HomeMy WebLinkAboutCity of Tamarac Resolution R-95-277Temp Reso #7236 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-95- ;(7-7 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TAMARAC, FLORIDA; AUTHORIZING LUTZ PETROLEUM EQUIPMENT INSTALLATIONS, INC. TO INSTALL A FIVE HUNDRED GALLON CONVAULT DIESEL TANK AND REMOVE THE EXISTING TANK AT FIRE STATION #2 UTILIZING THE PALM BEACH COUNTY SCHOOL BOARD BID AT A TOTAL COST OF $26,775.00; FUNDING IN THE AMOUNT OF $26,775 IS BUDGETED UNDER ACCOUNT #001-888-539-61 D ENTITLED, "DIESEL TANK CONVERSION"; PROVIDING FOR CONFLICTS, PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE. Whereas, the Department of Natural Resource Protection has concerns with the current diesel dispensing system meeting appropriate standards; and Whereas, Lutz Petroleum Equipment Installations has offered to extend the terms and conditions of the Palm Beach County School Board Bid to the City of Tamarac (attached as Exhibit "A"); and Whereas, the total cost will be $26,775.00 and is funded under Account no. 001- 888-539-61 D entitled, "Diesel Tank Conversion," in the amount of $26,775; and Whereas, it is the recommendation of the Fire Chief and the Purchasing Officer that this work be awarded to Lutz Petroleum Equipment Installations; and 1 Temp Reso #7236 Whereas, City Code §6-154 allows the Purchasing Officer to join with other units of Government in cooperative purchasing when the best interest of the City will be served; and Whereas, the City Commission of the City of Tamarac, deems it to be in the best interest of the citizens and residents of the City of Tamarac to authorize Lutz Petroleum Equipment Installation to remove the existing non -compliant diesel tank and install a five hundred gallon vaulted diesel tank at Fire Station #2. NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF TAMARAC, FLORIDA: SEQI 1: The foregoing "WHEREAS" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this resolution. SECTION 2: That Lutz Petroleum Equipment Installation is authorized to install a five hundred gallon vaulted diesel tank and to remove the existing diesel tank at a cost of $26,775.00 under the terms and conditions of the Palm Beach County School Board Bid (attached as Exhibit "B") work. SECTION 3: Lutz Petroleum will secure all necessary permits prior to beginning SECTION 4: All Resolutions or parts of Resolutions in conflict herewith are hereby repealed to the extent of such conflict. SECTION 5: If any clause, section, other part or application of this Resolution is held by any court of competent jurisdiction to be unconstitutional or invalid, in part or Temp Reso #7236 0 1 1 application, it shall not effect the validity of the remaining portions or applications of this Resolution. SECTION 6: This Resolution shall become effective immediately upon its passage and adoption. A 01, PASSED ADOPTED AND APPROVED this day of 1995. ATTEST: I HEREBY CERTIFY that I have approved this RESOLUTION as to form. MITCHELL S. KW CITY ATTORNEY JMB:TAS lutzreso 10/31 /95 Reso. 95-7236 i `1_... I. l • - .kj . r - • • LTA FWAY, Lei - RE -CORD CF CO WL VV 1 G MAYOR DISTRICT 1:,r,1,� t 14 �.—..--- DISTRICT 2:.1 �t+C� DGMMCTT 3= DSTRICT 4, C r SEP-26-1995 P•02 Exhibit "A rroposall -. LUTZ PETROLEUM EQUIPMENT INSTALLATIONS, INC. Service SlAtion Construction • Tanks Installed, Lined and 7eared. Environment, r Sife Assessments Recovery Systems • Monitoring Wells Installed 2020 Clinton Street P 0 Box. 605 Linden. New Jersey 07036-0605 (2W) 662-5808 Fax (201) 862•3885 PROPOSAL SUBMITTED TO City of 'Tamarac STREET 750' N.W. 881h Ave. 96,TffAba 33321 PAUL FORNSBERG 2200 N.W. 171h Street P.O. Box 367 Pompano Beach, Florida 33061.0367 (305) 971.5222 Fax (305) 960-OQSZ PHONE DATE (305) 724-2430 ,1013 NAME Tank Removal and Replacement R ' Yt-_k' . "a0115epartment, Commercial and Tumplke OF Ill I (305) 434-1307 JOB PHONE GENTLEMEN; EVE ARE PLEASE0 TO SUBMIT QUOTATION ON OUR INTERPRETATION OF YOUR REQUIREMENTS, SUBJECT TO TERMS AND CONDITIONS PRINTED ON REVERSE SIDE OF THIS PROPOSAL. Furnish labor, equipment end materials to install one Convault 500 gallon doublewall above ground tank (20 I year *arranty) equipped with all overspill devices, vents, drop tubes and one 15GPM dispenser for diesel with filter.; Furnish and install concrete slab (11`x915"x8" thick) and T-W concrete filled pipe bollards. Connect electne from generator rodm to dispenser. spencer. Furnish and install new fast supply and return lines to existing generator (D6Wy COST: ............. $ 24,570.00 Remove existing 500 gailgn aboveground tank, dispenser and dike, dispose of property, backfill with existing fill and flew as required, grade and sod area. Perform closure and prrovide closure papers to the County, COST: .............. $ 2,205.00 NOT Permits and drawings included Handling of Contaminated soitsAiquids by others Transfer of fuel from old tank to new tank included N01e" In'the •.ens any lrnloteseen objects are cenlnrt.,.a vnderground thrl wifl be an oddlllenal charge. We Propose hereby to furnish moler;dl and labor -- con,I,il in accvrdonce with above speciPlcotions, for the sum of: rwen} Six Thousand gev6nHundrled Seventy Five and 00/100 25,T75.00 1 to h• mode as lotlows: All r.. pr.aal if (1VOlantccd to be ., .p.rtned. All work to be Compl.bd In o r,,I n like mannrr eccardrrng to H.ndard pro[licesAnr alteration or d..l.linn tram abn.e twr..rG.. ninnt in.o l-iF4 eerie r..r, ill be ececuled only upon written evirl and `•ill b.4e.nl an e•Iia chat qy . .nd .k.. 11he est:rnoteAll agree lnente renungrnl ,.Pnn .r. rkee ill or drlan beyond out cpnlrol. Owner to Corry ilr., 1.,nodo and ot4 •� ••,err sv onc.. O.r w 11,. y ore I fully co.ered by wmkar s Caroni ar Int�ronre ACCEPTANCE OF PROPOSAL— The above Prices. speciticalions and conditions are sahslaclory and dre hereby acceprea. You ors authorized to (fo the work as Lpecdled. Paymej l will be made AS outlined above See rc�erse side for 9u Iran;; and conditions. Date pl Acct,lnxnce AOhariiod No,... IN;, Props>a may be G. De ll Randolph .•rheiinwn by u% if net aee.Wl ..chin An drys. I UNDERSTAND AND AGREE TO ALL THE TERMS AND CONDITIONS ON THE REVERSE SIDE OF THIS PROPOSAL, e'gr rlurr TOTAL P.02 1995 08:40 7 3—rroposal LUTZ PETROLEUM EQUIPMENT INSTALLATIONS, INC. Service Station Construction - Tanks Installed. Lined and rested • Environmental Site Assessments Recovery Systems • Monitoring wells Installed 2020 Clinton Street 2200 N W. 1179) Street P.O. Bo 50,5 P WIX .51591 Linden, New Jersey 07036.0605 Pompano Beach. Florida 33061.0367 (201) M2-8888 Fax (201) 852-8883 (305) 971-5222 Fax (3O5) 960-0082 PROPOSAL SUBMITTED TO .. PMONC DATE City of Tamarac 7501 N.W. 88th Avenue CITY, :;rArg AND ZID CODE Tamarac, Florida AFCNITECT ATTN. PAUL FORKS DATF Or PLANS P.03 Exhibit"A" (305) 724-2436���-1t 6111`195 JOB NAMe Tank Removal & Replacement IOH LOCATION Fine Department-Commetdal b Turnpike ADDENDUM 01 JOB PHOI GENTLEMEN: WE ARE PLEASED TO SUBMIT QUOTATION ON OUR INTERPRETATION OF YOUR REQUIREMENTS. SUBJECT TO TERMS AND CONDITIONS PRINTED ON REVERSE SIDE OF THIS PROPOSAL. Please accept this as; Addendum incorporating the current contract between Lutz and the School Board of Palm beach County into our, previous quote to you dated 09/28/95 including indemnification as described therein. Nate In the event any unloraseen ebjeth are cvnranrd undrrpround There will be an additianat Chargq. We Propose hereby to furnish material and labor --- complete in accordance with above specifications, for the sum oft Parmrnt to be made as follows - All n.o+e... I 1. gvmnnr.ed to be at spgtiGed. All wwk re he completes in a wc•ti •••w+ Lee n rdinq To stondvrd piscineT. A..v ahereKen er Irgm Pbc.n +nrnGwr wr•t i ..ling e.trp costs -•Ill;be e..t,.reA anty wr vwon ind .n ardent. crW�II h.,nrn. un e.nv char q. aver and eboae Ihr .tir.•a Ie All ng.e.rN_T. ranungrn• wc,. ••s •.. .r. rr drlays beyond awrtontrvl. Owns• •v carry lie, Ie.nntle n.d v ti••r rntto•Y n.vro Ovr watsers qtr f..11r 1 .....1 by warlt m . rono•^rv,:e. InT.,, 6.Tr ACCEPTANCE OF PROPOSAL— The above prices, speciliCetions Lind canddiontt nre satislwory andlare hereby accepted You ere authorized to co the work as specified Psymjanl will be made as outlined above bee •t: vi: ?,C :��dtp for all terms anp or)ndilions. tio4; nl Ar�rptan<r dollars A „Ihor:sed S,gnatura Na- This P.prtgsal a•ay be G. Da Randolph ..rhd-awn by vs if not accepted within 30--------.--- -days. I UNDERSTAND AND AGREE TO ALL THE TERMS AND CONDITIONS ON THE REVERSE SIDE OF THIS PROPOSAL. TOTAL. P.03 OCT--05-1995 11:38 9 7 ] Exhibit u$u P.02 CONTRACT BETWEEN THE SCHOOL BOARD OF PALM BEACH COUNTY, FLORIDA AND LUTZ PETROLEUM EQUIPMENT This contract is made by and between THE SCHOOL BOARD OF PALM BEACH COUNTY, FLORIDA, (hereinafter referred to as the Board or School Board) and LUTZ PETROLEUM EQUIPMENT, (hereinafter referred to as the Contractor to provide Petroleum Related Services, SECTION I - Term of Contract This contract shall be for the period beginning April S. 1995 through April 5, 1996. The contract may be renewed for three additional one-year periods at the annual anniversary date. The contract will not extend beyond the fourth year. SECTION 11 - Services The Contractor shall provide Petroleum Related Services per specifications in RFP 95C-015W and the proposal submitted by the Contractor. All addenda issued to RFP 95C-015W, if any, are also made a part of this contract. SECTION III - Cost of Services The Contractor shall be paid for services as listed in the RFP for Petroleum Related Services for the School District of Palm Beach County. SECTION IV - Terms and Conditions The Contractor shall have the option to terminate the contract upon written notice to the autho- rized representative of the School Board. Such notice must be received at least 90 days prior to the effective date of termination. The School Board shall have the option to terminate the contract upon written notice to the authorized representative of the Contractor. Such notice must be received at least 30 days prior to the effective date of termination and the Contractor shall only be entitled to compensation up to the date of termination. The Contractor shall not be entitled to lost profits. 0 OCT--06-1995 11:39 j ,S--' C2 7 7 Exhibit "Bn P.03 Early termination of the contract by the Contractor may prohibit the Contractor from submitting proposals for a period of three years from the date of completion of the contract_ The School Board, shall establish the expiration date of the contract. There shall be no assignment of the contract or compensation to be derived therefrom by the Contractor. Included in this Agreement are the terms and conditions as described in the Request for Proposal, RFP 95C=015W, which by reference herein is made a part thereof. SECTION V - Indemnification For the purposes of general liability as opposed to professional liability which is addressed in the second paragraph of this Article, the Contractor agrees to protect, defend, reimburse, indemnify and hold the School Board, its agents, employees and elected officials, and each of them free and harmless at all times from and against any and all suites, actions, legal or administrative proceedings, claims, demands, damages, liabilities, interest, attorney's fees, costs and expenses of whatever kind or nature whether arising during or after completion of the work hereunder and in any manner directly or indirectly caused; occasioned or contributed to In whole or in part, by reason of any act, omission, fault or negligence whether active or passive of the Contractor or anyone acting under its direction or control, or on its, behalf in connection with or incident to the performance of this contract. The Contractors aforesaid indemnity and hold harmless obligations, or portions of applications thereof, shall apply to the fullest extent permitted by law but in no event shall they apply to liability caused by the sole negligence or willful misconduct of the School Board, its elected officials, employees and authorized agents. SECTION VI - Insurance Insurance will be required as stated in RFP 95C-015W. The School Board of Palm Beach County shall be named as additional insured. SECTION VII - Amendment This contract shall only be amended or modified in writing executed by both parties. OCT-05-1995 11:39 ._ �% S� ? 7 Exhibit "B" P.04 SECTION VIII - Strict Performance • The failure of either party to insist on strict performance of any covenant or conditions herein shall not be construed as a waiver of such covenants or conditions for any Instance, This contract shall be construed in accordance with the laws of the State of Florida, If any litigation shall result from this agreement, venue shall lie in Palm Beach County, Florida, and the prevailing party shall be entitled to attorneys fees and court costs. This agreement shall not be construed against the party who drafted the same as both parties have had experts of their choosing review the same. This agreement is binding on the parties hereto, their heirs, successor and/or assigns. Section IX Should either party breach this agreement, the non -breaching party shall be entitled to all remedies as provided by law and equity. In witness whereof, this contract has been executed on the day and year first above written. L z Pet Equipment kZ��� WITNES WITNES 0 3. THE SCHOOL BOARD OF PALM BEACH COUNTY, FLORIDA BY: ai an Approved as to form: Schnol Board Attom ' ROSERTA. FpOSILLO • pC7-06-1995 11 4p REQUEST FOR PROPOSAL_ NO. SB 95Q-015W Tank Cleaning 24-hour Emergency Spill Response Calibration of Dispensing Systems Calibration of Inventory Systems Sheetpilirig (Z-Spline) De -Watering Systems Hydraulic Vehicular Lifts Fuel Delivery, Transfer Exhibit "B" P.05 X X X X X X B. List any additional services below- Price lists, rates, etc. may be attached to submittal. Fall Range of Environmental 5 ces Including! Assessments, GARS, RAPS, Remediations, Etc. Well:Drilling Services (In House) C. Equipment - Attach a list of specialized equipment necessary to complete tasks within your capabilities; Give descriptions as to size, age, and type. 34.0 SITE SAFETY; PLAN - Attach a Copy of your firm's generic Health and Safety Plan. 35.0 SCENARIO RtSPONSE: 35,1 Described below is a sample project. Prepare a proposal specific to complete the project. Include a description of tasks to be completed, a list of equipment to be supplied, a breakdown of hours per employee, projected time requirements, destination of all wastes, and site safety plans that would be consistent with the project. An elementary school located in the city of West Palm Beach has a 1,000 gallon under- ground, We steel, single -walled storage tank that supplied No. 2 diesel fuel to a boller. Product line (50 feet) and vent pipe (20 feet) are steel. Soils surrounding the tank were found to contain petroleum products at 75 ppm as read by an Organic Vapor Analyzer. Tank has been pumped and currently contains less than one inch of product. The tank is under asphalt with 1,000 yards clearance In all directions. No underground or overhead utilities are known to be in the area. One ton of concrete is involved in ballast and bed. Tank' and line are to be tested, removed, and replaced with a double -walled fiberglass tank and secondarily contained piping. School will be in session during all tasks. Attach additional pages as necessary. -17- OCT-®G-1995 11: 40 _ S Ste_ - / Exhibit "B" P• 06 REQUEST FOR ROP08At, N . SO 95C-015W C� 36.0 FEES: 3611 The following fees will remain fixed for the first year of the contract. A. Base Price; On a separate paper, following the format below, list employees (by position) ) required to complete these tasks indicated and their hourly compensation, You should include si4bcontractors where necessary. Examples. Project Manager $ Jhour Electrician $ /hour SEE ATTACHED Crane Operator B. Eauipment and Serv_Icg Q2§1§: Listed below are typical items that could be purchased during contractual period. Give costs. Double -walled fiberglass underground storage tanks (as manufactured by Owens -Coming) 550 gallon(600) 1,000 gallon 2,000 gallon (2,500) 5,000 gallbn 10,000 gallon 20,000 gallon $ 3, 945.00 /unit $5_,_J 42. Q0/unit $ 7+195.00 /unit $ 7, $00 00 /unit $ 11. 000, 00 ]unit $ 23,965.00_1unit Fiberglass clad steel underground storage tanks (as manufactured by Modem Welding) 550 gallon $ 2, 725, gg /unit 1,000 gallon $ 3,500,00/unit 2,000 gallon $ % 725___00 /unit 5,000 gallon $ 7, 0 unit 10,000 gallon $ 10, 900.00 /unit 20,000 gallon $ 21, 490_.00 /unit Vaulted above -ground steel storage tanks (as manufactured by Convault) 250 gallon $6,362.00 /unit 500 gallon $ 7, 450.00 /unit 1,000 gallon S9 230 010/unit 2,000 gallon All prices for vaulted above -ground tanks listed immediately above shall include a 30 year warranty and transportation to site. Miscellaneous Five Gallon Overspill Manhole Installed $600 /unit 2" FRP piping with 3" FRP Second. Containment as manufactured by Ameron, installed. $ 35 /foot -18- ❑CT-06-1995 11!40 j S�-c,Z 7 7 Exhibit "B" P.07 BF —QUEST FOR P OPOS C-015W 1/2" copper piping with 3" FRP Second. Containment, installed_ $_ 10 00 _/foot A/G 314" copper piping with. 3" FRP Second, Containment. (installed) $ 9.00 /foot A/G Sheetpiling (Z-Spline) 25 ft, sheets (installed) $_. _ Z10.00 Ain. foot De-Wateri ms 8" Primary with PVC wellpoints (installed) $, no nn /foot Operation Costs $ 250_on /day Tank Sluriy Sealing with concrete $_ _ 0_5oe/gallon Crane Services $ :5n nn /day OVA Rental with technician $ 500_00 /day Petroleum Contaminated Soils Stockpiling with berm $ 3.00 /ton Dispos.ol with analysis and transportation $_ rn_nn ton Services Services Tank Tightness Testing $ 450.00 /Petroleum tank Line Tightness Testing $100.00 /line Virgin Fuel Transfer $ /gallon Oily Waste ,Disposal $ 0.75(P [gallon FuelM/ater Mixture Disposal $ 0.50(r /gallon Sludge Disposal Gasoline Sludge $4nr?_nn /55 gal, drum Diesel Sludge $ 375.00 /55 gal. drum (Sludge disposal to include drumming, analysis, transportation and disposal fees.) C. Miscellaneous Charges Briefly define additional charges as related to the following. Give their amounts and explain when and how they are assessed. (Attach a separate page if necessary.) Overtime: 1 .5 x normal rate after B.0 hours/day Downtime: Normal rates as quoted herein Mobilization Charges: $1, 000 — $1, 500 for Heavy Bqu pment typically _ -19- OCT-06-1995 11:41 Exhibit "B" P-0" LUTZ, PEI, INC. CONSTRUCTION PRICE LIST C� C� C� P n-R-1-10IL-1; . . . $ 30-00/Hour Electrician, Hc]Pcr . . . ... . . . . . . . . . . . . . . . . . . . . . . . . ' * . . . . . . . . . . . . $ 40.00/Hour Elettrician, JoUrnc)mlan . . . . . . . . . . . . . . . . . . . * . . . . . . . . . . . . . . . . . . . $ 60.00/Hour Elo�icfffi'4 Muter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 45.00/HouForeman, Foreman, Job . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 30.00/Hour Larorer . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 40.00fHour pl*ber� journeyman I . $ 60.00/Hour Plumber, Master - - - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . 1 $ 55.00/Hour Supervisor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * . . . . . . . . . 0 -- * 31.4 Air, Compressor Aith Tools . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . 150.00/Day Backhoe, Rubber Tire Coinbination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S 500.00/Day Backhoe. 80,000 gTrack txca-vator N-00 Move . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1.250.00/Day Cement Mixer ......................................... S 125.00/DayS Compactor . . . . . . . ........................... * , . . . . . . 75-OO/Day Concrete Saw ......................................... .......$ 100.00/Day Duinp Truck . . . . . ........................................... $ 500.00/Day Loader . . . .............. . . . . . . . . . . . . . . . . . $ 750.00/Day Generator, Honda 120-140 volt (Fuel not inc) .. . . . . . . . . . . . . . . . . . . . . . . . . 50.00/Day Pi i c Fitting Truck .......................... I . . . P . . . . I . . . . . . . . . . . . $ 25.00/Day Pump, 2" Air - Air Compressor not included . . . . . . . . . . . . . . . . . . . . . . . . . . . . S 100.00/Day Pump, 2" Electric . . . . ........................... - . . . $ 85.00/Day. Pump, Simmer ............. $ 40.00/Day ......... Pump, 3" Trash ............... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S 100,00/Day Service Track ............................................. * * * $ 10.001Hour Wilder and Torches ....................................... * .... $ 20.00/Hour Trawit................................ . . . . . . . . . . . . . . . . . . . . $ 15.00/Day Trowel Machine . . .......... I ... I . I ........ . . . . . . . . I . . I . . . •S 75-001Day H6 . )ium Detector . . . . . . . . . . I .......... . . . . . . . . . . . . . . . . . . S 200,00/Day Nitro . . .I . ................... gen . I I .$ . . . . . . . * ' ' 100.00/Day Explosive Meter .... ; ........... ......... . . . . . . . . . . . . . . . . . . . . $ 25.00/Day Pen-X Devaporizer for Tanks ........................................ S 150.00/Day Pcn.X tite tank Test (onc;tank up to 2,000 921) ............. . . . . . . . . . . . . $ 600.00/1"ank Petro -Tito tack Test for 06b additional tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S 450.00/Tank Subcontractors ................................................ $ Cost + 200/6 OCT-06-1995 11:41 `�.w � Exhibit "B" P.09 SCHEDULE A ENVIROI TwENTAL MJOR OIL L.alaoR: Administrator. ...... $ 45.00/Hour Administrator, Sr. ................. ......... $ 75.00/Hour Architect, Professional ............. ..................... _ ..... $ 50.00lHour Chemist .............................................. . ... S 25.00/Hour Clerical........ _ ............ . .... . ................... $ 45.00/Hour Computer Drafting ................. ............................. $ 35.00/Hour Drafti5 n....................................... I ........... ..... . . $ 60.00/Hour irnginecr................ . ..... . .............. . ... .. . $ 85.00/] our Enginep-r, Professional ............................ ............ Errtironmentel Scientist .. .............................. * ........... $ SOAO/Haur ...... $ SO.OQ/Hour Go6logist..................................... I ...... _ $ 75.00/Hour Hydrogeologist ......... . ......................... I ....... _ ..... Hydrogeologist, Professional ......................................... $ 85.00/Hour $ 50.00/Hour inspector ........ ....... . ..... . . ... . ...................... $ 65.00/Hour Landscape Architect .. ............ . ....... . ........... ......... 105.00/f dour Principal ................................................... S 55.00/Hour Supervisor ................................... . .............. $ 80,00/hour 5uivcy Crew .. . .... .......................................... Technician, Sr ..... ........................... ...... . .. .... $ 45,00/Haur 7 $ 40.00/Hour Technician ....... .............. . .................. . ........ UIP Interface Probe ..... .. ...... ...... ...... $ 25.00/Hour Monitor Well Bailer Pump .......................... ....... • • ...... S 15.00/Hour Teflon Bailer ...................... . .... . ............ . ........ $ 10.00/14our Organic Vapor Analyzer/Flame Ionization Damtor ............................ $145.00/1-lour Transit ......... ...... . ...... . ........... . ............ . ... $ 15.00/Day Hand Auger Samples ..:.............................. ... $ 10.00/Ft. Split Spoon Samples .. . . .... . ................... ............... $ 12.00/FL. Double Ring Infiltrorneter Test .............. . .................. . ..... $100.00/Hour Data Logger ............ ................................. . ... $145.00/Hour S Transducers .......................................... ........ 25-00/Day $ 5.00/Day PhMeter ...... . ..... ....................................... $ 25.00/Day Conductivity Meter ................................. ............ S Cost + 20% Subcontractors................................................ 0 OCT-05-1995 11:41 73 Exhibit "Be' P.10 RAVEL AND PER Dl Z= ... $ 0.25/Mile Auto ....... . . .. ... ....... . .. . ......... ....... . ..... $ 0,40/Mile Light Truck ........ ................ .................... 0 Heav1; y Truck and Meals ... ........ . ........ . ........ . ... . I ... I .. $ Cost + 15% & 0 C� • OCT--06-1995 11:42 53 % Exhibit nSnP.11 petro-Tite tank testing process include two on -site certified technicians (up to 10 hours portal to portal), all required Petro - able air compressor, generator, scaffolding, product transfer (up Titeltesting equipment, PO4to 50 gallons) and viscosity al".3 fluids. Overtime labpr for Petro-Tite tank: and line testing mill be charged after ten (10) hours at the rate of $60.00 per hour, per man. The; Pcn-X Devaporiter is used for the removal of trapped air in tanks or lines prior to Petro -Title testing to insure valid test results. The Helium Detector is used for the detection of underground line leaks through the subgrade, asphalt or concrete. The Nitrogen Tester is used for testing Stage 11 Vapor RecoN'ery Systems. The Explosive Meter is used to monitor the % LEL in ail atmosphere. TRAVEL. AND PER DTL,M: Auto .... _ ...... ' ............................. . .... . ......... S 0.25/Mile Light Truck .................. .................................. $ 0,40/Mile $ 0.75/mile Heavy Truck ............... . ..... _ ........... ............. Lodging and Meals..... .................. . ........... . ...... . .....$Cosh 15% TOTAL P.11