Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution (138)1 Temp. Reso #9740 3/22/02 Revised 4/9/02 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-2002-138 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, INCREASING AND RESTRUCTURING BUILDING DEPARTMENT PERMIT FEES;; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Tamarac at the time of restructuring the Schedule of Permit Fees in 1997 did not provide for the development of a parking garage structure; and WHEREAS, the review of the Schedule of Permit Fees shows items omitted when the comprehensive structure changes were drafted and approved in 1997; and WHEREAS, Section 5-1 (a) of the Tamarac City Code authorizes the City Commission to review, alter, add to, modify, deduct from or in any other way change any fees or any categories on any schedule of building permit fees in existence or to be in existence by a resolution adopted by the City Commission; and WHEREAS, the Building Department has submitted an attachment indicating the additions and structure changes to the Building Department Schedule of Permit Fees (attached as Exhibit 1); and WHEREAS, the City Manager and the Building Official have recommended that certain additions and increases of such fees should be made; and I 2 Temp. Reso #9740 3/22/02 Revised 4/9/02 WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the best interests of the citizens and residents of the City of Tamarac to restructure these fees. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution. SECTION 2: That the Schedule of Permit Fees, attached hereto as Exhibit 2 and made a part hereof, is HEREBY APPROVED. SECTION 3: All Resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 4: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application,, it shall not affect the validity of the remaining portions or applications of this Resolution. 3 Temp. Reso #9740 3/22/02 Revised 4/9/02 SECTION 5: This Resolution shall become effective immediately upon its passage and adoption. PASSED, ADOPTED, AND APPROVED this 22nd day of May, 2002. ATTEST:,- MARIO4SENSON, CMC CITY CLERK I HEREBY CERTIFY that I ppfoved this SO U ION as to form. ITCHELL S. KF CITY ATTORN rl ' � r RECORD OF COMMISSION VOTE: MAYOR SCHREIBER _Aye, DIST 1: V/M. PORTNER 6Xge DIST 2• MM. MISHKIN_Aye, 3: COMM. SULTANOF_Aye, DIST 4: COMM. ROBERTS A el r CITY OF TAMARAC Exhibit 1 Temp Reso #9740 BUILDING DEPARTMENT SCHEDULE OF PERMIT FEES SECTION 1: As set forth in Section 301 of the South Florida Building Code, it is unlawful for any person, firm or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration or repair on or within private property, and such act is punishable as provided in Section 1-13 of the Tamarac City Code. SECTION II: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous, signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of 0.30 $0.20 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the Occupancy and the value of which does not exceed eight hundred ($800.00) dollars in labor and material as determined by the Building Official. A. EXPIRED PERMIT FEES Renewal -Expired Permits -All Disciplines (a) Within 90 days of expiration Originalfee at...................................................................................50% (b) Renewal after 90 days of expiration Originalfee at.................................................................................100% B. MISCELLANEOUS FEES 1. Copies (as per Section 6-36 of Tamarac City Code) (1) Microfilm....................................................................4 pages or less $2.00 otherwise $0.50 per page (11) Photocopies........................................................................$0.15 per page 2. Fire Inspection (required before Certificate of Occupancy or Safety Inspection issuance) Commercial and Residential.................................$25.00 Plus $5.00 per unit (after final inspection) l 2 Miscellaneous Fees (coat' d) 3. Ins action for Certificate of OccuRancy or Safety Inspection eurposes only Includes all disciplines.....................................$125.00 4. Cost of Construction exceeding_. 2,600.00 Construction Lien Law Notification Fee.................$6.00 5. Board of Rules Appeals BORA fee...........................$0.35 per $1,000.00 cost of job 6. Radon........................................................................................$0.005 per SF 7. Construction Recovery Fund...........................................................$0.005 per SF 8. Fire Plan Review Fee.....................................................................$0.015 per SF new construction (residential and commercial), commercial alterations and additions 9. Any item not explicitly listed shall be based on the required number of inspections x 45.00. C. BUILDING PERMIT FEES 1. New Construction -Residential Fees SINGLE FEE FOR ALL DISCIPLINES Square footage x Factor of 60 x 1.272% 2. New Construction -Commercial Fees SINGLE FEE FOR ALL DISCIPLINES Square footage x Factor of 40 x 1.092% PARKING GARAGE ONLY Square footage x Factor of 28 x 1.092% 3. Residential Additions TOTAL CONSTRUCTION VALUE shall be calculated as square footage x Factor of 50 (a) Structural..............................................2.15% of Total Construction Value or minimum fee of $45.00, whichever is greater (b) Electrical .............................................. 0.60% of Total Construction Value or minimum fee of $46.00, whichever is greater (c) Plumbing...............................................0.92% of Total Construction Value or minimum fee of $46.00, whichever is greater (d) Mechanical............................................0.50% of Total Construction Value or minimum fee of $45.00, whichever is greater 3 Building Permit Feeslcont'd) 4. Residential Alterations (a) Structural...............................................2.74% of Total Construction Value or minimum fee of $45.00, whichever is greater (b) Electrical................................................1.68% of Total Construction Value or minimum fee of $45.00, whichever is greater (c) Plumbing................................................2.64% of Total Construction Value or minimum fee of $45.00, whichever is greater (d) Mechanical...........................................1.32% of Total Construction Value or minimum fee of $45.00, whichever is greater 5. Commercial -Alterations Additions Tenant Improvements (a) Structural...............................................1.90% of Total Construction Value or minimum fee of $46.00, whichever is greater (b) Electrical................................................1.08% of Total Construction Value or minimum fee of $46.00, whichever is greater (c) Plumbing................................................0.60% of Total Construction Value or minimum fee of $45.00, whichever is greater (d) Mechanical.............................................0.84% of Total Construction Value or minimum fee of $45.00, whichever is greater 6. Pro -inspection -All Disci lines................................................................$45.00 7. Reins action -All Disci lines...................................................................$36.00 8. Lost Plan Replacement (single family, multi -family, commercial )...............$60.00 9. Plan Resubmittal (prior to permit issuance) All Disciplines....................................................0.30% Cost of Construction minimum $30.00, maximum $100.00 10. Upfront fee for plan processing..............................................50% of permit fee 11. Canvas Awnings..................................................................up to 40 LF $45.00 each additional 40 LF, $10.00 12. Carports & Canopies..........................................................up to 200 SF $45.00 each additional 200 SF, $10.00 Ll Building Permit Fees cont'd 13. Hurricane Shutte_rs............................................................... ............$45.00 "— Plus $3.00 per shutter 14. Wood Decks...................................................................up to 200 SF $70.00 each additional 100 SF, $10.00 15. Demolition....................................................................up to 1,500 SF $120.00 each additional 1,000 SF, $10.00 Plumbing..............................................................................$45.00 Electrical..............................................................................$45.00 Mechanical...........................................................................$45.00 16. Fence.................................................................................................$35.00 plus $0.20 per LF 17. Roofing & Re-roofin...................................................up to 1,000 SF $105.00 each additional 600 SF or fraction thereof, $10.00 18. Siding................................................................................................$35.00 plus $0.05 per SF 19. House movina into the city..................................................................$250.00 20. Plan Revision (except as required for as built submittal).........................$126.00 21. Minor Plan Revision u2 to 2 disci lines..................................................$70.00 22. Masonry Walls & Precast concrete walls................................................$70.00 plus $0.20 per LF 23. Permit Card Replacement (no recorded inspections)...............................$10.00 $5.00 for each additional recorded inspection 24. Swimming Pools (private)......................................1.20% Cost of Construction 25. Spas / Hot Tubs not attached to swimming Pools ........ 3.0% Cost of Construction 26. Commercial Swimming Pools..................................1.20% Cost of Construction 27. Satellite dish (1 meter or greater)............................................................$75.00 (includes both Structural & Electrical Permits) 28. Screen Enclosure (pool) ......... 2.74% of Total Construction Value or minimum fee of 45.00 whichever is areater...................................$66.00 P Building Permit Fees cont'd 29. Screen Enclosure (patio / porch) ......... 2.74% of Total Construction Value or minimum fee of $45.00, whichever is areater......................................$46.00 30. Slab (porch / patio-monolithic)............................................up to 100 SF $45.00 each additional 100 SF or fraction thereof, $5.00 31. Blacktop / Concrete 2avina & parkina ...............................up to 1,000 SF $60.00 each additional 500 SF, $10.00 32. Sidewalks.........................................................................up to 50 LF $50.00 each additional 10 LF or fraction thereof, $0.60 33., Sims (a) All Wall Signs.............................................................................$75.00 (b) All Monument Signs..................................................................$125.00 (c) All Temporary Signs....................................................................$75.00 (d) Banners (30 days once per year)...................................................$15.00 e Directional Signs .................................................................. $15.00 each 34. Docks...............................................................................up to 30 LF $70.00 each additional 10 LF or fraction thereof, $6.00 35. Utility Shed Only.................................................................................$46.00 36. Fireplace (when not part of original plans).............................................$70.00 37. Sea Walls (see ordinance #74-75) 38. Sea Wall Repairs...................................................3.0% Cost of Construction D. ELECTRICAL PERMIT FEES 1. Burglar Alarm.......................................................................$40.00 per floor Plus $1.00 per drop 2. Burglar Alarm re-wire........................................................................$45.00 3. Commercial Site Liahtina 1-3 standards................................................$30.00 each additional standard $10.00 4. Electrical Sign ...................................................................................$45.00 S. Fire Alarm..............................................................................$70.00 per floor 6. Heat Pump..........................................................................................$60.00 Electrical Permit Fees cont'd 7. Low Voltage -individual systems (minimum fees) (a) Computer Lines (b) Intercom (c) Phone (d) Speakers (e) T.V. (0 Vacuum.................................................................................all $46.00 8. Minimum Fee (1) inspection...................................................................$45.00 9. Phone Booth.......................................................................................$45.00 10. Pool, Spa, Hot Tubs, Landscape Fountains..........................................$100.00 11. Satellite Dish (see item #27 under Building Permit Fees) 12. Service Change (a) Residential..................................................................................$60.00 (b) Commercial.................................................................................$80.00 13. Sprinkler Pump....................................................................................$60.00 14. Tem ora Electric...............................................................................$45.00 30 day Temporary Electric Testing..................$36.00 15. Construction or Sales Trailer................................................................$60.00 16. Utilization Equipment (motors, x-ray, generators, etc.).............................$46.00 E. MECHANICAL PERMIT FEES 1. A/C Change Out....................................................................................$60.00 A/C Stands for Commercial and Multi Family .................................. $7.50 each 2. Pool Heater / Heat Pump.......................................................................$45.00 3. Minimum Permit Fee 0 inspection).........................................................$45.00 4. Smoke Duct Detector.....................................................................$40.00 each FA F. PLUMBING PERMIT FEES 1. Minimum Permit Fee Per Inspect! .........................................................$45.00 2. Fire Sarinkler System...........................................................................$135.00 Plus $1.50 per head Plus $25.00 per floor above 3"d floor 3. Site Work. ©rainane, Water Mains Fire Mains, Sewer Mains.............................................2.0% Cost of Construction 4. Water Heater / Solar Pool Heater...........................................................$100.00 S. Solar System for pool ...........................................................................$200.00 6. Water Heater (domestic water).................................................................$46.00 i. Water Well.............................................................................................$60.00 8. Gas, Pool Heater...................................................................................$40.00 9. 9-.-LP Gas Tank(s) and system....................................................................$150.00 10. Irrieation Systems Residential 0.92% of Total Construction Value with a minimum of 90--0050.00 Commercial 0.60% of Total Construction Value with a minimum of $136.00 CITY OF TAMARAC Exhibit 2 Temp Reso #9740 BUILDING DEPARTMENT SCHEDULE OF PERMIT FEES SECTION I: As set forth in Section 301 of the South Florida Building Code, it is unlawful for any person, firm or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration or repair on or within private property, and such act is punishable as provided in Section 1-13 of the Tamarac City Code. SECTION II: In the event of an emergency requiring immediate repairs a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION III: All permits for new construction, including permits for building, alterations, miscellaneous, signs, swimming pools, plumbing, electric and mechanical, shall include a fee for training and education of Building Department personnel of $0.30 per thousand dollars of estimated cost. SECTION IV: No permit shall be required for general maintenance or repairs which do not change the Occupancy and the value of which does not exceed eight hundred ($800.00) dollars in labor and material as determined by the Building Official. A. EXPIRED PERMIT FEES Renewal -Expired Permits -All Disciplines (a) Within 90 days of expiration Original fee at ....................................................... ............ .......... ......50% (b) Renewal after 90 days of expiration Original fee at ......................................... ............... .....100% B. MISCELLANEOUS FEES 1. Codes (as per Section 6-35 of Tamarac City Code) (i) Microfilm....................................................................4 pages or less $2.00 otherwise $0.50 per page (ii) Photocopies........................................................................$0.15 per page 2. Fire Inspection (required before Certificate of Occupancy or Safety Inspection issuance) Commercial and Residential.................................$25.00 Plus $5.00 per unit (after final inspection) 2 Miscellaneous Fees cont'd 3. Inspection for Certificate of Occupancy or Safety Inspection Purposes only Includes all disciplines.....................................$125.00 4. Cost of Construction exceeding 2 500.00 Construction Lien Law Notification Fee.................$5.00 5. Board of Rules Appeals BORA fee...........................$0.35 per $1,000.00 cost of job 6. Radon...........................................................................................$0.005 per SF 7. Construction Recover Fund...........................................................$0.005 per SF 8. Fire Plan Review Fee......................................................................$0.015 per SF new construction (residential and commercial), commercial alterations and additions 9. Any item not explicitly listed shall be based on the required number of ins ections x $45.00. C. BUILDING PERMIT FEES 1. New Construction -Residential Fees SINGLE FEE FOR ALL DISCIPLINES Square footage x Factor of 60 x 1.272% 2. New Construction -Commercial Fees SINGLE FEE FOR ALL DISCIPLINES Square footage x Factor of 40 x 1.092% PARKING GARAGE ONLY Square footage x Factor of 28 x 1.092% 3. Residential Additions TOTAL CONSTRUCTION VALUE shall be calculated as square footage x Factor of 50 (a) Structural..............................................2.15% of Total Construction Value or minimum fee of $45.00, whichever is greater (b) Electrical .............................................. 0.60% of Total Construction Value or minimum fee of $45.00, whichever is greater (c) Plumbing...............................................0.92% of Total Construction Value or minimum fee of $45.00, whichever is greater (d) Mechanical............................................0.50% of Total Construction Value or minimum fee of $45.00, whichever is greater Building Permit Fees (cont'd 4. Residential Alterations (a) Structural ...............................................2.74% of Total Construction Value or minimum fee of $45.00 whichever is greater (b) Electrical ..................................... •... • • • • • • •1.68% of Total Construction Value or minimum fee of $45.00, whichever is greater (c) Plumbing ............................................ I ... 2.64% of Total Construction Value or minimum fee of $45.00, whichever is greater (d) Mechanical.............................................1.32% of Total Construction Value or minimum fee of $45.00, whichever is greater 5. Commercial -Alterations Additions Tenant Improvements (a) Structural...............................................1.90% of Total Construction Value or minimum fee of $45.00, whichever is greater (b) Electrical................................................1.08% of Total Construction Value or minimum fee of $45.00, whichever is greater (c) Plumbing................................................0.60% of Total Construction Value or minimum fee of $45.00, whichever is greater (d) Mechanical.............................................0.84% of Total Construction Value or minimum fee of $45.00, whichever is greater 6 Pre -inspection -All Disciplines.................................................................$45.00 7. Reinspection-All Disciplines ...................................................................$35.00 8. Lost Plan Replacement (single family, multi -family, commercial) ...............$60.00 9. Plan Resubmittal (prior to permit issuance) All Disciplines....................................................0.30% Cost of Construction minimum $30.00, maximum $100.00 10. Up front fee for Rlan processing ..............................................50% of permit fee 11. Canvas Awnings ..................................................................up to 40 LF $45.00 each additional 40 LF, $10.00 12. Carports & Canopies ..........................................................up to 200 SF $45.00 each additional 200 SF, $10.00 IN Building Permit Fees cont'd 13. Hurricane Shutters..........................................................................$45.00 Plus $3.00 per shutter 14. Wood Decks....................................................................up to 200 SF $70.00 each additional 100 SF, $10.00 15. Demolition....................................................................up to 1,500 SF $120.00 each additional 1,000 SF, $10.00 Plumbing..............................................................................$45.00 Electrical........................................................ • ........ .............. $45.00 .......................$45.00 Mechanical............................................. 16. Fence_..................................................................................................$35.00 plus $0.20 per LF 17. Roofing & Re -roofing .....................................................up to 1,000 SF $105.00 each additional 500 SF or fraction thereof, $10.00 18. Sidin.................................................................................................$35.00 plus $0.05 per SF 19. House moving into the city..................................................................$250.00 20. Plan Revision (except as required for as built submittal).........................$125.00 21. Minor Plan Revision up to 2 disciplines..................................................$70.00 22 Masonry Walls & Precast concrete walls................................................$70.00 plus $0.20 per LF 23. Permit Card Replacement (no recorded inspections)...............................$10.00 $5.00 for each additional recorded inspection 24. Swimming Pools (private)......................................1.20% Cost of Construction 25. Spas / Hot Tubs not attached to swimming Pools ........ 3.0% Cost of Construction 26. Commercial Swimming Pools..................................1.20% Cost of Construction 27. Satellite dish (1 meter or greater)............................................................$75.00 (Includes both Structural & Electrical Permits) 28. Screen Enclosure (pool).................................2.74% of Total Construction Value or minimum fee of $45.00, whichever is greater A Building Permit Fees cont'd 29. Screen Enclosure (patio / porch).....................2.74% of Total Construction Value or minimum fee of $45.00, whichever is greater 30. Slab (porch / patio-monolithic)............................................up to 100 SF $45.00 each additional 100 SF or fraction thereof, $5.00 31. Blackto / Concrete paving & Rarking ...............................up to 1,000 SF $60.00 each additional 500 SF, $10.00 32. Sidewalks..........................................................................up to 50 LF $50.00 each additional 10 LF or fraction thereof, $0.50 33. Suns All Wall Signs (a) .............................................................................$75.00 All Monument Signs (b) (c) ..................................................................$125.00 All Temporary Signs....................................................................$75.00 (d) Banners 30 days once per ear ..... 1..$15.00 (e) Directional Signs..................................................................$15.00 each 34_ Docks.............................................................................up to 30 LF $70.00 each additional 10 LF or fraction thereof, $6.00 35. Utility Shed Only .................................................................................$45.00 36. Fire lace (when not part of original plans).............................................$70.00 37. Sea Walls (see ordinance #74-75) 38. Sea Wall Repairs...................................................3.0% Cost of Construction D. ELECTRICAL PERMIT FEES 1. Burglar Alarm.......................................................................$40.00 per floor Plus $1.00 per drop 2. Burglar Alarm pre-wire........................................................................$45.00 3. Commercial Site Lighting 1-3 standards..............................................$30.00 each additional standard $10.00 4. Electrical Si n....................................................................................$45.00 5. Fire Alarm..............................................................................$70.00 per floor 6. Heat Pump .........................................................................................$60.00 0 Electrical Permit Fees cont'd 7. Low Voltage -individual sstems (minimum fees) (a) Computer Lines (b) Intercom (c) Phone (d) Speakers (f) Vacuum .................................................................................all $45.00 8 Minimum Fee (1) inspection...................................................................$45.00 9. Phone Booth........................................................................................$45.00 10. Pool Spa, Hot Tubs Landsca a Fountains...........................................$100.00 11. Satellite Dish (see item #27 under Building Permit Fees) 12. Service Change (a) Residential..................................................................................$60.00 (b) Commercial.................................................................................$80.00 13. Sprinkler Pump....................................................................................$60.00 14. TemRorary Electric...............................................................................$45.00 30 day Temporary Electric Testing..................$35.00 15. Construction or Sales Trailer.................................................................$60.00 16. Utilization E ui ment (motors, x-ray, generators, etc.).............................$45.00 E. MECHANICAL PERMIT FEES 1. A/C Chan a Out............................................................................... ..$60.00 A/C Stands for Commercial and Multi Family..................................$7.50 each 2. Pool Heater / Heat Pum........................................................................$45-00 3. Minimum Permit Fee (1 inspection).........................................................$45.00 4. Smoke Duct Detector.....................................................................$40.00 each 7 F. PLUMBING PERMIT FEES 1. Minimum Permit Fee Per Ins ection.........................................................$45.00 $135.00 2. Fire Sprinkler System ............................................................. ..... ......... Plus $1.50 per head Plus $25.00 per floor above 3rd floor 3. Site Work, Drainage, Water Mains, Fire Mains Sewer Mains.............................................2.0% Cost of Construction 4. Water Heater / Solar Pool Heater............................................................$100.00 5. Solar System forlool............................................................................$200.00 6. Water Heater (domestic water).................................................................$45.00 i. Water Well.............................................................................................$60.00 8. Gas, Pool Heater....................................................................................$40.00 9. LP Gas Tank(s) and system......................................................................$150.00 10. Irrigation Systems Residential 0.92% of total Construction Value with a minimum of $50.00 Commercial 0.60% of Total Construction Value with a minimum of $135.00