HomeMy WebLinkAboutCity of Tamarac Resolution R-98-167Temp. Reso. #8230 April 21, 1998 1
CITY OF TAMARAC
RESOLUTION NO. R-98-1.62
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF TAMARAC, FLORIDA, AUTHORIZING THE
APPROPRIATE CITY OFFICIALS TO EXECUTE ADDENDUM
NO. 98-02 TO THE CONTRACT WITH HARTMAN AND
ASSOCIATES, INC. TO PROVIDE ENGINEERING
SERVICES TO PREPARE A WASTEWATER CAPACITY
STUDY FOR THE CITY OF TAMARAC, IN AN AMOUNT NOT
TO EXCEED $50,500.00, IN ACCORDANCE WITH THE
CITY'S CONSULTING ENGINEERING AGREEMENT AS
AUTHORIZED BY RESOLUTION R-96-163 AND APPROVE
FUNDING FROM THE APPROPRIATE UTILITIES CIAC
ACCOUNT; PROVIDING FOR CONFLICTS; PROVIDING FOR
SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE
DATE.
WHEREAS, the wastewater flow from residential and business establishments
within the western portion of the City of Tamarac is collected, and conveyed to Broward
County for treatment and disposal; and
WHEREAS, the City of Tamarac has an existing contractual capacity limit of 7.04
MGD for wastewater treatment and disposal with Broward County; and
WHEREAS, the average monthly wastewater flow generated from the city over the
last two years has increased and is approaching the contractual capacity limit; and
WHEREAS, the City of Tamarac will continue to experience an increase in
wastewater flow due to the growth in population and business establishments; and
1
Temp. Reso. #8230 April 21, 1998 2
WHEREAS, the projected developments within the City of Tamarac for the next few
years will require an additional wastewater treatment and disposal capacity that need to
be secured; and
WHEREAS, in accordance with the City's mandate to ensure the provision of
adequate wastewater treatment and disposal capacity to accommodate future
developments, the City Commission in FY99 approved a budget to permit the preparation
of an Engineering Study to address the wastewater capacity issue; and
WHEREAS, the City requires the service of a consulting firm knowledgeable in this
matter and capable of providing recommendations whereby the City may successfully
secure additional treatment capacity and disposal for present and future demands; and
WHEREAS, Hartman and Associates, Inc. possesses the required knowledge and
experience to undertake a Wastewater Capacity Study; and
WHEREAS, Hartman and Associates, Inc. has been prequalified as an approved
consultant for engineering services by the City of Tamarac; and
WHEREAS, Hartman and Associates, Inc. has submitted Addendum No. 98-02 to
the Consulting Engineering Agreement, (attached hereto as Exhibit 1) to provide
engineering services pertaining to the required Wastewater Capacity Study in an amount
not to exceed $50,500.00; and
WHEREAS, it is the recommendation of the Director of Utilities that Addendum No.
98-02 from Hartman and Associates, Inc. be approved, executed and funded; and
1
1-1
Temp. Reso. #8230 April 21, 1998 3
WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in
the best interest of the citizens and residents of the City of Tamarac to execute Addendum
No. 98-02 to the Consulting Engineering Agreement with Hartman and Associates, Inc. to
prepare an Engineering Study to address the wastewater treatment and capacity issue for
a proposed amount not to exceed $50,500.00, and to provide funding from the appropriate
Utilities CIAC account.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA:
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct and are hereby made a specific part of this resolution.
SECTION 2: That the appropriate City Officials are hereby authorized to
accept and execute Addendum No. 98-02 to the Engineering Agreement with Hartman and
Associates, Inc. to prepare a Wastewater Capacity Study for a proposed amount not to
exceed $50,500.00 in accordance with the City Consulting Engineering Agreement as
authorized by Resolution No. R-96-163 on July 10, 1996.
SECTION 3: That $50,500.00 is approved to be funded from the appropriate
budgeted Utilities CIAC account.
SECTION 4: That the City Manager, or his designee, be authorized to make
changes, issue change orders not to exceed $10,000.00 per Section 6-156 (b) of the City
Code, and close the contract award including, but not limited to making final payment
within the terms and conditions of the contract and within the contract price.
11
1
Temp. Reso. #8230 April 21, 1998 4
SECTION 5: All resolutions or parts of resolutions in conflict herewith are
hereby repealed to the extent of such conflict.
SECTION 6: If any clause, section, other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid,
in part or application, it shall not affect the validity of the remaining portions or applications
of this Resolution.
SECTION 7: This Resolution shall become effective immediately upon its
passage and adoption.
PASSED, ADOPTED AND APPROVED this /0 day of , 1998.
JOE SCHREIBER
MAYOR
ATTES
CAROL GOO CMC/AAE
CITY CLERK
I HE Y CERTIFY that I have
ap ov d this RESOLUTION as
td for , n _ /
v MITCNELL S.
CITY ATTOR E RECORD OF COMMISSION VOTE
TRmk MAYOR SCHREIBER
DIST 1: COMM. McKAYE
Le
DIST 2: WM MISHKIN
DIST 3: COMM. SULTANOF
DIST 4: COMM. ROBERTS
HARTMAN & ASSOCIATES, INC.
NCIPAIS:
engineers, hydrogeologists, surveyors &management consultants
ASSOCIATES:
et li. Chrinopher, PE.
Marco H. Rocca, C. M,C,
arles W. IJrake,PG.
J. Richard Voorhees, PE.
<urald C, Hartman, Pli.
Douglas P Dufresne. PG.
Mark I.Lukc. BS.M.
Richard C. Copeland, M.R.A.
Mark A, Ryoning, PE.
Roderick K. Cashe. P.E.
Harold E. Schmidt. Ir. PE.
Jon D. Fnx, PE•.
William D. ,\lower, PP:.
James E. Golden, PG,
SIiN1UR A SSU(:IAI,E:
April 29, 1998
Troy E. Lay on, PE.
Alicia E. Oiler. M.S.
<.Zachar) Fisher, P.E.
(Revised May 26, 1998)
Andre T.Woodcock, PE.
HAI #96-108.08
Mr. Tony Rabbat, P.E.
City of Tamarac
6001 Nob Hill Road
Tamarac, Florida 33321
Subject: Wastewater Capacity Study — Addendum No. 98-02
Proposal for Professional Engineering Services
Dear Mr. Rabbat:
Hartman & Associates, Inc. (HAI) is pleased to submit this proposal for engineering services to
prepare a Wastewater Capacity Study for the City of Tamarac. This plan will address the following
items as major components of the study:
1. Wastewater flow projections for build -out of the specific wastewater, catchment areas
within the City's service area, consistent with the City's landuse plans (especially
development of land Section 7) though inclusive throughout all of the City's service
area.
2. Wastewater system balancing to avoid surcharge penalties to Sroward County.
3. Inflow/infiltration investigation.
4. Water conservation methods for new developments within the City limits.
Included in Attachment "A" is a description of the scope of services and schedule for preparing the
Wastewater System Master Plan for the City. Our estimated not -to -exceed fee is $50,500, which
includes reimbursable expenses. We would expect to begin our services promptly after notice to
proceed and shall complete this study within 3 months.
This proposal is subject to the terms and conditions specified in the contract for CITY CONSULTING
ENGINEERING SERVICES between the City of Tamarac, Florida and Hartman & Associates, Inc.
(HAI), dated July 10, 1996, as accepted by the City Commission in Resolution No. R-96-163, dated
July 10, 1996.
On behalf of HAI, we appreciate the opportunity to serve the City of Tamarac and look forward to
providing the technical expertise which you desire. If this proposal is acceptable to the City, please
execute one (1) copy of this Addendum to Engineering Services Agreement and return it to this office.
201 EAST PINE STREET • SUITE 1000 - ORLANDO, FL 32801
TELEPHONE (407) 839-3955 - FAX (407) 839-3790 • www.consulthai.com
ORLANDO FORT MYERS PLANTATION JACKSONVILLE
•
•
Mr. Tony Rabbat, P.E.
April29, 1998
Page 2
IN WITNESS WHEREOF, the parties have made and executed this Agreement on the respective dates
under each signature. CITY OF TAMARAC, through its Mayor and HARTMAN & ASSOCIATES,
INC. signing by and through its Vice President, duly authorized to execute same.
c.. L-f1X" 1 oA(.An &P e
Type name of Corporate Secretary
(CORPORATE SEAL)
ATTEST:
Carol Gold, C /AAE
City Clerk
Date: J 0 n C-
l0, 19�8
GUYsma/96-108.08/corresp/
Rabbatlgch
Attachment
Very truly yours,
Hartman & Associates, Inc.
L� 6
Vice President
Mark A. ayLuluig. P.E.
Type/Print name of President
Date:
CITY OF TAMARAC
By ()InleU
o Schreiber, Mayor
Date: Ju ne /0 / qP
t s
S. Noe, Jr.
C ager
Date: Yl c- v 8
jAr Wvedas form and leg sufficiency:
A k4lte�
,ft, 6iy A rri y
ATTACHMENT "A"
SCOPE OF SERVICES AND SCHEDULE
Purpose/Backjzround
The purpose of this wastewater transmission capacity study is to develop a for providing
sufficient wastewater transmission service within the City of Tamarac's Planning Area through
buildout. This study will assist the City in determining system transmission and wastewater
treatment capacity needed through buildout.
The City has an existing contractual capacity limit of 7.04 MGD measured as the three
continuous maximum monthly average for wastewater treatment with Broward County. The
average monthly wastewater flow from the City over the last two years has increased from 6.6
MGD in 1996. There have been several months recently in which the monthly average flows
have been over the contractual limits and penalty surcharges have been assessed. With the
projected development within the City, there is no question that additional wastewater treatment
capacity will need to be secured.
The City staff has met with officials of the Broward County Wastewater Management Division
to discuss wastewater treatment and conveyance capacity issues. They explained the current
plans of the County to expand the plant capacity issues. The County is planning plant expansion.
The expansion will most likely be a combination of process modification and effluent disposal
through injection wells. This may increase the treatment plant's rated capacity from 80 to 86
MGD. The second phase of the expansion may be an additional process train that may increase
the rated capacity of the plant to 100 MGD.
Presently, there are no firm schedules for the expansion plans. It is anticipated that the project
will be completed in mid -calendar year 1998. The implementation of process modification and
the effluent wells could take about 18 months to complete, and the design and construction of an
additional process train could take between 3 and 4 years. Therefore, the City is at least 18
months, and probably closer to 4 or S years, before having additional capacity available from the
treatment plant.
This project involves the preparation of a capacity analysis for the City's wastewater transmission
system. A major component of such an analysis will be a projection of the future wastewater
flows for Tamarac.
Based on the purpose of this Wastewater Transmission Capacity Analysis for the City of
Tamarac, the study is described below.
r--I
TASK 1 - DATA COLLECTION
Data will be collected from, but not be limited to, the offices of the South Florida Water
Management District (SFWMD), Florida Department of Environmental Protection
(FDEP), City of Tamarac Community Development Department, Broward County
Planning Department, the Soil Conservation Service, the United States Geological
Service, Department of Community Affairs, and others. The data collected will include,
but not be limited to, Agreement with Broward County, FDEP Monthly Operating
Reports, drawings and engineering reports (if available), soil data, land use maps,
building permit data, planning department reviews and other relevant information. Such
data will be utilized in assessing the City's inflow and infiltration problems.
TASK 2 -INTERIM CAPACITY MEASURES
Interim treatment capacity must be addressed in order to serve existing projects and those
that are projected for the next few years. The most viable alternatives that Hartman &
Associates, Inc. will address include:
A. Purchase capacity from another large wastewater user. It appears that Pompano Beach
has additional capacity. They currently have 3 MGD surplus based on the average of
their last 12 months. Even with considerations of future growth, they may be able to
release up to 2 MGD. In order to secure all or a portion of this capacity, the County
believes that Tamarac would need to compensate Pompano Beach for its costs. The City
will take the lead in contracting municipalities to ascertain availability of options. Once
the City determines which municipality to work with, HAI may assess the associated
costs.
B. "Borrow" some capacity from other large users. There are a few large users, including
Coconut Creek, that, although they will eventually need their assigned capacity, the
timing of their wastewater needs may be such that they could "lease" some capacity to
Tamarac until the Broward treatment plant expansion is completed.
C. Increase I&I reduction efforts. Although a reduction in infiltration and inflow (I&I) does
not directly secure additional capacity, it reduces the average of the flows from the
existing system to free up capacity for new growth. An evaluation of the cost/benefit will
be reviewed.
D. Allow for months of exceeded flows reimbursing the County as required until such time
as the plant is expanded and additional capacity is available to large users. HAI will
discuss a rate to recover the interim surcharge costs and future capacity costs for the
City. Under separate assignment, a detailed cost allocation could be performed.
E. Divert more wastewater flow to the City of Ft. Lauderdale. HAI will investigate the
feasibility of this future option. Potentially, the City of Ft. Lauderdale could serve the
incremental needs of the City and this cost will be compared to the County cost.
GCH/chs/96-108.08/corresp/
Rabbat.att -2- 042998
•
F. Water conservation analyses and programs to reduce wastewater generated. HAI will
assess the effectiveness and make recommendations regarding this component.
G. Rate and charge pricing analyses such that increased costs are incurred with increased
uses.
TASK 3 - EXISTING WASTEWATER SYSTEM
A. Wastewater Transmission 012timization
HAI will evaluate the existing wastewater pumping stations to delineate the hydraulic
range of performance and design conditions to allow for the bypassing of the existing
repumping station and possible retirement of the same. All piping, equipment, rerouting
and other improvements will be described with an associated detailed cost estimate. The
improvements costs and operational costs will be compared to the repumping costs and
refurbishment costs to ascertain the most cost-effective, reliable and efficient system to
implement. Existing studies of the wastewater system will be provided by the City's
staff.
An engineering opinion overview will be performed on the wastewater transmission
system. It will be necessary to obtain from the City of Tamarac information on all pump
stations and transmission mains. This information will include:
1. pump make and model or head curves;
2. wet well diameter;
3. wet well depth;
4. invert depth;
5. float switch or bubbler level settings;
6. overall wastewater transmission system map;
7. transmission main lengths and diameter;
8. Cybernet data files and key maps.
The overview will be directed at determining system deficiencies and recommending
improvements to the wastewater transmission system including pump station
maintenance, repair and replacement. The affect of inflow and infiltration on the sizing
of such transmission facilities will also be discussed. Discussion text and detailed
transmission system maps will be provided to summarize the review.
TASK 4 - REGULATORY REVIEW
Deleted.
GCH/chs/96-108.08/corresp/
Rabbat.att -3- 042998
TASK 5 - POPULATION CUSTOMER AND FLOW PROJECTIONS
Based on
a review of the historical population and growth projections as developed in the
City's and County's Comprehensive Land Use Plans, building permits, traffic zone data
and other relevant information, an accurate forecast of population and ERC's through a
15-year forecast horizon will be developed. Projections will be coordinated with the City
Planning Department. Flows will be categorized as prior committed flows, near term
development flows, fill-in flows, long term development flows and future projected
flows. Such projections will predict future system deficiencies and illustrate seasonal
operational trends. These characterizations will aid the development of the conceptual
ERC and CIAO fee evaluation, and the implementation of I/I programs. Historical peak
flow information will be reviewed to determine the appropriate peaking factor.
TASK 6 - WASTEWATER TRANSMISSION SYSTEM EVALUATION
A. Wastewater Transmission System Analysis
Based on the information obtained from the City of Tamarac relative to the wastewater
transmission facilities, HAI will utilize the existing a pipe and node map of the
wastewater force main system, as well as the City Cyber-Net data file based upon the
node map for input into the computer run. The program will be utilized to model selected
areas of the wastewater force main system under various forcemain pressures. Based
upon the data from the previous sections of the report, HAI will develop a per ERC
wastewater generation for projection of future wastewater needs. HAI will coordinate
with the City's Community Development Department and focus on 5 lift stations that will
be impacted by new development (ERCs). One of these areas will be land section 7. An
estimate of the future wastewater generation per pump station service area, based upon
total build -out development units and per ERC, will be developed. HAI will develop four
scenarios to include:
1. Existing System.
2. Future System Improvements (5 years).
3. Future System Improvements (10 years).
4. Future System Improvements (15 years).
TASK 7 - INFLOW/INFILTRATION EVALUATION
A preliminary study will consist of collecting and reviewing all available engineering
data pertaining to the wastewater collection and transmission system. The review of the
system will include collecting and summarizing the following information.
1. Raw wastewater quality;
2. Water demand by wastewater catchment area and wastewater flow data (pump run
times);
3. Daily rainfall data (from gauge at WTP);
GCH/chs/96-108.08/corresp/
Rabbat.att -4- 042998
4. Wastewater collection system drawings and reports;
5. Customer data; and
6. Interviews with key staff.
Following the collection of preliminary data, HAI will perform a cursory analysis to
quantify the overall contributions to the Broward County WWTP. HAI will also identify
I/I contributions by sub -area and prioritize each sub -area based on estimated I/I
contributions. This study will also recommend and prioritize a course of action to reduce
the I/I in the system.
TASK 8- WASTEWATER SYSTEM PLANNING (CIP)
Deleted.
TASK 9 - ECONOMIC ANALYSIS
Based on the existing and near term capital improvements for the City's wastewater
system, and the improvements recommended to reduce I/I in the City's collection system,
cost of capacity purchases, and the cost of surcharges on present flow generation, an
economic analysis will be conducted on all viable alternatives developed.
Utilizing the customer projections, capital costs, staffing and operational requirements,
is and other relevant data determined in the previous tasks, a range will be developed that
will identify the average costs per customer.
•
TASK 10 - DRAFT AND FINAL REPORT
Ten (10) copies of all preliminary draft report will be provided to the City staff for their
review. A review meeting will be conducted to review the draft report and discuss any
comments the City may have. As a result of the review meeting, the City's comments
will be incorporated into the final report and twenty (20) copies of the final report will be
submitted for approval. In addition, HAI will present the final report to the City
Commission.
TASK 11 - WASTEWATER SYSTEM ATLAS MAPS
Deleted.
TASK 12 - WORKSHOP PRESENTATION
If requested, HAI will present our findings to the City Commission in a workshop format
to provide ample time for questions and discussions of the projects.
GCH/chs/96-108.08/corresp/
Rabbat.att -5- 042998
ESTIMATED PROJECT SCHEDULE AND COST
The estimated project schedule for this project from data collection to report preparation
is two (2) weeks from the date of approval of the proposal. A draft report will be
provided to the City for review within eleven (11) weeks from authorization, and a final
report submitted approximately ten (10) days thereafter. Summarized below is the
recommended project schedule:
Task
Completion
No.
Description
Time
1.
Data collection
14 days
2.
Interim Capacity Measures
60 days
3.
Existing wastewater collection, and transmission
70 days
4.
Regulatory review
N/A
5.
Projections
40 days
6.
Wastewater transmission system evaluation
60 days
7.
Inflow/infiltration evaluation
70 days
8.
Wastewater system planning (CIP)
N/A days
9.
Economic Analysis
70 days
10.
Draft report
77 days
18 11.
12.
Review meeting
Final report
15 to 80 days
90 days
13.
Presentation to City Commission
To be Scheduled
ESTIMATED PROJECT COST
The estimated project cost by task is summarized in the following tabulation. The total not -to -
exceed cost was estimated to be $50,500, for this project.
Task No.
Description
Amount
1.
Data Collection
$ 3,000.00
2.
Interim Capacity Measures/Meetings
14,000.00
3.
Existing Wastewater System
4,000.00
4.
Regulatory Review
N/A
5.
Population, Customer, and Flow Projections
5,000.00
6.
Wastewater System Evaluation
6,000.00
7.
Inflow/Infiltration Evaluation
4,000.00
8.
Wastewater System Planning (CIF)
N/A
9.
Economic Analysis
8,000.00
11.
Draft and Final Report
5,000,00
12.
Wastewater System Atlas Maps
N/A
13.
Workshop Presentation
1,500.00
TOTAL
$50,500.00
GCH/chs/96-108.08/corresp/