HomeMy WebLinkAboutCity of Tamarac Resolution R-2001-089Temp. Reso. #9297
February 22, 2001 1
Revision 1, April 18, 2001
Revision 2, April 19, 2001
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-2001-89
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY
OFFICIALS TO AWARD BID NO. 01-03B TO, AND EXECUTE A
CONTRACT WITH, THE LOWEST RESPONSIVE AND RESPONSIBLE
BIDDER, OCEAN BAY CONSTRUCTION, INC., FOR AN AMOUNT OF
$867,786.00 FOR THE TAMARAC EAST UTILITIES UPGRADE -- PHASE 1
PROJECT; APPROVING FUNDING FOR THIS PROJECT FROM THE
APPROPRIATE UTILITIES OPERATIONAL ACCOUNT INCLUDING THE
APPROPRIATION OF $606,042.00 FROM RETAINED EARNINGS;
AUTHORIZING THE APPROPRITE CITY OFFICIALS TO ADMINISTER
THE CONTRACT; PROVIDING FOR CONFLICTS; PROVIDING FOR
SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, in November 1999, Hazen and Sawyer completed a final engineering study
recommending capital improvements to existing utilities in Tamarac East in conjunction with the
City's comprehensive street resurfacing program; and
WHEREAS, the recommendation for improvements to the water and wastewater
systems in Tamarac East have been prioritized in Hazen and Sawyer's report based on the
Roadway Resurfacing Program schedule; and
WHEREAS, Phase 1 of the Tamarac East Utilities Upgrades has been scheduled for the
utilities located at Tamarac Lakes Sections 1 and 2 (a copy of which is attached hereto in map
form as "Exhibit 1"); and
WHEREAS, the scope of work for the Tamarac Lakes Sections 1 and 2 community
includes replacement of some existing water mains and the construction of new gravity
wastewater lines to replace approximately 10 privately owned septic systems; and
Temp. Reso. #9297
February 22, 2001 2
Revision 1, April 18, 2001
Revision 2, April 19, 2001
WHEREAS, the City of Tamarac submitted an application and received approval from
Broward County for Community Development Block Grant (CDBG) funds in the amount of
$210,000.00 for the extension of wastewater service to Tamarac Lakes Section 1; and
WHEREAS, the CDBG funds are available on a reimbursement basis; and
WHEREAS, the Utilities Department retained the services of Hazen and Sawyer, one of
the City's consulting engineers, to complete the design and prepare construction Bid documents
in accordance with the City Consulting Engineering Agreement as authorized by the City on July
10, 1996, Resolution Number R-96-163; and
WHEREAS, the City of Tamarac advertised Bid No. 01-03B for the Tamarac East Utilities
Upgrade — Phase 1 project; and
WHEREAS, on February 21, 2001, the following bids were opened:
COMPANY NAME
TOTAL BID $
Ocean Bay Construction,
Inc.
867,786.00
Man -con, Inc.
882,246.50
Asphalt Consultants, Inc.
924,871.00
Gianetti Contracting, Inc.
991,571.00
Foster Marine
1,025,511.00
W. Jackson & Sons
Construction, Inc.
1,063,556.00
1
77
and
Temp. Reso. #9297
February 22, 2001 3
Revision 1, April 18, 2001
Revision 2, April 19, 2001
WHEREAS, Ocean Bay Construction, Inc. had the lowest bid proposal of $867,786.00;
WHEREAS, approved funds are available in the amount of $261,744.00 and additional
funds in the amount of $606,042.00 from the Retained Earnings account is available to fully fund
this project; and
WHEREAS, it is the recommendation of the Director of Utilities and Purchasing/Contracts
Manager that the project be fully funded and that Bid No. 01-03B
be awarded to the lowest responsive and responsible bidder, Ocean Bay Construction, Inc.; and
WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be in the
best interest of the citizens and residents of the City of Tamarac to approve the award of Bid No.
01-03B for the Tamarac East Utilities Upgrade — Phase 1 project to Ocean Bay Construction,
Inc., at a cost of $867,786.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA, THAT:
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct and are hereby made a specific part of this resolution.
SECTION 2: The contract for the Tamarac East Utilities Upgrade — Phase 1
project is hereby approved and that all appropriate City Officials are authorized to execute the
contract between the City of Tamarac and Ocean Bay Construction, Inc. (a copy of which is
attached hereto as "Exhibit 2")
1
Temp. Reso. #9297
February 22, 2001 4
Revision 1, April 18, 2001
Revision 2, April 19, 2001
SECTION 3: An appropriation in the amount of $606,042.00 from the Retained
Earnings account is hereby approved for correct accounting purposes and the
contract is fully funded in the amount of $867,786.00.
SECTION 4: The City Manager, or his designee, be authorized to make
changes, issue Change Orders not to exceed $10,000 per Section 6-156(b) of the City Code,
and close the contract award including, but not limited to, making final payment and releasing
bonds when the work has been successfully completed within the terms and conditions of the
contract and within the contract price.
SECTION 5: All resolutions or parts of resolutions in conflict herewith are
hereby repealed to the extent of such conflict.
SECTION 6: If any clause, section, other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part
or application; it shall not affect the validity of the remaining portions or applications of this
Resolution.
1-1
1
Temp. Reso. #9297
February 22, 2001 5
Revision 1, April 18, 2001
Revision 2, April 19, 2001
SECTION 7: This Resolution shall become effective immediately upon its
passage and adoption.
PASSED, ADOPTED AND APPROVED this 251h day of April, 2001.
ATTEST:
MARION SWENSON, CMC
CITY CLERK
I HEREBY CERTIFY that I
have a pro d this
RES L TI Nast farm.
ITCHELL S.�RAFT
CITY ATTORNEY
RG/TR/mg
/ JOE SCHREIBER
r MAYOR
RECORD OF COMMISSION VOTE:
MAYOR SCHREIBER L.L#
DIST 1: COMM. PORTNER
DIST 2: COMM. MISHKINS
DIST 3: VIM SULTANOFS
DIST 4: COMM. ROBERTS
EXHIBIT I
TEMP. RESO # 9297
MUNICIPAL
PARKING LOT
TAMARAC
THE BOULEVARDS
INDUSTRIAL
w Q
r
a ,
PARK
N
u¢
N
m
N
m a
N N
sa
ST
N
(u
53 ST
CAPORELLA
PARK
I-
52 ST
cy
0
51 ST
7
�
TEXACO
o m Q�
FORT
LAUDERDALE
Vl U UP
Z nZ
V 1
N UNITED
METHODIST
LAND
SEC 16 SITE
CHUR
,
LOCATION
Q
TAMARAC
LAKES
_
SEC P
SEC 1
NAT'L
SAFETY
COUNCIL
/
—I I
❑gK�gND
I
PgRK
Q
WILDLIFE REFUGE
TAMARAC EAST PHI,DWG
CONSTRUCTION CONTRACT AWARD FOR TAMARAC
EAST UTILITIES UPGRADE PHASE I
AGREEMENT
BETWEEN THE CITY OF TAMARAC
AND
OCEAN BAY CONSTRUCTION, INC.
THIS AGREEMENT is made and entered into this '2-9 day of Aj.: )v 1 1 , 2001
by and between the City of Tamarac, a municipal corporation with principal offices located
at 7525 N.W. 88th Ave., Tamarac, FL 33321 (the "CITY") and Ocean Bay Construction,
Inc., a Florida corporation, with principal offices located at 2200 N.W. 16t" Street, Pompano
Beach, Florida 33069 (the "CONTRACTOR") to provide for construction of Tamarac East
Utilities Upgrade - Phase 1.
Now therefore, in consideration of the mutual covenants hereinafter set forth, the
CITY and CONTRACTOR agree as follows:
1) The Contract Documents
The contract documents consist of this Agreement, conditions of the contract
(General, Supplementary and other Conditions), drawings, specifications, all addenda
issued prior to, and all modifications issued after execution of this Agreement. These
contract documents form the Agreement, and all are as fully a part of the Agreement if
attached to this Agreement or repeated therein.
2) The Work
The CONTRACTOR shall perform all work for the City required by the contract
documents as set forth below:
a) The work of this contract consists of constructing new 8-inch water lines, new 8-inch
gravity sewer lines, service lateral rehabilitation and all appurtenant work as identified in
the contract documents.
b) CONTRACTOR shall clean up and remove each day all debris and material created by
the work at the CONTRACTOR's expense.
c) CONTRACTOR shall supervise the work force to ensure that all workmen conduct
themselves and perform their work in a safe and professional manner. CONTRACTOR
shall comply with all OSHA safety rules and regulations in the operation of equipment
and in the performance of the work. CONTRACTOR shall at all times have a competent
1
field supervisor on the job site to enforce these policies and procedures at the
CONTRACTOR's expense.
d) All equipment must be stored in a safe manner when not in operation. The CITY shall
not be responsible for damage to any equipment or personal injuries caused by the
CONTRACTOR's failure to safely store equipment.
e) CONTRACTOR shall provide the CITY with seventy-two (72) hours written notice prior
to the beginning of work under this Agreement and prior to any schedule change with
the exception of inclement weather.
f) CONTRACTOR shall comply with any and all Federal, State, and local laws and
regulations now in effect, or hereinafter enacted during the term of this Agreement,
which are applicable to the CONTRACTOR, its employees, agents, or subcontractors, if
any, with respect to the work and services described herein.
g) CONTINUING USE OF EXISTING FACILITIES: The water and sanitary sewer systems
to be replaced and/or repaired will be maintained in continuous operation by the
OWNER during the entire construction period of this contract. Work underthis contract
shall be so scheduled and coordinated by the CONTRACTOR that such work shall not
impact any operation of distribution, collection, and pumping systems that connect to
the water mains and sanitary sewers within the City. In addition, the CONTRACTOR
shall coordinate his work so as not to impact any nearby public or private facilities.
3) Insurance
CONTRACTOR shall obtain at Contractor's expense all necessary insurance in such
form and amount as required by the City's Risk Manager before beginning work under this
Agreement including, but not limited to, Workers' Compensation, Commercial General
Liability, and all other insurance as required by the City, including Professional Liability
when appropriate. CONTRACTOR shall maintain such insurance in full force and effect
during the life of this Agreement. CONTRACTOR shall provide to the City's Risk Manager
certificates of all insurances required under this section prior to beginning any work under
this Agreement. The CONTRACTOR will ensure that all subcontractors comply with the
above guidelines and will retain all necessary insurance in force throughout the term of this
agreement.
CONTRACTOR shall indemnify and hold the City harmless for any damages
resulting from failure of the CONTRACTOR to take out and maintain such insurance.
Contractor's Liability Insurance policies shall be endorsed to add the City as an additional
insured. CONTRACTOR shall be responsible for payment of all deductibles and self-
insurance retentions on Contractor's Liability Insurance policies.
E
4) Time of Commencement and Substantial Completion
The work to be performed under this Agreement shall be commenced after
execution of the Agreement and not later than ten (10) days after the date of the receipt of
the official Notice -to -Proceed. The work shall be substantially completed no later than one
hundred fifty (150) calendar days after the date of the Notice -to -Proceed. All work shall be
completed no later than thirty- (30) days after the date of substantial completion.
5) Contract Sum
The Contract Sum is $867,786.00 (Eight hundred sixty-seven thousand seven
hundred eighty-six dollars and 00/100), which includes a contingency allowance in the
amount of $50,000.00. Payment shall be computed based on lump sum or applying unit
prices to actual units installed and/or worked. Contingency allowance will only be used
for changes in the scope of work due to unforeseen conditions and upon authorization
from the engineer of record.
6) Payments
A monthly payment/progress payment will be made for work that is completed,
inspected and properly invoiced. The CITY shall pay Contractor's itemized invoice on a
monthly basis for work completed. The City shall pay the CONTRACTOR for work
performed subject to the specifications of the job and subject to any additions and
deductions by subsequent change order provided in the contract documents. No payment
will be made for material stored on site.
7) Waiver of Liens
Prior to payment of the Contract Sum, a final waiver of lien shall be submitted by all
suppliers, subcontractors, and/or Contractors who worked on the project that is the subject
of this Agreement.
8) Warranty
CONTRACTOR shall warrant the Tamarac East Utilities Upgrade - Phase 1 against
defect for a period of one year from the date of completion and final acceptance of work.
In the event that defect occurs during this time, CONTRACTOR shall perform such steps
as required in Section 01700, Paragraph 1.07 and Section 02752, Paragraph 3.03 of the
Project Specifications to remedy the defects. CONTRACTOR shall be responsible for any
damages caused by defect to affected area.
3
9) Indemnification
The CONTRACTOR shall indemnify and hold harmless the CITY, its elected and
appointed officials, employees, and agents from any and all claims, suits, actions,
damages, liability, and expenses (including attorneys' fees) in connection with loss of life,
bodily or personal injury, or property damage, including loss of use thereof, directly or
indirectly caused by, resulting from, arising out of or occurring in connection with the
operations of the CONTRACTOR or its officers, employees, agents, subcontractors, or
independent contractors, excepting only such loss of life, bodily or personal injury, or
property damage solely attributable to the gross negligence or willful misconduct of the
CITY or its elected or appointed officials and employees. The above provisions shall
survive the termination of this Agreement and shall pertain to any occurrence during the
term of this Agreement, even though the claim may be made after the termination hereof.
Nothing contained herein is intended nor shall be construed to waive CITY's rights
and immunities under the common law or Florida Statutes 768.28, as amended from time
to time.
10) Non -Discrimination
The CONTRACTOR agrees that it shall not discriminate against any of its
employees or applicants for employment because of their race, color, religion, sex, or
national origin, and to abide by all federal and State laws regarding non-discrimination.
The CONTRACTOR further agrees to insert the foregoing provisions in all subcontracts
hereunder except subcontracts for standard commercial supplies or raw materials. Any
violation of such provisions shall constitute a material breach of this Agreement.
11) Independent Contractor
CONTRACTOR is an independent contractor under this Agreement. Personal
services provided by the CONTRACTOR shall be by employees of the CONTRACTOR and
subject to supervision by the CONTRACTOR, and not as officers, employees, or agents of
the CITY. Personnel policies, tax responsibilities, social security and health insurance,
employee benefits, purchasing policies and other similar administrative procedures
applicable to services rendered under this Agreement shall be those of the
CONTRACTOR.
12) Assignment and Subcontracting
CONTRACTOR shall not transfer or assign the performance required by this
Agreement without the prior written consent of the City. This Agreement, or any portion
thereof, shall not be subcontracted without the prior written consent of the city.
4
13) Notice
Whenever either party desires or is required under this Agreement to give notice to
any other party, it must be given by written notice, sent by registered United States mail,
with return receipt requested, addressed to the party for whom it is intended at the
following addresses.
"slow
City Manager
City of Tamarac
7525 N.W. 88th Avenue
Tamarac, FL 33321
With a copy to the City Attorney at the same address.
CONTRACTOR
Ronald E. Penta
President
Ocean Bay Construction, Inc.
2200 NW 16th Street
Pompano Beach, Florida 33069
14) Termination
This Agreement may be terminated by City or CONTRACTOR for cause or by the
City for convenience, upon seven (7) days of written notice by the terminating party to the
other party for such termination in which event the CONTRACTOR shall be paid its
compensation for services performed to termination date, including services reasonably
related to termination. In the event that the CONTRACTOR abandons this Agreement or
causes it to be terminated, CONTRACTOR shall indemnify the city against loss pertaining
to this termination.
Default by CONTRACTOR: In addition to all other remedies available to the CITY,
this Agreement shall be subject to cancellation by the CITY should the CONTRACTOR
neglect or fail to perform or observe any of the terms, provisions, conditions, or
requirements herein contained, if such neglect or failure shall continue for a period of
seven (7) days after receipt by CONTRACTOR of written notice of such neglect or failure.
15) Agreement Subject to Funding
This agreement shall remain in full force and effect only as long as the expenditures
provided for in the Agreement have been appropriated by the City Commission of the City
of Tamarac in the annual budget for each fiscal year of this Agreement, and is subject to
termination based on lack of funding.
16) Venue
This Agreement shall be governed by the laws of the State of Florida as now and
hereafter in force. The venue for actions arising out of this agreement is fixed in Broward
County, Florida.
17) Signatory Authority
The CONTRACTOR shall provide the CITY with copies of requisite documentation
evidencing that the signatory for CONTRACTOR has the authority to enter into this
Agreement.
18) Severability; Waiver of Provisions
Any provision in this Agreement that is prohibited or unenforceable in any
jurisdiction shall, as to such jurisdiction, be ineffective to the extent of such prohibition or
unenforceability without invalidating the remaining provisions hereof or affecting the validity
or enforceability of such provisions in any other jurisdiction. The nonenforcement of any
provision by either party shall not constitute a waiver of that provision nor shall it affect the
enforceability of that provision or of the remainder of this Agreement.
19) Merger; Amendment
This Agreement constitutes the entire Agreement between the CONTRACTOR and
the CITY, and negotiations and oral understandings between the parties are merged
herein. This Agreement can be supplemented and/or amended only by a written document
executed by both the CONTRACTOR and the CITY.
R
IN WITNESS WHEREOF, the parties have made and executed this Agreement on
the respective dates under each signature. CITY OF TAMARAC, through its Mayor and
Ocean Bay Construction, Inc., signing by and through its President, duly authorized to
execute same.
ATTEST:
a.
Marion Swenson, CIVIC
City Clerk
Date:
ATTEST:
( orp a Secretary)
Type/Print Name of Corporate Secy
(CORPORATE SEAL)
STATE OF FLORIDA
7
CITY OF TAMARAC
J chreiber, Mayor
u
Date: `f" -)-%-o
ay! 2
Jeffrey . MITer, City Manager
Date: -//-d-7-o /
prbled as to fora) ar)d legs
S
Mitchell S. KrAftft,,,q�ity',Attorney
OCEAN BAY CONSTRUCTION, INC.
(Signature of President)
Ronald E. Penta
Type/Print Name of President
Date: Z'V-4�
SS
COUNTY OF
I HEREBY CERTIFY that on this day, before me, an Officer duly authorized in the
Sate aforesaid and in the County aforesaid to take acknowledgments, personally appeared
Ronald E. Penta of Ocean Bay Construction, Inc., a Florida Corporation, to me known to
be the person(s) described in and who executed the foregoing instrument and
acknowledged before me that he executed the same.
WITNESS my hand and official seal this % day of MlgkCl-x , 2001.
( Personally known to me or
( ) Produced Identification
Signature of Nd aPublic — State of
Florid
;�. »y-. MAiTHE1N JOHN PFICHAL
MY COMMISSION # CC 895512
.:_ EXPIRES: April 8, 2004
Print, Ty
Public
Type of I.D. Produced
( ) DID take an oath, or( ,<DID NOT take an oath.
E:?