April 5, 2011
Page 1 of 4
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-2011- il-_3
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF TAMARAC, FLORIDA, REVISING THE CURRENT
ENGINEERING DIVISION, PUBLIC WORKS DEPARTMENT,
SCHEDULE OF PERMIT FEES FOR CONSTRUCTION
PROJECTS WITHIN THE CITY OF TAMARAC; REPEALING
RESOLUTION NO. R-2007-82; PROVIDING FOR CONFLICT;
PROVIDING FOR SEVERABILITY; AND PROVIDING FOR
AN EFFECTIVE DATE.
WHEREAS, Section 20-42 of Tamarac City Code authorizes the City Commission to
establish permit fees by resolution for excavation and construction of improvements in
roadways or medians, or within public rights -of way; and
WHEREAS, Section 10-159 of Tamarac Code authorizes the City Commission to
establish fees by resolution for construction of land development improvements; and
WHEREAS, Resolution No. 2007-82, enacted by Tamarac City Commission on June
13, 2007, established the current permit fee schedule; and
WHEREAS, a revision to the current permit fee schedule is necessary to establish a
fee for pavement resurfacing, restoration, or repair permits, and re -inspections, not
previously established through Resolution No. 2007-82; and
WHEREAS, the revised permit fee schedule is attached hereto as "Exhibit 1",
Temp. Reso. # 12015
April 5, 2011
Page 2 of 4
incorporated herein, and made a specific part of this resolution; and
WHEREAS, it is the recommendation of the Director of Public Works and the
Director of Financial Services that the current schedule of permit fees for construction
projects be modified to establish a fee for pavement resurfacing, restoration, and repair
permits and re -inspections, to reflect the administrative, management and inspection costs
related to these items; and
WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in
the best interest of the citizens and residents of the City of Tamarac to establish a new
permit fee schedule for construction projects within the City.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA,
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct, and are hereby made a specific part of this Resolution
upon adoption hereof. All exhibits attached hereto are incorporated herein and made a
specific part of this resolution.
SECTION 2: That the following Engineering Division, Public Works
Department Schedule of Permit Fees is hereby amended as follows:
C. ENGINEERING PERMIT FEES
The following permit fees shall be doubled if work commences
before a permit is issued to the applicant.
1
Temp. Reso. # 12015
April 5, 2011
Page 3 of 4
• Permit fees for Paving, Drainage Water & _,Se1+!wer
t p V@.M. _j ts, which includes initial and follow-up plan
review fee, shall be equal to 10.00% of the construction cost
• permit fees for Clearing & Grubbing and Site Development,
which includes initial and follow-up plan review fee, shall be
equal to 10 00%o.._of_the construction cost
• AsphaltPayement Resurfacing, Restoration, or Repair
(onshall be.._egua_I_ta.,5 00%o,._of the construction cost
• Engineering plan review (more than two (2) rounds) per
review.............$400.00
• Water and Sewer Developer's Agreement Preparation
a. Agreement for 0 --- 5 ERC's.........................$250.00
b. Agreement for 6 — 10 ERC's.........................$500.00
c. Agreement for 11 or more ERC's..................$750.00
• Sidewalk (only) ........................................ up to 50 LF $60.00
each additional 10 LF or fraction thereof, $20.00
• Curbing (only) ........................................ up to 50 LF $60.00
each additional 10 LF or fraction thereof, $20.00
D. INSPECTION FEES
itial inspection costs are included within the above established
permit fees
• Re.. -inspection fees.
a. First
Failure....................................................... $95.00
b. Second.
Failure.....................................................s5.00
c. Th%rd.and each successive Failu_re._.. �.__�.$_ _00_�_A_0.
• Overtime or Off -hour Inspections_-_..$75.00..per hour/
minimum of four 4 hau_rs.
SECTION 3: That Resolution No. R-2007-82 is hereby repealed.
SECTION 4: All resolutions or parts of resolutions in conflict herewith are
hereby repealed to the extent of such conflict.
Temp. Reso. # 12015
April 5, 2011
Page 4 of 4
SECTION 5: If any clause, section, other part or application of this Resolution
is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or
application, it shall not affect the validity of the remaining portions or applications of this
Resolution.
SECTION 6:
passage and adoption.
This Resolution shall become effective immediately upon its
PASSED, ADOPTED AND APPROVED this
ATTE
PETER M. J. RICHA1bSbN, CRM, CMC
CITY CLERK.
F -TAMAR '
o............
ST Age.\SHOO - Ca
1963 i(r=
C)
I HEREBY CERTIFY THAT I HAVE
APPROVED THIS RESOLUTION
AS Tq FORM.
y—X—fl �—' - 9/// " -1/4.
SAMUEL S. GOR
CITY ATTORNEY
% day of KL r'2011.
PAM BUSHNELL
MAYOR
RECORD OF COMMISSION VOTE:
MAYOR BUSHNELL
DIST 1: COMM. SWENS N
DIST 2: V/M GOMEZ
DIST 3: COMM. GLASS = :=
DIST 4: COMM. DRESSLER
,r
1
1
Temp. Reso. #12015
April 5, 2011
Exhibit 1
CITY OF TAMARAC
ENGINEERING DIVISION PUBLIC WORKS DEPARTMENT
SCHEDULE OF PERMIT FEES
As set forth in Section 10-157 of The Code of The City of Tamarac, Florida, following approval of the final
site development plan by the City Commission and posting of all required public improvement bonds and
payment of fees, the owner of the land being developed, or his bona fide agent, is required to take out an
improvement permit with the City for all land improvements occurring on public or private property. No
improvement or alteration of any existing public or private property or utility shall be allowed without a city
improvement permit issued for such specific improvements. The permit shall be visibly displayed at all times
during construction.
As set forth in Section 20-41 of The Code of The City of Tamarac, Florida, no person shall open any street
of median or alter or cut any curb adjacent to any street or thoroughfare without first obtaining a permit from
the City authorizing such alteration or change of pavement or median cut.
The Schedule of Permit Fees shall apply to the following:
For any construction or improvements that are associated with land development or redevelopment
as covered by Chapter 10 or elsewhere in the Tamarac City Code, exclusive of that work covered
through the required Building Department Permit fees or required Community Development
Department improvement fees, whether on public or private property.
For any construction or improvements in roadway or medians, or within the City's roadway rights -of -
way, water and sewer easements, utility easements, or other public easements, as covered in
Chapter 20 or elsewhere in the Tamarac City Code.
A. EXPIRED PERMIT FEES
As set forth in Section 10-161 of The Code of The City of Tamarac, Florida, if work covered by a
permit has not commenced within three (3) months from the date of issuance of the permit, or has
been commenced and then suspended or abandoned for a period of sixty (60) days from the date of
the most recent inspection, the permit automatically is terminated and shall become null and void.
When a permit has been terminated, all fees paid shall be forfeited and any work started after such
termination shall be subject to all applicable City Ordinances in effect at the time a subsequent permit
is issued.
Renewal -Expired Permits
• 10.00% of the construction cost for all remaining incomplete improvements
Engineering division, Public Works Department
Schedule of Permit Fees
Page 2 of 3
B. MISCELLANEOUS FEES
1. Copies (as per Section 6-35 of Tamarac City Code)
Photocopies (legal or letter size)............................................$0.15 per page
Photocopies (24" X 36").......................................................$4.00 per page
2. Building Permit Plan Review Fees to be paid upon each building ermitt agplicati2n
New Construction
• Residential Project — Single Family..........................................$50.00 per unit
• Residential Project — Multi-Family............................................$50.00 per unit
• Non -Residential Projects.................................................$50.00 per structure
Alteration/Additions
• Structural Commercial and Residential.................................................$25.00
• Screen Enclosures............................................................................$25.00
• Docks................................................................................................$25.00
• Sea Walls...........................................................................................$25.00
• Pools...............................................................................................$25.00
• Driveways.........................................................................................$25.00
Fencing
• Commercial or Residential..................................................................$25.00
3. Community Development Plan Review Fees to be Paid upon each improvement submittal
• Development Review Committee site plan reviews..............................$300.00
• Development Review Committee site plan revisions............................$150.00
• Development Review Committee plat reviews......................................$300.00
• Development Review Committee delegation request reviews................$150.00
• Development Review Committee vacation of easements/rights-of-way... $100.00
C. ENGINEERING PERMIT FEES
The following permit fees shall be doubled if work commences before a permit is
issued to the applicant.
• Permit fees for Paving, Draina a Water & Sewer Improvements, which
includes initial and follow-up plan review fee, shall be equal to 10.00% of the
construction cost
• Permit fees for Clearin & Grubbing and Site Development, which includes
initial and follow-u Ian review fee shall be equal to 10.00% of the
construction cost
+ As halt Pavement Resurfacing, Restoration or Repair(only), shall beequal to
5.00% of the construction cost
• Engineering plan review (more than two (2) rounds) per review.............$400.00
Engineering division, Public Works Department
Schedule of Permit Fees
Page 3 of 3
• Water and Sewer Developer's Agreement Preparation
a. Agreement for 0 — 5 ERC's....................................................$250.00
b. Agreement for 6 —10 ERC's....................................................$500.00
c. Agreement for 11 or more ERC's............................................$750.00
• Sidewalk (only)................................................................ up to 50 LF $60.00
each additional 10 LF or fraction thereof, $20.00
• Curbing (only)................................................................. up to 50 LF $60.00
each additional 10 LF or fraction thereof, $20.00
D. INSPECTION FEES
Initial inspection costs are included within the above established permit fees
Re -inspection fees:
a. First Failure............................................................................ 95.00
b. Second Failure...................................................................... $95.00
c. Third and each successive Failure .......................................... 190.00
Overtime or Off -hour Inspections - 75.00 per hour / minimum of four 4 hours