Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2006-0941 1 Temp. Reso. #10976 May 23, 2006 Page 1 CITY OF TAMARAC RESOLUTION NO. R-2006-d4 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO RECEIVE THE FISCAL YEAR 2005 CITY OF TAMARAC WATER AND WASTEWATER SYSTEMS ANNUAL REPORT PREPARED BY THE CITY'S CONSULTING ENGINEERS, MATHEWS CONSULTING, INC., ON BEHALF OF THE CITY OF TAMARAC UTILITIES DEPARTMENT AS REQUIRED BY BOND COVENANTS FOR CONTINUING DISCLOSURE FOR THE TAXABLE WATER AND SEWER UTILITY REVENUE REFUNDING BONDS SERIES 1996 AND 2004 SERIES CAPITAL IMPROVEMENT BONDS; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Tamarac has covenanted for the benefit of the bondholders through continuing disclosure to provide certain financial information and operating data relating to the City by no later than April 1 of each year; and WHEREAS, the City of Tamarac's Bond Resolution Nos. R-95-296 and R- 85-436 require that the Consulting Engineers for the Utilities Department review the operation, maintenance and repair of the City's water and wastewater facilities, and to report annually to the City with their recommendations and comments as to the water and wastewater systems; and Temp. Reso. #10976 May 23, 2006 Page 2 WHEREAS, the City's Consulting Engineers, Mathews Consulting, Inc., have prepared the Fiscal Year 2005 City of Tamarac Water and Wastewater Systems Annual Report (a copy of which is attached hereto as "Exhibit 1 ") which addresses the sufficiency of the water and wastewater systems rates and charges, the operation and maintenance of the water and wastewater systems, and the status of compliance with covenants and agreements contained in the Bond Resolution; and WHEREAS, Mathews Consulting, Inc., has concluded that the Utilities Department has performed the necessary operation and maintenance activities to keep the facilities in proper condition and that the planned capital activities are adequate to meet the anticipated growth of the City's service area; and WHEREAS, Mathews Consulting, Inc., concluded that water and wastewater rates were sufficient to maintain the operation of the Utilities Department in Fiscal Year 2005; and WHEREAS, it is the recommendation of the Director of Utilities that the City Commission receive the Fiscal Year 2005 City of Tamarac Water and Wastewater Systems Annual Report; and 1 C 1 Temp. Reso. #10976 May 23, 2006 Page 3 WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interest of the citizens and residents of the City of Tamarac that they receive the Fiscal Year 2005 City of Tamarac Water and Wastewater Systems Annual Report as prepared by Mathews Consulting, Inc. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, THAT: SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this resolution. SECTION 2: The Fiscal Year 2005 City of Tamarac Water and Wastewater Systems Annual Report as prepared by the City's Consulting Engineers, Mathews Consulting, Inc., (a copy of which is attached hereto as "Exhibit 1 "), is hereby received. SECTION 3: All Resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or Temp. Reso. #10976 May 23, 2006 Page 4 invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 5: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED this 4.day of J(j­je2006. ATTEST: MARION SWENSON, CMC CITY CLERK I HEREBY CERTIFY that I have approved this RESOLUTION as to form. Cl ATTORNEY BETH FLANSBAUM-TALABI CO J MAYOR RECORD OF COMMISSION VOTE: MAYOR FLANSBAUM-TALABISCO DIST 1: V/M PORTNER DIST 2: COMM. ATKINS-GRAD _ DIST 3: COMM. SULTANOF DIST 4: COMM. DRESSLER 1 1 1 I City of Tamarac Vater and Wastewater Systems Fiscal Year 2005 Annual Report Table of Contents Section 1 Executive Summary • Background • Utility Awards • Conclusions and Recommendations Section 2 Background and System Summary • Purpose • Background • System Summary ♦ Fixed Assets ♦ Ordinances and Resolutions ♦ Water and Wastewater Service Area ♦ Existing Water Treatment Facilities ♦ Existing Water Distribution System ♦ Existing Wastewater Collection, Treatment and Disposal Facilities • Utility Awards Section 3 Utility Organization • General Organization • Utility Administration Division • Utility Engineering Division • Water Plant Facility Division • Operations Division • Support Services Division Section 4 Ongoing System Maintenance, Renewal and Replacement Improvements and Depreciation • General • Wastewater System Maintenance • Water System Maintenance • Renewal and Replacement Improvements • Utility Operating Budgets • Depreciation • Conclusions • Recommendations Mathews Consulting TOG 1 Table of Contents (Contd.) Section 5 Rate Sufficiency and Debt Service Coverage • General • Rates and Charges • Water and Wastewater Customers (Accounts) and Billable Flows • Projected FY 2006 Water and Wastewater Rate Revenue • Rate Sufficiency Analysis and Debt Service Coverage for FY 2006 • Conclusions and Recommendations Attachment A Utility Maintenance Record/Schedule Mathews Consulting TOC-2 Section 1 Executive Summa Background This Fiscal Year (FY) 2005 Annual Report has been prepared by the City of Tamarac (City) to meet disclosure requirements outlined in the 1996 Series Taxable Water and Sewer Utility Revenue Refunding Bonds and 2004 Series Capital Improvement Bonds. For the benefit of bondholders, the City has covenanted to provide certain financial information and operating data on an annual basis. Consequently, this document reports on the sufficiency of rates and charges for services, determines whether the level of maintenance is adequate, and reviews the adequacy of the renewal and replacement program and other capital funding for FY 2005. Information was collected and analyzed to determine the utility's progress on complying with bond covenants. Data considered included: • End of FY 2004 reserve balances (audited) • End of FY 2005 reserve balances (audited) • Audited FY 2004 Financial Statements • Audited FY 2005 Financial Statements • Current and Projected Customer Account Data • Metered and Billed Water Reports • Water and Wastewater Rates and Charges, including revised rates authorized in Ordinance No. 0-2003-17 • Adopted FY 2006 budget • Utility Fund Capital Improvement Program (CIP) • Renewal and Replacement Funding • Maintenance and Repair Records Utility Awards In 2005, the Florida Section of the American Water Works Association (FSAWWA) — Region 6 presented the City with an award for "Outstanding Distribution System". The award is presented annually to a water, wastewater, stormwater or reclaimed water utility or municipality within the state that is judged to provide the most outstanding distribution system to their customers. This award demonstrates the City's commitment to excellence in the operation and maintenance of its distribution system. Mathews Consulting 1-1 I Lj 0 Section 1 — Executive Summary Conclusions and Recommendations The following conclusions and recommendations are made as a result of the Water and Wastewater Systems Fiscal Year 2005 Annual Report: • The City adequately maintains its water and sewer systems in accordance with good utility management principles. • Water and wastewater user charges are expected to be sufficient to meet FY 2006 debt service coverage requirements, in accordance with bond covenants. • The City has the financial resources to implement its water and wastewater capital improvement plan. • No event has occurred during the past fiscal year that might materially affect outstanding bonds. There have been no defaults or delinquencies, unscheduled draws from debt service reserves or credit enhancements, substitution of credit or liquidity providers, modification of bondholder rights, unscheduled redemption calls, defeasances, or ratings changes. • The City's FY 2005 Comprehensive Annual Financial Report is hereby incorporated by reference into this Annual Report. Mathews Consulting 1-2 ILI t Section 2 Background and System Summary Purpose The City has covenanted to provide to bondholders an Annual Report as required by the Taxable Water and Sewer Utility Revenue Refunding Bonds, Series 1996 as well as by the 2004 Series Capital Improvement Bonds. The Annual Report provides information on the Utility Department's organizational structure and funding. The report also contains information about ongoing maintenance and new improvements to the City's water and wastewater facilities. Additionally, the report reviews proposed capital funding, especially renewal and replacement funding, and evaluates sufficiency of the existing rates and charges. Background The City of Tamarac was incorporated in 1963 by the State of Florida Legislature and occupies an area of approximately twelve (12) square miles in the northwestern portion of Broward County. The City is primarily a residential community with easy access to nearby areas of industry, commerce and recreation. System Summary The following sections provide a summary of the City's Utility framework, including fixed assets, ordinances and resolutions, and water and wastewater facilities. Fixed Assets Based on audited results, as of September 30, 2005, total assets of the City's water and wastewater systems are reported to be $74,136,087. Fixed assets have a book value of $48,247,524. Other assets and debits include pooled cash and investments, and restricted assets. Fixed assets are carried at historical cost or estimated cost if historical cost information is unavailable. Major fixed assets include the water treatment facilities, the water distribution system, the wastewater collection and transmission system, computers, trucks, equipment, meters and other property. Capital contributions for FY 2005 were $2,950,141. Contributed capital represents water and wastewater grants and contributions in aid of construction (C1AC) reserved for future system acquisition or expansion. Ordinances and Resolutions In 2003, the City passed Ordinance No. 0-2003-17 stipulating that, commencing on October 1, 2004 and effective on the 1 st of October of each year thereafter, all water and wastewater service availability charges and consumption rates then in effect will be adjusted automatically, without further action by the City Commission, in accordance Mathews Consulting 2-1 • '. I Section 2 -- Background and System Summary with the U.S. Consumer Price index as determined in June of the calendar year of adjustment. . The outstanding debt includes three bond issues. The Series 1992 bonds bear interest rates varying from 4.7% to 5.9% and mature through 2011..The taxable Series 1996. bonds bear interest rates varying from 5.3% to 6.5% and mature through 2009. The 2004 Series Capital Improvement Bonds bear interest rates from 2.5% to 3.5% and mature through 2022. Non -current outstanding debt supported by the City's Utility Fund in FY 2005 was $13,576,045 and current bonds payable were $1,725,580. Water and Wastewater Service Area The City's water service area is approximately 11.65 square miles and the wastewater service area is approximately 11.80 square miles of urbanized residential, commercial and industrial land uses. The service area is approximately 99% built -out. The City Planning Department estimates that the projected development will fill in the remaining land over the next few years. Most of the service area (approx. 10.67 square miles) is west of State Road 7 (a.k.a. U.S. Highway 441). Existing Water Treatment Facilities The City's existing water treatment plant (WTP) facility is located one block west of the northwest corner of the intersection of University Drive and N.W. 61" Street within the corporate City limits. The existing treatment process consists of raw water supply wells, pre -chlorination, lime softening, chlorination, polymer addition, rapid sand filtration, and. fluoridation. The raw water production facilities consist of 19 water supply wells. Six (6) of the wells are located at the WTP site and three (3) of the wells are located adjacent to the plant site. Two (2) additional wells were completed in 1996 and are located south of the WTP. Eight (8) remote wells are located approximately 0.3 miles east of the WTP. All of the raw water wells are controlled from the main control system in the WTP. The South Florida Water Management District renewed the City's Water Use Permit in February 2004. The City is allocated an average 7.54 million gallons per day (MGD) or 2,754 million gallons per year through the Year 2009. Maximum month allocation is 261.8 MGD. The WTP has a design and permitted capacity of 20 mgd. The plant currently produces an average daily flow (ADF) of approximately 6.303 MGD of finished water. Lime softening of the water is provided by three (3) steel water softening units ("accelators") including two (2) with a capacity of 8 MGD and one with a capacity of 4 MGD. The two (2) 8 MGD accelators are alternated every six (6) months as the duty unit, and the 4 MGD accelator serves as a standby unit. Mathews Consulting 2-2 f k• Section 2 — Background and System Summary Softened water is fed from the accelators to six (6) steel rectangular dual -media gravity filters, each with three cells, or to a single 8-MGD automatic filter with four cells. The 8 MGD filter was placed into operation during FY 1989. The filters are periodically backwashed (manually for the rectangular gravity filters and automatically or manually for the 8 MGD filter) for the removal of residual solids in the media. Backwash and blow off water is routed to an onsite lime pond. Finished filtered water is piped to the clearwel I. Finished water may be pumped directly into the potable water distribution system from the clearwell, or transferred to either of the one (1) million gallon (MG) or two (2) million gallon (MG) onsite storage tanks prior to re -pumping into the distribution system. Existing Water Distribution System Water is distributed throughout the City's service area in over 245.9 miles of water mains ranging in size from 2 to 30 inches in diameter. In addition, there are two storage/booster pump stations located within the distribution system. The storage and booster pump stations in the water distribution system include the Grant's Plaza and the Tract 27 booster stations. • Grant's Plaza Station: The facility is located near the corner of Commercial Boulevard and U.S. Hwy. 441. The station consists of a one million gallon ground level storage tank, and is equipped with two (2) 2,000 gallon per minute (gpm) booster pumps. • Tract 27 Station: The facility is located near the corner of N.W. I00th Avenue and 77'h Street. The station consists of a two million gallon ground level storage tank, and is equipped with two (2) 3,000 gpm and one (1) 1,500 gpm booster pumps. These stations, along with on -site storage at the WTP, have a combined storage of six million gallons. Both the Grant's Plaza and Tract 27 stations are connected to the telemetry system to enable monitoring and control from the WTP. The City has seven (7) emergency interconnects with neighboring utilities, including: Broward County, City of Lauderhill, City of North Lauderdale, and the City of Coral Springs. Existing Wastewater Collection, Treatment and Disposal Facilities The City abandoned its WWTP in 1988, when it signed a Large User Wastewater Agreement with Broward County. The City of Tamarac's wastewater system is in the North region of the Broward County Wastewater Service Area. The City agreed to purchase wastewater transmission, treatment and disposal services from Broward County at the North Regional Wastewater Treatment Plant (NRWWTP) located in Pompano Beach. Mathews Consulting 2-3 • " I Section .2 — Background and System The City is required to construct, operate and properly maintain all necessary sanitary gravity sewers, lift stations, pumping stations, wastewater force mains and other required appurtenances related and directly attributable to the wastewater collection system upstream of the point of connection to Broward County's wastewater system. Broward County provides wastewater transmission, treatment and disposal service to the City at fees, rates and charges constituting the full costs of such service. The City currently reserves 8.04 MGD of capacity at the NRW WTP. Flows from the local collection system are routed to two (2) Broward County regional wastewater pumping stations. These stations pump wastewater from the City into Broward County's regional wastewater transmission system where the flow is then conveyed to the NRWWTP. These two stations are owned, operated and maintained by the Broward County Office of Environmental Services (BCOES). In addition to Broward County, the City of Tamarac has had a large user agreement with the City of Fort Lauderdale since 1981 to service the eastern portion of the City, formerly known as Tamarac East Utilities. The agreement allows up to 0.165 MGD of wastewater flow to be transferred to Fort Lauderdale. The City of Tamarac's wastewater system also includes 151.0 miles of gravity sewer lines, 31.0 miles of transmission (force) mains, and seventy-eight (78) wastewater pumping stations. Most of these stations serve small areas and are minor in size, with pumping capacities ranging from 75 to 1,000 gpm. These pumping stations are currently monitored by a radio -based telemetry system. The monitoring system is located in the WTP building which serves as the master control station of the wastewater pumping station network. Utility Awards In 2005, the Florida Section of the American Water Works Association (FSAWWA) — Region 6 presented the City with an award for "Outstanding Distribution System". The award is presented annually to a water, wastewater, stormwater or reclaimed water utility or municipality within the state that is judged to provide the most outstanding distribution system to their customers. This award demonstrates the City's commitment to excellence in the operation and maintenance of its distribution system. Mathews Consulting 2-4 Section 3 Utility Organization General Organization The Utility Department is currently organized into five (5) divisions grouped by function. The Utility Department's Organizational Chart is shown in Figure 3-1. Funding for the Utility Department is derived from user charges (Utility Fund), and Contribution in Aid of Construction (CIAC) charges paid by developers to connect to the water and wastewater systems. CIAC revenues are used to finance growth -related capital improvement projects. The Department's mission statement is as follows: "Utilities Department Committed to ... Continuously protect the public health by providing safe water and wastewater service in a responsible and cost effective manner." Utility Administration Division The Utility Administration Division provides the organizational leadership for the Utilities Department. This division is responsible for implementing the City Commission's utility policies. Utility Administration is the primary liaison between the Utility Department, the City administrative staff and elected officials, and other public and private organizations. The division is responsible for coordinating and facilitating the efforts of the other utility divisions, and Utility Administration is also responsible for long range planning and policy development. Utility Engineering Division The Utility Engineering Division provides technical support to the Utility Department. These services include: design, review and approval of development plans; providing construction inspection; as well as overseeing the optimization and rehabilitation of the water and wastewater systems. Water Plant Facility Division The Water Plant Facility Division operates and maintains the City owned lime softening Water Treatment Plant. The finished potable water quality meets or exceeds applicable Federal and State Regulatory primary and secondary drinking water requirements. Finished water is delivered at sufficient pressure levels for potable water use and fire protection in the City's water distribution system. This division is also responsible for monitoring the potable water quality at the Water Plant Facility Division certified laboratory. Mathews Consulting 3-1 Section 3 — Utility Organi2ation Operations Division The Operations Division operates and maintains the City's 245.9 miles of water distribution, and 182.0 miles of wastewater collection and transmission system which includes 151.0 miles of gravity sewer lines, 78 pump stations, and 31.0 miles of transmission (force) mains. The division also performs miscellaneous construction required for the Utility Department to effectively and efficiently carry out its mission. The division is also responsible for reducing the amount of unaccounted for water usage and coordinates the repair of wastewater lines that have experience infiltration/inflow. Support Services Division The Support Services Division provides required non -technical support services for the other division, including clerical, financial, purchasing and warehouse inventory. This division also provides water meter readings, billing, related customer service, and administers the City's Backflow Prevention Program. Mathews Consulting 3-2 � ! 7 ! l\ u! - . �§ �L LW ! � !;! § !y . . .� - � , = !E •± |. { \ / § . W � Section 4 Ongoing System Maintenance, Renewal and Replacement Improvements and Dexeciation General The City of Tamarac recognizes the importance of maintaining and improving the operations of the Utility. The City also recognizes how important it is to maintain fixed assets. The City performs maintenance on all components of its utility systems. Maintenance is either conducted by in-house personnel or outside contractual services. Maintenance is classified as preventative maintenance or corrective service. Attachment A provides a complete listing of maintenance record/schedules for the last four fiscal years. wastewater System Maintenance The City repairs thousands of feet of sewer main annually. A listing of maintenance activities performed on the wastewater system is provided in Table 4-1. Table 4-1 Wastewater System Maintenance and Repairs Fiscal Year 20O5 Preventative ( P ) Quantity Description Corrective (C� Construction Division _._._.._.__._...._..._..._ ........................................ ................. _.... ...................... ....... ... ...... .................. ewer lateral repair ._ C — 1 Sewer gravity main repair C __... 2 ... .... .... ... main repair ..... t C ....._.................._............. Maintenance mForce ..... Division . ._. 67 ................ _.............. ................ ............... ............... _.............. _............. _......................................... ... _.............. _............................ ....... ........................ ........... Mechanical repairs at Pump Stations ... C 70_.........._..........._....._...... P..... ...... ............................ Electrical repairs Pump Stations ...........,�........__........._�__� ..__.... C _ ._................. ._.. _. __. _... 189 .. ......... ......... ......... ................. .. ....... ......... Motors/pumps pulled for Inspection ......... ......... P 29 Motors sent out for electrical repairs C 36 Motors repaired in house C _ 560 .... L Wet we Is cleaned P _.... _ _... 109,914 . Sanitary Mains CCTV (LF) P _. _..._...._...._ .....�............... 164,332 ..... ... ......... . ...... ...... ..... .. ..... ... ...... . ........ ; Sanitary Mains Cleaned (LF) ; C __.._....... 29826 _..._..._ ............................_........................................._........................................ ...._......._.................._....................._....__..... _................ ...__.......... _........... ........... ................ _............. _......................_......_.............._............ Gravity Mains Air Tested and. Sealed (LF) ............... ...... ........ ..... .............. ............. .... .........,,,................................ ..... ......... ... .......... C ­...­_­.___­_ --- I Manhole rehabs. . C 114 _. Sewer blockages C — .._. - _ P.. I.,. P 14,724 ........ .... Gra itnSewernMa ns reli ed b contracto s �)_� ...................... 62 After-hours emergency call outs (Pump Stations) C Mathews Consulting 4-1 i S' Section 4 - Ongoing System Maintenance, Renewal and Replacement Improvements and Depreciation Table 4-1 Continued Wastewater System Maintenance and Repairs Fiscal Year 2005 Water System Maintenance The maintenance performed on the water system can be divided into two categories: water treatment facilities; and water distribution system maintenance. Water system maintenance activities are highlighted in Table 4-2. Table 4-2 Water System Maintenance and Repairs Fiscal Year 2005 Preventative ( P ) Corrective ( C ) Construction Division ............................................................................................................._........_...................................................._.................................................................................................................................................__........_-............-._......-- 2,694 ' Meters Replaced .. C 141__........�......... ....� ..... ... New...& Tei �...... ...._ _......._._..__.....___...._._.......�........_...... �..._. �__.....__..._..._.._.._.......... nporary Meter Installations _.._T. P 11 Service Line Rep .............. ............ ................................................. ..................................................._ ................_ ...._.... - --- - 1,603 ...............Work . Meter Re -reads C ..._...__.._._,..0 14,777_.............. ............................................................................................._.............._............................................................................................................................................................................................................. Orders...Completed................_..._....._...._....._....__._............_._........._......._. .........-..........-_.......-....... 229,05. ._....................._..............._............�............�..........._........._..............._.............._......................................._............._...................._..................�........._..........__...._ ... 19 Meter Valves Replaced C _............._...__ 149 . ;......._......_ _.......__....._...._.........._..._....._ ._..__...._.._...._....._..........._.........._..._...._.........._.........._........_.._.....__.....__.._._....- Meters Relocated --- - P 44_... ..... ...... ....... ............ ... '....Meter .............. Box Replacemen�.............................................. _......... .._............ ............ .- ... ... ........ _.............. _. ................. ....... _......0 1,326 Backflow Devices Certified P 21553 Backflow Renewal Notices _....................._..........._............_..._......m...-...................,.... ........._... .........._............................_.............._.............._..............._ ........... ....................._........._._._.........._ P 21. _.. Water Main Repairs _..._....._.._...._.._..._ ................. . .... .......__...._...._ �.. _...._.._ _._ C 199 Water Service Repairs .. C 25 ... .... ......... ......... ......... Yokes Made Accessible ...._.... _ P ..._ 16 ;New Service Line Installed ___._._...._..._.._ } P 2,694 ................._...._...........,,_.............................._..w........_.........._._.._................................_............._....._............................._....._..............._............. Water Valves Exercised _-..........._............._............._....... 1 P ............................................................._.._..............._........_....._......._......_......_......_...._.......... 29 ............ __............._............__.................._......._............._............._.............................._......._..... _.Water Valves Replaced........._............_.....W......_........._ 14 ............._..........._....................._.........._.....�.........-.........._.-..........-C. New Water Valves Installed il P Mathews Consulting 4-2 { Section 4 - Ongoing System Maintenance, Renewal and Replacement Improvements and Depreciation Preventative ( P ) Quantity Description Corrective C i._1.5 j Fire Hydrant Repairs C 6 ............................._........._........._. i....... __......... __............._..........__....,......_.........m...._.....�..........__.....�._._.�...�_...._.... ; Fire Hydrants Replaced P .................. ..................................................................._...._......_......_y I ........... __..........._................................................................).........................................................................................................T....__..._...__....._...---........ Fire Hydrants Installed new P ......... ..............._............._............_.._........_._._..._...._._._.._...._....__... 287 Q_-... m....._.............._..........._..............................w......_..._................,.._........................._.....:........_._........._...._..._....__..... Customer Queries at Residence _.........._._.._...._........_.._..._...-.._...._........__... _........_. P 214 ........................._..._.._..._...._...._.....W...._..._..._...._....._.._-...-...._ After -hour Call Outs ..................................................................................................................................... is P 664 ... -.__...-..._.....__....__...._....__...._...._........_...._........_...__............_............._............_....._.._T.._.._......_..._.. Restore Water Service _.._.m ..__�... C _............._............._...... ....... 660 .................. ._.. __._........._..........._..._............................._.........._............._..._....._...._.._...._...._..............._...._...._.._..........-....�...._........ i.._Paint Fire Hydrants...... ......... .... . ..... ... _..._. _......................... _. . ........................._....................._...._..........._............._.....................�.........._.........._........._........_......... Water Treatment Plant .. Number Bacteriological...Analysis ...._1,394 ......................................_........_[._. 651 _. .. ............................................................................................_............P........................_..............._.. Number of Chemical Analysis P 1.........................._...........a. r_................._.................._........... _ .... ....... _..._............_........... ....._.......... _...._............ ......,..._...._............ _......_..................._....,......_........_ ...... .. . of Customer Complaint...Visits......................-............_............_.........__..._..- ......_....._._......._. .... .... .............. _Num.ber Maintenance Division -- -P . --- 44 ........._............_...........-..........................._............_...........-............_..........__............._............._............__.............._.............._..........._.............m..................................._............_.........._.................... Mech. Repairs on WTP Equipment C _........._......_............_........... 32 __......__...._._ ..._._..._...._...._...._.............__..._...__...._...._.._...._....__...._....._..._._.._...__._...__..._..__...._..-..._....__......_.... - Elect. Repairs on WTP Equipment - -- --- -- -.. C .....__....._..._...._..._.._..._...._ _........................ ..... ........_........__..__.._._._...._..._...._....._..._......_....._..._......_................_..._....._..._......_...._.............__.._...._....__......_ Motor sent out for Repair (WTP) ........................................... . .._...._.._ ..._..._. C 230 ......... ................... _.............._......_... Electrical P/M at WTP P 229 Mechanical P/M at WTP P The City tracks unaccounted for water losses reporting less than 10% each year, the industry standard. Water distribution system maintenance is performed to reduce the amount of unaccounted for water. Renewal and Replacement Improvements The FY 2005 Utility Fund budget included a number of projects designed to renew and/or replace City water and wastewater infrastructure. These projects were funded from user charge revenue and Utility Fund reserves. Some projects were partially funded with CIAC revenues. • Inflow and Infiltration Reduction Program: A review of the wastewater flow to Broward County for treatment indicates that there is excessive infiltration and inflow (I&I) within the wastewater collection system. This program identifies sources of I&i and eliminates them by a number of methods depending on the source. This program enables the City to optimize its reserve treatment capacity with the County and reduces unnecessary wastewater treatment charges. It requires $500,000 of annual capital expenditures through FY 2007 and $300,000 each year through at least FY 2009. • Wastewater System Renewal and Replacement: The City budgeted approximately $0.52 million of capital improvements for the wastewater collection and transmission system in FY 2005 (over and above the $0.5 million discussed above). These projects included mechanical and electrical upgrades to pump stations, replacement and Mathews Consulting 43 R. i Section 4 — Ongoing System Maintenance, Renewal and Replacement Improvements and Depreciation installation of new force mains, and general wastewater system improvements. For FY 2006, the City has budgeted approximately $0.92 million for capital improvements, including rehabilitation and upgrade of pump stations and various wastewater system improvements. • Water Treatment and Distribution Facilities Renewal and Replacement: The City budgeted approximately $1.18 million of capital improvements for the water treatment and distribution facilities in FY 2005. These projects included continued rehabilitation of the water treatment filters, water distribution system improvements, replacement of Grant's Plaza water storage tank pumping equipment, and optimization of the water treatment process. For FY 2006, the City has budgeted approximately $1.27 million for water facilities improvements, including water main replacement and utility relocations, as well as other water distribution system additions and improvements. Utility Operating Budgets The Utility's operating expenses for the last two fiscal years (FY 2004 and FY 2005 Actual) and for the upcoming fiscal year (FY 2006 Budget) are presented in Table 4-3 (Ref. FY 2006 Adopted Budget). Mathews Consulting 4-4 Section 4 - Ongoing System Maintenance, Renewal and Replacement Improvements and Depreciation Table 4-3 Utility Operating Expenses Expense Category FY 2004 FY 2005 FY 2006 Actual Actual Budget Personal Services 4,247,775 4,359,059 4,889,600 Contractual Services 3,555,624 4,112,633 3,958,700 Service Charges 2,997,400 2,999,900 3,334,900 Repairs and Maintenance 193,761 233,678 247,500 Other Operating Expenses 1,756,568 1,932,442 2,303,500 Depreciation & Amoritization 3,245,041 2,770,746 - Capital Outlay Building 5,100 Lift station rehab - 127,121 - Meters and meter hoses 22,619 122,301 32,000 Back flow preventers 453 - 1,000 Hydrants and valves 1,931 21,063 - Construction - 11,313 - Construction -Water 394,267 3,548,919 - Construction -distribution 760,441 518,494 - Const-Service line replace - 5,331 - Const-WW collect 185,433 633,023 - Equipment-$750 or greater 19,815 86,989 92,500 Office furniture - 9,000 2,000 Computer equipment 6,306 19,651 8,200 Laboratory equipment - - - Motor vehicles - - 59,500 Capitalized Fixed Assets (51,124) 38,081 - Subtotal 1,340,141 5,146,386 195,200 Debt Service and Renewal & Replacement Transfer Principal-1996 Revenue bonds 700,000 745,000 790,000 Principal-1992 Revenue bonds 770,000 815,000 865,000 Principal-2004 Revenue bonds - 63,310 170,500 Interest-1996 Revenue bonds 319,655 274,855 227,200 Interest-1992 Revenue bonds 448,678 404,403 357,600 Interest-2004 Revenue bonds 86,794 172,006 167,900 Service costs 19,145 9,407 23,000 Utility Improvement Replacement Fund 2,581,780 2,221,180 1,575,400 Subtotal 4,926,052 4,705,160 4,176,600 Contingency - - 1,080,600 1 TOTAL OPERATING EXPENSES 22,262,362 26,260,005 20,186,600 FY 2004 and FY 2005 based on audited results. Mathews Consulting 4-5 Section 4 — Ongoing Systern Maintenance, Renewal and Replacement Improvements and Depreciation Depreciation The City depreciates its fixed assets annually, representing a non -cash cost to the City's Utility Fund. The annual allowance for depreciation is $ 2,682,732 based on audited FY 2005 financial statements). Conclusions The following summarizes the maintenance and renewal and replacement program implemented by the City: • The City of Tamarac Utility Department maintains the utility system in accordance with accepted utility management practices. • As indicated by utility records, the Utility makes required improvements to the system in order to maintain proper operation. • The Utility Fund balance sheet reflects an annual allowance for depreciation of water and wastewater system fixed assets. Renewal and replacement project funding has historically met or exceeded the annual allowance for depreciation. • The City has the financial resources to implement its water and wastewater Capital Improvement Program. + Unaccounted for water losses are monitored to stay within industry standards. Recommendations • The City should continue to fund the renewal and replacement of fixed assets at approximately the same level as depreciation. Replacement of fleet trucks, office equipment, and other capital expenses can be considered. • The City should continue the Inflow and Infiltration Program to reduce the amount of storm runoff and groundwater flow into the wastewater collection thereby optimizing the capacity of the system. + The City should continue to monitor unaccounted for water losses and reduce these losses where possible. Mathews Consulting 4-6 Section 5 Rate Sufficiency and Debt Service Cover General Water and wastewater services are organized as an enterprise fund of the City of Tamarac (City). As such, the intent and focus of this enterprise fund (referred to as the Utility Fund) is to ensure that the costs of providing services are recovered primarily through user charges. This section presents a review of water and wastewater user charges to finance the ongoing operations of the Utility Fund for the fiscal year 2006 (FY 2006) ending September 30, 2006. Rates and Charges In 2005, the City adopted new rates both to meet the utility fund's fiscal requirements and to demonstrate adequate debt service coverage in accordance with bond covenants. Table 5-1 presents current water user charges and Table 5-2 presents current wastewater user charges. Table 5-3 summarizes current miscellaneous service charges. These rates are projected to remain effective through FY 2006. They are expected to be increased in accordance with the consumer price index in October 2006. Mathews Consulting 5-1 Section 5 — Rate Sufficiency and Debt Service Coverage Table S-1 Water Rates and Charges October 1, 2005 through September 30, 2006 Single Family Residential Service Availability Charge, per Month All Meter Sizes $ 7.90 Monthly Consumption Charge, per 1000 Gallons 0 to 6,000 Gallons 1.49 6,001 to 15,000 Gallons 1.85 In Excess of 15,000 Gallons 2.9 Multiple Familv Residential Service Availability Charge, per Month All Meter Sizes $ 5.73 Monthly Consumption Charge, per 1000 Gallons 0 to 6,000 Gallons 1.49 In Excess of 6,000 Gallons 2.06 General Service or Commercial Service Availability Charge, per Month Meter Size 5/8 Inch $ 8.89 1 Inch 22.25 1-1/2 Inch 44.42 2 Inch 71.09 3 Inch 142.18 4 Inch 222.14 6 Inch 444.30 Monthly Consumption Charge, per 1000 Gallons $ 1.49 $ 2.06 Meter Size Block 1, Gallons Block 2, Gallons 5/8 Inch 0-6,000 In Excess of 6,000 1 Inch 0-15,000 In Excess of 15,000 1-1/2 Inch 0 — 30,000 In Excess of 30,000 2 Inch 0 — 48,000 In Excess of 48,000 3 Inch 0 -- 96,000 In Excess of 96,000 4 Inch 0 — 150,000 In Excess of 150,000 6 Inch 0 — 300,000 In Excess of 300,000 Mathews Consulting 5-2 Section 5 — Rate Sufficiency and Debt Service Coverage Table 5-1 Water Rates and Charges October 1, 2005 through September 30, 2006 (continued) Irrigation Service (all Classes) Service Availability Charge, per Month Meter Size 5/8 Inch $ 8.89 1 Inch 22.25 1-1/2 Inch 44.42 2 Inch 71.09 3Inch 142.18 4 Inch 222.14 6 inch 444.30 Monthly Consumption Charge, per 1000 Gallons $ 2.06 Fire Line Service Charge, per Year Meter Size 4 Inch $ 509.58 6 Inch 1,019.16 8 Inch 1,832.05 Over 8 Inch By Agreement Water CIAC per ERC $ 1,400,00 (One ERC equals 350 gallons per day of water consumption) Mathews Consulting 5-3 y M Section 5 --- Rate Sufficiency and Debt Service Coverage Table 5-2 Wastewater Rates and Charges October 1, 2005 through September 30, 2006 Single Family Residential Service Availability Charge, per Month All Meter Sizes $ 13.59 Disposal Charge, per 1000 Gallons of Metered Water Usage 2.92 (up to 15,000 gallons) Multiple Family Residential Service Availability Charge, per Unit per Month All Meter Sizes $ 9.03 Disposal Charge, per 1000 Gallons of Metered Water Usage 2.92 (up to 15,000 gallons) General Service or Commercial Service Availability Charge, per Month Meter Size 5/8 Inch $ 17.46 1 Inch 43.69 1-1/2 Inch 87.31 2 Inch 139.69 3 Inch 279.38 4 Inch 436.54 6 Inch 873.07 Disposal Charge, per 1000 Gallons of Metered Water Usage 2.92 Dumpster Service Availability Charge, per Month $ 11.95 Consumption Fee of $2.48 per 1000 Gallons based on 7,300 gallons of discharge per month 21.33 Wastewater CIAO per ERC $ 1,800.00 Mathews Consulting 5-4 I r f Section 5 — Rate Su ciency and Debt Service Coverage Table 5-3 Miscellaneous Service Charges October 1, 2005 through September 30, 2006 Meter Installation Charges and Deposits Meter Size Meter Installation Charge Deposit Residential 5/8 Inch $ 160.00 $ 90.00 1 Inch 230.00 235.00 1-1/2 Inch 505.00 470.00 2 Inch 590.00 745.00 Over 2 Inch By Agreement By Agreement Commercial, Multiple Family, General Service 5/8 Inch $ 160.00 $ 105.00 1 Inch 230.00 265.00 1-1/2 Inch 505.00 530.00 2 Inch 590.00 745.00 Over 2 Inch By Agreement By Agreement Renters 5/8 Inch 1 Inch 1-1/2 Inch 2 Inch Over 2 Inch Construction $ 115.00 225.00 400.00 525.00 By Agreement $ 180.00 470.00 650.00 745.00 By Agreement 5/8 Inch $ 160.00 $ 105.00 Over 5/8 Inch By Agreement By Agreement $50 for meter installation for each additional service call if the meter cannot be installed on the first trip at no fault of the City. Mathews Consulting 5-5 Section 5 — Rate Sufficiency and Debt Service Coverage Table 5-3 Miscellaneous Service Charges October 1, 2005 through September 30, 2006 (continued) Meter Turn On and Turn Off During Normal After Normal Working Hours Working Hours Meter Turn $ 20.00 $ 50.00 On Meter Turn 20.00 45.00 Off Reconnection After Discontinued Service for Cause of Non -Payment During Normal Working Hours $ 30.00 After Normal Working Hours $ 60.00 Returned Check Service Charge $ 15.00 Meter Re -Reads and Special Reads $ 15.00 Testing of Water Meters Meter Size 5/8 to I Inch $ 35.00 Over 1 Inch Actual Cost Dual Check Valve Installation Sin le Family Residential: Cost of dual check valve plus 15% for administrative cost Back Flow Test Fee Back Flow Re -Certification Fee Mathews Consulting 5-6 $ 40.00 per test plus Tamarac Building Department Plumbing permit fee. $ 25.00 per year. Section 5 — Rate Sufficiency and Debt Service Coverage Water and Wastewater Customers (Accounts) and Billable Flows Table 5-4 and 5-5 summarize projected water and wastewater customers and billable flow for FY 2005. These projections are based on historical and recent available customer data. Billable water and flows are based on historical average demands expressed on a per customer basis. Climatic and economic conditions may affect the accuracy of these estimates, and deviations from these estimates may be material. Table 5-4 Projected FY 2006 Water Customers and Billable Flow West Area East Area Total Single Family Residential 16,476 1,040 17,516 Multiple Family [1] 15,413 0 15,413 Irrigation 475 0 475 Commercial 913 30 913 TOTAL AVERAGE CUSTOMERS 33,277 1,070 34,347 ANNUAL BILLABLE WATER 2,384,700 50,300 2,435,000 1,000 Gallons [ I] — The number indicated is dwelling units Table 5-5 Projected FY 2006 Wastewater Customers and Billable Flow West Area East Area Total Single Family Residential 16,476 955 17,431 Multiple Family [1] 15,473 0 15,473 Commercial 763 25 788 TOTAL AVERAGE CUSTOMERS 32,712 980 33,692 ANNUAL BILLABLE WASTEWATER 1,000 Gallons 2,075,300 44,700 2,120,000 11] — The number indicated is dwelling units Mathews Consulting 5-7 . A Section 5 — Rate Sufficiency and Debt Service Projected FY 2006 Water and Wastewater Rate Revenue Based on the above projected FY 2006 numbers of customers and billable flows, projected FY 2006 user charge revenues were developed and are shown in Table 5-6. Table 5-6 Projected FY 2006 User Charge Revenue Water System Single Family Residential $ 3,247,100 Multiple Family Residential 2,198,100 Irrigation 470,000 Commercial 890,000 Total Water User Charges $ 6,805,200 Wastewater Svstem Single Family Residential 5,650,000 Multiple Family Residential 3,900,200 Commercial 1,264,300 Total Wastewater User Charges $ 10,814,500 These estimates presume normal usage patterns, uninterrupted by demand restrictions. Assuming that current water and wastewater user charges are applied to all customers, it is projected that the total water user charge revenue in FY 2006 would be approximately $6,805,200 and total wastewater user charge revenue would be approximately $10,814,500. Rate Sufficiency Analysis and Debt Service Coverage for FY 2005 As discussed above, the primary objective of this rate analysis is to determine if the current rates and/or existing reserves will be sufficient to recover the utility's revenue requirements in FY 2006. Operating and capital budgets, along with other data provided by City staff, served as the basis for this rate analysis. These revenue requirements were then compared to the projected rate revenues generated by applying the current rates to all customers, as discussed previously, as well as revenue available from other sources, including miscellaneous service charges and interest income, to determine the sufficiency of these rates. Mathews Consulting 5-8 e � r Section 5 -- Rate Table 5-7 Projected FY 2006 Debt Service Coverage and Debt Service Coverage Revenues Total Charges for Services $18,179,800 Other Charges and Fees 1,000 Interest Earnings 252,300 CIAC Interest Earnings 118,000 Renewal & Replacement Interest Earnings 57,000 Customer Billing Services 110,200 Total Available Revenue $ 18,718,300 Ooeratina and Maintenance Expenses Customer Service 682,800 Administration 302,200 Engineering 634,300 Water Treatment 2,302,900 Construction 1,520,300 Support Services 201,600 Maintenance 4,952,200 Non -Departmental 4,138,900 Less Payments in Lieu of Taxes (664,50.0) Total O&M Expenses $14,070,700 Net Revenue $4,647,600 Debt Service 2,601,200 Debt Service Coverage Ratio 1.79x Required Debt Service Coverage Ratio 1.10 (Based on City of Tamarac Adopted FY 2006 Budget.) Mathews Consulting 5-9 k + r Section S —Rate Su fciency and Debt Service Coverage In FY 2006, existing user charges are expected to be sufficient to recover water and wastewater operating expenses, debt service, internal transfers, and capital projects funded from rates as budgeted by the City. Please refer to Table 5-7. Existing bond covenants require that coverage must be at least L I 0 (without CIAC revenue) and at least 1.20 (with CIAO revenue). Based on the analysis presented in Table 5-7, it is estimated that the debt service coverage ratio for FY 2006 will be 1.40x without CIAC and 2.03x with assumed CIAC revenues of $1,650,000. These estimated CIAC revenues, unbudgeted by the City, are based on 2005 CIAC revenues. Conclusions and Recommendations To summarize the above analyses, the following conclusions may be drawn: Water and wastewater user charges are expected to be sufficient to meet FY 2006 debt service coverage requirements, in accordance with bond covenants. The City has the financial resources to implement its water and wastewater capital improvement plan. In April 2004, the City of Tamarac issued $9.5 million of Capital Improvement Revenue Bonds to fund the acquisition, construction and purchase of capital improvements to the City's water, wastewater and stormwater utility systems. The serial bonds will have a final maturity in 2022 and are secured and payable solely from non ad valorem revenues appropriated by the City. The Utility Department's share of the proposed revenue bonds is approximately $5 million. No event has occurred during the past fiscal year that might materially affect outstanding bonds. There have been no defaults or delinquencies, unscheduled draws from debt service reserves or credit enhancements, substitution of credit or liquidity providers, modification of bondholder rights, unscheduled redemption calls, defeasances, or ratings changes. • The City's FY 2005 Comprehensive Annual Financial Report is hereby incorporated by reference into this Annual Report. Based on the above, it is recommended that: • The utility continues to examine and refine its long-term capital improvement program. The utility consider alternative funding mechanisms for its capital needs other than depletion of existing reserves in order to mitigate potential rate adjustments in the future. Mathews Consulting 5-10 Attachment A Utility Maintenance Record/Schedule Equipment Task Due Date Water Treatment Plant 2003 2004 2005 2006 4 MGD Accelerator Lubricate Drive Q Q Q Q Accelerator Drive Motor Check Motor/Electrical Q Q Q Q Air Condo No.1 Fan Motor Check Motor/Electrical A A A A Air Condo No. 2 Fan Motor Check Motor/Electrical A A A A Back -Up Scott Air Packs Open & Check SCBAA M M M M Backwash Pump No.1 Motor Check Motor/Electrical Q I Q Q Q Backwash Pump No.2 Motor Check Motor/Electrical Q Q Q Q Backwash Pump No, 1 Grease Fittings Q Q Q Q Backwash Pump No.2 Grease Bearings Q Q Q Q Backwash Valve Motor Check Motor/Electrical Q Q Q Q CL2 Building Sump Motor Check Motor/Electrical Q Q Q Q CL2 Control Building Exhaust Check Motor/Electrical Q Q Q Q CL2 Exhaust Blower Motor Check Motor/Electrical Q Q Q Q Coa . Blower Motor Check Motor/Electrical Q Q Q Q Coa . Feed Motor Check Motor/Electrical Q Q Q Q Coa . Mixer Motor Check Motor/Electrical Q Q I Q Q E. 8 MGD Accelerator Chan e Oil -Drive Unit A A A A E. 8 MGD Accelerator Motor Check Motor/Electrical Q Q E. 8 MGD Oil Pump Motor Check Motor/Electrical Q Q Q Q Exhaust Blower Motors Check Motor/Electrical SA SA SA SA Exhaust Fan - Fluoride Room Check Motor/Electrical SA SA SA SA Exhaust Fan - Motor Check Motor/Electrical SA SA SA SA Fluoride Pump Motor Check Motor/Electrical Q Q Q Q Generator - WTP Clean & Check Gen Set W W W W Greenleaf Sum Motor Check Motor/Electrical Q Q Q Q Greenleaf Vac. No. 1 Electrical Check Q Greenleaf Vac. No. 2 Electrical Check Q Q Q Q Grit Conveyor Motor No. 1 Check Motor/Electrical Q Q Q Q Grit Conveyor Motor No. 2 Check Motor/Electrical Q Q Q Q High Service No. 1 Motor Grease Motor Bearings Q Q Q Q Legend W - weekly M - monthly Q - quarterly SA - semi annually A - annually Mathews Consulting A-1 Attachment A — Utility Maintenance Record/Schedule Utility Maintenance Record/Schedule Continued Equipment Task Due Date Water Treatment Plant cont'd. 2003 2004 2005 2006 High Service No. 2 Motor Grease Motor Bearings Q Q Q Q High Service No. 3 Motor Change Oil- Motor Q Q High Service No. 4 Motor Change Motor Oil Q Q Q Q High Service No. 5 Motor Grease Motor Bearings Q Q Q Q High Service No. 6 Motor Grease Fittings Q Q Q Q High Service No. 7 Motor Grease All Fittings Q Q Q Q Hi h Service No. 1 Motor Check Motor/Electrical Q Q Q Q High Service No. 2 Motor Check Motor/Electrical Q Q Q Q High Service No. 3 Motor Check Motor/Electrical Q Q Q Q High Service No. 4 Motor Check Motor/Electrical Q I Q Q Q High Service No. 5 Motor Check Motor/Electrical Q Q Q Q High Service No. 6 Motor Check Motor/Electrical Q Q Q Q High Service No. 7 Motor Check Motor/Electrical Q Q Q Q Hoist Clean Tracks for Hoist SA SA SA SA Lime Slurry Pot - N Slake Check Drive Belts Q Q Q Q Lime Slurry Pot - S Slake Check Drive Belts Q Q Q Q Manual Filter No. 1 Grease Valve Boxes A A A A Manual Filter No. 2 Grease Valve Boxes A A A A Manual Filter No.3 Grease Valve Boxes A A A A Manual Filter No. 4 Grease Valve Boxes A A A A Manual Filter No. 5 Grease Valve Boxes A A A A Manual Filter No. 6 Grease Valve Boxes A A A A Motorola UPS Order Batteries N. Lime Slaker Check Gear Box Oil SA SA SA SA Polymer Pump Motor No. 1 Check Motor/Electrical Q Q Q Q Polymer Pump Motor No. 2 Check Motor/Electrical Q Q Q Q Pump No. 1 Recovery Pond Check Motor/Electrical Q Q Q Q Pump No. 2 Recovery Pond Check Motor/Electrical Q Q Q Q Room Exhaust Fan Electrical Check SA SA SA I SA Legend W - weekly M - monthly Q - quarterly SA - semi annually A - annually Mathews Consulting A-2 Attach►nent A — Utility Maintenance Record/Schedule Utility Maintenance Record/Schedule Continued Equipment Task Due Date Water Treatment Plant cont'd. 2003 2004 2005 2006 S. Lime Slaker Change Gear Box Oil SA SA SA SA Scott Air - Pack (East) Open & Check SCBA M M M M Scott Air - Pack West O en & Check SCBA M M M M Shop Air Com . Motor Check Motor/Electrical Q Q Q Q Silo Air Compressor Mtr Check Motor/Electrical Q Q Slaker Air Compressor Change Oil M M M M Slaker Drive Motor No. 1-S Check Motor/Electrical Q Q Q Q Slaker Drive Motor No. 2-N Check Motor/Electrical Q Q Q Q Slaker Feeder Belt Mtr Check Motor/Electrical Q Q Q Q Slurry Pot Mixer Motor Check Motor/Electrical Q Q Q Q Slurry Pot Mixer Motor Check Motor/Electrical Q Q Q Q Transfer Punt No. 1 Motor Check Motor/Electrical Q I Q Q Q Transfer Pump No. 1 Check Lubrication Q Q Q Q Transfer No. 2 Motor Check Motor/Electrical Q Q Q Q Transfer Pump No. 2 Check Lubrication Q Q Q Q Vacuum Pum Motors Check Motor/Electrical Q Q Q Q W 8 MGD Drive Motor Check Motor/Electrical Q Q Q Q W 8 MGD Oil Pump Check Motor/Electrical Q Q Q Q W 8 MGD Accelerator Check Lubrication Q Q Q Q W 8 MGD Accelerator Motor Check Motor/Electrical Q Q Q Q WTP Fluoride System Clean Fluoride Room Q Q Q Q WTP Fuel Containment Clean Out Debris, Etc. Q Q Q Q WTP Vehicles Ins ect Vehicles W W W W WTP - CL2 Equipment Check CL2 Equipment W W W W Legend W - weekly M - monthly Q - quarterly SA - semi annually A - annually Mathews Consulting A-3 v w v Attachment A — Utility Maintenance Record/Schedule Utility Maintenance Record/Schedule Continued Equipment Task Due Date Water Distribution 2003 2004 2005 2006 Generator - Grants Clean & Check Gen Set W W W W Generator - T27 Clean & Check Gen Set W W W W GP — Fuel Containment Clean out containment Grants No. 1 Pump Grease Motor Bearings Q Q Grants Pump No. 1 Motor Check Motor/Electrical Grants No. 2 Pump Grease Motor Bearings Grants Pump No. 2 Motor Check Motor/Electrical Q Q Q Q Grants — CL2 Equipment Check CL2 Equipment W W W W T27 Pump No. 1 Motor Grease Bearings Q T27 Pump No. 2 Motor Grease Motor Bearings Q I Q Q T27 Pump No. 3 Motor Grease Motor Bearin s Q Q Q Tract 27 CL2 Equipment Check CL2 E ui ment W W W W Tract 27 Scott Air - Pack O en & Check SCBA M M M M Wastewater Collection /Transmission See Section 3 Raw Water Wells Well No. 01 Grease Motor All Maintenance Performed Quarterly Well No. 01 Pump Motor Check Motor/Electrical Well No. 02 Grease Bearings Q Q Q Well No. 03 Grease Bearings Well No. 03 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 04 Grease Motor Q Q Q Q Well No. 04 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 05 Grease Motor Bearings Q Q Q IQ Well No. 05 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 06 Grease Motor Bearings Q Q Legend W - weekly M - monthly Q - quarterly SA - semi annually A - annually Mathews Consulting A-4 Attachment A — Utility Maintenance Record/Schedule Utility Maintenance Record/Schedule Continued Equipment Task Due Date Raw Water Wells Cont'd. 2003 2004 2005 2006 Well No. 06 Pump Motor Check Motor/Electrical Well No. 07 Grease Motor Bearings Well No. 07 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 08 Grease Motor Bearings All Maintenance Performed Quarterly Well No. 08 Pump Motor Check Motor/Electrical Well No, 09 Grease Motor Bearings Q Q Q Q Well No. 09 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 10 Clean Sump Pump Pit Q Q Q Q Well No. 10 Exhaust Motor Check Motor/Electrical Well No. 10 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 10 Sump Motor Check Motor/Electrical Well No. 1 l Paint Well Lids A A A A Well No. 11 Pump Motor Check Motor/Electrical Well No. 11 Sump Motor Check Motor/Electrical Well No. 12 Clean Sump Pump Pit Q Q Q Q Well No, 12 Exhaust Motor Check Motor/Electrical Q Q Well No. 12 Pump Motor Check Motor/Electrical Well No. 12 Sump Motor Check Motor/Electrical Q Q Q Q Well No. 1.3 Clean Sump Pump Pit Well No. 13 Exhaust Motor Check Motor/Electrical Well No. 13 Pump Motor Check Motor/Electrical Well No. 13 Sump Motor Check Motor/Electrical Well No. 14 Grease Motor Bearings All Maintenance Performed Quarterly Well No. 14 Pump Motor Check Motor/Electrical Well No. 15 Grease Motor Bearings Well No. 15 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 16 Grease Motor Bearings Q Q QQ Well No. 16 Pump Motor I Check Motor/Electrical Legend W - weekly M - monthly Q - quarterly SA - semi annually A - annually Mathews Consulting A-5 w y � Attachment A — Utility Maintenance Record/Schedule Utility Maintenance Record/Schedule Continued Equipment Task Due Date Raw Water Wells Cont'd. 2003 2004 2005 2006 Well No. 17 Grease Motor Bearings All Maintenance Performed Quarterly Well No. 17 Pump Motor Check Motor/Electrical Well No. 18 Pump Motor Check Motor/Electrical Q Q Q Q Well No. 18 Check Motor/Electrical Q Q Q Well No. 19 Check Motor/Electrical Q Q Q Q Well No. 19 Grease Motor Bearings Legend W - weekly M - monthly Q - quarterly SA - semi annually A - annually Mathews Consulting A-6 No Text