HomeMy WebLinkAboutCity of Tamarac Resolution R-2011-047Temp. Reso # 12016
Mayl1, 2011
Pagel
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-2011- '� 7
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF TAMARAC, FLORIDA, APPROVING EXECUTION OF
TASK AUTHORIZATION No. 011-02E WITH CORZO
CASTELLA CARBALLO THOMPSON SALMAN, P.A. (C3TS)
TO PROVIDE PROFESSIONAL ENGINEERING SERVICES
FOR THE DESIGN OF PHASE III OF THE CITYWIDE CANAL
CULVERT IMPROVEMENT PROJECT, IN ACCORDANCE
WITH THE CITY'S CONTINUING SERVICE AGREEMENT AS
AUTHORIZED BY RESOLUTION R-2009-90; AUTHORIZING
AN EXPENDITURE FOR SAID PURPOSE IN AN AMOUNT
NOT TO EXCEED $45,777.50; AUTHORIZING BUDGET
AMENDMENTS AS NEEDED FOR PROPER ACCOUNTING
PURPOSES; PROVIDING FOR CONFLICT; PROVIDING FOR
SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE
DATE.
WHEREAS, the City of Tamarac desires to provide its residents a better stormwater
drainage system throughout the City; and
WHEREAS, City personnel has examined various canal crossing locations
throughout the City and determine five (5) locations that require immediate restoration by
utilizing a design that incorporates an aluminum headwall system and culvert pipe
extensions; and
WHEREAS, the improvements are necessary due to erosion along the edge of
roadway at the said culvert crossings that are now undermining sidewalks and creating
potentially unsafe conditions along the sidewalks and roadways; and
Temp. Reso # 12016
May11, 2011
Page2
WHEREAS, the City requires the services of a consultant firm knowledgeable in the
area of aluminum headwall system design; and
WHEREAS, Corzo Castella Carballo Thompson Salman, P.A. (C3TS) possesses
the required knowledge and experience to provide professional engineering services for
the design of Phase III of the Citywide Canal Culvert Improvement Project and has
submitted detailed proposal in the amount of not to exceed $45,777.50 attached hereto as
Exhibit 1 ", incorporated herein and made a specific part of this resolution; and
WHEREAS, the proposal for this work describes all tasks to be performed in
accordance with Article I, "Scope of Work", of the City of Tamarac Continuing Engineering
Services Agreement as authorized by resolution R-2009-90 dated July 8, 2009,
incorporated herein by reference and on file in the office of the City Clerk; and
WHEREAS, Corzo Castella Carballo Thompson Salman, P.A. has been pre -
qualified to provide professional engineering services by the City of Tamarac as authorized
by Resolution R-2009-90 and the associated Continuing Engineering Services Agreement
dated July 8, 2009; and
WHEREAS, adequate funding exists for this work in the Stormwater Capital
Improvement Project Budget; and
WHEREAS, it is the recommendation of the Director of Public Works and the
Purchasing Contracts Manager that task Authorization No. 11-02E from Corzo Castella
Carballo Thompson Salman, P.A. be approved, executed and funded; and
Temp. Reso # 12016
May11, 2011
Page3
WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in
the best interest of the citizens and residents of the City of Tamarac to accept and execute
Task Authorization No. 11-02E with Corzo Castella Carballo Thompson Salman, P.A. to
provide professional engineering services for the design of Phase III of the Citywide Canal
Culvert Improvement Project for a proposed amount not to exceed $45,777.50 and to
provide funding from the appropriate budgeted Public Works account.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA,
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct, and are hereby made a specific part of this Resolution
upon adoption hereof. All exhibits attached hereto are incorporated herein and made a
specific part of this resolution.
SECTION 2: The City Commission HEREBY approves execution of Task No.
011-02E with Corzo Castella Carballo Thompson Salman, P.A., in an amount not to
exceed $45, 777.50, and the appropriate City Officials are hereby authorized to execute
Task No. 011-02E per the proposal, attached hereto as Exhibit 1 ", incorporated herein and
made a specific part of this resolution.
SECTION 3: Funding for Task Authorization No. 011-02E in an amount not to
exceed $45,777.50 is available in the Stormwater Capital Projects Fund
SECTION 4: The appropriate City Officials are hereby authorized to expend
an amount not to exceed $45,777.50 for said purpose.
SECTION 5: All resolutions or parts of resolutions in conflict herewith are
hereby repealed to the extent of such conflict.
1
Temp. Reso # 12016
May11, 2011
Page4
SECTION 6: If any clause, section, other part or application of this Resolution
is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or
application, it shall not affect the validity of the remaining portions or applications of this
Resolution.
SECTION 7
passage and adoption.
This Resolution shall become effective immediately upon its
PASSED, ADOPTED AND APPROVED this.
ATTEST:
PETER M. J. R ARDSON, RM,, CMC
CITY CLERK.
.�'\\ Of TAMq' "/'
�A • 9
w �
ESTABLISHED o
50. 1963
. 0;O
SEAL
,,/ CO UtAl
I HEREBY CERTIFY THAT I HAVE
APPROVED THIS RESOLUTION
AS TO 0
SAMUft S. G RE
CITY ATTORNEY
/ W'day of , 2011.
e0mvL _
PAMELA BUSHNELL
A1veV
RECORD OF COMMISSION VOTE:
MAYOR BUSHNELL'�
DIST 1: COMM. SWEN ON41z"' I
E
DIST 2: V/M GOMEZ 1 �—'
DIST 3: COMM. GLASSER /-) --f
DIST 4: COMM. DRESSLER
J
1
April 4, 2011
CORZ0
CASTELLA City of CARBAlLO Tamarac6011 Nob Hill Road
THOMPSON
S A L M A N Tamarac, FL 33321
Engineers
Architects Attention: Mr. John Doherty, P.E.
Planners City Engineer
TEMP. RESO. #12016
Reference: Professional Design Services for
Canal Culvert Bulkhead Improvements — Phase
C3TS Proposal No. 2008-140
Dear Mr. Doherty:
EXHIBIT "1"
The firm of Corzo Castella Carballo Thompson Salman, P.A. (C3TS) is pleased to
submit this price proposal for the above referenced project for your review and
consideration. We look forward to the opportunity of working with The City of Tamarac
FB0005022 (City). It is our understanding that the City would like to perform improvements to canal
AAC002142 pipe culvert crossings at various locations throughout the City. The improvements are
necessary due to erosion along the edge of roadway at the culvert crossings that is now
undermining sidewalks and creating potentially unsafe conditions along the roadway
guardrail. The City also desires to perform the improvements utilizing a design that
incorporates an aluminum bulkhead wall system with a small pipe culvert extension.
Consultant Scope
C3TS proposes to provide design and plans for the following five (5) locations:
NW 77t" Street west of Pine Island Road — south side — Canal 31
NW 77t" Street west of Pine Island Road — north side — Canal 31
NW 80tt' Street west of University Drive — south side — Canal 1 B
NW 8151 Street west of Pine Island Road — north side — Canal 3C
NW 8151 Street at NW 81st Avenue — south side -- Canal 5M
Each location will be evaluated individually with respect to geotechnical conditions,
hydraulic gradient, roadway and canal bank geometries in sufficient detail to support the
design of the aluminum seawall system. Plans shall be produced for each project location
showing the plan view, profiles and elevations, cut sections, notes and details for the
purpose of advertising and bidding all of the projects for construction either as a package
or individually. During design, plans shall be submitted to the City for review at 30%, 60%,
90% and final plan production phases. Upon completion, a final set of plans, along with a
digital copy of the plans and technical specifications specific to each location, shall be
submitted to the City for reproduction during the bidding process. A written engineer's cost
estimate shall also be provided upon completion.
C3TS shall provide the geotechnical data for each location through a geotechnical sub -
consultant. C3TS shall also be responsible for providing the survey needed to produce the
3996 North West 9" Avenue. Fort Lauderdale Florida 33309 954.565,21 13 1,800 448.0227 Facsimile 954,567.4079
Web Site. www c3ts.com Equal Opportunity Employer
No Text
Professional Design Services for
Canal Culvert Bulkhead Improvements
April 4, 2011
Page 2 of 3
base sheets and geometry for the plans and shall perform the necessary utility locates so
that all utility lines can be shown in sufficient detail on the plan sheets. C3TS shall provide
any permitting services that may be required as part of the design process. Previous
projects required a Broward County Tree Removal permit and a City of Tamarac
Engineering and Public Works permit. It is not anticipated that any other services such as
electrical design, soft dig utility locates or landscape architecture will be needed for this
work.
C3TS shall provide construction administration services on a limited basis to assist the City
during construction. These services shall include shop drawing review, response to RFI's
during bidding and construction, minimal site inspections during construction (typically one
to two), and a final inspection upon completion. Logs for shop drawings and RFI's shall be
maintained as part of these services. The City shall be responsible for all correspondence
to and from the Contractor but C3TS shall provide the necessary responses and technical
support to the City for issue regarding RFI's and such. C3TS shall review the final as -built
drawings submitted by the Contractor, provide a punch list inspection report for each
project and issue a letter of substantial conformance upon completion.
Fees
The fees for our services will consist of a not to exceed contract amount of Forty Five
Thousand Seven Hundred Seventy Seven Dollars and Fifty Cents ($45,777.50) broken
down as follows.
Field Data Collection $ 15,927.50
Design and Plan Production $ 21,810.00
Construction Administration $ 6,040.00
Reimbursable Expenses Allowance 2 000.00
TOTAL FEE $ 45,777.50
We will bill you monthly for the percentage of services or hours of service rendered and for
any Reimbursable expenses. Any request for printing above the indicated amount will be
billed as a reimbursable expense as allowed in the contract. It is not anticipated that any
permits shall be required beyond the mandatory City and County permits needed for
construction, but should permitting fees be required, the City of Tamarac shall provide all
costs associated with the permit fees.
Deliverables and Schedule
C3TS will deliver 60% complete plans to the City to review within 45 days of Notice to
Proceed. 90% plans and specifications will be delivered to the City to review after 30 days
of the City's approval of 60% plans at which time C3TS will have addressed 60% review
comments. The 100% plans and specifications will be delivered to the City to review after
21 days of the City's approval of 90% plans at which time C3TS will have addressed 90%
review comments. The 60% and 90% will include three (3) copies. Upon the City's approval
No Text
Professional Design Services for
Canal Culvert Bulkhead Improvements
April 4, 2011
Page 3of3
of the 100% plans, four (4) sets of full size plans and two (2) sets of half size plans will be
signed and sealed and submitted to the City. In addition, an electronic file of the plans will be
presented in pdf format for the City's use as needed.
We look forward to the opportunity of working with the City of Tamarac. Should you have
any questions, please feel free to contact me at (954) 565-2113 or by e-mail at
tgluntO.c3ts.com.
Respectfully Submitted
Corzo Castella Carballo Thompson Salman, P.A. (C3TS)
errance N. Glunt, P.E.
Principal Associate
Vice President
No Text
- Corzo Castella Carballo'Fhompson Salman, P.A.
- Engineers • Architects • Planners
3996 NW 9 Avenue
Co R 7 o Fort Lauderdale, Florida 33309
C:ASIttLA(954)565-2113(Phone)-(954)567-4079(Fax)
CARtiAILO
TW)W$a%l
SAtMAN
SI.4NHOUR ISTI\L1TES
Pro ect No.: 2032-001
Name. Citywide Canal Culvert Improvements • Phase 2
City of Tamarac, Florida
Date 4/4/2011
Principal
in Charge
Manhours
Client
Manager
Manhours
Sr Project
Manager
Manhours
Project
Manager
Manhours
Technician
Manhours
Clerical
Manhours
TOTAL
Running
Total
Flours
Cost For
Activity
S150.00
$135.00
$135.00
$105,00
$65.00
$35.00
Task 1.00
Data Colleelluns
TNO
3C
ED
EH
TR
DS
S 16.927,60
JA
jr;lllal \Ieatlnes
2
2
4
S 510.00
i.0
12ata CaRecllon
1.11
Site Visits • Initial & Follow Up
4
4
8
S IA20.00
1.1.3
Staff interviews • Initial & Follow U
IAA
Review of AS-Ruilts/Survey Data
2
2
4
S 510,00
3_1
Field 1:ys1lnaslt111111v Locates
1.2.1
Geotechnical Coordination
2
2
4
S 510.00
Gcolechnical Sub Consultant - Nutting
$ 2.467.50
1-2,2
SurveyingCoordination -SpecifiePuilwseandTopographieSurvc
2
2
4
$ 510.00
Survey Sub Consultanl-Gibhs Surveying
S 5.54040
1.2.3
Utility Locates
4
4
S 420.00
. k
Analysis of Collected Dotu
Geotechnical and Structural Analysis
•1
8
12
S 1.440.00
16
0
0
24
0
0
40
5 15,92X30
Task 2.00
Plans Productions
$21.810.00
2.1
relni a s
Design Analysis
8
8
16
S 2.040,00
2.1.1
Plan production
8
16
40
64
S 500.00
Rcvicw and Cnnnne"l
6
6
12
$ 1 430.00
f _nal Deslen
Plan Production
8
16
40
64
$ 5,480.00
2.2.3
Quality Contrel/Quallry Assurance
a
Final Staff Review
4
4
S 540.00
Ir
Modifications
8
16
24
S 1.880.00
2.2.4
Submit F'Inal plena
4
8
12
$ 1.440.00
23
a milli
Broward Count v ERP mimit.City Ingiceerb!& 13t rl. vrmit
8
16
4
8
36
$ 3,420.00
SUBrOTALS
42
4
0
71t
1f10
N
232
$21.810.00
Talk3.00
Construction Services
S 6,040,00
3-I
1 ucl d
Biddin Assislancc
4
2
b
S 810.00
Site Inspections
4
20
24
$ 270000
Administrative Support
4
8
4
16
S 1.580.00
Final Certification
4
2
4
10
S 950.00
L4MrA
16
0 1
0
32
0
g J6
S O40.00
I cguaislrl;I f>�ia �� Sri f�iia SL4� 1=Lr� �'a
LABOR COST, TOTAL S 43.777.50
REISIBUR,SABLEAI.LOWANCE $ 2m.00
TOTAL PROPOSED COMPENSATION S 45.777.30