Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2012-106Temp Reso #12237 08/21 /12 / Rev 09/10/12 Page 1 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2012- A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA REVISING THE CITY'S BUILDING FEES PURSUANT TO EXHIBIT "A" ATTACHED HERETO AND INCORPORATED HEREIN; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Section 5-1(a) of the Tamarac City Code authorizes the City Commission to review, alter, add to, modify, deduct from or in anyway change any fees or any categories of building permit fees by Resolution (existing fee schedule attached as Exhibit A); and WHEREAS, in compliance with City Ordinance 0-2008-6 requires the City Manager, or his designee, review building permits fees (every two years) and; WHEREAS, the current fee schedule is set to determine the actual cost of services providing for building plan review, permitting and inspection services; and WHEREAS, this revised fee schedule makes recommendations for changes of certain fees to ensure fairness and equity to users (a copy of which is attached as Exhibit A); and Temp Reso #12237 08/21 /12 / Rev 09/10/12 Page 2 WHEREAS, the fees reviewed provide the actual cost incurred by the city in providing each of the various services performed in the enforcement of the Florida Building Code; and WHEREAS, the Building Official and Finance Director recommends the building permit fee schedule updates be adopted, effective October 1, 2012, utilizing the Schedule of Permit Fees which accurately reflect the costs associated with performance of the activities connected with enforcement of the Florida Building Code as provided for in the Florida Statutes, hereto attached as Exhibit A; and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interests of the citizens and residents of the City of Tamarac that the City adopt the revised Building Department Schedule of Permit Fees to support the expenditures authorized in the fiscal year 2013 budget. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true a correct and are hereby made a specific part of this Resolution; all exhibits attached hereto are incorporated herein and made a specific part of this Resolution. SECTION 2: The City Commission of the City of Tamarac hereby approves the schedule of Permit Fees, attached hereto and incorporated herein as Exhibit A. Temp Reso #12237 08/21 /12 / Rev 09/10/12 Page 3 SECTION 3: All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 5: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this ATTEST: ,PETER M. J. RIC ARDSON, C14M, CIVIC CITY CLERK I HEREBY CERTIFY THAT I HAVE APPROVED THIS RESOLUTION AS TO FORM F. SA EL S. GO :EN, CITY ATTORNEY kF day of 2012. BETH TALABISCO, MAYOR RECORD OF COMMISSION VOTE: MAYOR TA LAB I SCO DIST 1: COMM. BUSHNELL - Y DIST 2: COMM. GOMEZ- DIST 3: VIM GLASSER- �3 DIST 4: COMM. DRESSLEI_. [l TR#12237 ' Memo Attachment CITY OF TAMARAC BUILDING DEPARTMENT Schedule of Permit Fees SECTION I: As set forth in Section 105 of the 2007 Broward Coun Amendments to the 2010 Florida Building Code, it is unlawful for any person, firm, or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration, or repair on or within private property, and such act is punishable as provided in Section 1 - 13 of the Tamarac City Code. SECTION ll: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. Failure to do so may be subject to a penalty for commencing work without a permit as provided in Section B #18 of this fee schedule. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous, signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of $0.30 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the occupancy and the value of which does not exceed one thousand five hundred ($1,500.00) dollars in labor and material as determined by the Building Official. SECTION V: As per City of Tamarac Ordinance No. 0-2004-15 Addition Article XI, entitled "Public Art Program", a Public Art Fee will be assessed based on construction value of improvements to real property in the City of Tamarac as provided for in Section 5-304. Public Art Fees shall be collected at the time of permit issuance. A. EXPIRED PERMITS FEES 1. Permit Extension Prior to Expiration ................................. $ 95.00 B. MISCELLANEOUS FEES 1. Copies (as per Section 6-35 of Tamarac City Code (a) Microfilm ............................... Four (4) pages or less $ 2.00 Otherwise $0.50 per page (b) Photocopies ...................................... Per page $ 0.15 2. Building Department Research for Determination of Open Permits and Outstanding Building and Code Enforcement Violations .. Per address $ 50.00 3. $ 260.00 Safety Permit: Includes review of plans and field inspections of all $ 260.00 disciplines for issuance of a Certificate of Occupancy. Fee is non-refundable. Fire Dept fees are additional ................ 4. Board of Rules & Appeals (BORA) Fee ......... Per $1,000 cost of job 0.68 Per $1,000. cost of construction with a minimum of $2.00 5. DCA Surcharge .................. 1.5 % of the permit cost with a minimum of $2.00 6. Building Permit Certification Surcharge (DBPR) .................. 1.5 % of the permit cost with a minimum of $2.00 T. Any item not explicitly listed shall be based on the required number of inspections ................................. $ 95.00 1 TR#12237 Memo Attachment 10 C. 8. Certificate of Occupancy ........................................ $ 75.00 (a) Residential Single Family .............................. No additional charge (b) Multi -Family .................................... Plus per unit $ 3.00 (c) Commercial ............................ Plus for each 1,000 SF $ 3.00 MISCELLANEOUS FEES (Con't.) 9. Temporary Certificate of Occupancy .............. Per ninety (90) days $ 250.00 10. Certificate of Completion ......................................... $ 75.00 11. Change of Contractor ........................................... $ 75.00 12. Contractor Annual Records Maintenance ........................... $ 50.00 13, 40 Year Building Safety Inspection Program Processing Fee ............ $ 190.00 14. Partial Release of Liens (a) Special Magistrate Hearing Administrative Fee (if not already paid) .... $ 75.00 (b) Building Department Administrative Fee (minimum) .................. $ 380.00 (c) Fee to File Lien .............................................. $ 18.50 (d) Fee to Release Lien ......................................... $ 18.50 Additional time required, above the minimum time will be charged at $50.00 per 1/2 hour. 15. Stipulated Agreements (Related to real estate transactions) .......... 492.00 16. Review of Special Inspector's Documentation for missed inspections after the permit has been issued . 190.00 17. Scanning Fees for Converting Paper Files to Electronic Submittals. 20.00 (a) Letter, le al and ledger size scanning .................... per page 0.15 Obj Large plans (ie: 24x36) .... per page 3.00 - City will scan large plans up to five M12ages. 18. Penalty for commencing work without a permit. Lal Contractors - $285 00 or Double Permit Fee, whichever is greater. 1) Homeowners-1190.00 or Double Permit Fee, whichever is Greater .... BUILDING PERMIT FEES 285-00 190.00 New Construction and Additions (a) Single -Family (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 1,500 sq. ft.................................. Minimum $ 750.00 or $2.30 per sq. ft.; whichever is greater 2) 1,501 - 3,000 sq. ft........................................ $ 3,444.00 Plus $0.79 per sq. ft. in excess of 1,500 sq. ft. 3) 3,001 - 4,500 sq. ft........................................ $ 4,622.00 Plus $0.79 per sq. ft. in excess of 3,000 sq. ft. 4) 4,501 - 6,000 sq. ft. ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5,810.00 Plus $0.79 per sq. ft. in excess of 4,500 sq. ft. 5) Greater than 6,000 sq. ft.................................... $ 6,992.00 Plus $0.71 per sq. ft. in excess of 6,000 sq. ft. 2 TR#12237 Memo Attachment (b) Multi-Family/Condo/Apartment/Townhouse (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 5,000 sq. ft................................... Minimum $ 750,00 or $1.77 per sq. ft.; whichever is greater 2) 5,001 - 10,000 sq. ft........................................... $ 8,860.00 Plus $1.36 per sq. ft. in excess of 5,000 sq, ft, 3) 10,001 - 15,000 sq. ft......................................... $ 151662.00 Plus $1.17 per sq. ft. in excess of 10,000 sq. ft. 4) 15,001 - 25,000 sq. ft. ........................................ $ 21,521.00 Plus $0,62 per sq. ft. in excess of 15,000 sq. ft. 5) Greater than 25,000 sq. ft...................................... $ 27,721.00 Plus $0.56 per sq. ft. in excess of 25,000 sq. ft. (c) Office/Retail (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft................................. Minimum $ 5,000.00 or $1.23 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... , $ 12, 334.00 Plus $0.78 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft........... ........................... , $ 24,005.00 Plus $0.49 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft.................................... , $ 361361.00 Plus $0.31 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 51,904.00 (d) Industrial (Includes ALL Disciplines) 1) 1 - 10,000 sq. ft.. ................................Minimum $ 4,000.00 - Minimum or $1.21 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... $ 12,112.00 Plus $0.64 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... , $ 210649.00 Plus $0.44 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft.................................... , $ 32,725.00 Plus $0.28 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 46,714.00 Plus $0.25 per sq. ft. in excess of 100,000 sq. ft. 3 TR#12237 Memo Attachment (e) Parking Garage (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft.. ................................Minimum $ 3,000,00 or $0.91 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... , $ 9,109.00 - Plus $0.68 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft....................................... $ 19,271.00 Plus $0.39 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft.................................... , $ 29,122.00 Plus $0.25 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft. ................................ $ 41,576.00 Plus $0.22 per sq. ft. in excess of 100,000 sq. ft. (f) Assembly/Hotel/Other (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq, ft................................. Minimum $ 6,000.00 or $1.36 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... , $ 13,579.00 Plus $0.86 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... , $ 26,460.00 Plus $0.54 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft. ..... . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . . $ 39,998.00 Pius $0.34 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft. ............... . ................ $ 57,095.00 Plus $0.31 per sq. ft. in excess of 100,000 sq. ft. 2. Remodels and/or Alterations (a) Single Family (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 . . .................... . ..... . ........ $ 2,572.00 Plus $0.09 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000....................................... $ 4,906.00 Plus $0.06 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (b) Multi-Family/Condo/Apartment/Townhouse (includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000.............. ......................... $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50, 001 - $100,000 ........ 0 ......... 6 .................... $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000 .... . ........................ . ...... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 4 TR#12237 Memo Attachment 3. Remodels/Alterations/Tenant Improvements (a) Office/Retail (Includes ALL Disciplines) 1) $0 $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000....................................... $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 (b) Industrial/Parking Garage (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,572.00 Plus $0.07 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000 ............................ . .......... $ 4,376.00 Plus $0.07 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (c) Assembly/Hotel/Others (includes ALL Disciplines) 1)$0-$25,000............................................ $ 500.00 or $0.13 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 3,142.00 Plus $0.11 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000 . . . . . . . . . . . . . . . . . . .i .................... $ 5,812.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 9,738.00 Plus $0.07 per additional dollar of project value greater than $100,000 4. Reinspection Fees .................................. All disciplines $ 95.00 (a) Second Failure .............................................. $ 95.00 (b) Third Failure ............................................... $ 190.00 (c) Fourth Failure .............................................. $ 285.00 5 TR#12237 Memo Attachment 5. Inspection/plae-review outside normal business hours (including after business 66, hours and weekend) ..................... Minimum for two (2) hours this was a scriveners error - typo)$ ?95.Q0 .....:...:::.... ...:.................. Plus each additional hour or fraction thereof $ 147.00 (a) For Ex edited Plan Review for three 3 or less disciplines the fee is $295.00 per discipline ...................... $ 295.00 LbI For Expedited Plan Review of four 4 or more disciplines, the fee is a maximum of $886.00 rather than $296.00 per discipline ........ $ 885.00 NOTE: Expedited Fees for plan review or inspection requests after business hours are paid at time of request and are due at each submittal for expedited service. 6. Lost Plan Replacement ......................................... $ 1125.00 ) ................................................. $--125.00 (7 Eleot ina.l .. . . . . . . . .. . . . . . .. . . .. . .. .. . . . . $ i 13.00 - `/ Merhani . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r . + $ i i 0.00 r' l l . . . . . . . . . . . . . . . . . . . . ■ . . . . . . . . . . . . . . . . . . . . . . . . . 0. . . $ 114.00 7. Plan Resubmitted (prior to permit issuance) (a) Structural..... ............................................. $ 60.00 (b) Electrical. ................................................. $ 60.00 (c) Mechanical.... ............................................. $ 60.00 (d) Plumbing . .................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 60.00 C,f10/ of Of permitfrsn iGSUaR . . . . . . . . .applied to permit fee at time 8. _Plan Processing Fee at time of Permit Submittal: These fees are based on the Value of the work and are Non -Refundable; however, applied to permit fee at time of issuance. J.aj 110,000 - $50,000 ... ... $ 500.00 LbI $50,001 - $100,000 ......................... $ 2,10 0.00 LCI 1100,001 - 500 000 .. $ 3,000.00 JAI $500,001 - or Greater . ... 5,000.00 9. Canvas Awnings ..................................... Up to 40 LF $ 190.00 Each additional 40 LF or fraction thereof $ 33.00 10. Metal/Canvas Carports & Canopies . ................... Up to 200 SF $ 219.00 Each additional 200 SF or fraction thereof $ 33.00 (a) Temporary Tent for Special Events .. 190.00 11. Hurricane Shutters ............................. First five (5) shutters $ 141.00 Each additional shutter $ 23.00 Any combination of windows/doors/and shutters up to five (5) $ 141.00 12. Windows & Doors First five (5) windows/doors $ 141.00 Each additional windows/doors $ 23.00 Any combination of windows/doors/and shutters up to five (5) $ 141.00 13. Wood Decks ..................................... Up to 200 SF $ 190.00 Each additional 100 SF or fraction thereof $ 33.00 0 TR#12237 Memo Attachment 14. Demolition (a) Demolition of Entire Building ................................... $ 570.00 (b) Interior/Exterior Alteration Demo Only: 1) Structural ................................................ $ 95.00 2) Electrical ................................................ $ 95.00 3) Mechanical .............................................. $ 95.00 4) Plumbing ................................................ $ 95.00 (c) Demolition in Conjunction With Build Out Permit No add'I charge 15.Fence........................................... Up to150 LF $ 190.00 Each additional 50 LF or fraction thereof $ 33.00 16. Roofing & Re-roofing................................Up to 1,000 SF $ 234.00 Each additional 500 SF or fraction thereof $ 33.00 (a) Roof Repairs 1) 1 - 25,000 sq. ft. ...................... ■ ............ $ 190.00 2) 25,001 - 50,000 sq. ft.................................... $ 240.00 3) 50,001 to 100,000 sq. ft......... • I .................... • ■ . ■ . $ 290.00 4) Greater than 100,000................................... $ 340.00 - 17. Siding (Stucco & Soffit) ............................. Up to 50 500 SF $ 190.00 Each additional 100 SF or fraction thereof $ 33.00 18. House Moving Into the City ....................................... $ 570.00 19. Plan Review or Revisions ........................... Base charge $ 49.00 Plus per each page $ 16.00 (a) Review of Shop Drawincis/Doc uments after permit issuance).. $ 95.00 20. Masonry Walls & Precast Concrete Walls ................ Up to 100 LF $ 360.00 for each additional 100 LF or fraction thereof $ 61.00 21. Permit Card Replacement (no recorded inspections) .................. $ 10.00 Each recorded inspection $ 5.00 22. Safety Determination for Above Ground Portable Pools/Spas Not Attached to Swimming Pools ................................... $ 104.00 23. Commercial & Residential Swimming Pools (Includes ALL Disciplines) (a) 1 - 16,000 gallons .......................................... $ 520.00 (b) 16,001 - 30,000 gallons ..................................... $ 640.00 Per each additional 1,000 gallons or fraction thereof above 30,000 $ 33.00 (c) Re-marciting commercial pools .... . . $ 190.00 7 TR#12237 Memo Attachment 25, Screen Enclosure (Patio/Porch/Pool) (a) 1-200 sq. ft................................................ $ 248.00 (b) 201 - 400 sq. ft.............................................. $ 273.00 (c) 401 - 600 sq. ft............................................. $ 299..00 (d) 601 - 800 sq. ft............................................. $ 324.00 (e) 801 - 1,000 sq. ft............................................ $ 349.00 (f) 1,001 - 1,200 sq. ft........................................... $ 375.00 (g) 1,201 - 1,400 sq. ft........................................... $ 400.00 (h) 1,401 - 1,600 sq. ft........................................... $ 425.00 (i) 1,601 - 1,800 sq. ft........................................... $ 451.00 U) 1,801 - 2,000 sq. ft.. .... . . . . . ............................... , $ 476.00 (k) Per additional 100 sq. ft. or fraction thereof $ 12.50 26. Slab (Porch/Patio-monolithic) .......................Up to 40-0 500 SF $ 190.00 (Walkways & Pavers) ........ for each additional 100 SF or fraction thereof $ 33.00 27. Concrete Paving & Parking .......................... Up to 1,000 SF $ 190.00 (Driveways & Pavers) for each additional 500 SF or fraction thereof $ 33.00 28. Sealcoat/Restripe (a) Up to 25,000 sq. ft......................................... $ 190.00 (b) 25,001 - 100,000 sq. ft..................................... $ 285.00 (c) Each addition of 25,000 sq. ft. ............................... $ 33.00 29. Walkways (Only) ...................................... Up to 50 LF $ 190.00 each additional 50 LF or fraction thereof $ 33.00 30. Signs (a) All Wall Signs ............................................... $ 227.00 (b) All Monument Signs ......................................... $ 227.00 (c) All Temporary Signs ......................................... $ 227.00 (d) Banners (30 days once per year or two 15 day; +SurchargesfTotal $44.00) .... $ 40.00 (e) Directional Signs (per sign) .................................... $ 53.00 (f) Face Change Only .......................................... $ 190.00 31. Docks ............................................ Up to 30 LF $ 227.00 each additional 10 LF or fraction thereof $ 17.00 32. Utility Shed.................................Up to 10' X 10' X 7' high $ 141.00 Larger than 10' X 10' X 7' high $ 235.00 33. Fireplace (when not part of original plans) ........................... $ 141.00 34. Sea Walls .......................................... (See Ordinance #74-75) 35. Sea Wall Repairs ................................ 3.0% of Cost of Construction or a minimum of $190.00, whichever is greater 36. Garage Door ................................................. $ 141.00 37. Trailer Tie -Down (Construction or Sales) ........................... $ 141.00 38. (Code #38 used in computer setup for: A/C Stands (MechanicallStructural) nIa 39. Kitchen Cabinets ............................................. $ 141.00 8 TR#12237 Memo Attachment 40. Solar Panels or Photovoltaic Systems - up to 10KW ................ 500.00 Fee includes Electrical and Structural Disciplines) 41. Cellular / Wireless Facilities .... ... ... $ 770.00 Maintenance and New Equipment on existing towers only (Fee includes Electrical and Structural Disciplines) D. ELECTRICAL UNIT FEE SCHEDULE 1. Burglar Alarm - Commercial ...................... Up to 10 drops $ 111.00 for each additional drop in excess of 10 drops $ 2.00 (a) Burglar Alarm -Residential .............. . ... .... $ 95.00 2, Commercial Site Lighting ........................ Up to 3 standards $ 146.00 for each standard in excess of 3 standards $ 16.00 3. Electrical Sign ............................................ Each $ 122.00 4. Fire Protection .... Each alarm bell, horn, or similar device up to 10 devices $ 235.00 Each additional device in excess of 10 devices $ 8.00 5. Electrical Connections for Res identiallCommercial A/C System Per new system $ 190.00 Each change out $ 95.00 6, Low Voltage Wiring (a) Each Data Line Up To 10 .......................... $111.00 $ 95.00 Each additional device in excess of 10 devices $ 2.00 (b) Each Intercom Up To 10 ......................... $74.00 $ 95.00 Each additional device in excess of 10 devices $ 2.00 (c) Each Telephone Outlet Up To 10 ................ $74.00 $ 95.00 Each additional device in excess of 10 devices $ 2.00 (d) Video Camera System EaGh Video Line Up tG 1 Q ................. $ 95.00 Each additional device in excess of 10 devices $ 2.00 (e) Each Sound System ............................... $74-00 $ 95.00 Each additional device in excess of 10 devices $ 2.00 EachV.,,-„,R,m $ 74.00 I .... .. ............. V . I .. .... M 8 a a Door Access System $ 96.00 Plus $2.00 per device in excess of 10 devices $ 2.00 Cable TV ....... ... ... .... ... .. $ 95.00 Plus $2.00 per CATV outlets in excess of 10 outlets $ 2.00 7. Service Change ....................... Up to 200 AMPS $95.00 $190.00 (a) Res identiallCommercial ....................... 200 - 400 AMPS $ 190.00 Every 100 amps over 400 $ 10.00 8. Sprinkler Pump .......................................... Each $ 146.00 9. Temporary Electric ............................................. $ 122.00 9 TR#12237 " Memo Attachment 10. 30-Day Temporary Electric For. Testing ................. • ........... $ 146.00 11. Construction or Sales Trailer ....................... • ... 99.00 12. Generators {Power Apparatus} 167.00 JgJ Residential (with transfer switch) r r .... • ... • .. Up to 20 KW_ 190.00 _Commercial (with transfer switch) ... ■ ...... • .. Up to 20 KW $ 285.00 Each additional 1 KW or fraction thereof in excess of 20 KW $ 8.00 JcJ Transfer Switch only - 200 Amps (Residential) ......... $ 95.00 M Transfer Switch only - 200 Amps (Commercial) ................. $ 190.00 Every 100 Amp over 200 Amps 45.00 13. Meter Can Replacement .. ■ . . . .......... • ........ ■ ......... • . $ 95.00 E. MECHANICAL UNIT FEE SCHEDULE 1. Replacement of Air Conditioning Split System r . r . . . . . . . . . . . . . . r $ 190.00 2. Air Handler or Condensing Unit Replacement ....................... $ 120.00 3. Package Unit ................................................. $ 150.00 4 A/C Stands .. , .... • ..... ■ With no equipment changes $ 95.00 $ �a o In conjunction with equipment replacement $ 15.00 5. Pool Heater ..................•................................. $ 120.00 6. Smoke Duct Detector ........................ ■ ................... $ 99.00 7. Air Conditioning Duct Work ............. When attached to A/C permit $ 95.00 Stand alone $ 190.00 8. Hood System With Fire Suppression ... ■ ............................ $ 390.00 9. Suppression System Only ....................................... $ 190.00 10. Bathroom Exhaust Fan (New or Replacement),, . • .... $ 95.00 11. Replacement of Air Conditioning Unit - 10 Tan or above ........... $ 380.00 (Commercial properties onlyl 12. Pressure Process Piping (New or Replacement) ..... ■ ........... $ 95.00 F. PLUMBING UNIT PERMIT FEES 4, FiFe Sprinkler System . • • • • ■ r . • . • ■ . r . . . . ■ ■ • . • • . ■ • ■ ■ ■ ■ r • a@ per head d"3,nn *Fire Dept Fees Apply 2. Backflow Devices ................................. Up to 4 devices $ 125.00 Plus each additional device $ 50.00 3. Solar Pool Heater / Water Heater . ................................. $ 125.00 4. Domestic Water Heater / Tank less ........ r ........... s-80-00 $ 95.00 5. Water Well .......... •......................................... $ 125.00 6. LP Gas System .................................... Up to 4 outlets $ 150.00 Plus each additional outlet $ 66.00 10 r, TR#12237 Memo Attachment 7. LP Gas Tank(s)..............•..................•.......•...... $ 125.00 = 8. Irrigation Systems (a) Residential ................................................ $ 125.00 (b) Commercial ...... . • .......... ....... $159i00 $ 190.00 9. Replace Plumbing Fixtures 1 Toilets One (1) fixture of any type $ 95.00 Up to five (5) fixtures $ 190.00 Each additional fixture $ 23.00 10. Temporary Portable Toilet Permit .. ........... .. .. $ 95.00 Note: Due to codes utilized in the permitting software item numbers C24, D6f, and F1 - will show as inactive, Coding: Words in StWok through type are deletions Words in underscored type are additions 11 Temp Reso #12237 08/21 /12 / Rev 09/10/12 Page 1 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2012- A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA REVISING THE CITY'S BUILDING FEES PURSUANT TO EXHIBIT "A" ATTACHED HERETO AND INCORPORATED HEREIN; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Section 5-1(a) of the Tamarac City Code authorizes the City Commission to review, alter, add to, modify, deduct from or in anyway change any fees or any categories of building permit fees by Resolution (existing fee schedule attached as Exhibit A); and WHEREAS, in compliance with City Ordinance 0-2008-6 requires the City Manager, or his designee, review building permits fees (every two years) and; WHEREAS, the current fee schedule is set to determine the actual cost of services providing for building plan review, permitting and inspection services; and WHEREAS, this revised fee schedule makes recommendations for changes of certain fees to ensure fairness and equity to users (a copy of which is attached as Exhibit A); and Temp Reso #12237 08/21 /12 / Rev 09/10/12 Page 2 WHEREAS, the fees reviewed provide the actual cost incurred by the city in providing each of the various services performed in the enforcement of the Florida Building Code; and WHEREAS, the Building Official and Finance Director recommends the building permit fee schedule updates be adopted, effective October 1, 2012, utilizing the Schedule of Permit Fees which accurately reflect the costs associated with performance of the activities connected with enforcement of the Florida Building Code as provided for in the Florida Statutes, hereto attached as Exhibit A; and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interests of the citizens and residents of the City of Tamarac that the City adopt the revised Building Department Schedule of Permit Fees to support the expenditures authorized in the fiscal year 2013 budget. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true a correct and are hereby made a specific part of this Resolution; all exhibits attached hereto are incorporated herein and made a specific part of this Resolution. SECTION 2: The City Commission of the City of Tamarac hereby approves the schedule of Permit Fees, attached hereto and incorporated herein as Exhibit A. Temp Reso #12237 08/21/12 / Rev 09/10/12 Page 3 SECTION 3: All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 5: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this day of , 2012. BETH TALABISCO, MAYOR Mayor ATTEST: Peter Richardson, CRM, CMC CITY CLERK I HEREBY CERTIFY that I have approved this RESOLUTION as to form. SAMUEL S. GOREN City Attorney Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 CITY OF TAMARAC BUILDING DEPARTMENT Schedule of Permit Fees SECTION I: As set forth in Section 105 of the Broward County Amendments to the 2010 Florida Building Code, it is unlawful for any person, firm, or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration, or repair on or within private property, and such act is punishable as provided in Section 1 - 13 of the Tamarac City Code. SECTION II: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. Failure to do so may be subject to a penalty for commencing work without a permit as provided in Section B #18 of this fee schedule. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous, signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of $0.30 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the occupancy and the value of which does not exceed one thousand five hundred ($1,500.00) dollars in labor and material as determined by the Building Official. SECTION V: As per City of Tamarac Ordinance No. 0-2004-15 Addition Article XI, entitled "Public Art Program", a Public Art Fee will be assessed based on construction value of improvements to real property in the City of Tamarac as provided for in Section 5-304. Public Art Fees shall be collected at the time of permit issuance. A. EXPIRED PERMITS FEES 1. Permit Extension Prior to Expiration ......................... $ 95.00 B. MISCELLANEOUS FEES 1. Copies (as per Section 6-35 of Tamarac City Code (a) Microfilm ............................ Four (4) pages or less $ 2.00 Otherwise $0.50 per page (b) Photocopies ........................................ Per page $ 0.15 2. Building Department Research for Determination of Open Permits and Outstanding Building and Code Enforcement Violations .. Per address $ 50.00 3. Safety Permit: Includes review of plans and field inspections by all $ 260.00 disciplines for issuance of a Certificate of Occupancy. Fee is non-refundable. Fire Dept fees are additional. ............. 4. Board of Rules & Appeals (BORA) Fee ......... Per $1,000 cost of job $0.68 Per $1,000. cost of construction with a minimum of $2.00 5. DCA Surcharge .................. 1.5 % of the permit cost with a minimum of $2.00 6. Building Permit Certification Surcharge (DBPR) .................. 1.5 % of the permit cost with a minimum of $2.00 7. Any item not explicitly listed shall be based on the required number of inspections ................................. $ 95.00 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 C. 8. Certificate of Occupancy ........................................ $ 75.00 (a) Residential Single Family .............................. No additional charge (b) Multi -Family .................................... Plus per unit $ 3.00 (c) Commercial ............................ Plus for each 1,000 SF $ 3.00 MISCELLANEOUS FEES (Con't.) 9. Temporary Certificate of Occupancy .............. Per ninety (90) days $ 250.00 10. Certificate of Completion ......................................... $ 75.00 11. Change of Contractor ........................................... $ 75.00 12. Contractor Annual Records Maintenance .......................... $ 50.00 13. 40 Year Building Safety Inspection Program Processing Fee ........ $ 190.00 14. Partial Release of Liens (a) Special Magistrate Hearing Administrative Fee (if not already paid) .... $ 75.00 (b) Building Department Administrative Fee (minimum) .................. $ 380.00 (c) Fee to File Lien ............................................. $ 18.50 (d) Fee to Release Lien ......................................... $ 18.50 Additional time required, above the minimum time will be charged at $50.00 per 1/2 hour. 15. Stipulated Agreements (Related to real estate transactions) ......... $ 492.00 16. Review of Special Inspector's Documentation for missed inspections after the permit has been issued ............................... $ 190.00 17. Scanning Fees for Converting Paper Files to Electronic Submittals. $ 20.00 (a) Letter, legal and ledger size scanning .................. per page $ 0.15 (b) Large plans (ie: 24x36) .............................. per page $ 3.00 City will scan large plans up to five (5) pages. 18. Penalty for commencing work without a permit: (a) Contractors - $285.00 or Double Permit Fee, whichever is greater ... $ 285.00 (b) Homeowners - $190.00 or Double Permit Fee, whichever is greater ... $ 190.00 BUILDING PERMIT FEES New Construction and Additions (a) Single -Family (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 1,500 sq. ft.................................. Minimum $ 750.00 or $2.30 per sq. ft.; whichever is greater 2) 1,501 - 3,000 sq. ft......................................... $ 3,444.00 Plus $0.79 per sq, ft. in excess of 1,500 sq. ft. 3) 3,001 - 4,500 sq. ft......................................... $ 4,622.00 Plus $0.79 per sq. ft. in excess of 3,000 sq. ft. 4) 4,501 - 6,000 sq. ft....................................... $ 5,810.00 Plus $0.79 per sq. ft. in excess of 4,500 sq. ft. 5) Greater than 6,000 sq. ft.................................... $ 6,992.00 Plus $0.71 per sq. ft. in excess of 6,000 sq. ft. 2 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 (b) Multi-Family/Condo/Apartment/Townhouse (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 5,000 sq. ft................................... Minimum $ 750.00 or $1.77 per sq. ft.; whichever is greater 2) 5,001 - 10,000 sq. ft............................................ $ 8,860.00 Plus $1.36 per sq. ft. in excess of 5,000 sq. ft. 3) 10,001 - 15,000 sq. ft.......................................... $ 15,662.00 Plus $1.17 per sq. ft. in excess of 10,000 sq. ft. 4) 15,001 - 25,000 sq. ft.......................................... $ 21,521.00 Plus $0.62 per sq. ft. in excess of 15,000 sq. ft. 5) Greater than 25,000 sq. ft....................................... $ 27,721.00 Plus $0.56 per sq. ft. in excess of 25,000 sq. ft. (c) Office/Retail (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft................................. Minimum $ 5,000.00 or $1.23 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft....................................... $ 12,334.00 Plus $0.78 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft....................................... $ 24,005.00 Plus $0.49 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 36,361.00 Plus $0.31 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 51,904.00 (d) Industrial (Includes ALL Disciplines) 1) 1 - 10,000 sq. ft.. ................................Minimum $ 4,000.00 Minimum or $1.21 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... $ 12,112.00 Plus $0.64 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft....................................... $ 21,649.00 Plus $0.44 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 32,725.00 Plus $0.28 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 46,714.00 Plus $0.25 per sq. ft. in excess of 100,000 sq. ft. 3 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 (e) Parking Garage (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft.. ................................Minimum $ 3,000.00 or $0.91 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft....................................... $ 9,109.00 Plus $0.68 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft....................................... $ 19,271.00 Plus $0.39 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 29,122.00 Plus $0.25 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 41,576.00 Plus $0.22 per sq. ft. in excess of 100,000 sq. ft. (f) Assembly/Hotel/Other (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft................................. Minimum $ 6,000.00 or $1.36 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft....................................... $ 13,579.00 Plus $0.86 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft....................................... $ 26,460.00 Plus $0.54 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 39,998.00 Plus $0.34 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 57,095.00 Plus $0.31 per sq. ft. in excess of 100,000 sq. ft. 2. Remodels and/or Alterations (a) Single Family (Includes ALL Disciplines) 1) $0 - $25,000 .....................................Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000..................................... $ 2,572.00 Plus $0.09 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 4,906.00 Plus $0.06 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (b) Multi-Family/Condo/Apartment/Townhouse (Includes ALL Disciplines) 1) $0 - $25,000 .....................................Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000....................................... $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 4 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 3. Remodels/Alterations/Tenant Improvements (a) Office/Retail (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ......................................... $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 (b) Industrial/Parking Garage (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ , $ 2,572.00 Plus $0.07 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 4,376.00 Plus $0.07 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (c) Assembly/Hotel/Others (Includes ALL Disciplines) 1)$0-$25,000............................................ $ 500.00 or $0.13 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ......................................... $ 3,142.00 Plus $0.11 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 5,812.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 9,738.00 Plus $0.07 per additional dollar of project value greater than $100,000 4. Reinspection Fees ................................ All disciplines $ 95.00 (a) Second Failure .............................................. $ 95.00 (b) Third Failure ............................................... $ 190.00 (c) Fourth Failure .............................................. $ 285.00 5 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01/2012 5. Inspections outside normal business hours (including after business hours and weekend) ..................... Minimum for two (2) hours $ 295.00 Plus each additional hour or fraction thereof $ 147.00 (a) For Expedited Plan Review for three (3) or less disciplines, the fee is $295.00 per discipline. .............. $ 295.00 (b) For Expedited Plan Review of four (4) or more disciplines, the fee is a maximum of $885.00 rather than $295.00 per discipline. ......... $ 885.00 NOTE: Expedited fees for plan review or inspection requests after business hours are paid at time of request and are due at each submittal for expedited service. 6. Lost Plan Replacement ........................................ $ 125.00 7. Plan Resubmitted (prior to permit issuance) (a) Structural ................................................... $ 60.00 (b) Electrical ................................................... $ 60.00 (c) Mechanical ................................................. $ 60.00 (d) Plumbing ................................................... $ 60.00 8. Plan Processing Fee at time of Permit Submittal: These fees are based on the Value of the work and are Non -Refundable; however, applied to permit fee at time of issuance. (a) $10,000 - $50,000 ............................... I ........ $ 500.00 (b) $50,001 - $100,000........................................ $ 2,000.00 (c) $100,001 - $500,000........................................ $ 3,000.00 (d) $500,001 - or Greater ........................................ $ 5,000.00 9. Canvas Awnings ............................... Up to 40 LF $ 190.00 Each additional 40 LF or fraction thereof $ 33.00 10. Metal/Canvas Carports & Canopies . .............. Up to 200 SF $ 219.00 Each additional 200 SF or fraction thereof $ 33.00 (a) Temporary Tent for Special Events ......................... $ 190.00 11. Hurricane Shutters ....................... First five (5) shutters $ 141.00 Each additional shutter $ 23.00 Any combination of windows/doors/and shutters up to five (5) $ 141.00 12. Windows & Doors ..................... First five (5) windows/doors $ 141.00 Each additional windows/doors $ 23.00 Any combination of windows/doors/and shutters up to five (5) $ 141.00 13. Wood Decks ..................................... Up to 200 SF $ 190.00 Each additional 100 SF or fraction thereof $ 33.00 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 14. Demolition (a) Demolition of Entire Building ................................... $ 570.00 (b) Interior/Exterior Alteration Demo Only: 1)Structural ................................................ $ 95.00 2) Electrical ................................................ $ 95.00 3) Mechanical ............................................... $ 95.00 4) Plumbing ................................................ $ 95.00 (c) Demolition in Conjunction With Build Out Permit No addl charge 15. Fence ........................................... Up to 150 LF $ 190.00 Each additional 50 LF or fraction thereof $ 33.00 16. Roofing & Re -roofing ........................... Up to 1,000 SF $ 234.00 Each additional 500 SF or fraction thereof $ 33.00 (a) Roof Repairs 1) 1 - 25,000 sq. ft.................................... $ 190.00 2) 25,001 - 50,000 sq. ft.................................... $ 240.00 3) 50,001 to 100,000 sq. ft.................................... $ 290.00 4) Greater than 100,000................................... $ 340.00 17. Siding (Stucco & Soffit) ........................ Up to 500 SF $ Each additional 100 SF or fraction thereof $ 18. House Moving Into the Cit)........................................ $ 19. Plan Review or Revisions ........................... Base charge $ Plus per each page $ (a) Review of Shop Drawings/Documents (after permit issuance) ... $ 20. Masonry Walls & Precast Concrete Walls ........... Up to 100 LF $ for each additional 100 LF or fraction thereof $ 21. Permit Card Replacement (no recorded inspections) ............ $ Each recorded inspection $ 22. Safety Determination for Above Ground Portable Pools/Spas Not Attached to Swimming Pools ................................... $ 190.00 33.00 570.00 49.00 16.00 95.00 360.00 61.00 10.00 5.00 104.00 23. Commercial & Residential Swimming Pools (includes ALL Disciplines) (a) 1 - 16,000 gallons .......................................... $ 520.00 (b) 16,001 - 30,000 gallons ..................................... $ 640.00 Per each additional 1,000 gallons or fraction thereof above 30,000 $ 33.00 (c) Re-marciting commercial pools $ 190.00 24. Satellite n,eti (I metep „r gpeatep)................................ inactive 7 Ternp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 25. Screen Enclosure (Patio/Porch/Pool) (a) 1 - 200 sq. ft................................................. $ 248.00 (b) 201 - 400 sq. ft.............................................. $ 273.00 (c) 401 - 600 sq. ft............................................. $ 299.00 (d) 601 - 800 sq. ft............................................. $ 324.00 (e) 801 - 1,000 sq. ft............................................ $ 349.00 (f) 1,001 - 1,200 sq. ft........................................... $ 375.00 (9) 1,201 - 1,400 sq. ft........................................... $ 400.00 (h) 1,401 - 1,600 sq. ft........................................... $ 425.00 (i) 1,601 - 1,800 sq. ft........................................... $ 451.00 0) 1,801 - 2,000 sq. ft........................................... $ 476.00 (k) Per additional 100 sq. ft. or fraction thereof $ 12.50 26. Slab (Porch/Patio-monolithic) ..................... Up to 500 SF $ 190.00 (Walkways & Pavers) ....... for each additional 100 SF or fraction thereof $ 33.00 27. Concrete Paving & Parking ................... Up to 1,000 SF $ 190.00 (Driveways & Pavers) for each additional 500 SF or fraction thereof $ 33.00 28. Sealcoat/Restripe (a) Up to 25,000 sq. ft......................................... $ 190.00 (b) 25,001 - 100,000 sq. ft..................................... $ 285.00 (c) Each addition of 25,000 sq. ft. ............................... $ 33.00 29. Walkways (Only) ............................... Up to 50 LF $ 190.00 each additional 50 LF or fraction thereof $ 33.00 30. Signs (a) All Wall Signs ................................................ $ 227.00 (b) All Monument Signs ......................................... $ 227.00 (c) All Temporary Signs ......................................... $ 227.00 (d) Banners (30 days once per year or two 15 day; +Surcharges/Total $44.00) .... $ 40.00 (e) Directional Signs (per sign) .................................... $ 53.00 (f) Face Change Only .......................................... $ 190.00 31. Docks ............................................ Up to 30 LF $ 227.00 each additional 10 LF or fraction thereof $ 17.00 32. Utility Shed .............................. Up to 10' X 10' X 7' high $ 141.00 Larger than 10' X 10' X 7' high $ 235.00 33. Fireplace (when not part of original plan, ........................... $ 141.00 34. Sea Walls .......................................... (See Ordinance #74-75) 35. Sea Wall Repairs ................................ 3.0% of Cost of Construction or a minimum of $190.00, whichever is greater 36.Garage Door .................................................. $ 141.00 37. Trailer Tie -Down (Construction or Sales) .................... $ 141.00 38. Code #38 used in computer setup for: A/C Stands (Mechanical/Structural) n/a 39. Kitchen Cabinets .............................................. $ 141.00 8 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 40. Solar Panels or Photovoltaic Systems - up to 10KW .............. $ 500.00 (Fee includes Electrical and Structural Disciplines) 41. Cellular / Wireless Facilities ..................................... $ 770.00 Maintenance and New Equipment on existing towers only (Fee includes Electrical and Structural Disciplines) D. ELECTRICAL UNIT FEE SCHEDULE 1. Burglar Alarm -Commercial ...................... Up to 10 drops $ 111.00 for each additional drop in excess of 10 drops $ 2.00 (a) Burglar Alarm - Residential .................................. $ 95.00 2. Commercial Site Lighting .................. Up to 3 standards $ 146.00 for each standard in excess of 3 standards $ 16.00 3. Electrical Sign ......................... ............... Each $ 122.00 4. Fire Protection .. Each alarm bell, horn, or similar device up to 10 devices $ 235.00 Each additional device in excess of 10 devices $ 8.00 5. Electrical Connections for Resid/Comm A/C System Per new system $ 190.00 Each change out $ 95.00 6. Low Voltage Wiring (a) Each Data Line Up To 10 .......................... $ 95.00 Each additional device in excess of 10 devices $ 2.00 (b) Each Intercom Up To 10 ......................... $ 95.00 Each additional device in excess of 10 devices $ 2.00 (c) Each Telephone Outlet Up To 10 ................ $ 95.00 Each additional device in excess of 10 devices $ 2.00 (d) Video Cameras System .............................. $ 95.00 Each additional device in excess of 10 devices $ 2.00 (e) Each Sound System ................................ $ 95.00 Each additional device in excess of 10 devices $ 2.00 (f) EaGh VaG ALA ............................................... inactive (g) Door Access System .................................. $ 95.00 Plus $2.00 per device in excess of 10 devices $ 2.00 (h) Cable TV ........................................... $ 95.00 Plus $2.00 per CATV outlet in excess of 10 outlets $ 2.00 7. Service Change ............................... Up to 200 Amps $190.00 (a) Residential/Commercial ....................... 200 - 400 AMPS $ 190.00 Every 100 amps over 400 $ 10.00 8. Sprinkler Pump .......................................... Each $ 146.00 9. Temporary Electric .............................................. $ 122.00 10. 30-Day Temporary Electric For Testing ...................... $ 146.00 0 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01/2012 11. Construction or Sales Trailer ...................................... $ 99.00 12. Generators (Power Apparatus) (a) Residential (with transfer switch) ............. Up to 20 KW $ 190.00 (b) Commercial (with transfer switch) ............. Up to 20 KW $ 285.00 Each additional 1 KW or fraction thereof in excess of 20 KW $ 8.00 (c) Transfer Switch only - 200 Amps (Residential) ............. $ 95.00 (d) Transfer Switch only - 200 Amps (Commercial) ................. $ 190.00 Every 100 Amp over 200 Amps $ 45.00 13. Meter Can Replacement ................................... $ 95.00 E. MECHANICAL UNIT FEE SCHEDULE 1. Replacement of Air Conditioning Split System .................. $ 190.00 2. Air Handler or Condensing Unit Replacement ....................... $ 120.00 3. Package Unit .................................................. $ 150.00 4. A/C Stands ........................... With no equipment changes $ 95.00 In conjunction with equipment replacement $ 15.00 5. Pool Heater ................................................... $ 120.00 6. Smoke Duct Detector ....................................... $ 99.00 7. Air Conditioning Duct Work ............ When attached to A/C permit $ 95.00 Stand alone $ 190.00 8. Hood System With Fire Suppressio................................ $ 390.00 9. Suppression System Only ....................................... $ 190.00 10. Bathroom Exhaust Fan (New or Replacement) ................. $ 95.00 11. Replacement of Air Conditioning Unit - 10 Ton or above ......... $ 380.00 (Commercial properties only) 12. Pressure Process Piping (New or Replacement) ................. $ 95.00 F. PLUMBING UNIT PERMIT FEES 1. Fire Sprinkler Sy -stem ........................ `Fire Dept Fees Apply inactive 2. Backflow Devices ............................... Up to 4 devices $ 125.00 Plus each additional device $ 50.00 3. Solar Pool Heater / Water Heater . ............................... $ 125.00 4. Domestic Water Heater / Tank less .......................... $ 95.00 5. Water Well .......................................... $ 125.00 6. LP Gas System .................................... Up to 4 outlets $ 150.00 Plus each additional outlet $ 66.00 7. LP Gas Tank(s)............................................. $ 125.00 10 Temp Reso 12237 Exhibit A - 09/20/12 Effective 10/01 /2012 8. Irrigation Systems (a) Residential ................................................ $ 125.00 (b) Commercial ................................................ $ 190.00 9. Replace Plumbing Fixtures / Toilet(s) ...... One (1) fixture of any type $ 95.00 Up to five (5) fixtures $ 190.00 Each additional fixture $ 23.00 10. Temporary Portable Toilet Permit ................................ $ 95.00 Note: Due to codes utilized in the permitting software item numbers C24, W, and F1 - will show as inactive. 11 No Text