Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2007-193Temp. Reso. # 11328 November 20, 2007 Page 1 of 4 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2007-JYJ RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE TASK AUTHORIZATION NO. 08-01 E WITH MATHEWS CONSULTING, INC., TO PROVIDE PROFESSIONAL SERVICES TO PREPARE A WATER SYSTEM MASTER PLAN (STUDY) IN ACCORDANCE WITH THE CITY'S CONSULTING ENGINEERING AGREEMENT AS AUTHORIZED BY RESOLUTION NO. R-2006-131, FOR AN AMOUNT NOT TO EXCEED $212,868.00; APPROVING FUNDING FROM THE APPROPRIATE BUDGETED UTILITIES OPERATIONAL AND CIAC ACCOUNTS; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO ADMINISTER THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Tamarac owns, operates and maintains the water supply, treatment, and distribution systems; and WHEREAS, it has been eleven years since a Comprehensive Water System Study of capital improvement needs within the City of Tamarac water system has been conducted; and WHEREAS, this Water System Master Plan (Study) will upgrade the City of Tamarac hydraulic model and ultimately result in recommendations for future Capital Improvement Projects that will satisfy the requirements of our outstanding bonds; and I Temp. Reso. # 11328 November 20, 2007 Page 2 of 4 WHEREAS, the City requires the service of a consulting firm knowledgeable in this area and capable of providing professional services to prepare a Water System Master Plan (Study) for the City of Tamarac; and WHEREAS, Mathews Consulting, Inc., possesses the required knowledge and experience to provide professional services needed to prepare a Water System Master Plan (Study) for the City of Tamarac; and WHEREAS, Mathews Consulting, Inc., has been pre -qualified as an approved consultant for engineering services by the City of Tamarac as authorized by Resolution No. R-2006-131, passed and adopted by the City Commission on July 12, 2006; and WHEREAS, it is the recommendation of the Director and Assistant Director of Utilities that Task Authorization No. 08-01 E from Mathews Consulting, Inc., be approved, executed and funded; and WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to accept and execute Task Authorization No. 08-01 E (a copy of which is attached hereto as "Exhibit A") with Mathews Consulting, Inc., to provide professional services to prepare a Water System Master Plan (Study) for the City of Tamarac for an amount not to exceed $212,868.00 and to provide funding from the appropriate Utilities Operational and CIAC accounts. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, THAT: 1 Temp. Reso. # 11328 November 20, 2007 Page 3 of 4 SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this resolution. SECTION 2: The appropriate City Officials are hereby authorized to accept and execute Task Authorization No. 08-01 E with Mathews Consulting, Inc., to provide engineering services to prepare a Water System Master Plan (Study) for the City of Tamarac, in accordance with the City's Consulting Engineering Agreement as authorized by Resolution No. R-2006-131, for an amount not to exceed $212,868.00. SECTION 3: The $212,868.00 is approved to be funded from the appropriate budgeted Utilities FY 2008 Operational and CIAO accounts. SECTION 4: The City Manager, or his designee, are hereby authorized to make changes, issue Change Orders not to exceed $30,000.00 per Section 6-156 (b) of the City Code, and close the contract award including, but not limited to making final payment within the terms and conditions of the contract and within the contract price. SECTION 5: All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 6: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. 1 SECTION 7 passage and adoption. f 111ifyj Temp. Reso. # 11328 November 20, 2007 Page 4 of 4 This Resolution shall become effective immediately upon its PASSED, ADOPTED AND APPROVED this day ofkzez� , ATTEST: MARION SWENSON, CMC CITY CLERK I HEREBY CERTIFY that I have approved this RESOLUTION as to form. MUEL S. GOREN CITY ATTORNEY NINE, • 1114YOT RECORD OF COMMISSION VOTE: MAYOR FLANSBAUM-TALABISCO4(e,4� DIST 1: COMM. PORTNER DIST 2: COMM. ATKINS-GRAD DIST 3: V/M SULTANOF DIST 4: COMM. DRESSLER ;1 1 CITY OF TAMARAC "EXHIBIT A" Task Order Authorization No. 08-01E TR #11328 Engineering Services for Development of a Comprehensive Water Master Plan DATE: November 12, 2007 PROJECT DESCRIPTION The City of Tamarac has requested professional services for the preparation of a Comprehensive Water Master Plan. The purpose of the Master Plan is to keep the City current with overall water planning strategies and identify future water supply, treatment and distribution needs for the City's service area. SCOPE OF WORK The services provided under this authorization will be divided into defined tasks in order to develop the information required to be included in the Comprehensive Water Master Plan. The following is the description of the tasks to be completed by the Consultant: Task I —Project Management Consultant shall provide overall project management which includes monitoring progress of work on a weekly basis for billing and compliance with established schedule, budget, and work quality requirements, and coordination with team subconsultants to ensure timely project deliverables and budget management. Consultant shall also provide attendance at general project meetings which shall include the following: ■ One project kick-off meeting to discuss overall project tasks and to discuss City Water System goals. • One meeting with the City's IT department to coordinate consumption data download. ■ One meeting with City staff to discuss existing condition of raw water system, treatment unit process, and distribution facilities. ■ One meeting with City staff to coordinate collection of calibration data for hydraulic model. ■ One meeting with City staff to discuss draft report. ■ One meeting with City Council for adoption of Master Plan. 11/13/07 Task 2 — Identify City's Water Treatment & Distribution Goals, Strategies and Level of Service (LOS) Task 2.1 Evaluate Historical Data Consultant shall evaluate and provide trending of the WTP historical flows, including raw, finished and distribution flows for the last 2-years of operation. Consultant shall evaluate and provide trending of the WTP historical raw and finished water quality (select parameters) for the last 5-years of operation. Consultant shall obtain and evaluate 2-years of water consumption data in MS Excel® format and establish trends for per capita water consumption. The data shall be provided in spreadsheet format and shall include customer acct. #, customer name, customer type (residential, commercial, etc.) customer address, property control number, meter route and monthly water consumption for the 26-month period. It is estimated that 19,000 accounts will be included in the consumption data. Consultant shall obtain past population data for the City and project future population growth based on previous trends, and projected buildout and/or redevelopment areas within the City. Consultant shall coordinate with population projections contained in the City's current Comprehensive Plan. Task 2.2 Identify Water System Goals Consultant shall identify overall general capacity goals of the system and overall general facility goals, including standards for flood protection, hurricane protection, emergency power, and communications. Consultant shall identify water quality goals of the treatment and distribution system. Consultant shall identify the City's desired Level of Service (minimum water pressures, fire flows, peaking factors, per capita demands, etc.). Task 2.3 Summarize Future Regulatory Requirements Consultant shall review and summarize future regulatory impacts to the City's water system, including water quality, monitoring requirements, sludge management, and staffing levels required for the City's existing and future WTP. Consultant shall identify those critical regulatory issues that need to be incorporated into planning and design of future facilities. Task 2.4 Review Water Conservation Program Consultant shall review the City's current water conservation program and recommend modifications, if required, to optimize the conservation program and to align the program with future conservation goals established by the SFWMD Lower East Coast Water Supply Plan and the City's Sl~ WMD Water Use Permit. Task 2.5 Coordinate with Strategic Plans Consultant shall review the City's current City and Utilities strategic plans and make reference to relevant sections of those plans in the Water Master Plan. Consultant shall coordinate the proposed water master plan with relevant sections, goals and objectives of the strategic plans. 11/13/07 Task 3 — Water Treatment Plant Evaluation Task 3.1 Asset Evaluation and Assessment of Existing Structures and Equipment Consultant shall perform field investigations of the WTP raw water wells and treatment processes and shall develop a listing of all equipment and structures, including volumes, power, capacity, age and assessment of condition. The purpose of the assessment is to inventory all existing facilities and identify improvements needed to be incorporated into the Water Master Plan Capital Improvement Program (CIP) over the next 20 years. To assist with the inventory process, City shall provide copies of available record drawings, facility permits and operating reports in a timely manner. Task 3.2 Capacity Analysis of Existing Treatment System The purpose of this Task is to evaluate the ability of the existing water treatment plant to meet the future water demand and desired water quality goals for the next twenty years. The future water demands and the City's desired water quality goals are to be determined in Task 2. For the evaluation, Consultant shall perform a desk top analysis to assess the existing plant ability to meet the projected maximum daily flow or projected peak hourly flow, as applicable. Based on discussions with the City, a 2.0 mgd low pressure reverse osmosis (LPRO) treatment system is planned to be on-line sometime between 2012 and 2020 to supplement the flow from the existing lime softening plant and to address future water supply needs of the City. Subtask 3.2.A — Hydraulic Capacity Evaluation Consultant shall perform a hydraulic profile evaluation through the plant -site to determine if hydraulic limitations exist for the plant to meet future water demands for the next twenty years. Each unit process including the raw water wells, major in -plant piping, treatment units, storage tanks and on -site high service pumps shall be evaluated before and after the LPRO system is constructed. Each applicable unit process shall be evaluated assuming firm capacity which assumes the largest component out of operation. Fire flow design flow shall also be considered per FAC 62-555.320(6) which states that the capacity of the water storage and treatment facilities must meet design maximum day demand including design fire flow. Storage tanks shall be evaluated for operational equalization plus fire flow per FAC 62- 55.320(19). Pipe flow capacity shall be evaluated assuming a maximum velocity of 8 ft/s. Subtask 3.2.B — Treatment Capacity Evaluation Consultant shall perform an evaluation of the lime softening treatment capacity at projected flow rates for the major treatment units before and after the construction of the LPRO system. Generally accepted operational or design loading rates shall be compared against the loading rates at the projected flow rates to determine if lime softening treatment will be acceptable. At the future water demand, the chemical usage shall also be projected to determine if an increase in storage or feed rate will be needed. Chlorine disinfectant CT calculations will also be evaluated at future flow rate to determine if the existing disinfection procedures will be adequate at the future flow rate. 11/13/07 The ability of the existing plant to meet the desired water quality goals of the City shall also be discussed. Potential new treatment processes to meet the desired water shall be discussed and compared, if required. Subtask 3.2.0 — Auxiliary Systems Evaluation The auxiliary systems that support the existing lime softening treatment system and the future LPRO system shall be evaluated for capacity. These auxiliary systems include: electrical power, backup power, instrumentation and control, plant water service, and laboratory services. Each auxiliary system shall be evaluated on its reliability and ease of use. Sound engineering and operational practices shall be considered. Future normal and backup power demand shall be determined based on existing maximum power demand from the lime softening system and estimated power demand for the LPRO system. Task 3.3 — Evaluation of Future Treatment Systems The purpose of this Task is to provide a conceptual plan and estimated cost for the planned 2.0 mgd LPRO system. The task will also look at water quality blending options with LPRO membrane permeate. Any other future treatment system that may be needed to meet the City's desired water quality as may be recommended in Task 3.2 above will also be addressed. Subtask 3.3.A — Planned LPRO System Consultant shall perform a desktop analysis to determine the conceptual design for the planned 2.0 mgd LPRO system for planning purposes. The desktop analysis will consider the water quality from Floridan wells in the area with similar anticipated construction for treatment with the LPRO. The water quality data from the nearby Floridan wells will be used to estimate required flows and pressure for the LPRO system as well as the resulting water quality from the LPRO system using predictive model programs from membrane manufacturers (DOW and Hydranautic). Based on the desktop analysis, Consultant shall develop a conceptual design to provide layout information for space planning and budgeting purposes. Major components will be sized preliminarily to determine required mechanical and electric requirements. These major components shall include but not limited to Floridan wells, cartridge filters, membrane feed pumps, LPRO membrane trains, chemical systems, permeate degassifiers, and odor control scrubbers. A site plan shall be developed showing the general location for the LPRO on the existing LPRO site. Clearwell issues concerning CT disinfection requirements and redundancy shall also be address with the plant layout. Potential membrane concentrate disposal system available to the City will be discussed. However, the options open to the City are limited. For the purposes of this scope, a deep injection well system is assumed for the conceptual design and layout. 11/13/07 4 Subtask 3.3.B — LPRO Water Blending Based on the finished water quality of the LPRO system, blending Floridan or Surficial raw water with membrane permeate may be a cost effective treatment alternative to produce the desired finished water quality at a lower cost. This evaluation will determine the feasibility of blending raw water with membrane permeate by performing mass balance calculations at various ratios of membrane permeate to raw water to determine if the desired water quality can be achieved economically. The resulting finished water quality from blending the LPRO membrane permeate with the water produced from the existing lime softening treatment process will also be assessed by performing mass balance calculations. This evaluation will identify potential water quality issues associated with corrosion control. Subtask 3.3.0 — Lime Softening Future Treatment System A conceptual design (if recommended in Task 3.2 above) to augment or replace the existing lime softening system shall be developed for space planning and budgeting purposes. Major components shall be sized and site plan proposed as required. This task includes evaluation of water recovery from filter backwash and lime sludge blowdown from Accelators, including conceptual design and CIP recommendations. This task will also review replacement of existing clearwell with new clearwell and new administration building designed to meet current hurricane windload standards. Task 3.4 — Recommendations Based on the evaluations above, Consultant shall summarize recommendations for WTP improvements. Included with the recommendations shall be estimated construction costs and schedules for engineering, permitting, construction and commissioning of the raw water and treatment improvements. The schedule will identify when the City should have the proposed Floridan wellfield on-line with associated LPRO system. Task 4 — Water Distribution System Evaluation Task 4.1 Asset Evaluation and Assessment of Existing Structures and Equipment Consultant shall perform field investigations of the water distribution storage and pumping facilities and shall develop a listing of all equipment and structures, including volumes, power, capacity, age and assessment of condition. The purpose of the assessment is to inventory all existing facilities and identify improvements needed to be incorporated into the Water Master Plan CIP over the next 20 years. To assist with the inventory process, City shall provide copies of available record drawings, facility permits and operating reports in a timely manner. Task 4.2 Capacity Analysis of Existing Water Distribution System The purpose of this Task is to evaluate the ability of the existing water distribution system to meet the future water demand and desired water quality goals for the next twenty years. The future water demands and the City's desired water quality goals are to be determined in Task 2. For the evaluation, Consultant shall perform a desk top analysis to assess the existing distribution 11/13/07 storage and pumping facilities to meet the projected maximum daily flow or projected peak hourly flow, as applicable. Each system shall be evaluated assuming firm capacity which assumes the largest component out of operation. Fire flow design flow shall also be considered per FAC 62-555.320(6) which states that the capacity of the water storage and treatment facilities must meet design maximum day demand including design fire flow. Storage tanks shall be evaluated for operational equalization plus fire flow per FAC 62-55.320(19). Pipe flow capacity shall be evaluated assuming a maximum velocity of 8 ft/s. Task 4.3 Evaluate Unaccounted for Water Loss in the Distribution System Consultant shall obtain 2-years plus 2 months of water production and water billing data from the City (assumes use of data obtained in Task 2.1). Water production data shall include water produced at the water treatment plant as well as any flows obtained through interconnects. Consultant shall obtain non -billed, accounted for water from the City for the 26-month study period. Consultant shall also obtain meter reading schedule for the City and meter calibration data for plant meters as well as for customer meters. Water produced and water billed will be corrected for meter reading lag time and meter inaccuracies. The Consultant shall then calculate unaccounted for water based on the following equation: Water — Water — Accounted -for = Leakage or Produced Billed Non -billed Water Unaccounted For Water The results of this task shall be presented in a customized worksheet model format (including electronic copy) that can be used by the City for future water accounting purposes. Task 4.4 Develop Hydraulic Model of the Distribution System Subtask 4.4.A — Model Development Consultant shall develop a hydraulic model using WaterCad® software for the potable water main system to assess the capacity in order to accommodate future water demands. The model shall be developed based on City GIS maps converted into AutoCad v. 2005 format (conversion by the City). City shall also provide information regarding any future developments and/or modifications to the water system not yet reflected on the GIS maps. The model shall include pipe sizes 4-inches and larger. It is assumed that a minimum 2,000 pipe model is required based on preliminary transmission and distribution maps provided by the City. C-Factors shall be established based on estimated age of the pipelines and field. verification data for system pressures, both provided by the City. Previous hydrant flow testing reports will also be used, if available. Consultant shall utilize the water consumption data received under Task 4.3 and assign each customer in the water consumption data to a grid area designated on the City's water 11/13/07 6 distribution map. The entries will be grouped according to grid number, and an average daily demand for each grid will be established. The number of nodes in each grid will be determined, and an average day demand per grid area will be calculated. An average day demand per node per grid will also be calculated and input into the model. A leakage value per node will be input into the model based on the unaccounted for water calculation performed under Task 4.3. Subtask 4.4.B — Calibrate Flow Model Consultant shall calibrate the model using calibration data provided by the City. Calibration data shall consist of system pressure readings taken throughout the City and plant finished water flow records. It is anticipated that 24-hour pressure recording devices will be installed and data collected by the City staff for Consultant's use to calibrate the model. A pre -determined time period will be established for collecting the data (for example, for a 1-week period, every half hour). Minimum, maximum and average readings shall be provided for each location and time interval. The model will be calibrated using the above listed data to within ± 10% of the field readings. Subtask 4.4.0 — Calibrate Chlorine Residual Water Quality Model Consultant shall incorporate the latest chlorine residual data into the model and calibrate the water quality model extended -period simulation. The City shall provide to Consultant the latest map showing chlorine residual monitoring locations, as well as chlorine dosage points. The City will provide chlorine residual readings at all of the monitoring points and injection points. Consultant will run the model with the average of all of the chlorine residual data for each location. Chlorine bulk reaction coefficient and wall reaction coefficients will be adjusted until the model is calibrated to within f 10% of the field readings. Subtask 4.4.D — Model Future Flow Scenarios The model shall be used to identify nature and extent of needed improvements to meet future needs and to improve current conditions. Up to five (5) "what -if' scenarios shall be run to confirm needed improvements. Up to four (4) fire flow scenarios shall be run based on ISO and the City's Fire Department minimum fire flow capacity requirements. The extended -period water quality model simulation shall be checked at future flows to identify needed improvements to meet water quality goals. Task 4.5 — Recommendations Based on the evaluations above, Consultant shall summarize recommendations for the water distribution system improvements. Included with the recommendations shall be estimated construction costs and schedules for engineering, permitting, construction and commissioning of the improvements. 11/13/07 Task S — Prepare Final Report Consultant shall prepare a Draft Final Report summarizing the results of Tasks I through 4 listed above. The report shall include an Executive Summary of the report sections. Five (5) copies of the report shall be submitted to the City for review and comment. Upon receipt of City comments, Consultant shall prepare the Final Report and submit ten (10) copies to the City. ADDITIONAL SERVICES Mathews Consulting will provide Additional Services as mutually agreed upon between Mathews Consulting and the Client. Additional Services may include any service that is requested that is not specifically outlined within the Scope of Services. ASSUMPTIONS Work described herein is based upon the assumptions listed below. If conditions differ from those assumed in a manner that will affect schedule of Scope of Work, Consultant shall advise City in writing of the magnitude of the required adjustments. Changes in completion schedule or compensation to Consultant will be negotiated with City. All documents to be provided by the City to the Consultant shall be delivered in a timely manner. 1. City to provide copies of existing WTP and water distribution system GIS maps, as -built drawings, schematics, etc. 2. City to provide copies or information regarding permits for plant construction, operation, and water consumptive use. 3. City to provide copy of last water master plan report. 4. To develop costs, City staff will provide information on desired level of architecture, visibility and sound proofing for recommended facilities. 5. City to prioritize water quality goals. 6. City to provide required fire flow rates. All data required for implementation of this scope of services (population data, water flow data, water quality data, historical chemical residual data, pressure data, accounted for non -billed water, and consumption data) shall be provided by or made available by City Staff. It is assumed this data may not be in spreadsheet format and may need to be manually input into spreadsheet format by Consultant. 8. Consumption data shall be provided as MS Excel® spreadsheet in format acceptable to Consultant. An allowance will be provided for Consultant to re -organize the data should the City's IT staff not be able to provide the data in the desired format. 9. No survey services are included. 10. No exploratory services are included which would confirm line sizes, pipe materials or other characteristics of buried facilities. 11/13/07 11. All flow readings, pressure readings, and operational records shall be provided by the City. 12. Flow demands for individual residential homes may be grouped into common "neighborhood" demand nodes to optimize model components for pipes and nodes. 13. Any conversions of AutoCad maps to GIS Arcview format will be performed by City staff. 14. City shall provide copy of all Conservation Program documents/elements. 15. Services do not include providing a copy of the modeling software & associated license to the City. 11/13/07 9 CONTRACT PERFORMANCE Proposed fees and schedule for completion of major work tasks are summarized below. COMPLETION DATES: The items described in the above Scope of Services shall be completed as follows: Task: Time from NTP* Task 1 — Project Management 180 days Task 2 — Identify City Goals 60 days Task 3 — Water Treatment Plant Evaluation 150 days Task 4 — Water Distribution System Evaluation 150 days Task 5 — Final Report 180 days *Note: Time frames for each task overlap. Overall schedule for completion of the Scope of Services is 180 (calendar) days. SUMMARY OF PROPOSED FEES: Proposed labor costs and associated expenses for basic engineering services and additional engineering services are tabulated below. ENGINEERING SERVICES LUMP SUM Task 1 — Project Management $10,160.00 Task 2 — Identify City Goals $22,840.00 Task 3 — Water Treatment Plant Evaluation $54,063.00 Task 4 — Water Distribution System Evaluation $86,720.00 Task 5 — Final Report $28,085.00 Consumption Data Allowance $ 6,000.00 Reimbursables $ 5,000.00 TOTAL PROJECT COST $212,868.00 Additional Services - The fee for Additional Services shall be billed using the Hourly Rate Schedule contained in the General Contract, or as an agreed upon fixed fee. 11/13/07 10 IN WITNESS WHEREOF, the parties have made and executed this Agreement on the respective dates under each signature. CITY OF TAMARAC, signing by and through its Mayor and City Manager, and MATHEWS CONSULTING INC., signing by and through its President, duly authorized to execute same. ATTEST: Marian Swenson, CMC City Clerk Date: ATT Signature of Cor orate Secretary David L. Mathews Type name of Corporate Secretary (CORPORATE SEAL) CITY QF TAMARAC By: (&q 46 Beth Flansbaum-Talabisco, Mayor Date: _ / �o 7 By: 1� .. u /17 c: ex-y.,-.... Jeffrey L. iller, City Manager Date: /a'h3l 7 Approv s to form and legal sufficiency: By:-. t,K S Goren, City Attorney Date: 1.01 a 7 MATHEWS CONSULTING, INC. M Rene L. Mthetvs, President/Owner Date: - 11-14-01—) 11/13/07 CORPORATE ACKNOWLEDGEMENT STATE OF Florida COUNTY OF Palm Beach I HEREBY CERTIFY that on this day, before me, an Officer duly authorized in the State aforesaid and the County aforesaid to take acknowledgements, personally appeared Rene L. Mathews , of Mathews Consulting, Inc., a Florida Corporation, to me know to be the person(s) described in and who executed the foregoing instrument and acknowledged before me that he executed the same. /9 WITNESS my hand and official seal this day of / , 2007. Nancy ArrnftrOnp Signature of NAary Public -- ,1�"' NN cWMn"W State of Floridaat Large yip Expires FMxw y 211, 200d Print, Type or Stamp Nance of Notary Public Personally known to me, or Produced identification Type of I.D. Produced Did take an oath, or Did not take an oath 11/13/07 12 City of Tamarac ConWrehensive Water Master Plan Engineering Fee P,regQsal Task No. Task Description Labor Classification and Hourly Rates Principal Engineer $130 Senior Project Engineer $120 Engineer I $94 Senior Eng. Tech. $85 Cad Designer $80 Clerical $50 Total 1 Labor EPA Sub- Consultant Services JLA Sub- Consultant Services GT Sub - Consultant Services ragement o act Man„ _ _..,_. . 1.1 Overall PM 24 0 $3.120 1.2 Project Kick-off Meetin 4 4 0 $1,000 $480 13_­_ IT Meeting 4 0 $520 1.4 System condition meeting 4 w 4 0 $1 000 $820 1.5 Hydraulic model meeting_ 4 _ 0 $520 1 e.... _ Draft Report meeting 5 LL 5 0 $1,200 Subtotal Task 1 45 13 _ _ 0 0 0 0 _$1,250 $7,410 $0 $0 $2,500 2 Identify City Goals 2.1 Evaluate Historical Data 60 20 80 $14,200 2.2 Identify Water System Goals 8 `.. 4 mm $1,520 2.3 Summarize Future Re Re uiremenls ^_ 6 __...W_. $780 _ $2,800 2.4 Review Water Conservation Plan 8 8 $2,000 2.5 Coordinate with Strata is Plans 8 4 $1,260 Subtotal Task 2 88 36 0 0 0 80 $19,760 _ $0 $0 $2,800 _ 3 Water Treatment Plant Evaluation ion l 3.1 Asset Evaluation and Assessment 30 30 1 6 $7,600 1 1 $2,400 3.2 Capacity Analysis of Existing Treatment S s. 3.2.a H draulic Capacity Evaluation 6 $780 $6,040 3.2.6 - Treatment Ca acit Evaluation Capacity �_. .,... 6 $780 $4,-....... gz0 3.2.c Auxiliary Systems Evaluation 6 8 $1 740 $3,750 $1,200 3.3 „ Evaluation of Future Treatment System " " 3.3.a Planned l PR0 System 6 _ _ $780 $960 $4,800 3.3.b LPRO Water Blendin 6 $780 $960 $1,840 3.3.c Lime Softening Future Treatment System 181 $2,340 $5,060 3.4 Recommendations -- 8 4 $1,520 $2,300 Subtotal Task 3 86 42 0 0 0 6 $16,520 1 $3,750 $1,920 $28,460 4 4A Water Distribution S stem Evaluation Asset Evaluation uation and Assessment 20 80 8 $12,500 $1,000 4.2 _ Capacity Analysis of Exist. Water Dist, System_,_,. 8 16 $2.960 4.3 Evaluate Unaccounted for Water Loss 64 40 24 $14,320 4.4 Develop Hydraulic Model of the 5 stem 4.4.a Model Development 120 40 4 40 $22,740 4.4.b Calibrate Model Flow 40 40 12 $10,600. Calibrate Chlorine Residual Water Quality Model 40 20 _ 12 $8,200 4.4.d Model Future Flow Scenarios 40 $5,200 4.5 Recommendations 40 20 l 8 Subtotal Task 4 372 258 0 4 0 102 $84,520 $2,000 $0 $0 5 Prepare Final Report _ 5.1 Draft Report 45 20 30 8 $11.200 $500 $8,570 5.2 Final Repon 25._- .,.. 10 __... 10 4 $5,500 _ Subtotal Task 5 70 30 0 40 _....._ 0 12 $16,700 $500 -.....,, ...-$1,280 $o $9,850 Labor Subtotal Hours 661 377 0 4.� 4 0 200 Labor Subtotal Costs $85,930 $45,240 $0 $3 740 $0 $10,000 $144 910 $6,250 $1,920 _ $43,610 Labor Total Costs $144,910 Subconsultant Costs Total $51,780 Subconsultant Multi lier 1.1 _.- Subconsultant Total $56,958 _-_........_ Consumption Data Allowance for manipulating un-formatted data $6,000 Reimbursable Expenses $5,000 Pro act Total $212,868 11/13/07 13