Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-98-303Temp. Reso. #8380, September 1, 1998 1 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-98- �_ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA, AUTHORIZING THE APPROPRIATE CITY OFFICIALS TO EXECUTE ADDENDUM NO. 98-02 TO THE CONTRACT WITH HAZEN AND SAWYER TO PROVIDE DESIGN, BIDDING, PERMITTING AND CONSTRUCTION DOCUMENTS FOR THE REHABILITATION OF FOUR WASTEWATER PUMP STATIONS ASSOCIATED WITH CAPITAL IMPROVEMENT PROJECTS AS APPROVED PREVIOUSLY, IN AN AMOUNT NOT TO EXCEED $85,000.00, IN ACCORDANCE WITH THE CITY'S CONSULTING ENGINEERING AGREEMENT AS AUTHORIZED BY RESOLUTION R-96-163 AND APPROVE FUNDING FROM THE APPROPRIATE UTILITIES OPERATIONAL AND CIAC ACCOUNTS; PROVIDING FOR CONFLICTS; PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Tamarac owns, operates and maintains 73 wastewater pump stations; and WHEREAS, Wastewater Pump Stations 9, 13, 25 and 34 were constructed in the early 1970's; and WHEREAS, the deteriorated condition of these stations has reduced their operating efficiency; and WHEREAS, in accordance with the Utilities Department's mandate to improve, renew and rehabilitate existing water and wastewater systems to ensure a safe, reliable and adequate water supply and wastewater systems to all residents and customers of the Temp. Reso. #8380, September 1, 1998 2 City, the City Commission previously approved a budget to permit the rehabilitation of Wastewater Pump Stations 9, 13, 25 and 34; and WHEREAS, the City requires the service of a consulting firm knowledgeable in this matter and capable of providing recommendations whereby existing utilities can be improved and rehabilitated to meet hydraulic demands and comply with current environmental regulations; and WHEREAS, Hazen and Sawyer possesses the required knowledge and experience to undertake the rehabilitation of four wastewater pump stations; and WHEREAS, Hazen and Sawyer has been pre -qualified as an approved consultant for engineering services by the City of Tamarac; and WHEREAS, it is the recommendation of the Director of Utilities that Addendum No. 98-02 from Hazen and Sawyer be approved, executed and funded; and WHEREAS, the City Commission of the City of Tamarac, Florida, deems it to be in the best interest of the citizens and residents of the City of Tamarac to accept and execute Addendum No. 98-02 (attached hereto as Exhibit 1) to the Consulting Engineering Agreement with Hazen and Sawyer to provide Engineering Services to rehabilitate Wastewater Pump Stations 9, 13, 25 and 34, serving Tamarac for a proposed amount not to exceed $85,000.00 and to provide funding from the appropriate Utilities Operational and CIAC accounts. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA: Temp. Reso. #8380, September 1, 1998 3 SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this resolution. SECTION 2: That the appropriate City Officials are hereby authorized to accept and execute Addendum No. 98-02 to the Engineering Agreement with Hazen and Sawyer to provide engineering services to rehabilitate Wastewater Pump Stations 9, 13, 25 and 34, a proposed amount not to exceed $85,000.00 in accordance with the City Consulting Engineering Agreement as authorized by Resolution No. R-96-163 on July 10, 1996. SECTION 3: That $85,000.00 is approved to be funded from the appropriate budgeted Utilities Operational and CIAC accounts. SECTION 4: That the City Manager, or his designee, be authorized to make changes, issue change orders not to exceed $10,000 per Section 6-156 (b) of the City Code, and close the contract award including, but not limited to making final payment within the terms and conditions of the contract and within the contract price. SECTION 5: That the City Clerk is hereby authorized and directed to record said Agreement in the Public Records of Broward County. SECTION 6: All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 7: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or application, it shall not affect the validity of the remaining portions or applications of this Resolution. SECTION 8: passage and adoption. ..; Temp. Reso. #8380, September 1, 1998 4 This Resolution shall become effective immediately upon its PASSED, ADOPTED AND APPROVED this /"—' day of ATTEST: CAR OLD, CMC/AAE CITY CLERK I HEREBY CERTIFY that I have appro th RESOLUTION as to f MITCHELL S. KR F CITY ATTORNE TR/sumg JOE SCHREIBER MAYOR RECORD OF COMMISSIOI V0'M MAYOR SCHREIBER' DIST 1: COMM. McKAYE DIST 2: V/M MiSHKIN DIST 3: �, comm.SULTANOF _ DIST 4: COMM. ROBERTS RAZEN AND SAWYER Environmental Engineers & Scientists August 21, 1998 Michael Woika, P.E. Utilities Director CITY OF TAMARAC 6001 Nob Hill Road Tamarac, Florida 33321 Dear Mr. Woika: Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Seventh Floor, North Tower Hollywood, FL 33021 954 987 0066 Fax: 954 987-2949 Addendum No. 98-02 to the Engineering Agreement To Provide City Consulting Engineering Services Pump Stations 9, 13, 25 and 34 Rehabilitation Project Nos. US98A, US9713, US97C and US97K Tamarac Utilities DenartmPnt In accordance with staff instruction, we are pleased to submit this Task Order Authorization (Addendum No. 98-02) to provide engineering services as described hereinafter. It is understood that said services will be provided in accordance with our City Consulting Engineering Services Agreement with the City, as authorized by the City on July 10, 1996. Except as may be explicitly revised or amended below for application specifically to this Addendum, all provisions of said Agreement shall apply. In accordance with Section I of the Agreement, ENGINEER has assigned Job Number 8641 to the task(s) included under this Addendum. ASK SCHEDULE SUMMARY(') Task Time of Order General Description Performance() Compensation(3) 1 Site Surveys 21 Days $ 2,000 2 Design 90 Days 54,000 3 Coordination at PS 25 120 Days 1,000 4 BCDNRP Permit Application 120 Days 3,000 5 Bidding and Award 150 Days 5,000 6 General Construction Services 360_Days (4) 20,000 TOTAL 360 Days(4) $ 85,000 Notes: (') Task descriptions are detailed hereinafter. (2) Time of performance is measured in calendar days subsequent to the notice to proceed; assuming all necessary information is available to the Consultant. c31 Compensation refers to a not -to -exceed amount for the task. Billing will be in accordance with the Engineering Agreement. °) Based on an assumed construction period of 210 days. Page 1 of 5 Hwd.8641 c003. doc New York, NY • Armonk, NY • Woodbury, NY • Upper Saddle River, NJ • Detroit, MI • Raleigh. NC • Charlotte. NC • Fairtax, VA • Hollywood, F L • Boca Raton, FL • Fort Pierce. l L • Gainesville, Fl. • Sarasota, FL • Miami, FL RVENAND SAWYER Addendum 98-02 August2l, 1998 CITY OF TAMARAC PUMP STATIONS 9, 13, 25 AND 34 REHABILITATION TASK SCHEDULE Task Order General Description PREAMBLE The City of Tamarac (City) has reviewed the condition of the pump stations within the City's wastewater collection area. Four sewage Pump Stations (PS), PS 9, 13, 25 and 34, were determined to be in a deteriorated condition and require rehabilitation. The City has requested that Hazen and Sawyer, P.C. (H&S) prepare construction contract documents for the rehabilitation of these pump stations. The project will be issued as one construction contract. Hazen and Sawyer shall prepare a review set of contract documents to the City at the 30 and 70 percent stages of each design. A third and final review submittal shall also be utilized as the permitting submittal and the City Plan / Specification Review Committee submittal. H&S shall incorporate the City standard electrical panel into each of the pump stations. The City will provide design flow and pressures for the pump stations, front-end specifications on disk and existing as -built drawings of pump stations. H&S shall perform site surveys of four pump stations. Surveys shall identify property boundaries and all physical improvements on each site. The City will provide plats for each site as available. 2 DESIGN H&S shall design the required improvements for the four pump stations and prepare Contract Documents for bidding. Also included in the rehabilitation is the fencing of the easement around the pump stations. The rehabilitation of PS 9, 13 and 25 includes the conversion of existing wet (concrete) / dry pit (steel) type stations to a submersible type pump stations. The existing dry pits will be filled with sand and abandoned as appropriate. PS 25 also includes relocating the electrical disconnect to a location adjacent to the pump station. The rehabilitation of PS 34 includes the replacement of the existing submersible type pumps. Time of Performance(') Compensation (2) 21 Days $ 2,000 60 Days $ 54,000 Page 2 of 5 Hwd:8641 c003. doc HAZEN AND SAWYER Addendum 98-02 August 21, 1998 Task Order General Description Time of Performance(' Compensation(2) 3 COORDINATION AT PS 25 120 Days $ 1,000 H&S shall meet with the homeowner adjacent to PS 25 for the purposes of informing the homeowner of the elements of the project. Included in this task is up to two meetings in the field with the homeowner and attendance at a homeowners association meeting by both the H&S project manager and project engineer. Preparation of project exhibits, brochures or other documents for public information is not included in the scope of this project. BCDNRP PERMIT APPLICATION 120 Days $ 3,000 H&S shall prepare and submit a permit application to Broward County Department of Natural Resources Protection (BCDNRP) for the rehabilitation of the pump stations, attend one meeting with City / BCDNRP to discuss the application and respond to BCDNRP questions. Permit fees will be paid directly by the City. 5 BIDDING AND AWARD 150 Days $ 5,000 H&S shall prepare and print bidding documents, address questions from bidders, conduct a prebid conference, prepare addenda as required, and prepare a bid tabulation. H&S shall print and transmit to the City thirty copies of the bidding documents. The City will distribute bidding documents (and addenda as required) to prospective bidders and suppliers. The City will review the bid proposals and check bidder responsiveness. H&S shall check the references of the lowest responsive bidder and prepare a recommendation for award. After the bidding of the projects, H&S shall transmit to the City the construction bid documents (plans and specifications) on computer disk and one set of original prints. 6 GENERAL CONSTRUCTION SERVICES 360 Days $ 20,000 H&S shall perform general construction for the rehabilitation of the pump stations. The intent of this Task is to review shop drawings and to certify completion for the regulatory agencies. The City will perform day to day construction administration activities including site visits, pay request review, contract interpretation, etc. Page 3 of 5 Hwd.8641 c003. doc HAZEN AND SAWYER Addendum 98-02 August 21, 1998 Task Order General Description H&S shall perform the following tasks: • Attend the preconstruction conference. • Review construction progress by visiting each pump station a limited number (up to two visits per station) of times during construction to verify construction for project completion certifications. • Participate in a site visit (one site visit per station) for the preparation of the list construction deficiencies (punch list). • Prepare as -built drawings using information (dimensions, elevations and changes) provided by the City and the construction contractor. • Certify the project completion and complete appropriate application forms on the City's behalf required by the regulatory agencies. Fee associated with filing of such forms shall be paid for directly by the City. TOTAL Notes: Time of Performance(') Compensation(2) 360 Days $ 85,000 (') Time of performance is measured in calendar days subsequent to the notice to proceed; assuming all necessary information is available to the Consultant. z) Compensation refers to a not -to -exceed amount for the task. Billing will be in accordance with the Engineering Agreement. cs� Based on an assumed construction period of 210 days. Page 4 of 5 Hwd.8641c003.doc HAZEN AND SAWYER Addendum 98-02 August 21, 1998 IN WITNESS WHEREOF, the parties have made and executed this Agreement the respective dates under each signature. CITY OF TAMARAC, through its Mayor and Hazen and Sawyer signing by and through corporate officers duly authorized to execute same. ATTEST: Carol Gold, C /AAE City Clerk Date: l0- a 2 - 9�T CITY OF TAMARAC By: J e Schreiber, Mayor Date: X- 'obert S. Noe, Jr. City Manager gal sufficiency: Mitchell S. Kraft, Cg y/Attorney HAZEN AND SAWYER, P.C. 2—M k k e. & a., - Vice President Patrick A. Davis P.E. Page 5 of 5 Hwd.8641 c003. doc