Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2010-109Temp Reso #11905 07/27/10 Page 1 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2010- jd A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA INCREASING THE CITY'S BUILDING FEES PURSUANT TO EXHIBIT "C" ATTACHED HERETO AND INCORPORATED HEREIN; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO TAKE ANY AND ALL STEPS NECESSARY TO INCREASE AND RESTRUCTURE THE BUILDING DEPARTMENT PERMIT FEES; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Section 5-1(a) of the Tamarac City Code authorizes the City Commission to review, alter, add to, modify, deduct from or in anyway change any fees or any categories of building permit fees by Resolution (existing fee schedule attached as Exhibit A); and WHEREAS, the City Commission directed the City Manager to retain a consultant to review the current fee schedule to determine the actual cost of services providing for building plan review, permitting and inspection services; and WHEREAS, Willdan Financial Services (formally MuniFinancial) was retained to review the building permit fee study; and WHEREAS, the fee study makes recommendations for changes used to calculate certain fees to ensure fairness and equity to users (a copy of which is attached as Exhibit B); and 1 Temp Reso #11905 07/27/10 Page 2 WHEREAS, the fee study provides the actual cost incurred by the city in providing each of the various services performed in the enforcement of the Florida Building Code; and WHEREAS, the Building Official and Finance Director recommends the building permit fee schedule updates be adopted, effective October 1, 2010, utilizing the Schedule of Permit Fees which accurately reflect the costs associated with performance of the activities connected with enforcement of the Florida Building Code as provided for in the Florida Statutes, hereto attached as Exhibit C; and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interests of the citizens and residents of the City of Tamarac that the City adopt the revised Building Department Schedule of Permit Fees to support the expenditures authorized in the fiscal year 2011 budget. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true a correct and are hereby made a specific part of this Resolution. SECTION 2: The City commission of the City of Tamarac hereby approves the schedule of Permit Fees, attached hereto and incorporated herein as Exhibit C. The City Commission hereby further authorizes the appropriate City officials to take any and all steps necessary to increase and restructure the Building Department Permit Fees. 1 1 1 Temp Reso #11905 07/27/10 Page 3 SECTION 3: All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 5: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this )b day of , 2010. MARION SWENSON, CMC CITY CLERK I HEREBY CERTIFY that I have approved this RESOLUTION as to form. vawa 4-�') ' ,ri ghtl SAM L S. GO N CffY ATTORNEY .�I mil% I %I� /'.�!� BETH TALABISCO Mayor Record of COMMISSION VOTE - MAYOR TALABISCO DIST 1: COMM BUSHNELL 0t. DIST 2: COMM GOMEZ DIST 3: COMM GLASSER DIST 4: VM DRESSLER -—•� TR 11906 Exhibit A CITY OF TAMARAC Building Department Schedule of Permit Fees SECTION I: As set forth in Section 105 of the 2004 Florida Building Code, it is unlawful for any person, firm, or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration, or repair on or within private property, and such act is punishable as provided in Section 1 - 13 of the Tamarac City Code. SECTION II: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous, signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of $0.30 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the occupancy and the value of which does not exceed one thousand five hundred ($1,500.00) dollars in labor and material as determined by the Building Official. A. EXPIRED PERMITS FEES 1. Renewal of Expired Permits for All Disciplines (a) Within 180 days of expiration Reissue of Expired permit(s) (no change in Building Code) . A/2 of original permit fee (b) After 180 days of expiration............................Same as new permit fee B. MISCELLANEOUS FEES 1. Copies as per Section 6-35 of Tamarac City Code (a) Microfilm .................................. Four (4) pages or less $ 2.00 Otherwise $0.50 per page (b) Photocopies ...................................... Per page $ 0.15 2. Building Department Research for Determination of Open Permits and Outstanding Violations ............................ Per address $ 50.00 3. Inspection for Certificate of Occupancy for Safety Inspection Purposes Only $ 260.00 4. Board of Rules & Appeals BORA Fee . .......... Per $1,000 cost of job!, 5. Radon ................................................. Per SF $ 0.005 6, Construction Recove Fund ................................ Per SF $ 0.005 7. Any item not explicitly listed shall be based on the required number of inspections .................................. $ 85.00 1 TR 11905 Exhibit A B. MISCELLANEOUS FEES Cont. 8. Certificate of Occupancy ......................................... $ 75.00 (a) Residential Single Family................................No additional charge (b) Multi -Family ............. . ...................... Plus per unit $ 3.00 (c) Commercial ............................ Plus for each 1,000 SF $ 3.00 9. Tem ora Certificate of Occupancy ............... Per ninety (90) days $ 250.00 10. Certificate of Com le ion ......................................... $ 75.00 11. Change of Contractor ............................................ $ 75.00 12. Contractor Records Maintenance / Annual Registration .................. $ 50.00 C. BUILDING PERMIT FEES 1. New Construction and Additions (a) Single -Family Include ALL Disci lined (Does not include roof permit) 1) 1 - 1,500 sq. ft .................................. Minimum $ 750.00 or $2.30 per sq. ft., whichever is greater 2) 1,501 - 3,000 sq. ft..................................... $ 3,444.00 Plus $0.79 per sq. ft. in excess of 1,500 sq. ft. 3) 3,001 - 4,500 sq. ft......................................... $ 4,622.00 Plus $0.79 per sq. ft. in excess of 3,000 sq. ft. 4) 4,501 - 6,000 sq. ft........................................ $ 5,810.00 Plus $0.79 per sq. ft. in excess of 4,500 sq. ft. 5) Greater than 6,001 sq. ft.................................... $ 6,992.00 Plus $0.71 per sq. ft. in excess of 6,000 sq. ft. (b) Mul's i / t/Townhouse (Includes ALL Discplines) n op Doenot in000 permit) 1) 1 - 5,000 sq. ft................................... Minimum $ 750.00 or $1.77 per sq. ft.; whichever is greater 2) 5,001 - 10,000 sq. ft................. $ 8,860.00 Plus $1.36 per sq. ft. in excess of 5,000 sq. ft. 3) 10,001 - 16,000 sq. ft...................................... $15,662.00 Plus $1.17 per sq. ft. in excess of 10,000 sq. ft. 4) 15,001 - 25,000 sq. ft...................................... $21,521.00 Plus $0.62 per sq. ft. in excess of 15,000 sq. ft. 5) Greater than 25,001 sq. ft. .................................. $27,721.00 Plus $0.56 per sq. ft. in excess of 25,000 sq. ft. 2 TR 11905 Exhibit A C. BUILDING PERMIT EEES on't 1. New Construction and Additions con't. (c) Office/Retail Includes ALL Disci lines (Does not include roof permit) 1) 1 - 10,000 sq. ft................................. Minimum $ 5,000.00 or $1.23 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... $12,334.00 Plus $0.78 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... $24,055.00 Plus $0.49 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $36,361.00 Plus $0.31 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,001 sq. ft................................. $51,904.00 Plus $0.28 per sq. ft. in excess of 100,000 sq. ft. (d) Industrial Includes ALL Discip lines Does not include roof ermit 1) 1 - 10,000 sq. ft.................................. Minimum $ 4,000.00 Minimum or $1.21 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft....................................... $12,112.00 Plus $0.64 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft ...................................... $21,649.00 Plus $0.44 per sq. ft, in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $32,725.00 Plus $0.28 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,001 sq. ft................................. $46,714.00 Plus $0.25 per sq. ft. in excess of 100,000 sq. ft. (e) Parking Garage (Includes ALL Disci lines Does not include roofpermit) 1) 1 - 10,000 sq. ft.................................. Minimum $ 3,000.00 or $0.91 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... $ 9,109.00 Plus $0.68 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... $19,271.00 Plus $0.39 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $29,122.00 Plus $0.25 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,001 sq. ft................................. $41,576.00 Plus $0.22 per sq. ft. in excess of 100,000 sq. ft. 3 TR 11905 rxhibit A C. BUILDING PERMIT FEES (Con't) 1. New Construction and Additions (con't.) (f) Assembly/Hotel/Other (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft ................................. Minimum $ 6,000.00 or $1.36 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... $13,579.00 Plus $0.86 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... $26,460.00 Plus $0.54 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft. .................. . .......... . ...... $39,998.00 Plus $0.34 per sq. ft. in excess of 50,000 sq. ft_ 5) Greater than 100,001 sq. ft................................. $57,095.00 Plus $0.31 per sq. ft. in excess of 100,000 sq. ft. 2. Remodels and/or Alterations (a) Single Family (Includes ALL Disciplines) 1) $0 - $25,000..................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,572.00 Plus $0.09 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 4,906.00 Plus $0.06 per additional dollar of project value greater than $50,000 4) Greater than $100,001..................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (b) Multi-Family/Condo/Apartment/Town house 1) $0 - $25,000..................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,001..................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 3. Remodels/AlterationslTenant Improvements (a) Office/Retail (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000 ................ . ....................... $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4 TR 11906 Exhibit A C. BUILDING PERMIT FEES (Con't) 3. Remodels/Alterations/Tenant Improvements (a) Office/Retail Includes ALL Disciplines) con't. 4) Greater than $100,001..................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 (b) Industrial/Parking Garage (includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,572.00 Plus $0.07 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 4,376.00 Plus $0.07 per additional dollar of project value greater than $50,000 4) Greater than $100,001..................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (c) Assembly/Hotel/Others jlncludes_ALL Disciplines 1) $0 - $25,000........................................ Minimum ### or $0.13 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 3,142.00 Plus $0.11 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000........................................ $ 5,812.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,001..................................... $ 9,738.00 Plus $0.07 per additional dollar of project value greater than $100,000 4. Reinspection Fees ................................ All disciplines $ 74.00 5. _.. after business hours and weekend) Inspection outside normal business hours (including a,. Minimum for two (2) hours $ 295.00 Plus each additional hour or fraction thereof $ 147.00 6. Lost Plan Replacement (a) Structural ................................................... $ 125.00 (b) Electrical ................................................... $ 113.00 (c) Mechanical. ................................................ $ 110.00 (d) Plumbing ................................................... $ 114.00 7. Plan Resubmitted (prior to. permit issuance) (a) Structural ................................................... $ 96.00 (b) Electrical ................................................... $ 88.00 (c) Mechanical..... ............................................ $ 86.00 (d) Plumbing ................................................... $ 89.00 8. Up Front Fee for Plan Processing . , ............................ 50% of permit fee applied to permit fee at time of issuance 5 TR 11905 Exhibit A C. BUILDING PERMIT FEES Con't 9. Canvas Awnings, ..................................... Up to 40 LF $ 178.00 Each additional 40 LF or fraction thereof $ 33.00 10. Metal/Canvas Carports & Canopies . ................... Up to 200 SF $ 219.00 Each additional 200 SF or fraction thereof $ 33.00 11. Hurricane Shutters ............................. First five (5) shutters $ 150.00 Each additional shutter $ 23.00 12. Windows & Doors ....................... First five (5) windows/doors $ 150.00 Each additional windows/doors $ 23.00 13. Wood Decks ..................................... Up to 200 SF $ 198.00 Each additional 100 SF or fraction thereof $ 33.00 14. Demolition (a) Demolition of Entire Building ................................... $ 570.00 (b) Interior Alteration Demo Only: 1) Structural ................................................ $ 227.00 2) Electrical ................................................ $ 179.00 3) Mechanical...... ......................................... $ 177.00 4) Plumbing ................................................ $ 173.00 (c) Demolition in Conjunction With Build Out Permit ..................... No add9 charge 15.Fence............................................ Up to100 LF $ 178.00 Each additional 50 LF or fraction thereof $ 33.00 16. Roofing & Re -roofing ............................... Up to 1,000 SF $ 234.00 Each additional 500 SF or fraction thereof $ 95.00 17. Siding ............................................ Up to 50 SF $ 198.00 Each additional 100 SF or fraction thereof $ 33.00 18. House Moving Into the City ........................................ $ 570.00 19. Plan Review or Revisions . ........................... Base charge $ 49.00 Plus per each page $ 16.00 20. Masonry Walls & Precast Concrete Walls ................. Up to 50 LF $ 360.00 for each additional 50 LF or fraction thereof $ 61.00 21. Permit Card Replacement (no recorded inspections) ................... $ 10.00 Each additional recorded inspection $ 5.00 22. Safety Determination for Above Ground Portable Pools/Spas Not Attached to Swimming Pools ...... +_.:. .. • ........... ` ` $ 104.00 23. Commercial & Residential Swimming Pools Includes ALL Disci lines (a) 1 - 16,000 gallons $ 354.00 (b) 16,001 - 30,000 gallons ........................................ $ 503.00 Per additional 1,000 gallons or fraction thereof above 30,000 $ 33.00 24. Satellite Dish (1 meter or greater) ............. Structural and Electrical $ 145.00 6 TR 11905 Exhibit A C. BUILDING PERMIT FEES(Con'!) 25. Screen Enclosure Patio/Porch/Pool (a) 1 - 200 sq. ft ................................................. $ 248.00 (b) 201-400 sq. ft. ............................................. $ 273.00 (c) 401-600 sq. ft............................................ $ 299.00 (d) 601-800 sq. ft............................................. $ 324.00 (e) 801 -1,000 sq.ft............................................ $ 349.00 (f) 1,001-1,200 sq.ft........................................... $ 375.00 (g) 1,201 - 1,400 sq. ft........................................... $ 400.00 (h) 1,401 - 1,600 sq. ft........................................... $ 425.00 (i) 1,601-1,800 sq.ft........................................... $ 451.00 G) 1,801-2,000 sq.ft........................................... $ 476.00 (k) Per additional 100 sq. ft. or fraction thereof ....................... $ 248.00 26. Slab (Porch/Patio-monolithic) ......................... Up to 100 SF $ 167.00 for each additional 100 SF or fraction thereof $ 33.00 27. Concrete Paving & Parking .......................... Up to 1,000 SF $ 167.00 (Driveways) for each additional 500 SF or fraction thereof $ 33.00 28. Sealcoat/Restripe................................. Up to 1,000 SF $ 167.00 for each additional 500 SF or fraction thereof $ 33.00 29. Walkways .......................................... Up to 50 LF $ 167.00 each additional 50 LF or fraction thereof $ 33.00 30. Signs (a) All Wall Signs ................................................ $ 227.00 (b) All Monument Signs .......................................... $ 277.00 (c) All Temporary Signs ........................................... $ 227.00 (d) Banners (30 days once per year) ................................ $ 40.00 (e) Directional Signs (per sign) ..................................... $ 53.00 31. Docks ............................................ Up to 30 LF $ 227.00 each additional 10 LF or fraction thereof $ 17.00 32.Utility Shed .................................................... $ 141.00 33. Fire lace when not gart of originalplans) ............................ $ 141.00 34. Sea Walls .......................................... (See Ordinance #74-75) 35. Sea Wall Repairs ................................. > 3.0% of Cost of Construction 36. Garage Door . .................................................. $ 141.00 37. Trailer Tie -Down Construction or Sales ............................. $ 141.00 7 iR 11905 Exhibit A D. ELECTRICAL UNIT FEE SCHEDULE 1. Burglar Alarm ..................................... Up to 10 drops $ 111.00 for each additional drop in excess of 10 drops $ 2.00 2. Commercial Site Lighting... ......................... Up to 3 standards $ 146.00 for each standard in excess of 3 standards $ 64.00 3. Electrical Sign ... ......................................... Each $ 122.00 4. Fire Protection .... Each alarm bell, horn, or similar device up to 10 devices $ 167.00 Each additional device in excess of 10 devices $ 2.00 5. Electrical Connections for Residential A/C System ......... Per new system $ 167.00 Each change out $ 85.00 6. Low Voltage Wiring (a) Each Data Line Up To 10.................................. . . . $ 111.00 Each additional device in excess of 10 devices $ 2.00 (b) Each Intercom Up To 10 ..................... . .................. $ 74.00 Each additional device in excess of 10 devices $ 2.00 (c) Each Telephone Outlet Up To 10................................ $ 74.00 Each additional device in excess of 10 devices $ 2.00 (d) Each Video Line Up to 10..................................... $ 74.00 Each additional device in excess of 10 devices $ 2.00 (e) Each Sound System ................... . ............. . ........ $ 99.00 Each additional device in excess of 10 devices $ 2.00 (f) Each Vacuum ............................................... $ 74.00 7. Service Change ................................. Up to 200 AMPS $ 85.00 (a) Residential/Commercial . .................. . . . . . 200 - 400 AMPS $ 170.00 Every 100 amps over 400 $ 10.00 8. Sprinkler Pum.......................................... Each $ 146.00 9. Temporary Electric ... . .. ......................................... $ 122.00 10. 30-Day Temporary Electric For Testing . ............................. $ 146.00 11. Construction or Sales Trailer ...................................... $ 99.00 12. Generators (Power Apparatus) ......................... Up to 20 KW $ 167.00 Each additional 1 KW or fraction thereof in excess of 20 KW $ 8.00 8 TR 11905 Exhibit A E. MECHANICAL UNIT FEE SCHEDULE 1. Air Conditioning Split System ......... ..... ...... 180.00 2. Air Handier or Cgridensing Unit Replacement ........................ $ 120.00 3. Package Unit . .................................................. $ 160.00 4. A/C Stands . ........................... With no equipment changes $ 85.00 In conjunction with equipment replacement $ 15.00 5. Pool Heater .................................................... $ 120.00 6. Heater........................................................ $ 144.00 7. Smoke Duct Detector ............................................ $ 99.00 F. PLUMBING -PERMIT FEES 1. Fire_ Sprinkler System ................................. Base charge $ 150.00 Plus per head $ 3.00 2. Backflow Devices ................................. Up to 4 devices $ 125.00 Plus each additional device $ 50.00 3. Solar Pool Heater / Water Heater ................................... $ 125.00 4, Domestic Water Heater ........................................... $ 100.00 5. Water Well ..................................................... $ 125.00 6. LP Gas System ................................... Up to 4 outlets $ 150.00 Plus each additional outlet $ 66.00 7. LP Gas Tank(s)................................................ $ 125.00 8. Irrigation Systems (a) Residential . ................................................ $ 125.00 (b) Commercial ................................................ $ 150.00 R, 1 TR 11905 Exhibit B CITY OF TAMARAC BUILDING DEPARTMENT 08/05/10 Schedule of Permit Fees SECTION I: As set forth in Section 105 of the 2004 2007 Florida Building Code, it is unlawful for any person, firm, or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration, or repair on or within private property, and such act is punishable as provided in Section 1 - 13 of the Tamarac City Code. SECTION II: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous, signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of $0.30 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the occupancy and the value of which does not exceed one thousand five hundred ($1,500.00) dollars in labor and material as determined by the Building Official. SECTION V: As per City of Tamarac Ordinance No. 0-204-15 Addition Article XI, entitled "Public Art Program", a Public Art Fee will be assessed based on construction value of improvements to real property in the City of Tamarac as provided for in Section 5-304. Public Art Fees shall be collected at the time of permit issuance. A. EXPIRED PERMITS FEES 01 Change 1. Permit Extension Request Prior to Expiration $ 95.00 4. Renewa1,:cif- t*m#s-ftw-A ie ' W Within --off 0 Reisstm.. f..Expired ode) K (b) After...4 da -e*tier Same-e&1,ew...per-mit-fee B. MISCELLANEOUS FEES 1. Copies (as Der Section 6-35 of Tamarac City Code (a) Microfilm ............................... Four (4) pages or less $ 2.00 Otherwise $0.50 per page (b) Photocopies ...................................... Per page $ 0.15 2. Building Department Research for Determination of Open Permits and Outstanding Building and Code Enforcement Violations Per address $ 50.00 3. Ins ection for Certificate of Occupancy for Safe Ins ection Pur oses Only$ 260.00 *- 4. Board of Rules & Appeals BORA Fee . ......... Per $1,000 cost of job -- pq.p� Change $ 0.60 *- 1 5.Raden ......... ........................................ P*v-S 2,ng, I DCA Surcharge ................ 1.5 % of the permit cost with a minimum of $2.00 6.Gon........................... Change Building Permit Certification .... 1.5 % of the permit cost with a minimum of $2.00 Surcharge DBPR \\city_hall\bd\users\rosemaryf\Agenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xls TR 11905 Exhibit B B. MISCELLANEOUS FEES Cont. 08/05/10 *` 7. Any item not explicitly listed shall be based on Change the required number of inspections .4 95.00 8. Certificate of Occupancy ....................................... $ 75.00 (a) Residential Single Family ............................... No additional charge (b) Multi -Family ....................................Plus per unit $ 3.00 (c) Commercial ........................... Plus for each 1,000 SF $ 3.00 9. Temporary Certificate of Occupancy .............. Per ninety (90) days $ 250.00 10. Certificate of Completion ....................................... $ 75.00 11. Change of Contractor .......................................... $ 75.00 12. Contractor Records Maintenance / Annual Registration $ 50.00 New 13. 40 Year Building Safety Inspection Program ............. $ 190.0 "r 14. Partial Release of Liens (a) Special Magistrate Nearing Administrative Fee (if not already paid) $ 7.00 (b) Building Department Administrative Fee (minimum) $ 380.00 New (c) Fee to File Lien $ 1.50 (d) Fee to Release Lien $ 1 &5 Additional time required, above the minimum time will be charged at $50.00 per 1/2 hour. 2 \\city_hall\bd\users\rosemaryflAgenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xls L C TR 11905 Exhibit B BUILDING PERMIT FEES 08/05/10 1. New Construction and Additions (a) Single -Family Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 1,500 sq. ft.................................. Minimum $ 750.00 or $2.30 per sq. ft.; whichever is greater 2) 1,501 - 3,000 sq. ft..................................... $ 3,444.00 Plus $0.79 per sq. ft. in excess of 1,500 sq. ft. 3) 3,001 - 4,500 sq. ft....................................... $ 4,622.00 Plus $0.79 per sq. ft. in excess of 3,000 sq. ft. 4) 4,501 - 6,000 sq. ft...................................... $ 5,810.00 Plus $0.79 per sq. ft. in excess of 4,500 sq. ft. 5) Greater than 6,000 sq. ft.................................. $ 6,992.00 Plus $0.71 per sq. ft. in excess of 6,000 sq. ft. (b) Multi-Family/Cando/Apartment/Townhouse, (Includes ALL Disciplines (Does not include roof permit) 1) 1 - 5,000 sq. ft................................... Minimum $ 750.00 or $1.77 per sq. ft.; whichever is greater 2) 5,001 - 10,000 sq. ft........................................ $ 8,860.00 Plus $1.36 per sq. ft. in excess of 5,000 sq. ft. 3) 10,001 - 15,000 sq. ft...................................... $ 15,662.00 Plus $1.17 per sq. ft. in excess of 10,000 sq. ft. 4) 15,001 - 25,000 sq. ft...................................... $ 21,521.00 Plus $0.62 per sq. ft. in excess of 15,000 sq. ft. 5) Greater than 25,000 sq. ft................................... $ 27,721.00 Plus $0.56 per sq. ft. in excess of 25,000 sq. ft. (c) Office/Retail Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft. ................................Minimum $ 5,000.00 or $1.23 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft.................................... $ 12,334.00 Plus $0.78 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft.................................... $ 24,055.00 Plus $0.49 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft................................... $ 36,361.00 Plus $0.31 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft. .............................. $ 51,904.00 Plus $0.28 per sq. ft. in excess of 100,000 sq. ft. 3 \\city_hall\bd\users\rosemaryf\Agenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis TR 11905 Exhibit B C. BUILDING PERMIT FEES (Con't) 08/05/10 1. New Construction and Additions (con't.) (d) Industrial (Includes ALL Disciplines) 1) 1 - 10,000 sq. ft .. ............................... Minimum $ 4,000.00 Minimum or $1.21 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft..................................... $ 12,112.00 Plus $0.64 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft................................... . $ 21,649.00 Plus $0.44 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft................................... $ 32,725.00 Plus $0.28 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft. .............................. $ 46,714.00 Plus $0.25 per sq. ft. in excess of 100,000 sq. ft. (e) Parking Garage (Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft.. ............................... Minimum $ 3,000.00 or $0.91 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft................................... . $ 9,109.00 Plus $0.68 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft.................................... $ 19,271.00 Plus $0.39 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft................................... $ 29,122.00 Plus $0.25 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft. .............................. $ 41,576.00 Plus $0.22 per sq. ft. in excess of 100,000 sq, ft. (f) Assembly/Hotel/Other Includes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft. ................................Minimum $ 6,000.00 or $1.36 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft.................................... $ 13,579.00 Plus $0.86 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft................................... . $ 26,460.00 Plus $0.54 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft................................... $ 39,998.00 Plus $0.34 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft. .............................. $ 57,095.00 Plus $0.31 per sq. ft. in excess of 100,000 sq. ft. 4 \\city_hall\bd\users\rosemaryRAgenda Items\FY 2010411905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xls TR 11905 Exhibit B C. BUILDING PERMIT FEES (Con`t) 08/05/10 2. Remodels and/or Alterations (a) Single Family (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ...................................... $ 2,572.00 Plus $0.09 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000...................................... $ 4,906.00 Plus $0.06 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................. , $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (b) Multi-Famil /Condo/A artment/Townhouse Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ...................................... $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000...................................... $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................. , $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 3. Remodels/Alterations/Tenant Improvements (a) Office/Retail (Includes ALL Disciplines 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ...................................... $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000...................................... $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 (b) Industrial/Parkin Garage Includes ALL -Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ...................................... $ 2,572.00 Plus $0.07 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000...................................... $ 4,376.00 Plus $0.07 per additional dollar of project value greater than $50,000 4) Greater than $100,000................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 5 \\city_hall\bd\users\rosemeryNAgenda ItemsTY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis TR 11905 Exhibit B C. BUILDING PERMIT FEES (Con"t) 08/05/10 3. Remodels/Alterations/Tenant- Improvements Can't (c) Assembly/Hotel/Others (Includes ALL Disciplines) 1)$0-$25,000........................................ $ 500.00 or $0.13 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ...................................... $ 3,142.00 Plus $0.11 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000...................................... $ 5,812.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000................................... $ 9,738.00 Plus $0.07 per additional dollar of project value greater than $100,000 4. Reinspection Fees ................................ All disciplines Change All disciplines $ 95.00 New (a) Second Failure $ 95.00 () Third Failure $ 190.00 c Fourth Failure $ 285.00 5. Inspection/Oliann review outside normal business hours(including after business hours and weekend Minimum for two (2) hours $ 295.00 Added Plus each additional hour or fraction thereof $ 147.00 6. Lost Plan Replacement (a) Structural ................................................. $ 125.00 (b) Electrical . ................................................ $ 113.00 (c) Mechanical ............................................... $ 110.00 (d) Plumbing. ................................................ $ 114.00 w- 7. Plan Resubmitted (prior to permit issuance (a) Structural ................................................. $ 60.00 (b) Electrical ................................................. $ 60.00 ` (c) Mechanical ............................................... _._._.................g ,00 U $ 60.00 (d) Plumbing ................................................. $ 60.00 8. Up Front Fee for Plan Processing . , ............................ 50% of permit fee applied to permit fee at time of issuance 9. Canvas Awnings .................................... Up to 40 LF Change $ 190.00 Each additional 40 LF or fraction thereof $ 33.00 10. Metal/Canvas Carports & Canopies . ................... Up to 200 SF $ 219.00 Each additional 200 SF or fraction thereof $ 33.00 6 \\city_hall\bd\users\rosemaryMgenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis C. BUILDING PERMIT FEES (Con't) TR 11905 Exhibit B 08/05/10 *` 11. Hurricane Shutters ............................ First five (5) shutters $-----42-G-.0 Change $ 141.00 Each additional shutter $ 23.00 New Any combination of windows/doors/and shutters up to five 5 $ 141.00 ` 12. Windows & Doors ...................... First five (5) windows/doors $---1a38 Change $ 141.00 Each additional windows/doors $ 23.00 New Any combination of windows/doors/and shutters up to five 5 $ 141.00 0' 13. Wood Decks ..................................... Up to 200 SF Change $ 190.00 Each additional 100 SF or fraction thereof $ 33.00 14. Demolition (a) Demolition of Entire Building ................................. $ 570.00 (b) Interior/Exterior Alteration Demo Only: 1) Structural ............................................... - '-- '^ $ 95.00 2) Electrical .............................................. $ - "- ^ $ 95.00 3) Mechanical ............................................. ca $ 95.00 4) Plumbing .............................................. $ 95.00 c Demolition in CoWunction With Build Out Permit No add'i charge 15.Fence........................................ 150 LF . $ 190.00 cp,ar�ge Each additional 50 LF or fraction thereof $ 33.00 16. Roofing & Re -roofing ............................ Up to 1,000 SF $ 234.00 change Each additional 500 SF or fraction thereof $---------96-.00 $ 33.00 w - (a) Roof Repairs New 1) 1 - 25,000 sq. ft. $ 190.00 2) 25,001 - 50,000 sq. ft. $ 40.00 3) 50,01 to 100,000 sq. ft. $ 290.00 4 Greater than 100,00 $ 340.00 wir- 17. Siding Stucco & Soffit ............................... Up to 50 SF �48 Change $ 190.00 Each additional 100 SF or fraction thereof $ 33.00 18. House Moving Into the City ...................................... $ 570.00 19. Plan Review or Revisions . ........................... Base charge $ 49.00 Plus per each page $ 16.00 7 \\city_hall\bd\users\rosemaryt\Agenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis C. BUILDING PERMIT FEES Con't TR 11905 Exhibit B 08/05/10 0- 20. Masonry Walls & Precast Concrete Walls Q Up to 100 LF $ 360.00 for each add*ti -t: for each additional 100 LF or fraction thereof $ 61.00 21. Permit Card Replacement no recorded inspections) $ 10.00 22. Safety Determination for Above Ground Portable Pools/Spas Not Attached to Swimming Pools ................................. $ 104.00 w- 23. Commercial & Residential Swimming_ Pools fIncludes ALL Disciplines) (a) 1 - 16,000 gallons $-F $ 520.00 (b) 16,001 - 30,000 gallons $-.......................54300 $ 640.00 Per each additional 1,000 gallons or fraction thereof above 30,000 (b) Greater r $ $ ---64 33.00 24. Satellite Dish 0 meter or greater) ............ Structural and Electrical $ 145.00 25. Screen Enclosure (Patio/Porch/Pool) (a) 1 - 200 sq. ft............................................... $ 248.00 (b) 201 - 400 sq. ft ............................................ $ 273.00 (c) 401 - 600 sq. ft........................................... $ 299.00 (d) 601 - 800 sq. ft........................................... $ 324.00 a� (e) 801 - 1,000 sq. ft........................................... $ 349.00 (f) 1,001 - 1,200 sq. ft......................................... $ 375.00 (g) 1,201 - 1,400 sq. ft. ........................................ $ 400.00 v (h) 1,401 - 1,600 sq. ft......................................... $ 425.00 (i) 1,601 - 1,800 sq. ft......................................... $ 451.00 0) 1,801 - 2,000 sq. ft......................................... $ 476.00 (k) Per additional 100 sq. ft. or fraction thereof $ -- ----24 ° . $ 12.50 26. Slab (Porch/Patio-monolithic) ........................ Up to 100 SF (Walkways & Pavers for each additional 100 SF or fraction thereof $ $ 190.00 33.00 Change Add 27. Concrete Paving & Parking ......................... Up to 1,000 SF (Driveways & Pavers for each additional 500 SF or fraction thereof $ $ 190.00 33.00 change Add �r- 28. Sealcoat/Restripe................................ 4, -F (a) Up to 25,000 sq. ft. $ 190.00 24 &OG () 25,001 - 100,000 sq. ft. $ 25.00 } f . $..... __......... -.34W (c) Each addition of 25,000 sq. ft. $ 33,00 8 \\city_hall\bd\users\resemaryt\Agenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis • TR 11905 Exhibit B i C. BUILDING PERMIT FEES (Con't) 08/05/10 "r 29. Walkways (Only) .................................... LLp to 50 LF Change $ 190.00 each additional 50 LF or fraction thereof $ 33.00 wr 30. Signs (a) All Wall Signs .............................................. $ 227.00 (b) All Monument Signs ......................................... $ 277.00 (c) All Temporary Signs ........................................ $ 227.00 (d) Banners (30 days once per year) .............................. $ 40.00 (e) Directional Signs (per sign) ................................... $ 53.00 Add (f) Face Change Only $ 190.00 31. Docks ............................................ Up to 30 LF $ 227.00 each additional 10 LF or fraction thereof $ 17.00 If'* 132. Utility Shed ............................. Up to 10' X 10' X 7' high $ 141.00 New Lar er than 10' X 10' X 7' high $ 235.00 33. Fireplace when not part of originalplans) . $ 141.00 34. Sea Walls .......................................... (See Ordinance #74-75) *35. Sea Wall Repairs ............................... 3.0% of Cost of Construction New or a minimum of $190.00, whichever is greatei 36. Garage Door . ................................................ $ 141.00 37. Trailer Tie -Down (Construction or Sales) $ 141.00 V' 38. Kitchen Cabinets $ 141.00 New 9 \\city_hall\bd\users\rosemaryflAgenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis TR 11905 Exhibit B D. ELECTRICAL UNIT FEE SCHEDULE 08/05/10 1. Burglar Alarm .................................... Up to 10 drops $ 111.00 - for each additional drop in excess of 10 drops $ 2.00 2. Commercial Site Lighting ........................ Up to 3 standards $ 146.00 CA 10FT'Je for each standard in excess of 3 standards ------- 440 $ 16.00 3. Electrical Sign ........................................... Each $ 122.00 4. Fire Protection ...Each alarm bell, horn, or similar device up to 10 devices Change $ 235.00 Each additional device in excess of 10 devices -- - 0 Change $ 8.00 - 5. Electrical Connections for Residential/Commercial A/C System Per new system ----1fi- Change $ 190.00 Each change out Change $ 95.00 6. Low Voltage Wiring (a) Each Data Line Up To 10.................................... $ 111.00 Each additional device in excess of 10 devices $ 2.00 (b) Each Intercom Up To 10...................................... $ 74.00 Each additional device in excess of 10 devices $ 2.00 (c) Each Telephone Outlet Up To 10 .............................. $ 74.00 Each additional device in excess of 10 devices $ 2.00 (d) Each Video Line Up to 10.................................... $ 74.00 Each additional device in excess of 10 devices $ 2.00 (e) Each Sound System ....................................... $ 99.00 Each additional device in excess of 10 devices $ 2.00 (f) Each Vacuum ............................................. $ 74.00 r 7. Service Change ................................ Up to 200 AMPS a . Change $ 95.0 *` (a) Residential/Commercial . ..... 200 - 400 AMPS $---......... - .... 47.9.00 Change $ 190.00 Every 100 amps over 400 $ 10.00 8. Sprinkler Pump . ..........................................Each $ 146.00 9. Temporary Electric ............................................. $ 122.00 10. 30-Da Temr)orary Electric For Testing . $ 146.00 11. Construction or Sales Trailer .................................... $ 99.00 12. Generators (Power Apparatus) ........................ Up to 20 KW $ 167.00 Each additional 1 KW or fraction thereof in excess of 20 KW $ 8.00 10 \\city_hall\bd\users\rosemaryMgenda Items\FY 2010\#11905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis E. MECHANICAL UNIT FEE SCHEDULE TR 11905 Exhibit B 08/05/10 '0' 1. Air Conditioning Split System .................................... a Change $ 190.00 2, Air Handler or Condensing Unit Replacement $ 120.00 3. Package Unit . ................................................ $ 150.00 W. 4. A/C Stands . .......................... With no equipment changes w . Change $ 95.00 In conjunction with a ui ment re lacement $ 15.00 5. Pool Heater . ...... $ 120.00 Fr ,7-.Ve 1 6- Heat $--A44 ............ .. ... 7. Smoke Duct Detector .......................................... $ 99.00 8. Air Conditionin Duct Work When attached to A/C permit $ 95.00 New Stand alone $ 190.00 New 9. Hood S stem With Fire Su ression $ 390.00 New] 10. Su ression S steminl ...... $ 190.00 F. PLUMBING PERMIT FEES 1. Fire_ Sprinkler System ................................ Base charge $ 150.00 Plus per head $ 3.00 2. Backflow Devices ................................ Up to 4 devices $ 125.00 Plus each additional device $ 50.00 3. Solar Pool Heater / Water Heater ................................. $ 125.00 4. Domestic Water Heater ........................................ $ 100.00 5. Water Well ................................................... $ 125.00 6. LP Gas System ................................... Up to 4 outlets $ 150.00 Plus each additional outlet $ 66.00 7. LP Gas Tank(s).............................................. $ 125.00 8. Irrigation Systems (a) Residential . .............................................. $ 125.00 (b) Commercial .............................................. $ 150.00 *- 9. Replace Plumbing Fixtures One (1) fixture of any type $ 95.00 New Up to five (5) fixtures $ 190-00 Each additional fixture $ 23.0 11 \\city_hall\bd\users\rosemaryf\Agenda Items\FY 2010411905 Exhibit B 2010 wMarkUps Permit Fee Schedule 08-05-10.xis R-2010- TR 11905 Exhibit C CITY OF TAMARAC BUILDING DEPARTMENT Eff 10/01/2010 Schedule of Permit Fees SECTION I: As set forth in Section 105 of the 2007 Florida Building Code, it is unlawful for any person, firm, or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration, or repair on or within private property, and such act is punishable as provided in Section 1 - 13 of the Tamarac City Code. SECTION II: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous, signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of $0.30 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the occupancy and the value of which does not exceed one thousand five hundred ($1,500.00) dollars in labor and material as determined by the Building Official. SECTION V: As per City of Tamarac Ordinance No. 0-2004-15 Addition Article XI, entitled "Public Art Program", a Public Art Fee will be assessed based on construction value of improvements to real property in the City of Tamarac as provided for in Section 5-304. Public Art Fees shall be collected at the time of permit issuance. A. EXPIRED PERMITS FEES 1. Permit Extension Request Prior to Expiration ......................... $ 95.00 B. MISCELLANEOUS FEES 1. Copies as Der Section 6-35 of Tamarac City Code (a) Microfilm ............................... Four (4) pages or less $ 2.00 Otherwise $0.50 per page (b)Photocopies...................................... Perpage $ 0.15 2. Buildina Department Research for Determination of Open Permits and Outstanding Building and Code Enforcement Violations Per address $ 50.00 3. Inspection for Certificate of Occupancy for Safety Inspection Purposes Only $ 260.00 4. Board of Rules & Appeals BORA Fee . ......... Per $1,000 cost of job $ 0.60 5. DCA Surcharge .................. 1.5 % of the permit cost with a minimum of $2.00 6. Building Permit Certification _ e„ urc ar.g (DBPR) .................. 1.5 % of the permit cost with a minimum of $2.00 7. Any item not explicitly listed shall be based on the required number of inspections ................................. $ 95.00 8. Certificate of Occu anc........................................ $ 75.00 (a) Residential Single Family .............................. No additional charge (b) Multi -Family .................................... Plus per unit $ 3.00 (c) Commercial ............................ Plus for each 1,000 SF $ 3.00 R-2010- TR 11905 Exhibit C Eff 10/01 /2010 B. MISCELLANEOUS FEES (Con't. 9. Temporary Certificate of Occupancy .............. Per ninety (90) days $ 250.00 10. Certificate of Completion ......................................... $ 75.00 11. Change of Contractor ............................................ $ 75.00 12. Contractor Records Maintenance / Annual Registration ................. $ 50.00 13. 40 Year Building Safety Inspection Program .......................... $ 190.00 14. Partial Release of Liens (a) Special Magistrate Hearing Administrative Fee (if not already paid) ...... $ 75.00 (b) Building Department Administrative Fee (minimum) .................. $ 380.00 (c) Fee to File Lien ............................................. $ 18.50 (d) Fee to Release Lien ......................................... $ 18.50 Additional time required, above the minimum time will be charged at $50.00 per 1/2 hour. C. BUILDING PERMIT FEES 1, New Construction and Additions (a) Single -Family (Includes ALL Disciplines 1 (Does not include roof permit) 1) 1 - 1,500 sq. ft.................................. Minimum $ 750.00 or $2.30 per sq. ft.; whichever is greater 2) 1,501 - 3,000 sq. ft........................................ $ 3,444.00 Plus $0.79 per sq. ft. in excess of 1,500 sq. ft. 3) 3,001 - 4,500 sq. ft........................................ $ 4,622.00 Plus $0.79 per sq. ft. in excess of 3,000 sq. ft. 4) 4,501 - 6,000 sq. ft...................................... $ 5,810.00 Plus $0.79 per sq. ft. in excess of 4,500 sq. ft. 5) Greater than 6,000 sq. ft.................................... $ 6,992.00 Plus $0.71 per sq. ft. in excess of 6,000 sq. ft. (b) Multi-Family/Condo/Apartment/Town house (Includes ALL Disciplines (Does not include roof permit) 1) 1 - 5,000 sq. ft................................... Minimum $ 750.00 or $1.77 per sq. ft.; whichever is greater 2) 5,001 - 10,000 sq. ft........................................... $ 8,860.00 Plus $1.36 per sq. ft. in excess of 5,000 sq. ft. 3) 10,001 - 15,000 sq. ft......................................... $ 15,662.00 Plus $1.17 per sq. ft. in excess of 10,000 sq. ft. 4) 15,001 25,000 sq. ft......................................... $ 21,521.00 Plus $0.62 per sq. ft. in excess of 15,000 sq. ft. 5) Greater than 25,000 sq. ft...................................... $ 27,721.00 Plus $0.56 per sq. ft. in excess of 25,000 sq. ft. K C. R-2010- TR 11905 Exhibit C BUILDING PERMIT FEES (Con't) Eff 10/01/2010 c ice/Retail Incl O ( udes ALL Disciplines) (Does not include roof permit) 1) 1 - 10,000 sq. ft ................................. Minimum $ 5,000.00 or $1.23 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft....................................... $ 12,334.00 Plus $0.78 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... . $ 24,005.00 Plus $0.49 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 36,361.00 Plus $0.31 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 51,904.00 (d) Industrial (Includes ALL Disciplines) 1) 1 - 10,000 sq. ft.. ............................... Minimum $ 4,000.00 Minimum or $1.21 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft...................................... $ 12,112.00 Plus $0.64 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... . $ 21,649.00 Plus $0.44 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 32,725.00 Plus $0.28 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 46,714.00 Plus $0.25 per sq. ft. in excess of 100,000 sq. ft. (e) Parking Garage Includes ALL Disciplines) Does not include roof ermit 1) 1 - 10,000 sq. ft.. ............................... Minimum $ 3,000.00 or $0.91 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft....................................... $ 9,109.00 Plus $0.68 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... . $19,271.00 Plus $0.39 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 29,122.00 Plus $0.25 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 41,576.00 Plus $0.22 per sq. ft. in excess of 100,000 sq. ft. 3 R-2010- TR 11905 Exhibit C C. BUILDING PERMIT FEES (Con't) Eff 10/01/2010 (f) Assembly/Hotel/Other (Includes ALL. Disciplines) ,(Does not include roof permit 1) 1 - 10,000 sq. ft ................................. Minimum $ 6,000.00 or $1.36 per sq. ft.; whichever is greater 2) 10,001 - 25,000 sq. ft....................................... $ 13,579.00 Plus $0.86 per sq. ft. in excess of 10,000 sq. ft. 3) 25,001 - 50,000 sq. ft...................................... . $ 26,460.00 Plus $0.54 per sq. ft. in excess of 25,000 sq. ft. 4) 50,001 - 100,000 sq. ft..................................... $ 39,998.00 Plus $0.34 per sq. ft. in excess of 50,000 sq. ft. 5) Greater than 100,000 sq. ft................................. $ 57,095.00 Plus $0.31 per sq. ft. in excess of 100,000 sq. ft. 2. Remodels and/or Alterations (a) Single Family (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000......................................... $ 2,572.00 Plus $0.09 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000....................................... $ 4,906.00 Plus $0.06 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (b) Multi-Famil /Condo/A artment/Townhouse Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000........................................ I $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000 ....................................... $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 3. _Remodels/Alterations/Tenant Improvements (a) Office/Retail (Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.11 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,856.00 Plus $0.08 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000....................................... $ 4,841.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 8,853.00 Plus $0.07 per additional dollar of project value greater than $100,000 4 R-2010- TR 11905 Exhibit C C. BUILDING PERMIT FEES (Con't) Eff 10/01/2010 (b) Industrial/Parking Garage Includes ALL Disciplines) 1) $0 - $25,000.................................... Minimum $ 500.00 or $0.10 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 2,572.00 Plus $0.07 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000....................................... $ 4,376.00 Plus $0.07 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 7,976.00 Plus $0.06 per additional dollar of project value greater than $100,000 (c) Assembly/Hotel/Others j/ncludes ALL Disciplines) 1)$0-$25,000............................................ $ 500.00 or $0.13 per dollar of project value; whichever is greater 2) $25,001 - $50,000 ........................................ $ 3,142.00 Plus $0.11 per additional dollar of project value greater than $25,000 3) $50,001 - $100,000....................................... $ 5,812.00 Plus $0.08 per additional dollar of project value greater than $50,000 4) Greater than $100,000.................................... $ 9,738.00 Plus $0.07 per additional dollar of project value greater than $100,000 4. Reinspection Fees .................................. All disciplines $ 95.00 (a) Second Failure .............................................. $ 95.00 (b) Third Failure ............................................... $ 190.00 (c) Fourth Failure .............................................. $ 285.00 5. Inspection/Dian review outside normal business hours(including after business hours and weekend) ..................... Minimum for two (2) hours $ 2 95&00 Plus each additional hour or fraction thereof $ 147.00 6. Lost Plan_ Replacement (a) Structural .................................................. $ 125.00 (b) Electrical . ................................................. $ 113.00 (c) Mechanical ................................................. $ 110.00 (d) Plumbing .................................................. $ 114.00 7. Plan Resubmitted _(prior to permit issuance) (a) Structural .................................................. $ 60.00 (b) Electrical . ................................................. $ 60.00 (c) Mechanical ................................................. $ 60.00 (d) Plumbing .................................................. $ 60.00 8. Up Front Fee for Plan Processing .............................. 50% of permit fee applied to permit fee at time of issuance 9. Canvas Awnings ..................................... Up to 40 LF $ 190.00 Each additional 40 LF or fraction thereof $ 33.00 10. Metal/Canvas Carports & Canopies ................... Up to 200 SF $ 219.00 Each additional 200 SF or fraction thereof $ 33.00 61 R-2010- TR 11905 Exhibit C C. BUILDING PERMIT FEES (Con't) Eff 10/01/2010 11. Hurricane Shutters ............................. First five (5) shutters $ 141.00 Each additional shutter $ 23.00 Any combination of windows/doors/and shutters up to five (5) $ 141.00 12. Windows & Doors ....................... First five (5) windows/doors $ 141.00 Each additional windows/doors $ 23.00 Any combination of windows/doors/and shutters up to five (5) $ 141.00 13. Wood Decks ..................................... Up to 200 SF $ 190.00 Each additional 100 SF or fraction thereof $ 33.00 14. Demolition (a) Demolition of Entire Building ................................... $ 570.00 (b) Interior/Exterior Alteration Demo Only: 1) Structural ................................................ $ 95.00 2) Electrical ................................................ $ 95.00 3) Mechanical .............................................. $ 95.00 4) Plumbing ................................................ $ 95.00 (c) Demolition in Conjunction With Build Out Permit No add'I charge 15.Fence........................................... Up to150 LF $ 190.00 Each additional 50 LF or fraction thereof $ 33.00 16. Roofing & Re -roofing .............................. Up to 1,000 SF $ 234.00 Each additional 500 SF or fraction thereof $ 33.00 (a) Roof Repairs 1) 1 - 25,000 sq. ft.............................................. $ 190.00 2) 25,001 - 50,000 sq. ft.......................................... $ 240.00 3) 50,001 to 100,000 sq. ft ........................................ $ 290.00 4) Greater than 100,000......................................... $ 340.00 17. Siding (Stucco & Soffit) ............................... Up to 50 SF $ 190.00 Each additional 100 SF or fraction thereof $ 33.00 18. House Moving Into the City ....................................... $ 570.00 19. Plan Review or Revisions ............................. Base charge $ 49.00 Plus per each page $ 16.00 20. Masonry Walls & Precast Concrete Walls ................ Up to 100 LF $ 360.00 for each additional 100 LF or fraction thereof $ 61.00 21. Permit Card Replacement (no recorded inspections_) .................. $ 10.00 Each recorded inspection $ 5.00 22. Safety Determination for Above Ground Portable Pools/Spas Not Attached to Swimming ................................... $ 104.00 23. Commercial & Residential Swimming Pools (Includes ALL Disciplines (a) 1 - 16,000 gallons .......................................... $ 520.00 (b) 16,001 - 30,000 gallons ....................................... $ 640.00 Per each additional 1,000 gallons or fraction thereof above 30,000 $ 33.00 C. R-2010- TR 11905 Exhibit C BUILDINGPERMIT FEES (Con't) Eff 10/01/2010 4.e 1 meter or greater) eater) ............. Structural and Electrical $ 145.00 25. Screen Enclosure (Patio/Parch/Pool) (a) 1 - 200 sq. ft................................................ $ 248.00 (b) 201 - 400 sq. ft.............................................. $ 273.00 (c) 401 - 600 sq. ft............................................. $ 299.00 (d) 601 - 800 sq. ft............................................. $ 324.00 (e) 801 - 1,000 sq. ft ............................................ $ 349.00 (f) 1,001 - 1,200 sq. ft........................................... $ 375.00 (9) 1,201 - 1,400 sq. ft........................................... $ 400.00 (h) 1,401 - 1,600 sq. ft........................................... $ 425.00 (i) 1,601 - 1,800 sq. ft........................................... $ 451.00 0) 1,801 - 2,000 sq. ft........................................... $ 476.00 (k) Per additional 100 sq. ft. or fraction thereof $ 12.50 26. Slab (Porch/Patio,-monolithic) ......................... Up to 100 SF $ 190.00 (Walkways & Pavers) ........ for each additional 100 SF or fraction thereof $ 33.00 27. Concrete Paving & Parking .......................... Up to 1,000 SF $ 190.00 (Driveways & Pavers) for each additional 500 SF or fraction thereof $ 33.00 28. Sealcoat/Restripe (a) Up to 25,000 sq. ft.............................................. $ 190.00 (b) 25,001 - 100,000 sq. ft............................................ $ 285.00 (c) Each addition of 25,000 sq. ft..................................... $ 33.00 29. Walkways (Only) ..................................... Up to 50 LF $ 190.00 each additional 50 LF or fraction thereof $ 33.00 30. Sions (a) All Wall Signs ............................................... $ 227.00 (b) All Monument Signs .......................................... $ 227.00 (c) All Temporary Signs .......................................... $ 227.00 (d) Banners (30 days once per year) ................................ $ 40.00 (e) Directional Signs (per sign) .................................... $ 53.00 (f) Face Change Only .......................................... $ 190.00 31. Docks ............................................ Up to 30 LF $ 227.00 each additional 10 LF or fraction thereof $ 17.00 32. Utility Shed ................................. Up to 10' X 10' X 7' high $ 141.00 Larger than 10' X 10' X 7' high $ 235.00 33. Fireplace (when not part of original plans)_ ........................... $ 141.00 34. Sea Walls .......................................... (See Ordinance #74-75) 35. Sea Wall Repairs . 3.0% of Cost of Construction or a minimum of $190.00, whichever is greater 36. Garage Door . ................................................. $ 141.00 37. Trailer Tie -Down Construction or Sales ........................... $ 141.00 38. Kitchen Cabinets ............................................. $ 141.00 7 R-2010- TR 11905 Exhibit C D. ELECTRICAL UNIT FEE SCHEDULE Eff 10/01/2010 1. Burglar Alarm ..................................... Up to 10 drops $ 111.00 for each additional drop in excess of 10 drops $ 2.00 2. Commercial Site Lighting .......................... Up to 3 standards $ 146.00 for each standard in excess of 3 standards $ 16.00 3. Electrical Sign ............................................ Each $ 122.00 4. Fire Protection .... Each alarm bell, horn, or similar device up to 10 devices $ 235.00 Each additional device in excess of 10 devices $ 8.00 5. Electrical Connections for Residential/Commercial A/C System Per new system $ 190.00 Each change out $ 95.00 6. Low Voltage Wiring (a) Each Data Line Up To 10..................................... $ 111.00 Each additional device in excess of 10 devices $ 2.00 (b) Each Intercom Up To 10........................................ $ 74.00 Each additional device in excess of 10 devices $ 2.00 (c) Each Telephone Outlet Up To 10................................ $ 74.00 Each additional device in excess of 10 devices $ 2.00 (d) Each Video Line Up to 10..................................... $ 74.00 Each additional device in excess of 10 devices $ 2.00 (e) Each Sound System ......................................... $ 99.00 Each additional device in excess of 10 devices $ 2.00 (f) Each Vacuum .............................................. $ 74.00 7. Service Change ................................. Up to 200 AMPS $ 95.00 (a) Residential/Commercial . ....................... 200 - 400 AMPS $ 190.00 Every 100 amps over 400 $ 10.00 8. Sprinkler Pump ........................................... Each $ 146.00 9. Temporau Electric .............................................. $ 122.00 10. 30-Day TemporarN Electric For Testing ............................. $ 146.00 11. Construction or Sales Trailer ...................................... $ 99.00 12. Generators (Power Apparatus) ......................... Up to 20 KW $ 167.00 Each additional 1 KW or fraction thereof in excess of 20 KW $ 8.00 N 11 a R-2010- TR 11905 Exhibit C E. MECHANICAL UNIT FEE SCHEDULE Eff 10/01/2010 1. Air Conditioning Split System ..................................... $ 190.00 2. Air Handler or Condensing Unit Replacement $ 120.00 3. Package -Unit .................................................. $ 150.00 4. A/C Stands . ........................... With no equipment changes $ 65.00 In conjunction with equipment replacement $ 15.00 5. Pool Heater .................................................... $ 120.00 6. Smoke Duct Detector ............................................ $ 99.00 7. Air Conditioning Duct Work When attached to A/C permit $ 95.00 Stand alone $ 190.00 8. Hood System With Fire Su ression................................ $ 390.00 9. Suppression System Only ....................................... $ 190.00 F. PLUMBING PERMIT FEES 1. Fire Sprinkler System ................................. Base charge $ 150.00 Plus per head 2. Backflow Devices ................................. Up to 4 devices $ 125.00 $ 50.00 3. Solar Pool Heater / Water Heater . ................................. $ 125.00 4. Domestic Water Heater .......................................... $ 100.00 5. Water Well .................................................... $ 125.00 6. LP Gas System .................................... Up to 4 outlets $ 150.00 Plus each additional outlet $ 66.00 7. LP Gas Tank(s)................................................ $ 125.00 8. Irrigation ation Systems (a) Residential ................................................. $ 125.00 (b) Commercial ................................................ $ 150.00 9. Replace Plumbing Fixtures .................. One (1) fixture of any type $ 95.00 Up to five (5) fixtures $ 190.00 Each additional fixture $ 23.00 Q7