Temp. Reso. 7074
Rev. 05/30/95
CITY OF TAMARAC
RESOLUTION NO. R-95- 1,2-6
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF TAMARAC, FLORIDA, REPEALING RESOLUTION NO.
95-13 AND AUTHORIZING LUTZ PETROLEUM
INSTALLATION, INC. TO PERFORM THE TANK REMOVAL
AND REPLACEMENT AT THE TRACT 27 SITE BY
INSTALLING A 2,000 GALLON CONVAULTABOVEGROUND
DIESEL STORAGE TANK, AND REMOVE AND DISCARD
THE ABANDONED 1,000 GALLON ABOVEGROUND STEEL
STORAGE TANK AND GENERATOR MUFFLER AT THE
WATER TREATMENT PLANT SITE BY UTILIZING THE PALM
BEACH COUNTY SCHOOL BOARD BID AT A TOTAL COST
OF $40,550.00; PROVIDING FOR CONFLICTS; PROVIDING
FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE
DATE.
WHEREAS, the City of Tamarac has three current diesel storage tanks used to
fuel emergency power generating equipment at each potable water storage tank site
and one abandoned tank and generator muffler from the old sewage treatment facility
that must be properly discarded; and
WHEREAS, the current diesel storage tank located at the Tract 27 potable water
storage tank site is the only one of the underground type and underground diesel fuel
storage tanks are no longer permitted because they create a potential for contamination
1
Temp. Reso. 7074
Rev. 05/30/95
of the surrounding soil and in -ground tanks must be removed and replaced with an
aboveground unit; and
WHEREAS, provisions in current storage tank regulations allow project
completion by direct contractor service without the need of additional consultant
service fees thereby removing the need for Resolution No. 95-13 for project design
fees; and
WHEREAS, Lutz Petroleum Equipment Installation, Inc. has offered to extend
the terms and conditions of the Palm Beach County School Board Bid to the City of
Tamarac for the Tract 27 Underground Tank Removal Project completion; and
WHEREAS, the City Commission approved funding for this project in the FY95
Budget under Account Number 425-888-533-671, entitled "Tract 27 Fuel Containment
Structure" in the amount of $56,000.00; and
WHEREAS, the complete tank replacement project cost will be $40,550.00 and
is funded under Account No. 432-888-433-671 entitled "Tract 27 Fuel Containment
Structure"; and
2
Temp. Reso. 7074
Rev. 05/30/95
WHEREAS, it is the recommendation of the Utilities Director that the City
Commission repeal Resolution R-95-13 and authorize Lutz Petroleum Installation, Inc.
to complete the Tract 27 Tank Replacement Project; and
WHEREAS, the City Commission of the City of Tamarac, Florida deems it to be
in the best interest of the citizens and residents of the City of Tamarac to repeal
Resolution No. R-95-13 for tank replacement design and authorize Lutz Petroleum to
provide their services for project completion of Tract 27 Fuel Containment Structure
Replacement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA:
SECTION 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct and are hereby made a specific part of this
resolution.
�1
1
1
1
Temp. Reso. 7074
Rev. 05/30/95
SECTION 2: That Lutz Petroleum Equipment Installation is authorized to
install a 2,000 gallon convault diesel tank and to remove the existing diesel tank and an
abandoned 1,000 gallon aboveground diesel storage tank and large generator muffler
from the Water Treatment Plant site at a cost of $40,550.00 under the terms and
conditions of the Palm Beach County School Board Bid.
SECTION 3: Resolution No. 95-13 attached hereto is repealed in its
entirety.
SECTION 4: Lutz Petroleum will secure all necessary permits prior to
beginning work.
SECTION 5: All Resolutions or parts of Resolutions in conflict herewith
are hereby repealed to the extent of such conflict.
SECTION 6: If any clause, section, other part or application of this
Resolution is held by any court of competent jurisdiction to be unconstitutional or
invalid, in part or application, it shall not affect the validity of the remaining portions or
applications of this Resolution.
4
n
1
1
SECTION 7:
passage and adoption.
Temp. Reso. 7074
Rev. 05/30/95
This Resolution shall become effective immediately upon its
PASSED, ADOPTED AND APPROVED this /� day of "&11'6
1995.
ATTEST:
CAROL A. EVANS
CITY CLERK
I HEREBY CERTIFY that I have
approved this RESOLUTION as
to form.
MITCHELL S. KRffT
CITY ATTORNEY
UTILITIES/NB/nw
LIM
R
RECORD OF CC
MAYOR ABRAMOWITZ
DIST. 1: V / M KATZ
DIST. 2: COMM. MISHKIN
DIST. 3: COMM. SCHREIS
DIST. 4: —COMM. _ MACHEK
VOTE
MAY-31-95 WED 14:07 CITY OF TAMARAC FAX NO. 3057242406 P.01
MRY 31. '95 13:19 CITY O -
0<"".E6
UX"rwnft Me=70 It010 9 •
•
�J
Temp. Resv.
Rwised 1/17/95
RESOLUTION NO. R-95-13 '- - —.
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF TAMARAC, FLORIDA, AUTHORIZING THE
APPROPRIATE CITY OFFICIALS TO ENTER INTO AN
AGREEMENT WITH WILLIAMS, HATFIELD AND STONER,
FOR THE DESIGN, SIDDING, PERMITTING AND
CONSTRUCTION DOCUMENTS FOR THE REPLACEMENT'
OF THE WATER MAIN LOCATED ON PINE ISLAND ROAD
FROM N.W. 57TH STREET TO 350 FEET NORTH OF
LAGOS DE CAMPO BLVD; PROVIDING FOR CONFLICTS;
PROVIDING FOR SEVERABILITY; AND PROVIDING FOR
AN EFFECTIVE DATE.
WHEREAS, the City Commission of the City of Tamarac, Florida deem it to be
in the best interest of the citizens and residents of the City of Tamarac to acaept'and
execute Work Authorization No. 6 to the Enghw0 ling Agreemerrt with Wiliam, HatAeld
and Stonerfor the design, bidding, permitting and construction documents for the
installation of 2900' of IV D,I,P, for the Pine island Water Main Replacement; and
MiEREAS, The Ck of Tamarac is required to remove the existing 12" A;C.P.
water main to conform with Broward County Road Paving Requirements and Pine
Island Road Improvements: and
VyHF.REAS, It is recommendation of the Utilities Director that Work Authorization
No. 6 providing for the design, bidding, permitting and construction documents for the
Pine island Water Main Replacement be approved and executed.
U-1
•
MAY-31-95 WED 14:08 CITY OF TAMARAC FAX NO. 3057242406
MAY 31 095 13*19 CITY OF iH► -
Temp. Reno. OW
Revised 1A7195
NOW, THEREFORE- BE iT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF TAMARAC, FLORIDA:
SECMQN 11 The foregoing "MEREAS" clauses are hereby ragfied and
confirmed as being true and correct and are hereby made a specific part of this
resolution.
SECTION 2. That the appropriate Gity Officials am hereby euthoriaad to
accept and execute Work Authorization No. B (attached 119*0 as Exhibit t and shown
in map form in Exhibit 3) with Williams, Hetflald and Stoner, Inc. providing for the
design, bidding, permiEting and construction doeumetns for the Pine Island Water Main
replacement, for an amount not to exceed $36,400 to be funded from Account No.425-
888-533-67, E, "PINE ISLAND WATER MAIN REPLACEMENT".
SEQMQ'N;3: All resolutions or parts of resolutions In conflict herewith are
hereby repealed to the extant of such conflict.
�A; If any clause, section, other part or application of this
Resolutoon -is held by any court of competent jurisdiction to be unconstitutional or
invalid, in part or application, it shall not affect the vafldlty of the remaining portions or
applications of this Resolution.
P. 02
MAY-31-95 WED 14:08 CITY OF TAMARAC
MRY 31 '95 13:20 CITY OF TAB
FAX NO, 3057242406 .. P, 03
10
Temp. Reno. AM
Revised 1/17195
This Resolution shalt become effedive immedia" upon its
page and adoption.
PASSED, ADOPTED AND APPROVED this #75 day
ATTEST:
CAROL. A. VANS, CMC
CTiY CLERK
I HEREBY CERnFY #W I have
appr_ ed this RESOLUTION as
to 14ml.
CITY ATTORNEY
I•
• ''r�
MAYOR
RWQnD OF
�R ASrYIC
pIST. � � Y�" r.�■�
UST. Z:
Q�
V %*t t
Prnnnenl
Page No. of V�/Pa�es
/ -95_1zP \
LUTZ PETROLEUM EQUIPMENT INSTALLATIONS, INC.
Service Station Construction • Tanks Installed, Lined and Tested • Environmental Site Assessments
Recovery Systems • Monitoring Wells Installed
2020 Clinton Street 2200 N.W. 17th Street
P.O. Box 605 P.O. Box 367
Linden, New Jersey 07036-0605 Pompano Beach, Florida 33061-0367
(201)862-8888 Fax (201) 862-8883 (305)971-5222 Fax(305) 960-0082
PROPOSAL SUBMITTED TO,
PHONE
PATE
City of Tarrlarac - Water Department
905)724-2430
03/O/95
STREET
JOB NAME
7803 N.W. 61 st Street
CITY, STATE AND ZIP CODE
Tamww, Florida 33321
JOB LOCATION,'
Water Departm
ARCM: 1�N u w
pATE OF PLANS
FAX (305) T14-2434 ::��
PHONE
GENTLEMEN:
WE ARE PLEASED TO SUBMIT QUOTATION ON OUR INTERPRETATION OF YOUR REQUIREMENTS, SUBJECT
TO TERMS AND CONDITIONS PRINTED ON REVERSE SIDE OF THIS PROPOSAL.
I . Furnish labor, equipment and miler ials 10:cane � 2,000'g0 n doubleviiall above ground tank (30 year
warranty) equipped with all overspill dennaaas, ems, and ,tilrtcap tubes fordiesel. Furnish and install cmaete slab
(I Mc I WN thick) and 2-e Concrete filled bdlards t giu;,Be from Swvr w room tlo tank. Furnish and
install row fuel supply and return lines to , h. , . tank (DBW4 Repairfi eplaae fienoe as deeded.
Furnish and install OSHA approved stairs fiorink
COST: $31,2W.00
a�aaCld�II
Remove wdsting 2,000 wdlon rxdergr*�urad tic, c 'ro ily, with existing fill and new as required,
i�y'r'
VYj Yn'.
v
lade and sold area, Cap off any r emahing t f�iln domm and provide closure papers to the
P + h
COST: $ 5,800.00
3. Remove 1,000 gal aboeeeguund steel ti s Grade area flak.
COST: $ 3,500.00
f �
NOTES: Permits and dmwirv, induded (fees paid by alwr er•; qr)
Handling of corrtamnated soikilliquids by others.
Note: In the event any unforeseen objects are contacted underqround there will be an additional charge.
We Propose hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
Fody Thotaand Five Hundred and Ffty and 00/100 dollars ($ 40,550.00 ).
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be completed in a workman Authorized
like monner according to standard practices. Any alteration or deviation from obo—
specifications involving extra costs will be executed only upon written orders, and will Signature
an extra charge over and above the estimate. All agreements contingent upon G. Darnell ph
*,o-e
accidents or delays beyond our control. Owner to carry fire, tornado and orh.rr Note: This proposal may becc insurance. Our workers are fully covered by Workmen's Compensation,
30
withdrawn by us if not accepted within days.
ACCEPTANCE OF PROPOSAL— The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized
to do the work as specified. Payment will be made as outlined above. See
=rse side for all terms and conditions.
I UNDERSTAND AND AGREE TO ALL THE TERMS AND
CONDITIONS ON THE REVERSE SIDE OF THIS PROPOSAL.
Acceptance: Signature