Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2009-146Temp. Reso. #11704 October 14, 2009 Page 1 CITY OF TAMARAC, FLORID/A/ RESOLUTION NO. R-2009 � 6' A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE CHANGE ORDER No. 1 TO THE AGREEMENT WITH CHARLAND RUREY CONSTRUCTION, INC., FOR ADDITIONAL WORK AT THE FIRE STATION 41&78 RENOVATION PROJECT; AUTHORIZING AN ADDITIONAL EXPENDITURE IN THE AMOUNT NOT TO EXCEED $111,666.00; AUTHORIZING BUDGET AMENDMENTS FOR PROPER ACCOUNTING PURPOSES; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on June 24th, 2009, via Resolution No. R-2009-84, the City Commission approved the award of RFP No. 09-05B to Charland Rurey Construction, Inc., for the renovations to Fire Stations 41 & 78, incorporated herein by reference and on file at the City Clerk's office; and WHEREAS, Change Order No. 1 is required in order to ensure compliance with City Building Codes and enhance emergency management capabilities within the City; and WHEREAS, per the City's request, Charland Rurey Construction, Inc., has submitted a change order proposal for additional work for the Fire Station 41 & 78 Renovation Improvement Project, a copy of said proposals is hereto attached as Exhibit "2"; and Temp. Reso. #11704 October 14, 2009 Page 2 WHEREAS, the Public Works has reviewed said proposal and has determined that the pricing is competitive and acceptable; and WHEREAS, the cost of additional services attributed to this change order necessitates an additional expenditure in an amount not to exceed $111,666.00, a copy of said Change Order No. 1 is hereto attached as Exhibit "1 "; and WHEREAS, available funding for this change order is available in the project contingency allowance (Project #GP05C) for said purpose; and WHEREAS, the Director of Public Works recommend the authorization of Change Order No. 1 to the contract in the amount not to exceed $111,666.00 for the Fire Station 41 & 78 Renovation Improvement Project; and WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to approve Change Order No. 1 for the Fire Station 41 & 78 Renovation Improvement Project and authorize an additional expenditure in the amount not to exceed $111,666.00 for said purpose. 1 Temp. Reso. #11704 October 14, 2009 Page 3 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA THAT: SECTION 1: The foregoing "WHEREAS" clauses are HEREBY ratified and confirmed as being true and correct and are HEREBY made a specific part of this Resolution upon adoption hereof. All exhibits attached hereto are incorporated herein and made a specific part of this resolution. SECTION 2: The appropriate City Officials are hereby authorized to execute Change Order No. 1 to the contract with Charland Rurey Construction, Inc., for the additional cost and time incurred as a result of change order No. 1. SECTION 3: An additional expenditure in an amount not to- exceed $111,666.00 for this purpose is hereby approved. SECTION 4: The City Manager, or his designee, are hereby authorized to make changes, issue change orders in accordance with section 6-156(b) of the City Code, and close the contract award including, but not limited to making final payment within the terms and conditions of the contract and within the contract price. SECTION 5: All budget amendments for proper accounting purposes are hereby approved. Temp. Reso. #11704 October 14, 2009 Page 4 SECTION 6: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 7, This Resolution shall become effective immediately upon adoption. PASSED ADOPTED AND APPROVED this c2 1�7 day of �'�� 2009. BETH FLANSB UM-TALABI O MAYOR ATTEST: RECORD OF COMMISSION VOTE: f' MA ION4�SE NSON, C MAYOR FLANSBAUM-TALABIISSCO Cam''CIY CLERK DIST 1: COMM BUSHNELL zt � DIST 2: VM ATKINS-GRAD �- DIST 3: COMM. GLASSER DIST 4: COMM. DRESSLER I HEREBY CERTIFY that I have approved this RESOLUTION as to form. S L GOREN CITY ATTORNEY 1 CHANGE ORDER DATE OF ISSUANCE: October 8, 2009 OWNER: CITY OF TAMARAC Public Works Department 6011 Nob Hill Road Tamarac, FL 33321-6200 BID NO. 09-05B CONTRACTOR : Charland Rurey Construction, Inc. 2210 NW 3rd Ave, Suite 133 Pompano Beach, FL 33060 CHANGE ORDER 1 PROJECT NAME Fire Station 41 & 78 Renovation Project: PROJECT NO. NIA P.O. NUMBER 120898 IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS: DESCRIPTION: Increase contract cost in an amount not to exceed $111,666.00 PURPOSE OF CHANGE ORDER: To authorize the Contractor to perform additional work by the installation of: 1. Structural Screening for roof top air conditioning units. 2. Impact resistant storefront windows. 3. Flooring membrane for expansion joints in the bunk rooms. 4. Relocation of rain water leader 5. Additional renovations to weight room and new LT room The additional work shall include all necessary labor, material and equipment needed to complete this project See attached backup documentation for change order line items. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Y Original Contact Time $ 770,872.00 155 DAYS Original Contract Price(Less Contingency) $ 584,812.00 Previous Change Order and/or Amendments Net Change From Previous Change Orders $ 0.00 0 DAYS I Contract Price Prior To This Change Order (Less Contingency) Contract Time Prior To This Change Order $ 584,872.00 156 DAYS Net (Increase) Of This Change Order not to exceed Net (increase) Of This Change Order $ 111,666.00 35 DAYS Contract Price With All Approved Change Orders (Less Contract Time With All Approved Change Orders Contingency) 190 DAYS $ 696,538.00 Account No(s) Affected: $111,666.00 Amount Affected 32 46255226310 ROUTING: Dept. Director, Contractor, Purchasing Manager, City Manager, Purchasing Manager i, . CHANGE ORDER DATE OF ISSUANCE: October 8, 2009 OWNER: CITY OF TAMARAC Public Works Department 6011 Nob Hill Road Tamarac, FL 33321-6200 BID NO. 09-OSS CONTRACTOR : Charland Rurey Construction, Inc. 2210 NW 3rd Ave, Suite B3 Pompano Beach, FL 33060 CHANGE ORDER 1 PROJECT NAME Fire Station 41 & 78 Renovation Project: PROJECT NO. NIA P.O. NUMBER 120898 IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS: DESCRIPTION: Increase contract cost in an amount not to exceed $111,666.00 PURPOSE OF CHANGE ORDER: To authorize the Contractor to perform additional work by the installation of: 1. Structural Screening for roof top air conditioning units. 2. Impact resistant storefront windows. 3. Flooring membrane for expansion joints in the bunk rooms. 4. Relocation of rain water leader 5. Additional renovations to weight room and new LT room The additional work shall include all necessary labor, material and equipment needed to complete this project See attached backup documentation for change order line items. r`WANr_C IN CONTRACT PR!C.E CHANGE IN CONTRACT TIME Original Contract Price Original Contact Time $ 770,872.00 1155 DAYS Original Contract Price(Less Contingency) $ 584,872.00 Previous Change Order and/or Amendments Net Change From Previous Change Orders $ 0.00 0 DAYS I Contract Price Prior To This Change Order fLess Continoency) Contract Time Prior To This Change Order $ 584,872.00 156 DAYS Net (Increase) Of This Change Order not to exceed Net (Increase) Of This Change Order $ 111,666.00 35 DAYS Contract Price With All Approved Change Orders (Less Contract Time With All Approved Change Orders Contingency) 190 DAYS $ 696.538.00 Account No(s) Affected: $111,666.00 Amount Affected 32646255226310 ROUTING: Dept. Director, Contractor, Purchasing Manager, City Manager, Purchasing Manager Charland Rurey Construction, Inc. Change Order Proposal # 7 Owner: City of Tamarac 6011 Nob Hill Road Tamarac, FL 33321 roject Name; Fire Stations 41 & 78 Project #09-03 Dane: 9/ 15/ 200 Code: Our Contract Agreement dated June 24, 2009 Is hereby amended to include the provisions of the extra work order listed below: Amount Add Deduct Workscope Change install membrane over expansion joints In floors at Dormitory rooms tatlon 78, Price Includes material, freight and Installation of 44' x 3' f menbrane. $400.00 umpster and cleanup Subtotal: $400.00 Bond Premium = 2.S% $10.00 ddltional Contract'nme as a result of this Change Order- 0 Days Subtotals: $410.00 1 $0.00 TOTAL AMOUNT OF THIS CHANGE ORDER: F $410 106/6 OVERHEAD & PROFIT $41 TOTAL AMOUNT OF CHANGE ORDER of Tamarac Approved: _.._ rint Name. Date: Charland Rurey Construction, Inc. Approved: Print Name: William 0. Charland Date: 2210 NW 3rd Avenue, Suite 9-3 » Pompano Beach, FL 33060 - Phone% (954) 786.9119; Fox: (954) 785-5426 E-Mail: bchartand@charlondrurey.com 06/26/2009 13:08 9549716614 PERSPECTIVE GLASS PAGE 01/01 JPerspecfive Glass CLDmpany a Glazing Contractor 1903 NW 40th Court Pompano Beach, Florida 33064 Phone: 1954) 773-9714 Para. (954) 971-6614 TO: Charland Rurey Const. ATTN: Sheamus CHANGE ORDER Change Order #: 1 Date: August 26, 2009 Fax: 954-785-5426 Job: Fire Station #41 III We hereby agree to snake the change(s) specified below: III Remove existing storefronts and replace with new on the Front elevation as noted below: - Three openings approximately 111" x 26" - Ore opening approximately 111" x 88" with single storefront doUr and sidelights Storefront fhwing will be YKK°s YHS-50 Large Missile Impact resistant system. Door will be YKK 35H Medium stile impact door with butt hinges, panic device, surface mounted closer, standard pull handle and threshold. Finish will be Clear Anodized Glass will be 9/16 Gray Tint Laniuinatc. Exclude: Wood Bucks, Removal of existing accordion shutters, stucco repair worn Add 10 600.00 to Contract Price NOTE. This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the changes) specified above at this price: PREVIOUS CONTRACT ,AMOUNT:. I S REVISED CONTRACT TOTAL: S ACCEPTED — bova prices and specifications of this Change Order are satisfactory and are hereby accepted, All work to be perform un er some terms and conditions as specified in original contract, unless otherwise stipulated. Date: , 2009 Date of Acceptance: Shane Prieto, Perspective Glass Co. Signed; General Contractor Powertech Interiors Inc. 560 South Andrews. Pompano Beach, FI 33069 Phone:954-788-6788 Fax:954-788-6468 Bid Summary Window bucks Bid No. 50 - Job No. 09-136 Selected Sections: 05405 Fasteners, 06100 Rough Carpentry, 09105 Lt. gauge fasteners, 09110 Lt. gauge framing, 09250 Drywall, 09255 Finisher Selected Typical Areas: Selected Areas: (unassigned) Estimator: DP - Daniel Pare Job Status: Sold Job Class: Renovation Bid Date/Time: 4/1012009 12:00:00 PM Wage Type: Sub Plans Date: 4/10/2009 Job Site: Fire Station #41, 7501 NW. 88th Ave., Tamarac, FI. 33321 (unassigned) Na. Condition Height Quantity Unit Pricing Mat. Lab. Total Total Price Man Days 1 Window bucks 10' 0" 4.00 EA 19.22 25.36 44.591 EA 17s.35 0.60 2 Iniill 2))w��indew openings 5,00 LF 8.09 15.43 23.531 LF 117.64 0,36 It: +nd`- 2 Material 8 Labor Total: 295.99 0.96 {unassigned) Total: 295.99 0.96 Grand Total: $295.98 0.96 -116/2009 12 -13 om CharlandRurey Construction, Change Order Proposal #5 Owner: City of Tamarac Date: 6011 Nob Hill Road Tamarac, FL 33321 Cost Code: roject Name: Fire Stations 41 8c 78 Project #09-03 Our Contract Agreement dated June 24, 2009 is hereby amended to include the provisions or the extra work Order listed below: mount Add Deduct Workscope Change OOITIONAL STOREFRONT SYSTEM ddltlonal storefront $10,600.00 Demo Existing storefront Intl dd for wood bucks for new system 131 If $178.35 tucco repair around windows 111 sf $400.00 rywali repair around windows 61 sf $235.28 Demo 1 layer block at lintel and chip back stucco for patch 35 If $300,00 19 If at existing windows $150.00 l and epoxy In to 6# existing columns Install '5 bars. rm, Install rebar and pour new US lintel 35 If at new windows only F $525.00 19 If at existing windows $285.00 Install new window sills. Cut and place 7 lenghts $369.00 umpster to discard packaging and demo material and cleanup $150.00 metal cleanup $100.00 Subtotal: $13,292.63 and Premium = 2% $265.85 ddltlonal Contract Time as a result of this Change Order. included in CO e 2 Subtotals: $13,558.48 $0.00 TOTAL AMOUNT OF THIS CHANGE ORDER: $13,558 10% OVERHEAD & PROFIT _ $1,356 TOTAL AMOUNT OF CHANGE ORDER of Tamarac Approved: Approved: Charland Rurey Construction, Inc. Print Name: William O. Charland Date: Date - 2210 NW 3rd Avenue, Suite 0-3 - pampano Beach, FL 33060 - Phone- (954)786-9119: Fax: (954) 785.5426 E-Mail: bchar(and@charfandrurey.eom Charland Rurey Construction, Inc. Change Order Proposal # 4 REV i Owner: City of Tamarac 6011 Nob Hill Road Tamarac, FL 33321 roject Name: Fire Stations 41 & 76 Project #09-03 ate: 10/ 1/ 2009 Code: Our Contract Agreement dated 3une 24, 2009 is hereby amended to include the provisions of the extra work order listed below: Amount _ Add Deduct Workscope Change LOVE RAIN WATER LEADER WEIGHT ROOM aw cut and remove 16 sf 6" slab $225.00 Labor and Materials for Plumber to reconfigure existing cast Iron rain water $450.00 leader underground and above telling. Increase wall sine from 3 112" to 6" to accomadate pipe at new location In CO 3 ompaction and Soil poisoning $58,00 Laborand materials to dowel In with epoxy #5 bars and Install #5 mat and $320.00 cur bsck 16 sf of 6" concrete slab umpster and cleanup Subtotal: $1,053.00 Bond Premium = 2% $21.06 dditional Contract Time as a result of this Change Order= 0 Days Subtotals: $1,074.06 $0.00 TOTAL AMOUNT OF THIS CHANGE ORDER: $1,074 10% OVERHEAD Sit PROFIT $107 TOTAL AMOUNT OF CHANGE ORDER of Tamarac Approved: rint Name" Dates Charland Rurey Construction, Inc. Approved: Print Name: William O. Charland Date: 2210 NW 3rd Avenue, Suite 8-3 Pompano Beach, FL 33060 - Phone: (954) 786-9119; Fax: (954) 785-5426 H-Moil: bchartand@charlandruroy.com Charland Rurey Construction, Inc. Change Order Proposal #3 rev 1 . . . .... ............. . .... . Owner: City of Tamarac 6011 Nob Hill Road Tamarac, FL 33321 Project Name: Fire Stations 41 & 78 Project #09-03 11Date: 1 10/8/2009 1 Code: Our Contract Agreement dated June 24, 2009 is hereby amended to Include the provisions of the extra work order listed below: Amount Workscope Change Add Deduct Change tile to rubber flooring. 8'x10' No additional cost Credit on window $267.00 Additional return and supply grills modifications due to adding IT room $450.00 lAdditional light fixture and swithch at New IT room $400.00 Block and stucco at window $240.00 Demo existing door and frame at triage $100.00 D:-ywall t,,t window trOge t55.66 Credit on drywali and framing wall removed at triage 'nc IDrywall and framing to close up existing door opening inc Increase size of wall to 6" to accomadate rain water leader restroom inc New wail at clayrourn . L \ ,i * y;­) A V'Q $351.15 New door and hardware special size at day room as spec for other doors on )ob . $476.00 Install new door and hardware. $120.00 Clean up and durapstei $100.00 Subtotal: $2,137.15 Bond Premium = 2% $4234 1A dditional Contract Time as a result of this Change Order- 0 Days Subtotals: $2,179.89 $322.66 TOTAL AMOUNT OF THIS CHANGE ORDER: $1.857 10q/o OVERHEAD & PROFIT $J86 TOTAL AMOUNT OF CHANGE ORDERII $2,043 ity of Tamarac Approved: nt Name: Date: Charland Rurey Construction, Inc. Approved: Print Name. William 0. Charland Date: 2210 NW 3rd Avenue, 5utte 8-3 - Pompano Beach, FL 33060 - Phone; (954) 786-9119: Fax: (954) 785-5426 E-Mail: bcharland@chariandrurey,corn -TYP. NEW ROOF CURB DETAIL A2.2 N.TS. ROOFING GENERAL NOTESr I. 6C TO VERIFY EMMSTING ROOF SPECIFICATION. 2. ALL NEW ROOF PATCHING AND FLA%flW WORK SMALL BE PERFORMED .N EG0CIF THE ST106 ROOF SYSTEM SO AS TO MAINTAIN THE FASTING OWARRANTEE. 3. ROOFING INSTALLER 514ALL BL CERTIFIED BY c%ISTII46 ROOFING SYSTEM INSTALLER. 4. 5EE ARGNITEGTURAL,STRLGTURAL a MECHANICAL ROOF PLAN5 AND DETAIL5 FOR NEW ROOF OPENINGS, CURB5. PIPE FLASA9 AND MISCELLANEOUS DETAILS. 5. PROJIDE TRAFFIC PADS FROM ALL ACGE55 LADDER LOGATION5 rO ALL ROOFTOP EOWPMENT LOCATIONS. ELAPE awmr �SLIOULmilli SNFER l STRU:,TLRE -- 4'94•4/4' I10RIE, POST SEE 5TRKRFAL 0ETA45 A' A147 6' Ire• (TYP) -� 4•m4'xV4' P05T 5wM IF WDED SEE STRBGPA<AL DE rAlLS 'A' Mm & NEW RTU i m a;MPTCN:L ATTAGIED TO r m SLr4mwml5'!?Ek r7 STTOI6NRE. UAMYL BY I '� L- Z MGk0R5INg v SUftRdYOINaf 5T)4GTuzF Xea s ARE BY udYALLES irYY) _ r- c ' MOUEL NO. BLADE wPFDRT BY � 450XPI W.LYFS.fTYPJ Y `" .-- AC.GESSOPY WV5TRIAL SEALANT GOV✓:R LOWERS _ SEALANT Ii,Ic'. • �. ,3 OR EDUAL. Tt8E FLAT HIND . , _ , . T1,9E FLASHING — PRESOLDERED — SEAMS- MODEL WS FIELD 9:-LOERED SEAMS- MOD2L WD 5EE ATTAGwENT DETAILS'A' A/C SCREEN DETAIL �2.2 SCALE, P - --0" NOTE; ABOVE DETAIL5 AREPIAGRAMMATIG IN NATURE. GON5ULT HITH ROOFING MANUFACTURER FOR PRE6I5E PATGHIN6 AND FL A5HIN6 5PEGIFIGATION5 FOR THE EXI5TING MEMBRANE, TO EN5URE MA.INTAININ6 Eks-iTING ROOF HARRANTEE. R � I 7 Flo 9 <LLj (p "S+ t Q I.M JNr _3S 7. S3[ jVA a¢ lip N W A�� H u t I 1 ! IIG' I � 4'-5' 4W A A 6 m I I I I I � Ij i I '11�1�!I11I1'���1Ii g� 1:j 8 ■§�� � `�� § 2 A ■k■� ■qi$ { g f,,n E | k � f$� }� \ gg a p g) z E < o � r zC x=ZO r ��n;bf'7A �'1O•pxmb'.t+D r � b � n to ru tOo C IF" 12.1 d l7 �=p , t*t k7 r az P-1Lt!-4a`{x n bAl, L 3 z m � W Y x b P; Z rm M Y , rr O p ! i p p � M „ M A � e 2 ■ ro ¥ f • � � �i & ' q L1/ Aa 2 # ■ �EHi ■A (/ _ �■ ■ „ ■ � x m x xfit ■§ $k�§ a �% §§i � � $E �. ■ \� k \ B ix ■ � � k No Text I' W > V J N N O N R ' I o+ v W 6t t VI N a 'D 6fNw z ti A pyNy�r r mD� r N wO m� V N N Charland Rurey Construction, Inc. Change Order Proposal #2 REV 1 Owner: City of Tamarac 6011 Nob Wilt Road Tamarac, FL 33321 IlPro Name: Fire Stations 41 8t 78 Project #09-03 Code: 10/1/2009 Our Contract Agreement dated June 24, 2009 is hereby amended to Include the provisions of the extra work order listed below: Amount Workscope Change Add Deduct Structural steel support system Including 2 coats galvanised paint as required $25,610.00 luminum wall system with gates by Industrial louvers $19,557.00 Install Aluminum wall and gate system $4,680.00 3 roof pitch pans including cutting toof to deck ready for post Install $13,850.00 Demo stucco ceiling to allow for welding above ceiling at high bay area. 180 sf $672.00 came, lath & stucco ceiling at areas where welding takes place. 180 sf $1,080.00 !sc paint touch up interior building $300.00 lit for installing interior siructurdl work and siuccu patch 2 weeks $022.00 umpster for crating and demo material $385,00 Labor for clean up $250.00 Additional Supervision 35 days 0 $450 per day. $15,750.00 Subtotal; $82,956,00 nd Premium - 2% $1,659.12 ciditlonal Contract Time as a result of this Change Order= 3S Days Subtotalls:1 $84,615.12 $0.00 TOTAL AMOUNT OF THIS CHANCE ORDER: $84,615 10% OVERHEAD & PROFIT $8,462 TOTAL AMOUNT OF CHANGE ORDER Ity of Tamarac Approved____ nt Name: Date.• Charland Rurey Construction, Inc. Approved: Print Name: William O. Charland Date: 2210 NW 3rd Avenue, Suite 0-3 Pompano Beach, FL 33060 -• Phone: (954) 786-9119; Fax: (954) 785.5426 E-Mail. bcharland@chariandrurey.com