Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-2004-0701 Temp Reso. #10369 March 09, 2004 Revision 1: March 15, 2004 Revision 2: March 29, 2004 Revision 3: March 31, 2004 Revision 4: April 5, 2004 Page 1 of 4 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2004-'70 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE CHANGE ORDER NUMBER 1 TO THE SEVEN YEAR COMPREHENSIVE STREET IMPROVEMENT PROGRAM PHASE IV-B CONTRACT WITH VILA & SON LANDSCAPING, INC. FOR THE ADDITION OF GREENBRIAR MEDIAN BEAUTIFICATION, THE SUBSTITUTION OF DWARF FIRE BUSH FOR DWARF FAKAHATCHEE GRASS THROUGHOUT THE PROJECT AND THE COST OF MODIFYING THE FITTINGS USED WITH MAINLINE IRRIGATION PIPES; AUTHORIZING AN ADDITIONAL EXPENDITURE IN AN AMOUNT NOT TO EXCEED $101,038.11; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on April 9, 2003 the City Commission approved the award of Invitation For Bid No. 02-28B to Vila & Son Landscaping, Inc. for Median Beautification under Phase IV-B of the Street Improvement Program through Resolution R-2003-79, a copy of said Resolution attached hereto as Exhibit 1; and WHEREAS, the scope of work for Phase IV-B included the beautification of approximately 18 miles of street medians, including NW 75th Street medians from NW 88th Avenue to NW 801h Avenue; and WHEREAS, it is desirable to add '/ mile of median beautification on NW 75th Street from NW 75th Avenue to NW 73Id Terrace in the Greenbriar Subdivision to the original scope of work to be performed by Vila & Son Landscaping Inc.; and WHEREAS, the original scope of work included the installation of Dwarf Fakahatchee Grass be installed throughout the project; and Temp Reso. #10369 March 09, 2004 Revision 1: March 15, 2004 Revision 2: March 29, 2004 Revision 3: March 31, 2004 Revision 4: April 5, 2004 Page 2 of 4 WHEREAS, the use of Dwarf Fakahatchee Grass has been determined to constitute a potential sight hazard within the medians; and WHEREAS, it has been determined by the Public Works Department that Dwarf Fire Bush is an acceptable substitute for Dwarf Fakahatchee Grass; and WHEREAS, Wayne Kiser and Associates, P.A., the Architect of Record for the design of the irrigation system within Phase IV-B, is requiring the use of Schedule 80 fittings for all irrigation mains smaller than 6" diameter and requiring ductile iron fittings for all 6" irrigation mains; and WHEREAS, Public Works staff has reviewed said changes and have determined that the pricing is competitive and acceptable; and WHEREAS, the cost of additional work attributed to this change order necessitates an additional expenditure in an amount not to exceed $101,038.11 from the Road Resurfacing Program Budget, a copy of Change Order No. 1 attached hereto as Exhibit 2; RN WHEREAS, the cost breakdown for additional said work is as follow: Cost Item Cost Greenbriar Median Beautification $ 55,589.60 Fire Bush Substitution $ 11,767.50 Irri ation_ Modification $ 33,681,01 Total: $101,038.11 ; and WHEREAS, available funding exists in the Road Resurfacing Program Budget and in Account Number 311-5010-541.63-52 for said purpose; and 1 Temp Reso. #10369 March 09, 2004 Revision 1: March 15, 2004 Revision 2: March 29, 2004 Revision 3: March 31, 2004 Revision 4: April 5, 2004 Page 3 of 4 WHEREAS, the Director of Public Works and the Purchasing and Contracts Manager recommend the authorization of Change Order No. 1 to the Street Improvement Program Phase IV-B Project in an amount not to exceed $101,038.11; and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interest of the citizens and residents of the City of Tamarac to approve Change Order No. 1 to the Street Improvement Program Phase IV-B Project with Vila & Son Landscaping Inc. for the addition of Greenbriar Median Beautification, the substitution of Dwarf Fire Bush for Dwarf Fakahatchee Grass throughout the Project and the cost of modifying the fittings used with mainline irrigation pipes and authorize an additional expenditure in an amount not to exceed $101,038.11 for said purposes. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA THAT: SECTION 1: The foregoing "WHEREAS" clauses are HEREBY ratified and confirmed as being true and correct and are HEREBY made a specific part of this Resolution upon adoption hereof. SECTION 2: The appropriate City Officials are HEREBY AUTHORIZED to execute Change Order No. 1 to the contract with Vila & Son Landscaping, Inc. for the addition of Greenbriar Median Beautification, the substitution of Dwarf Fire Bush for Dwarf Fakahatchee Grass throughout the project and the cost of modifying the fittings used with mainline irrigation pipes. SECTION 3: An additional expenditure in an amount not to exceed $101,038.11 for these purposes is HEREBY approved. Temp Reso. #10369 March 09, 2004 Revision 1: March 15, 2004 Revision 2: March 29, 2004 Revision 3: March 31, 2004 Revision 4: April 5, 2004 Page 4 of 4 SECTION 4: All Resolutions or parts of Resolutions in conflict herewith are HEREBY repealed to the extent of such conflict. SECTION 5: If any provision of this Resolution or the application thereof to any person or circumstance is held invalid, such invalidity shall not effect other provisions or application, and to this end the provisions of this resolution are declared to be severable. SECTION 6: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED AND APPROVED THIS 14t" day of April, 2004. E SCHREIBER MAYOR ATTEST: MARION S ENSON, CMC CITY CLERK I HEREBY CERTIFY that I have approved this RESOLUTION as to form. ( L>V v MITC L S. CITY ATTO RECORD OF COMMISSION VOTE: MAYOR SCHREIBER DIST 1: COMM. PORTNER 44, DIST 2: COMM. FLANSBAUM-TALABISCO DIST 3: V/M SULTANOF DIST 4: COMM. ROBERTS e E 1 1 Table Of Contents Temp. Reso. No. 10369 1. Memorandum 2. Salmon Sheet 3. Resolution 4. Exhibit 1 5. Exhibit 2 ORIGINAL Exhibit 1 Temp. Reso. #10369 1 March 19, 2003 Temp, Reso. #10089 Page 1 of 1 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2003� A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, APPROVING CERTAIN STREETS FOR MEDIAN BEAUTIFICATION UNDER PHASE IV-B OF THE SEVEN YEAR COMPREHENSIVE STREET IMPROVEMENT PROGRAM; AWARDING BID NO. 02-28B TO VILA AND SON LANDSCAPING CORPORATION; AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE AN AGREEMENT WITH VILA & SON LANDSCAPING CORPORATION; AUTHORIZING AN EXPENDITURE IN AN AMOUNT NOT TO EXCEED $3,424,626.61, WHICH REPRESENTS A CONTRACT AWARD OF $3,113,296.92 AND A PROJECT CONTINGENCY OF $311,329.69; AUTHORIZING THE CITY TO MAKE NECESSARY ADDITIONS, DELETIONS, OR REVISIONS TO THE PHASE IV-B WORKPLAN PURSUANT TO SECTION 6-156 OF THE CODE OF THE CITY OF TAMARAC, FLORIDA; AUTHORIZING BUDGETARY TRANSFERS AS NECESSARY FOR PROPER ACCOUNTING PURPOSES; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on July 22, 1998, the City Commission of the City of Tamarac approved the Seven Year Comprehensive Street Improvement Program through the approval of Resolution No. R98-227; and WHEREAS, Phase I through III, encompassing approximately 101 miles of City streets have been completed; and WHEREAS, Phase IV -A is in progress and includes the rehabilitation of approximately 23 miles of roadway; and WHEREAS, Phase IV-B consists of the median beautification of approximately 18 miles of median as part of this program, a copy of which is attached hereto as Exhibit 1; and Exhibit 1 Temp. Reso. #10369 March 19, 2003 Temp. Reso. #10089 Page 2 of 2 WHEREAS, the City of Tamarac publicly advertised Bid No. 02-288 for median beautification under Phase IV-B in the Sun -Sentinel on November 3', 10ti'and 17`", 2002, hereto attached as Exhibit 2; and WHEREAS, on January 15, 2003, the following three (3) bids were opened and reviewed to determine cost and responsiveness to the City's specifications: ; and Bidder Cost $ Vila & Son Landscaping Corp. $ 3,113,296.92 MBR Construction, Inc. $ 4,205,574.33 APAC-Florida, Inc. $ 5,274,096.95 WHEREAS, based on the bid results, it was determined that Vila& Son Landscaping Corporation submitted the lowest responsive and responsible bid proposal, attached hereto as Exhibit 3; and WHEREAS, it is recommended that expenditures in an amount not to exceed $3,424,626.61 be authorized based on Vila & Son Landscaping Corporation's submitted bid price of $3,113,296.92 and a construction contingency of $311,329.69 to account for fluctuations in material prices, variance in quantities and unforeseen field conditions; and WHEREAS, available funds exist in the Street Improvement Program budget for said purpose; and WHEREAS, Vila & Son Landscaping Corporation, as the lowest responsible bidder, has re -reviewed the project scope of work and agrees the price submitted was as intended, as evidenced in Exhibit 4; and Exhibit 1 Temp. Reso. #10369 March 19, 2003 Temp. Reso. #10089 Page 3of3 WHEREAS, Glatting, Jackson, Kersher, Anglin, Lopez and Rinehart, Inc., as the provider of landscape architectural and engineering services for Phase IV-B, has reviewed the submitted bids, and agrees to the award of contract to Vila & Son Landscaping Corporation, as evidenced in Exhibit 5; and WHEREAS, it is the recommendation of the Public Works Department and the Purchasing and Contracts Division that the City award the Bid No. 02-28B and to execute an agreement with Vila & Son Landscaping Corporation for median beautification in the amount of $3,113,296.92 for Median Beautification under Phase IV-B of the Seven Year Comprehensive Street Improvement Program; and WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interest of the citizens and residents of the City of Tamarac to award Bid No. 02-28B and to execute an agreement with Vila & Son Landscaping Corporation, in an amount not to exceed $3,113,296.92 for Median Beautification under Phase IV-B of the Seven Year Comprehensive Street Improvement Program. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA THAT: SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. SECTION 2: The list of streets, identified as the Phase IV-6 Median Beautification Work Plan, and attached as Exhibit 1 is HEREBY APPROVED. SECTION 3: The appropriate City Officials are hereby authorized to award Bid No. 02-28B to Vila & Son Landscaping Corporation for median beautification included in Phase IV-B of the Seven Year Comprehensive Street Improvement Program, and to Exhibit 1 Temp. Reso. #10369 March 19, 2003 Temp. Reso. #10o89 Page 4 of 4 close the bid award including but not limited to making final payment and releasing bonds when work has been satisfactorily completed within the terms and conditions of the contract. SECTION 4: The appropriate City Officials are HEREBY AUTHORIZED to execute an agreement with Vila & Son Landscaping Corporation awarding a contract for median beautification under the Phase IV-B Work Plan, a copy of said agreement hereto attached as Exhibit 6. SECTION 5: A total expenditure in an amount not to exceed $3,424,626.61 is HEREBY AUTHORIZED, which represents a contract award of $3,113,296.92 to Vila & Son Landscaping Corporation and a project contingency of $311,329.69. SECTION 6.: The City is hereby authorized to make necessary additions, deletions or revisions to the Phase IV-B work plan, pursuant to Section 6-156 of the Code of the City of Tamarac, Florida. SECTION 7: Budget transfers which may be required for proper accounting purposes and financial control are HEREBY AUTHORIZED. SECTION 8: All Resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 9: If any provision of this Resolution or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are declared to be severable. Exhibit 1 Temp. Reso. #10369 11 1 SECTION 10: its passage and adoption. March 19, 2003 Temp. Reso. #10089 Page 5 of 5 This Resolution shall become effective immediately upon PASSED, ADOPTED AND APPROVED this 9`" day of April, 2003. ATTEST: 7 e MARION SWENSON, C C CITY CLERK I HEREBY CERTIFY that I have approved this RESOLWTION,as to form. MITCHELL S. CITY ATTO l o�C J E SCHREIBER AYOR RECORD OF COMMISSION VO1 MAYOR SCHREIBER ._/. DIST 1: COMM. PORTNER DIST 2: COMM. FLANSBAUM-T, DIST 3: COMM. SULTANOF DIST 4: V/M ROBERTS City of Tamarac K&I Exhibit 2 Temp. Reso. #10369 Purchasing Division DATE OF ISSUANCE: :oka] CONTRACTOR CHANGE ORDER March 9, 2004 CITY OF TAMARAC 7525 NW 881h Avenue Tamarac, FL 33321-2401 02-28B Vila & Son Landscaping, Inc. 20451 S.W. 21 fit" Street Miami, FL 33170 CHANGE ORDER NO. PROJECT NAME: PROJECT NO. I:�ia�t�Lril 3=1� Street Improvement Program, Phase IVB PW97C 061092 IN COMPLIANCE WITH SPECIFICATIONS IN THE ABOVE REFERENCED CONTRACT, THE CONTRACTOR AND THE CITY DO BOTH HEREBY AGREE THAT THE CONTRACTOR SHALL MAKE THE FOLLOWING CHANGES, ADDITIONS OR DELETIONS TO THE WORK SPECIFIED IN THE PLANS AND SPECIFICATIONS: DESCRIPTION: Pay Item Unit Quantity Unit Cost Cost Time Greenbriar Subdivision N/A N/A N/A $55,589.60 45 Days Median Beautification Work Change Directive No. EA 9,414 $1.25 $11,767.50 0 Days 1 Schedule 80 PVC fittings for L.F. 1,905 $0.96 $1,828.80 0 Days 2-1/2" Irrigation Mains Schedule 80 PVC fittings for L.F. 4,093 $1.25 $5,116.25 0 Days 3 Irrigation Mains Schedule 80 PVC fittings for L.F. 5,924 $1.79 $10,603.96 0 Days 4" Irrigation Mains Ductile Iron fittings for 6" L.F. 4,033 $4.00 $16,132.00 0 Days Irri ation Mains Total: $101,038.11 45 Days PURPOSE OF CHANGE ORDER: Greenbriar Subdivision Median Beautification The beautification of NW 75th Street medians within the Greenbriar Subdivision is to be added to the original scope of work to be performed by Vila & Son Landscaping Inc., as submitted in a proposal for the amount of $55,589.60 (Exhibit «A, Dwarf Fakahatchee Grass Replacement The original scope of work included the installation of Dwarf Fakahatchee Grass throughout the project. It has been determined that the use of Dwarf Fakahatchee Grass constitutes a potential sight hazard within the medians. It has also been determined by the Public Works Department that Dwarf Fire Bush is an acceptable No Text City of Tamarac Exhibit 2 Temp. Reso. #10369 Purchasing Division substitute for Dwarf Fakahatchee Grass, and this substitution will incur an additional cost of $11,767.50 to Phase IV-B of the Street Improvement Program. Schedule 80 PVC fittinas for 2-1/2". 3" & 4" and Ductile Iron fittings for 6"._Irrioation Mains Wayne Kiser and Associates, P.A., the Architect of Record for the design of the irrigation system within Phase IV-B, is requiring the use of Schedule 80 fitting for all irrigation mains smaller than 6" diameter and requiring ductile iron fittings for all 6" irrigation mains. The additional cost of using irrigation fitting as specified by the Architect was submitted as a proposal by Vila & Son Landscaping, Inc., totaling $33,681.01. Funding Funding for Change Order Number 1 is available in the Road Resurfacing Program Budget, under the General Street Improvement Fund, for an amount not to exceed $77,538.11, and under Account Number 001-5010-541.63-51 in the amount of $23,500.00 for said purposes upon approval of this change order by the City Commission. See "Exhibit A" for Quantity Calculations. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Time $ 3,113,296.92 365 Days Previous Change Order No. to No. Net change from previous change orders $ N/A N/A Contract Price prior to this Change Order Contract Time prior to this Change Order $ 3,113,296.92 365 Days Net (Increase) of this Change Order Net (Increase) of this Change Order $ 101,038.11 45 Days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 3,214,335.03 410 Days ENDED APPROVED • OV D BY BY �� BY ec or 7i Manager onttra r Date 3 I t Date 4 o Da Exhibit 2 Temp. Reso. #10369 Street Improvement Program - Phase IVB Change Order No. 1 - Exhibit "A" Greenbriar Subdivision Median Beautification NW 75th Street Item/Descri lion QuantityUnit Unit Price Amount Description Trees and Palms Live Oak - 100 Gal. 14'-15' 8 EA $ 456-00 $ 3,648.00 100 Gal.: 14'-15'x 7'-8': 4" Cal. FA, Gumbo Limbo 6 EA $ 435.00 $ 2 610.00 14'-15'x T-8' Subtotal Trees and Palma S 6 Z58.00 Blue Plumb o 161 FA $ 6.50 $ 1,046,50 3 Gallon .Fvergreen Giant Liriopu 110 FA $ 2.80 $ 308.00 1 Gallon 9, Variegated Bravo Croton 60 EA $ 9.60 $ 576,00 3 Gallon 11 St Aulistinc Sod 6,135 1 SF $ 0.23 $ 1,457.05 Solid Sod Subtotal Shrubs and Groundeover7777,77 S 3 87.55 5. §2nnKler, Model 1806 124 EA $ 15,50 $ 1,922.00 8. Valve, Model PGA 1.50" 5 FA $ 150.00 $ 750.00 10. Valve, Pressure re ualtor modulo 5 EA $ 75.00 $ 375.00 20. Valve box, irrigation, Plastic 5 EA $ 25.00 $ 125.00 22. Pie 3/4" w/fittings 740 LF $ 1.25 $ 925.00 23. Pi r, 1" w/fittingB 400 LF $ 1,30 $ 520.00 25, Pipe, 1-1/2" w/fittings 50 1.17 $ 1.45 $ 72.50 28. Pipe, 3" w/fittinp LF $ 2.75 $ 2,750.00 Plml station 311P w/F.SP-08MC controller, installed EA $ 7 875,00 $ 7,875.00 Subtotal Trri lion $ 15,314.50 T) eaLEE N'i 1. Meter EA $ 750.00 $ 750.00 Metor cart b Contractor Meter b FP&L 2 Disconnect switch with doses and rejection cli EA $ 2,575.00 $ 2,575.00 No larger than 60 am (Incl. W/ Cost of Mcicr 3. Conduit ' LF $ 0.70 $ 700.00 2" PVC Schedule 40 4. ILow Voltage Wiring 3,000 LF $ 0.25 $ 750.00 5. 1pole 1 EA $ 281.25 $ 281.25 6. 1 Conduit to the Purnp station) 310 LF $ 16.00 $ 4,960.00 7. 1 W - 48OV, 4 Wire Service 4 #2-1 1/4" 310 LF $ 10.00 $ 3,100.00 Subtotal Electrical $ 13,116.25 .. ,...: . ..:... ... ••...... ...ova 1. 1 Clearing mid aubbu 0.17. AC $ 1,730.00 294.1 $ 10 Removal of Su Weeds and Brush , W Subtotal Clearin dt Grubkifn $ 294.10 '.: 1 C die►ua . •. ;: .,:. . :: '. '777-.:. :.: •. .... .:, ., ^• \ .l .... 1. Selective Ttte Removal 8 EA $ 110.0 0 $ SSOA(1 Llnolcr 25' �n height; inclu � ss tunt and root. removal r 2. Selective 'free Removal 3 EA $ 460.00 $ 1,380.00 25' and over in hit; mcluding stump and root removal Subtotal Tree Removal $ 2,260.00 1. Protection of Existing Trees I I EA $ 5.00 $ 55,00 Size Varies Subtotal Tree Protection S 55.00 li'- Fil'A4 t 1. Fill to bring grade up to conb lovel LS $ 9,400.00 $ 9,400.00 Subtotal Fill Material S 9,400.00 I. Red Mulch K71 C:Y $ 35.00 $ 805,00 Subtotal Mulch S 805.00 nirwiallationof Concrete Pavers SF $ 6.60 $ 4,699.20 Subtotal Pavers S 4 699.20 Greenbriar Subdivision Median Beauification Total $ 55,589.60 Work Chan a Directive No. 1 Substitute Dwarf Fire Bush for Dwarf Fakahatchee Grass 9,414 EA $ 1,25 1 $ 11,767.50 Work Change Directive No. 1 Total $ 11,767.50 Schedule 80 Fittings for 2-1/2" Irrigation Mains Schedule 80 Fittuip for 2-1/2' Irrigation Mains 1,905 FA $ 0.96 1 $ 1,828.80 Schedule 80 Fittings for 3" Irrigation Mains Total $ 1,828.80 Schedule 80 Fittings for 3" Irrigation Mains Schedule 80 Fittmgs for 3" Irrigation Mains 1 4,093 1 FA $ 1.25 1 $ 5,116.25 Schedule 80 Fittings for 3" Irrigation Mains Total $ 5,116.25 Schedule 80 Fittinas for 4" Irria tion Mains Schedule 80 FlttMp for 4" Irrigation Mains 5,924 1 EA 1 $ 1.79 $ 10,60396 Schedule 80 Fittings for 4" Irrigation Mains Total $ 10,603.96 Ductile Iron Fittings for 6" Irri ation Mains lhtctile Tran Fitt for 6" hTigation. Mains I 4,033 I FA 1 $ 4.00 $ 16 132.00 Ductile Iron Fittings for 6" Irrigation Mains Total $ 16,132.00 Change Order No. 1 Total $ 101,038.11 U\RMURFACtNGPROJECI\PtimerVB\Changeordc Nu. 1\0iange Order#1 FAibitA 1 of 1