CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-95- ;(7-7
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF TAMARAC, FLORIDA; AUTHORIZING LUTZ
PETROLEUM EQUIPMENT INSTALLATIONS, INC. TO
INSTALL A FIVE HUNDRED GALLON CONVAULT DIESEL
TANK AND REMOVE THE EXISTING TANK AT FIRE
STATION #2 UTILIZING THE PALM BEACH COUNTY
SCHOOL BOARD BID AT A TOTAL COST OF $26,775.00;
FUNDING IN THE AMOUNT OF $26,775 IS BUDGETED
UNDER ACCOUNT #001-888-539-61 D ENTITLED, "DIESEL
TANK CONVERSION"; PROVIDING FOR CONFLICTS,
PROVIDING FOR SEVERABILITY; AND PROVIDING AN
EFFECTIVE DATE.
Whereas, the Department of Natural Resource Protection has concerns with the
current diesel dispensing system meeting appropriate standards; and
Whereas, Lutz Petroleum Equipment Installations has offered to extend the
terms and conditions of the Palm Beach County School Board Bid to the City of
Tamarac (attached as Exhibit "A"); and
Whereas, the total cost will be $26,775.00 and is funded under Account no. 001-
888-539-61 D entitled, "Diesel Tank Conversion," in the amount of $26,775; and
Whereas, it is the recommendation of the Fire Chief and the Purchasing Officer
that this work be awarded to Lutz Petroleum Equipment Installations; and
1
Temp Reso #7236
Whereas, City Code §6-154 allows the Purchasing Officer to join with other units
of Government in cooperative purchasing when the best interest of the City will be
served; and
Whereas, the City Commission of the City of Tamarac, deems it to be in the best
interest of the citizens and residents of the City of Tamarac to authorize Lutz Petroleum
Equipment Installation to remove the existing non -compliant diesel tank and install a
five hundred gallon vaulted diesel tank at Fire Station #2.
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF TAMARAC, FLORIDA:
SEQI 1: The foregoing "WHEREAS" clauses are hereby ratified and
confirmed as being true and correct and are hereby made a specific part of this
resolution.
SECTION 2: That Lutz Petroleum Equipment Installation is authorized to install a
five hundred gallon vaulted diesel tank and to remove the existing diesel tank at a cost
of $26,775.00 under the terms and conditions of the Palm Beach County School Board
Bid (attached as Exhibit "B")
work.
SECTION 3: Lutz Petroleum will secure all necessary permits prior to beginning
SECTION 4: All Resolutions or parts of Resolutions in conflict herewith are
hereby repealed to the extent of such conflict.
SECTION 5: If any clause, section, other part or application of this Resolution is
held by any court of competent jurisdiction to be unconstitutional or invalid, in part or
Temp Reso #7236
0
1
1
application, it shall not effect the validity of the remaining portions or applications of this
Resolution.
SECTION 6: This Resolution shall become effective immediately upon its
passage and adoption. A
01,
PASSED ADOPTED AND APPROVED this day of 1995.
ATTEST:
I HEREBY CERTIFY that I have
approved this RESOLUTION as to
form.
MITCHELL S. KW
CITY ATTORNEY
JMB:TAS
lutzreso
10/31 /95
Reso. 95-7236
i
`1_... I. l
• - .kj . r - • •
LTA FWAY, Lei -
RE -CORD CF CO WL VV 1 G
MAYOR
DISTRICT 1:,r,1,� t 14
�.—..---
DISTRICT 2:.1 �t+C�
DGMMCTT 3=
DSTRICT 4, C
r
SEP-26-1995
P•02 Exhibit "A
rroposall -.
LUTZ PETROLEUM EQUIPMENT INSTALLATIONS, INC.
Service SlAtion Construction • Tanks Installed, Lined and 7eared. Environment, r Sife Assessments
Recovery Systems • Monitoring Wells Installed
2020 Clinton Street
P 0 Box. 605
Linden. New Jersey 07036-0605
(2W) 662-5808 Fax (201) 862•3885
PROPOSAL SUBMITTED TO
City of 'Tamarac
STREET
750' N.W. 881h Ave.
96,TffAba 33321
PAUL FORNSBERG
2200 N.W. 171h Street
P.O. Box 367
Pompano Beach, Florida 33061.0367
(305) 971.5222 Fax (305) 960-OQSZ
PHONE DATE
(305) 724-2430
,1013 NAME
Tank Removal and Replacement
R ' Yt-_k' .
"a0115epartment, Commercial and Tumplke
OF Ill I (305) 434-1307
JOB PHONE
GENTLEMEN;
EVE ARE PLEASE0 TO SUBMIT QUOTATION ON OUR INTERPRETATION OF YOUR REQUIREMENTS, SUBJECT
TO TERMS AND CONDITIONS PRINTED ON REVERSE SIDE OF THIS PROPOSAL.
Furnish labor, equipment end materials to install one Convault 500 gallon doublewall above ground tank (20
I
year *arranty) equipped with all overspill devices, vents, drop tubes and one 15GPM dispenser for diesel with
filter.; Furnish and install concrete slab (11`x915"x8" thick) and T-W concrete filled pipe bollards. Connect
electne from generator rodm to dispenser. spencer. Furnish and install new fast supply and return lines to existing
generator (D6Wy COST: ............. $ 24,570.00
Remove existing 500 gailgn aboveground tank, dispenser and dike, dispose of property, backfill with existing fill
and flew as required, grade and sod area. Perform closure and prrovide closure papers to the County,
COST: .............. $ 2,205.00
NOT Permits and drawings included
Handling of Contaminated soitsAiquids by others
Transfer of fuel from old tank to new tank included
N01e" In'the •.ens any lrnloteseen objects are cenlnrt.,.a vnderground thrl wifl be an oddlllenal charge.
We Propose hereby to furnish moler;dl and labor -- con,I,il in accvrdonce with above speciPlcotions, for the sum of:
rwen} Six Thousand gev6nHundrled Seventy Five and 00/100 25,T75.00
1
to h• mode as lotlows:
All r.. pr.aal if (1VOlantccd to be ., .p.rtned. All work to be Compl.bd In o r,,I n
like mannrr eccardrrng to H.ndard pro[licesAnr alteration or d..l.linn tram abn.e
twr..rG.. ninnt in.o l-iF4 eerie r..r, ill be ececuled only upon written evirl and `•ill
b.4e.nl an e•Iia chat qy . .nd .k.. 11he est:rnoteAll agree lnente renungrnl ,.Pnn
.r. rkee ill or drlan beyond out cpnlrol. Owner to Corry ilr., 1.,nodo and ot4 •�
••,err sv onc.. O.r w 11,. y ore I fully co.ered by wmkar s Caroni ar
Int�ronre
ACCEPTANCE OF PROPOSAL— The above Prices. speciticalions
and conditions are sahslaclory and dre hereby acceprea. You ors authorized
to (fo the work as Lpecdled. Paymej l will be made AS outlined above See
rc�erse side for 9u Iran;; and conditions.
Date pl Acct,lnxnce
AOhariiod
No,... IN;, Props>a may be G. De ll Randolph
.•rheiinwn by u% if net aee.Wl ..chin An drys.
I UNDERSTAND AND AGREE TO ALL THE TERMS AND
CONDITIONS ON THE REVERSE SIDE OF THIS PROPOSAL,
e'gr rlurr
TOTAL P.02
1995 08:40 7
3—rroposal
LUTZ PETROLEUM EQUIPMENT INSTALLATIONS, INC.
Service Station Construction - Tanks Installed. Lined and rested • Environmental Site Assessments
Recovery Systems • Monitoring wells Installed
2020 Clinton Street 2200 N W. 1179) Street
P.O. Bo 50,5 P WIX .51591
Linden, New Jersey 07036.0605 Pompano Beach. Florida 33061.0367
(201) M2-8888 Fax (201) 852-8883 (305) 971-5222 Fax (3O5) 960-0082
PROPOSAL SUBMITTED TO .. PMONC DATE
City of Tamarac
7501 N.W. 88th Avenue
CITY, :;rArg AND ZID CODE
Tamarac, Florida
AFCNITECT
ATTN. PAUL FORKS
DATF Or PLANS
P.03 Exhibit"A"
(305) 724-2436���-1t 6111`195
JOB NAMe
Tank Removal & Replacement
IOH LOCATION
Fine Department-Commetdal b Turnpike
ADDENDUM 01
JOB PHOI
GENTLEMEN:
WE ARE PLEASED TO SUBMIT QUOTATION ON OUR INTERPRETATION OF YOUR REQUIREMENTS. SUBJECT
TO TERMS AND CONDITIONS PRINTED ON REVERSE SIDE OF THIS PROPOSAL.
Please accept this as; Addendum incorporating the current contract between Lutz and the School Board of Palm
beach County into our, previous quote to you dated 09/28/95 including indemnification as described therein.
Nate In the event any unloraseen ebjeth are cvnranrd undrrpround There will be an additianat Chargq.
We Propose hereby to furnish material and labor --- complete in accordance with above specifications, for the sum oft
Parmrnt to be made as follows -
All n.o+e... I 1. gvmnnr.ed to be at spgtiGed. All wwk re he completes in a wc•ti •••w+
Lee n rdinq To stondvrd piscineT. A..v ahereKen er Irgm Pbc.n
+nrnGwr wr•t i ..ling e.trp costs -•Ill;be e..t,.reA anty wr vwon ind .n ardent. crW�II
h.,nrn. un e.nv char q. aver and eboae Ihr .tir.•a Ie All ng.e.rN_T. ranungrn• wc,.
••s •.. .r. rr drlays beyond awrtontrvl. Owns• •v carry lie, Ie.nntle n.d v ti••r
rntto•Y n.vro Ovr watsers qtr f..11r 1 .....1 by warlt m . rono•^rv,:e.
InT.,, 6.Tr
ACCEPTANCE OF PROPOSAL— The above prices, speciliCetions
Lind canddiontt nre satislwory andlare hereby accepted You ere authorized
to co the work as specified Psymjanl will be made as outlined above bee
•t: vi: ?,C :��dtp for all terms anp or)ndilions.
tio4; nl Ar�rptan<r
dollars
A „Ihor:sed
S,gnatura
Na- This P.prtgsal a•ay be G. Da Randolph
..rhd-awn by vs if not accepted within 30--------.--- -days.
I UNDERSTAND AND AGREE TO ALL THE TERMS AND
CONDITIONS ON THE REVERSE SIDE OF THIS PROPOSAL.
TOTAL. P.03
OCT--05-1995 11:38 9 7 ] Exhibit u$u P.02
CONTRACT BETWEEN
THE SCHOOL BOARD OF PALM BEACH COUNTY, FLORIDA
AND
LUTZ PETROLEUM EQUIPMENT
This contract is made by and between THE SCHOOL BOARD OF PALM BEACH COUNTY,
FLORIDA, (hereinafter referred to as the Board or School Board) and LUTZ PETROLEUM
EQUIPMENT, (hereinafter referred to as the Contractor to provide Petroleum Related Services,
SECTION I - Term of Contract
This contract shall be for the period beginning April S. 1995 through April 5, 1996. The contract
may be renewed for three additional one-year periods at the annual anniversary date. The contract
will not extend beyond the fourth year.
SECTION 11 - Services
The Contractor shall provide Petroleum Related Services per specifications in RFP 95C-015W
and the proposal submitted by the Contractor. All addenda issued to RFP 95C-015W, if any, are also
made a part of this contract.
SECTION III - Cost of Services
The Contractor shall be paid for services as listed in the RFP for Petroleum Related Services
for the School District of Palm Beach County.
SECTION IV - Terms and Conditions
The Contractor shall have the option to terminate the contract upon written notice to the autho-
rized representative of the School Board. Such notice must be received at least 90 days prior to the
effective date of termination. The School Board shall have the option to terminate the contract upon
written notice to the authorized representative of the Contractor. Such notice must be received at
least 30 days prior to the effective date of termination and the Contractor shall only be entitled to
compensation up to the date of termination. The Contractor shall not be entitled to lost profits.
0
OCT--06-1995 11:39 j ,S--' C2 7 7 Exhibit "Bn P.03
Early termination of the contract by the Contractor may prohibit the Contractor from submitting
proposals for a period of three years from the date of completion of the contract_ The School Board,
shall establish the expiration date of the contract.
There shall be no assignment of the contract or compensation to be derived therefrom by the
Contractor.
Included in this Agreement are the terms and conditions as described in the Request for
Proposal, RFP 95C=015W, which by reference herein is made a part thereof.
SECTION V - Indemnification
For the purposes of general liability as opposed to professional liability which is addressed in
the second paragraph of this Article, the Contractor agrees to protect, defend, reimburse, indemnify
and hold the School Board, its agents, employees and elected officials, and each of them free and
harmless at all times from and against any and all suites, actions, legal or administrative proceedings,
claims, demands, damages, liabilities, interest, attorney's fees, costs and expenses of whatever kind
or nature whether arising during or after completion of the work hereunder and in any manner directly
or indirectly caused; occasioned or contributed to In whole or in part, by reason of any act, omission,
fault or negligence whether active or passive of the Contractor or anyone acting under its direction
or control, or on its, behalf in connection with or incident to the performance of this contract. The
Contractors aforesaid indemnity and hold harmless obligations, or portions of applications thereof,
shall apply to the fullest extent permitted by law but in no event shall they apply to liability caused by
the sole negligence or willful misconduct of the School Board, its elected officials, employees and
authorized agents.
SECTION VI - Insurance
Insurance will be required as stated in RFP 95C-015W. The School Board of Palm Beach
County shall be named as additional insured.
SECTION VII - Amendment
This contract shall only be amended or modified in writing executed by both parties.
OCT-05-1995 11:39 ._ �% S� ? 7 Exhibit "B" P.04
SECTION VIII - Strict Performance
•
The failure of either party to insist on strict performance of any covenant or conditions herein
shall not be construed as a waiver of such covenants or conditions for any Instance,
This contract shall be construed in accordance with the laws of the State of Florida,
If any litigation shall result from this agreement, venue shall lie in Palm Beach County, Florida,
and the prevailing party shall be entitled to attorneys fees and court costs.
This agreement shall not be construed against the party who drafted the same as both parties
have had experts of their choosing review the same.
This agreement is binding on the parties hereto, their heirs, successor and/or assigns.
Section IX
Should either party breach this agreement, the non -breaching party shall be entitled to all
remedies as provided by law and equity.
In witness whereof, this contract has been executed on the day and year first above written.
L z Pet Equipment
kZ���
WITNES
WITNES
0 3.
THE SCHOOL BOARD OF PALM BEACH
COUNTY, FLORIDA
BY:
ai an
Approved as to form:
Schnol Board Attom '
ROSERTA. FpOSILLO
•
pC7-06-1995 11 4p
REQUEST FOR PROPOSAL_ NO. SB 95Q-015W
Tank Cleaning
24-hour Emergency Spill Response
Calibration of Dispensing Systems
Calibration of Inventory Systems
Sheetpilirig (Z-Spline)
De -Watering Systems
Hydraulic Vehicular Lifts
Fuel Delivery, Transfer
Exhibit "B" P.05
X
X
X
X
X
X
B. List any additional services below- Price lists, rates, etc. may be attached to submittal.
Fall Range of Environmental 5 ces Including!
Assessments, GARS, RAPS, Remediations, Etc.
Well:Drilling Services (In House)
C. Equipment - Attach a list of specialized equipment necessary to complete tasks within your
capabilities; Give descriptions as to size, age, and type.
34.0 SITE SAFETY; PLAN - Attach a Copy of your firm's generic Health and Safety Plan.
35.0 SCENARIO RtSPONSE:
35,1 Described below is a sample project. Prepare a proposal specific to complete the project.
Include a description of tasks to be completed, a list of equipment to be supplied, a breakdown
of hours per employee, projected time requirements, destination of all wastes, and site safety
plans that would be consistent with the project.
An elementary school located in the city of West Palm Beach has a 1,000 gallon under-
ground, We steel, single -walled storage tank that supplied No. 2 diesel fuel to a boller.
Product line (50 feet) and vent pipe (20 feet) are steel. Soils surrounding the tank were
found to contain petroleum products at 75 ppm as read by an Organic Vapor Analyzer. Tank
has been pumped and currently contains less than one inch of product.
The tank is under asphalt with 1,000 yards clearance In all directions. No underground or
overhead utilities are known to be in the area. One ton of concrete is involved in ballast and
bed. Tank' and line are to be tested, removed, and replaced with a double -walled fiberglass
tank and secondarily contained piping. School will be in session during all tasks.
Attach additional pages as necessary.
-17-
OCT-®G-1995 11: 40 _ S Ste_ - / Exhibit "B" P• 06
REQUEST FOR ROP08At, N . SO 95C-015W
C�
36.0 FEES:
3611 The following fees will remain fixed for the first year of the contract.
A. Base Price; On a separate paper, following the format below, list employees (by position) )
required to complete these tasks indicated and their hourly compensation, You should
include si4bcontractors where necessary.
Examples.
Project Manager $ Jhour
Electrician $ /hour SEE ATTACHED
Crane Operator
B. Eauipment and Serv_Icg Q2§1§: Listed below are typical items that could be purchased during
contractual period. Give costs.
Double -walled fiberglass underground storage tanks (as manufactured by Owens -Coming)
550 gallon(600)
1,000 gallon
2,000 gallon (2,500)
5,000 gallbn
10,000 gallon
20,000 gallon
$ 3, 945.00 /unit
$5_,_J 42. Q0/unit
$ 7+195.00 /unit
$ 7, $00 00 /unit
$ 11. 000, 00 ]unit
$ 23,965.00_1unit
Fiberglass clad steel underground storage tanks (as manufactured by Modem Welding)
550 gallon $ 2, 725, gg /unit
1,000 gallon $ 3,500,00/unit
2,000 gallon $ % 725___00 /unit
5,000 gallon $ 7, 0 unit
10,000 gallon $ 10, 900.00 /unit
20,000 gallon $ 21, 490_.00 /unit
Vaulted above -ground steel storage tanks (as manufactured by Convault)
250 gallon $6,362.00 /unit
500 gallon $ 7, 450.00 /unit
1,000 gallon S9 230 010/unit
2,000 gallon
All prices for vaulted above -ground tanks listed immediately above shall include a 30 year
warranty and transportation to site.
Miscellaneous
Five Gallon Overspill Manhole Installed
$600 /unit
2" FRP piping with 3" FRP Second. Containment as manufactured
by Ameron, installed. $ 35 /foot
-18-
❑CT-06-1995 11!40 j S�-c,Z 7 7 Exhibit "B" P.07
BF —QUEST FOR P OPOS C-015W
1/2" copper piping with 3" FRP Second. Containment, installed_
$_ 10 00 _/foot A/G
314" copper piping with. 3" FRP Second, Containment. (installed)
$ 9.00 /foot A/G
Sheetpiling (Z-Spline) 25 ft, sheets (installed)
$_. _ Z10.00 Ain. foot
De-Wateri ms
8" Primary with PVC wellpoints (installed)
$, no nn /foot
Operation Costs
$ 250_on /day
Tank Sluriy Sealing with concrete
$_ _ 0_5oe/gallon
Crane Services
$ :5n nn /day
OVA Rental with technician
$ 500_00 /day
Petroleum Contaminated Soils
Stockpiling with berm
$ 3.00 /ton
Dispos.ol with analysis and transportation
$_ rn_nn ton
Services
Services
Tank Tightness Testing $ 450.00 /Petroleum
tank
Line Tightness Testing $100.00 /line
Virgin Fuel Transfer $ /gallon
Oily Waste ,Disposal $ 0.75(P [gallon
FuelM/ater Mixture Disposal $ 0.50(r /gallon
Sludge Disposal
Gasoline Sludge $4nr?_nn /55 gal, drum
Diesel Sludge $ 375.00 /55 gal. drum
(Sludge disposal to include drumming, analysis, transportation and disposal fees.)
C. Miscellaneous Charges
Briefly define additional charges as related to the following. Give their amounts and explain
when and how they are assessed. (Attach a separate page if necessary.)
Overtime: 1 .5 x normal rate after B.0 hours/day
Downtime: Normal rates as quoted herein
Mobilization Charges: $1, 000 — $1, 500 for Heavy Bqu pment typically
_ -19-
OCT-06-1995 11:41 Exhibit "B" P-0"
LUTZ, PEI, INC.
CONSTRUCTION PRICE LIST
C�
C�
C�
P n-R-1-10IL-1;
. . . $
30-00/Hour
Electrician, Hc]Pcr . . . ... . . . . . . . . . . . . . . . . . . .
. . . . . ' * . . . . . . . . . . . .
$
40.00/Hour
Elettrician, JoUrnc)mlan . . . . . . . . . . . . . . . . .
. . * . . . . . . . . . . . . . . . . . .
. $
60.00/Hour
Elo�icfffi'4 Muter . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . .
$
45.00/HouForeman,
Foreman, Job . . . . . . ... . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . $
30.00/Hour
Larorer . . . . . . . . ... . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
$
40.00fHour
pl*ber� journeyman I
.
$
60.00/Hour
Plumber, Master - - - - - . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . I . 1
$
55.00/Hour
Supervisor . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . * . . . . . . . . .
0 -- * 31.4
Air, Compressor Aith Tools . . . . . . . . . . . . . . . . . . . . .
. . . . . , . . . . . .
150.00/Day
Backhoe, Rubber Tire Coinbination . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . S
500.00/Day
Backhoe. 80,000 gTrack txca-vator N-00 Move . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . $ 1.250.00/Day
Cement Mixer .........................................
S
125.00/DayS
Compactor . . . . . . . ...........................
* , . . . . . .
75-OO/Day
Concrete Saw .........................................
.......$
100.00/Day
Duinp Truck . . . . . ...........................................
$
500.00/Day
Loader . . . .............. . .
. . . . . . . . . . . . . . . $
750.00/Day
Generator, Honda 120-140 volt (Fuel not inc) .. . . . . . . . . . . . .
. . . . . . . . . . . .
50.00/Day
Pi i c Fitting Truck .......................... I . . .
P
. . . . I . . . . . . . . . . . . $
25.00/Day
Pump, 2" Air - Air Compressor not included . . . . . . . . . . . . . . .
. . . . . . . . . . . . . S
100.00/Day
Pump, 2" Electric . . . . ...........................
- . . . $
85.00/Day.
Pump, Simmer .............
$
40.00/Day
.........
Pump, 3" Trash ............... . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . S
100,00/Day
Service Track .............................................
* * * $
10.001Hour
Wilder and Torches .......................................
* .... $
20.00/Hour
Trawit................................ . . .
. . . . . . . . . . . . . . . . . $
15.00/Day
Trowel Machine . . .......... I ... I . I ........ . .
. . . . . . I . . I . . . •S
75-001Day
H6 . )ium Detector . . . . . . . . . . I .......... . .
. . . . . . . . . . . . . . . . S
200,00/Day
Nitro . . .I . ...................
gen
. I I .$
. . . . . . . * ' '
100.00/Day
Explosive Meter .... ; ........... ......... . . .
. . . . . . . . . . . . . . . . . $
25.00/Day
Pen-X Devaporizer for Tanks ........................................
S
150.00/Day
Pcn.X tite tank Test (onc;tank up to 2,000 921) .............
. . . . . . . . . . . . $
600.00/1"ank
Petro -Tito tack Test for 06b additional tank . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . S
450.00/Tank
Subcontractors ................................................
$
Cost + 200/6
OCT-06-1995 11:41 `�.w �
Exhibit "B" P.09
SCHEDULE A
ENVIROI TwENTAL
MJOR OIL
L.alaoR:
Administrator.
...... $ 45.00/Hour
Administrator, Sr. ................. .........
$ 75.00/Hour
Architect, Professional ............. .....................
_ ..... $ 50.00lHour
Chemist ..............................................
. ... S 25.00/Hour
Clerical........ _ ............ . .... . ...................
$ 45.00/Hour
Computer Drafting ................. .............................
$ 35.00/Hour
Drafti5 n.......................................
I ...........
..... . . $ 60.00/Hour
irnginecr................ . ..... . ..............
. ... .. .
$ 85.00/] our
Enginep-r, Professional ............................
............
Errtironmentel Scientist .. ..............................
* ........... $ SOAO/Haur
...... $ SO.OQ/Hour
Go6logist.....................................
I ...... _
$ 75.00/Hour
Hydrogeologist ......... . .........................
I ....... _ .....
Hydrogeologist, Professional .........................................
$ 85.00/Hour
$ 50.00/Hour
inspector ........ ....... . ..... . . ... . ......................
$ 65.00/Hour
Landscape Architect .. ............ . ....... . ...........
.........
105.00/f dour
Principal ...................................................
S 55.00/Hour
Supervisor ...................................
. ..............
$ 80,00/hour
5uivcy Crew .. . .... ..........................................
Technician, Sr ..... ...........................
...... . .. .... $ 45,00/Haur
7
$ 40.00/Hour
Technician ....... .............. . ..................
. ........
UIP
Interface Probe ..... .. ......
...... ...... $ 25.00/Hour
Monitor Well Bailer Pump ..........................
....... • • ...... S 15.00/Hour
Teflon Bailer ...................... . .... . ............
. ........ $ 10.00/14our
Organic Vapor Analyzer/Flame Ionization Damtor ............................
$145.00/1-lour
Transit ......... ...... . ...... . ...........
. ............ . ... $ 15.00/Day
Hand Auger Samples ..:..............................
... $ 10.00/Ft.
Split Spoon Samples .. . . .... . ...................
............... $ 12.00/FL.
Double Ring Infiltrorneter Test .............. . ..................
. ..... $100.00/Hour
Data Logger ............ .................................
. ... $145.00/Hour
S
Transducers ..........................................
........
25-00/Day
$ 5.00/Day
PhMeter ...... . ..... .......................................
$ 25.00/Day
Conductivity Meter .................................
............
S Cost + 20%
Subcontractors................................................
0
OCT-05-1995 11:41 73 Exhibit "Be' P.10
RAVEL AND PER Dl Z=
... $ 0.25/Mile
Auto ....... . . .. ... ....... . .. . ......... ....... . ..... $ 0,40/Mile
Light Truck ........ ................ ....................
0
Heav1; y Truck and Meals ... ........ . ........ . ........ . ... . I ... I .. $ Cost + 15%
&
0
C�
•
OCT--06-1995 11:42 53 % Exhibit nSnP.11
petro-Tite tank testing process include two on -site certified technicians (up to 10 hours portal to portal), all required Petro -
able air compressor, generator, scaffolding, product transfer (up
Titeltesting equipment, PO4to 50 gallons) and viscosity
al".3 fluids. Overtime labpr for Petro-Tite tank: and line testing mill be charged after ten (10) hours at the rate of $60.00
per hour, per man.
The; Pcn-X Devaporiter is used for the removal of trapped air in tanks or lines prior to Petro -Title testing to insure valid
test results.
The Helium Detector is used for the detection of underground line leaks through the subgrade, asphalt or concrete. The
Nitrogen Tester is used for testing Stage 11 Vapor RecoN'ery Systems. The Explosive Meter is used to monitor the % LEL
in ail atmosphere.
TRAVEL. AND PER DTL,M:
Auto .... _ ...... ' ............................. . .... . ......... S 0.25/Mile
Light Truck .................. .................................. $ 0,40/Mile
$ 0.75/mile
Heavy Truck ............... . ..... _ ........... .............
Lodging and Meals..... .................. . ........... . ...... . .....$Cosh 15%