agreement between the City of Tamarac and Stantec dated August 24, 2011 and shall govern this agreement as applicable. When possible, all permitting, application, and similar project fees will be paid directly by the Client. Reimbursable expenses shall only be used when needed to expedite processes as directed by the Owner. Expenses are in addition to the labor amount. Re: Commercial Boulevard Buffer Walls — Phase IIB Additional Services City's Task Authorization Number: 16-02E Page 5 TR 12736 Exhibit 2 Fees and expenses will be invoiced monthly based, as applicable, upon the percentage of services completed and expenses incurred as of the invoice date. Payment will be due within 30 days of the date on the Stantec invoice. Fees and times stated in the agreement are valid for sixty (60) days after the date of this letter. The following task items represent a breakdown of the lump sum amounts for Stantec for reference: NOT -TO -EXCEED FEES Task Description Labor Fee Sub -Consultant Fee 1 Data Collection $ 3,450.00 N/A 2 Project Concept Design $ 3,010.00 N/A 3 Project Design and Construction Documents $ 13,410.00 N/A 4 Government Agency Approval Assistance $ 0.00 N/A 5 Bidding Assistance $ 0.00 N/A 6 Construction Phase Services $ 0.00 N/A Design, Permitting and CA Fees $ 19,870.00 REIMBURSABLE FEES Reimbursable Fees, Permits, Etc. TOTAL TASK AUTHORIZATION FEE $19,870.00 Re: Commercial Boulevard Buffer Walls — Phase IIB Additional Services City's Task Authorization Numbtr: 16-02E TR 12736 Exhibit 2 Page 6 CLOSURE If you concur with the foregoing and wish to direct us to proceed with the aforementioned services, please execute the enclosed copy of this letter agreement in the space provided and return. Fees and time stated in this agreement are valid for sixty (60) days after the date of agreement by Stantec Consulting Services, Inc. Stantec Consulting Services, Inc. appreciates the opportunity to submit this letter agreement. Please contact Terrance Glunt at (561) 487-3379 x 231 if you have any questions. Respectfully Submitted, STANTEC CONSULTING SERVICES, INC. e Glunt, P.E. Cc: file Agreed to this day of 92015 CITY OF TAMARAC A Municipality By: , City Manager Michael C. Cernech. City Manager (Print or Type Name) Attest: Witness (Print or Type Name) Official Seal: V:\2156\business_development\Tamarac\Commercial Blvd WallsWommercial Blvd walls,doc TR 12736 Exhibit 2 Slantec CdittultingSurvkcs, Inc. (� } Stantec Englneatx-Arcititccts-Planners 21"1 Pgtieflinc Row Boca Raton, Florida 33433 561) 487-3379 (Phone) - (561) 487-3466 (Fax) M.ANHOUR ESTIMATES ro ec o-: lanlcc Names Tamarac Buffer Walls- Phase 1113 Addl Services City of Tamnrnc, Florida - Task Authorization No, l(-n2E Date 11/20/2015 Principal in Charge Mahttours I Clicni Manager Manhours Sr I Manager Mmlhouts Prufw Manager Marabouts Technician Manlmurs Clerical M3nhours TOTAL Running Total Hours Cost For Activity . Y 133,00 3 } INI 105.00 SU.M S359D $ 3,45U,00 1.1 Ld13a1 Merl}ry" 1.2 Dale Collection 1,2.1 Site Visits -Initial & Follow Up 1.2.2 Staff Mcctines - Initial & Follow U2 I,1:2 Review of As-Builts/Survey Data 2 2 4 S 480.00 13 Eleld Testinss/Utility Locotes 13.1. aoteehnical Coordination 1.3,2 Surveying Coordination - Specific Purpose and Topographic Survey 2 4 6 $ 810,00 13.3 Utntty Locate Coordlnation 4 4 8 $ 1( 0.00 13.4 S ecific Purpose Survey - N/A - - 13,5 Ocotechnical Investigation - N/A IA Anulvsis of Collected Data 1.4.1 Traffic Changcs between 57th and 58th 1 4 4 8 $ 1,080A _ a U r=4 . $ 6,46o.n0 3.2 Concept Design 2 2 8 8 8 S 3,010,00 = 2 8 N 8 b U S J,OiQW lGfIiS.OMS" Pro .., n`a`h1i;GU'd."...''�.,._,. .. .,_ . ... ... -, _ $ 14A7D.f10 3.t w A DUM 3.1.1 Design Analysis 4 4 8 16 $ ],92000 3.1.2 Plan production 2 4 4 8 8 26 5 2.740,00 31 Reviewand Comment 33 Final Desi m 3,3,1 Ptao Production 2 4 4 4 4 18 1 $ 2.060,W 3,31 Technical S ciQcuttons 3.3.3Opinion of Probable Cost 3A Landsenpe andlrri anon• Notlncluded 3.4.1 Plan Production 3,4.2 Technical Specifications 14.3 O inion of Proboblc Cost 35 Quality Controlik'luafily Assurance 3.5.1 Final Staff Rcvncw 35.2 Modi(icah'nns ? '2 2 6 $ 670,00 3.6 Submit Final Plans 14 2; 20 14 U 66 5 13.41U.UU ril+YSB'3'A(f:' Government"enc 'A _.-royal AsslsWfice 5 19,870,00� 4.1 P­1111nat 4.1.1 Coordination with. FDOT 4.1.2 Broward County Tree and ERP permits, City En inccring De Le Peranit In .r ;W 4-f Ji r Cnns[rucUnn Administrotlon Bid Evaluationn 45;..1.2 n ff 0(Ifift1d"fildriFl0hpAs4ft 6.1 lCtictilmellnAdodnWivitan 6.1.1 Shp Drnwin 6.1.2 RFPs 6.1-3 Sitpias rthirys 6.1.4 Pre aMea{rt' 6,1.5 Administrative Su ion 6.I.6 Fnnl. Canihcltion f i7 U U U Lk:=�_T4Mh 1 13 1 44 1 56 1 M 1 44 0 I.ABO COST. TflT SUBCONSULTANT FEES- SURVEYINGNONE Ste Ali— SUBCONSU LTANT FEES (GEOTECHNICAL SERVICES NONE) - Sea Abnve $ REIMBURSABLE ALLOWANCE (permit fees) TOTAL PROPOSED COMPENSATION $ 19,870.00