HomeMy WebLinkAboutCity of Tamarac Resolution R-94-1591
Revised 8/17/94 Temp. Reso. No. 6803
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-94- 15Y
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TAMARAC, FLORIDA, AUTHORIZING THE
CITY MANAGER TO APPLY FOR FINANCIAL
ASSISTANCE FROM THE UNITED STATES
INTERMODAL SURFACE TRANSPORTATION
EFFICIENCY ACT (ISTEA) THROUGH THE
BROWARD COUNTY METROPOLITAN PLANNING
ORGANIZATION (MPO) FOR A TRANSPORTATION
ENHANCEMENT PROJECT TITLED "SOUTHGATE
BOULEVARD PEDESTRIAN AND BICYCLE
CORRIDOR"; PROVIDING FOR CONFLICTS;
PROVIDING FOR SEVERABILITY; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Tamarac, Florida has
determined the Southgate Boulevard Pedestrian and Bicycle Corridor
project to be an important transportation enhancement priority; and
WHEREAS, the City of Tamarac, Florida is requesting the Southgate
Boulevard Pedestrian and Bicycle Corridor project be considered and
placed on the Broward County Metropolitan Planning Organizations (MPO)
enhancement cycle 1994 priority projects lists; and
WHEREAS, it is a requirement of the program that this Resolution
be adopted and become an official part of the application; and
1
Revised 8/17/94 Temp. Reso. No. 6803
WHEREAS, the Director of Planning recommends approval of this
request; and
WHEREAS,
the
City of Tamarac,
Florida is willing
to
contribute
local funds in
the
minimum amount
of $35,000.00
for
financial
assistance to the Southgate Boulevard Pedestrian and Bicycle Corridor
project; and
WHEREAS, City of Tamarac, Florida wishes to encourage additional
support for the Southgate Boulevard Pedestrian and Bicycle Corridor
project by other interested parties; and
WHEREAS, the City of Tamarac has an officially adopted local
comprehensive plan, including a trafficways element, pursuant to the
Local Government Comprehensive Planning Act, and all segments of the
public were offered an opportunity to participate in the planning process
leading to the adoption of this document; and
WHEREAS, the City of Tamarac has determined the Southgate
Boulevard
Pedestrian
and
Bicycle
Corridor
project
to be consistent
with
the Goals,
Objectives
and
Policies
of the
Tamarac
Comprehensive
Plan;
and
WHEREAS, the City of Tamarac is in a fiscally and legally
responsible position to satisfactorily develop, operate and maintain the
project in accordance with the program requirements; and
2
Revised 8/17/94
Temp. Reso. No. 6803
WHEREAS, the City Manager is authorized to accept and execute all
appropriate documents and contracts for the purpose of administrating
the funding.
NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
TAMARAC, FLORIDA:
SECTION 1: That the foregoing whereas clauses are hereby
ratified and confirmed as being true and correct and are hereby made a
specific part of this Resolution upon adoption hereof.
SECTION 2: That the City Manager is hereby authorized to
request consideration and placement of the Southgate Boulevard
Pedestrian and Bicycle Corridor Project on the Broward County MPO's
Transportation Enhancement Priority Project Lists, for funding under the
Intermodal Surface Transportation Efficiency Act (ISTEA).
SECTION 3: All Resolutions or parts of Resolutions in conflict
herewith are hereby repealed to the extent of such conflict.
SECTION 4: If any clause, section, other part or application of
this Resolution is held by any court of competent jurisdiction to be
unconstitutional or invalid, in part or application, it shall not affect the
validity of the remaining portions or applications of this Resolution.
3
11
1
Revised 8/17/94 Temp. Reso. No. 6803
SECTION 5: This Resolution shall become effective
immediately upon adoption.
PASSED, ADOPTED AND APPROVED this,7� day of , 1994.
ort�� ak-�t�w�
NORMAN ABRAMOWITZ
MAYOR -
ATTEST:
CAROL A. EVANS
CITY CLERK
I HE CERTIFY that I h
thi& RE OLUTION as to for
Ww'T HELL S. K
CITY ATTORN
roved
RECORD OF COUNCIL VOTE
MAYOR ABRAMOWITZ /2
DIST. 1:
V / M KATZ
DIST. 2:
C / M MISHKIN
DIST. 3:
C / M SCHREIBER
DIST. 4:
C / W MACHEK
4
J
t «
' r r
H W
nmmb!AM�
I
r
f
9
rl on on N1 In M �ry Rj �j �j N N N N N N N N N N N N N
N N N N
in Ln
_N w .r erg M N O N p
`� In N O NN MN N N N N an cy M N N M N M M
r r N ~ N N N
N N
g €
Iw
11
y "
x
C V q
N N J N N N N N H N N N N J m J J N
a+
'O
N
OC
L
p
..
K
i
�
x
O
2
y
C
K
U
M
d
N
Y
p
d
d
w
W
{�
d
V
V
O
"
p
~p
N
M
x
N
W
a
L
VI
N
�
d
M
N
L.
C
6
J
L
x
Ee
0 4.0
z
C
~
d
o
~
`
L)
4
«
d
d
m
C]
iPC
Z
r
b
Mdc
m
/�y
N
LiN
L
w
N
O
U
tpp
'p
b
m OI
m
m
q1
Y
C
p
m
U
. N M a . . . q O• O •+ r •/ Y1 :d
Yr
_4
p
L
O[ I^ p
'mp 9
1 L U m
roL
r q P N N N N N N N N N N
iP J _a a :p w rq S a I�% m r
cc
N N N N cryN r p w
f. pSH
Sw
C. pgg
NppID t N N tiv NM
NM M M
W : C N M N
U
a y
L p
M U
tl
6 F
y V = d V V V V V V V V V V V L V V V V V V V 4
tlJ ttl 4 tl tl i tl tl tl tl tl L tl tl q tl q p tl tl
►-
4 L.
U tl 7 Y Y 4 4 u 4 Y. Y 4 t 1 , 2 9
u a = m m m m m m m m m m m iiiiii m m m �y of m pf m
lk-m M ` 1�
,,, ` q x g Y a �c a a g a 9 a a M a a a �, a s a s
.� tl a OYq Y tl 4 Y tl q tl 0 O a tl q A A L ya O tl tl tl
Y Y U U U U U U U Y M u u 0 Y U Y Y U
ZE
_ F g
J
Y V
_X X
W
O
M �
K V
~ � V
V
M
C
fYi M �
y� p r O
U 4z cc
P r V E fJ m
Y 4 fn ]+
In
.J ?+ O w Lp Vc ( N N N Y O E
W L Y tl �+ y p O CCC 6E
V L. N L
y E M 4 tyl O i i N O �. d r 1�+ a r e
~ x N a O
r p M « V V M O m L V O V O10
d 1[
dca m
a u Y h M o« r Y M V t M V 3N � A M t �p0 yH�
4.1
y� C 9 r
N ti O d N 4 .P-. Ci 0. id t iOK O W ti 5
gr►
O V
t O
L r
S V
d
F 4 L
L
d : L L
e
N y �
m _ o _g d
d x
m
Im
yuj p $ a e d Y a L M N in
K L a WN
F � tf a �+p L
t a �+
0. d
x m z d eC W 'i p O u O u hi itlmp CA Cio fO t a.lpp.► a AL
N M M F'1 M M M M M .Qf d .yf V J v J N f4 YM1 N h N V% 11p W •
k-yy-iS9
APPENDIX C
WAIT Or FLORIDA MPARTMFNT OF TRANSPORTATION
APPLICATION FOR TRANSPORTATION ORM LNVIRONAII:h"rAL AN1MAN$soRiyr
ACf!ML'N7
ENHANCEMENT PROJECTS 03,w
P+sc I of �
eamr of Applicant: Cit of Tamarac Project Name: Southgate Blvd. Pedestrian & Bicycle
Submired by: DOT/MPO/Count 3
y Priority (relative to other applications submitted
(circle as appropriate) by the Applicant).
Project Sponsor (municipal, )county, state, or federal agency):
of Tamarac, Florida
Contact Mike Vander M eulen, A i C P
Title Director of Planning
Address 7525 N W 88th Avenue, Tamarac, Florida 33321-2401
Phone 722-5900
FAX 724-2453
I. Qualifying Activities:
Check one or more categories under which the project qualifies as an enhancement activity:
possible does not ensure eligibility. Each activity checked must meet all criteria listed for thatactivity in Appendix IB ofegories FDOT
Procedure #525-030-300-c).
IJ Provision of facilities for pedestrians and bicycles. (See I of Appendix B)
❑ Acquisition of scenic easements and scenic or historic sites. (See II of Appendix B)
❑ Scenic or historic highway programs. (See III of Appendix B)
A Landscaping and other scenic beautification. (See IV of Appendix B)
Historic preservation. (See V of Appendix B)
Rehabilitation and operation of historic transportation buildings, structures or facilities (including historic railroad facilities and
canals). (See VI of Appendix B)
3 Preservation of abandoned railway corridors (including the conversion and use thereof for pedestrian or bicycle trails). (See VII
of Appendix B)
Control and removal of outdoor advertising. (See Vill of Appendix B)
] Archaeological planning and research. (See IX of Appendix B)
l Mitigation of water pollution due to highway runoff. (See X of Appendix B)
F NECESSARY, USE ADDITIONAL SHEETS TO RESPOND TO THE FOLLOWING:
Project Description:
(a) What t>> pe of project is beins proposed?
A pedestrian and Bicycle C orridor with landscape Improve m ents .
01ODescribe the direct relationship of the Project to the intcrmodal transportation system relative to function, hroxi n y m
impact. (Onc or more may apple)
This project abuts numerous state roadways including Sawgrass Expressway & University Dr.
(c) Where is the protect located (vtd \kllm arc the iernuni, if appropriate)'
T�eTaprooiect� u96
n e� t-tnrest alonq Southgate Blvd, from Sawgrass Expressway to the Eastern Limit
lIli iinun:ui/r ,ut� �prcl;lt rltal,ulrinlu t Ili„III see r'exerse side
This project will create a pedestrian & bicycle corridor
along the C-14 canal- Additional landscaping will add to Al'►'rNulx t
the scenic beauty. I UK^f 52` DW, k
I N"NONMINfAL MANAGLtiiI?.1
(1); W
I'+Rc of 7
(e) Explain the project's relationship to federally or state owned property or other publicly owned property This project abuts and intt'rsects the 5awgrass Expressway and University Dr. &pthe (�j a� lcana�
(0 What need will the project address?
The project will address the need for additional safe pedestrian & bicycle paths with scenic beauty.
(g) What is the status of the project (i.e. under design, plans on shelf, not begun, to be initiated, c(c.)?
The status is awaiting funding. No design has been planned. (very conceptual)
(h) What work has been performed to date and by whom?
"-None.
(i) What work is expected to be performed?
Dependant upon funding,
3. Selection Criteria:
Attach documentation as exhibits to this form.
(a) If it is proposed that the project be administered by a governmental entity other than the state, document that this entity
has the fiscal, managerial, environmental and engineering capabilities to manage the project consistent with federal
requirements.
(b) Document public (and private, if applicable) support of the proposed project. (Examples include; written endorsement,
formal declaration, resolution, financial donations or other appropriate means).
(c) Document proposed project has met all eligibility criteria for each activity marked on the front of this form (See Appendix
B).
4. Project Cost:
What is the estimated total cost of the project and how will it be funded?
Federal 5 280,000 _ + State $ 35,000 + Local $35 000
0 = Total S352, 000
Federal 80
+State 10 3'a +Local 10 %
(cannot exceed 80 %)
CERTIFICATION OF PROJECT SPONSOR
hereby cenify that the proposed enhancement project herein described is supported by the City of Tamarac
(municipal. county. slate e era agenc)
id that said entity is willing to: (1) provide the required funding match; (2) enter into a maintenance agreement with the Florida
apartment of Transportation; and/or (3) suppon other actions necessary to fully implement the proposed project.
S�cn�furr
Mike V o nder M eulen, ATC P
\Ante 1111re%C lyrr of pflljll •
Director of Planning
/; .
EXHIBIT A
The City of Tamarac is incorporated and has the physical, managerial,
environmental and engineering capabilities to manage this project consistent
with federal requirements. If the City of Tamarac does not have the staff
available, the City will contract with the proper agencies to complete the
project.
C�
EXHIBIT B
See attached letter to Mr. Bruce Wilson. 9
�J
_aJJ_
i CITY OF TAMARAC
7525 Northwest 88 Avenue
Tamarac, Florida 33321-2401 �� Rhone (305) 722-5900
Fax (305) 722-4509
0
May 20,1994
Mr. Bruce B. Wilson
MPO Administrative Assistant
Department of Strategic Planning & Growth Management
Transportation Planning Division
115 S. Andrews Avenue, Room 329H
Fort Lauderdale, FL 33301
RE: Southgate Boulevard Pedestrian and Bicycle Corridor
Dear Mr. Wilson:
I am submitting this application for the Southgate Boulevard Pedestrian and
Bicycle Corridor Project on behalf of the City of Tamarac.
At its Workshop on May 16, 1994, the City Council of the City of Tamarac
endorsed this project and requested submission of the project to the
Metropolitan Planning Organization under the U.S. Intermodal Surface
Transportation Efficiency Act of 1991 USTEA) funding program.
I look forward to working with you and the MPO on this enhancement
project.
If you have any questions, please feel free to contact me.
Sincerely,
Mike J. Vonder Meulen, AICP
Director of Planning
MJV/rmc
94-5-D 17L
.1 ,AN tt2l)A1 ,l,, i;,I ,'`C'. rI N,
EXHIBIT C
Provisions for Pedestrian and Bicycle facilities.
A. The City of Tamarac intends to meet or exceed all standard provisions
for the accommodation of pedestrians and bicycles along the roadways with
this project.
B. This project will meet or exceed the most recently -approved planning
and design requirements as follows:
1. American Association of State Trans ortation Officials
AASHTO Guide to Bigycle Facilities.
2. Federal Highway Administration FHWA Standards for
Pedestrians.
3. FDOT's Florida Pedestrian Safety Plan.
4. Americans with Disabilities Act Architectural Guidelines.
C. The City of Tamarac will submit a written commitment to maintain
and operate the bicycle and pedestrian facilities in perpetuity when requested
to do so.
D. The bicycle and pedestrian facilities are compatible with the goals,
objectives and policies found in the City of Tamarac Comprehensive Plan,
especially in the future land use element and traffic circulation element.
E. All bicycle and pedestrian facilities and their features will be available
to the general public during normal operating hours.
F. Map of the proposed improvements is attached.
I*
0
41
EXHIBIT C cont.
Provisions for Landscape Improvements
A. The City intends to utilize the funds for new landscaping on proposed
facility improvements. This project will not include any routine landscaping.
B. The proposed project will:
1. Be professionally designed by a registered landscape
architect.
2. Provide for period of plan establishment and perpetual
maintenance; and
3. The landscaping will conform to all safety standards in
accordance with Hichway Landsraping, Roadway and
Iraffic 12csimrSafety
C. The City of Tamarac plans to include the landscaping under the
approved City list of landscape materials. All irrigation will be well -style
irrigation for all medians with vegetation. Approximate number of plants
include five hundred (500) trees, one thousand (1,000) shrubs from the
approved plant list.
D. The City of Tamarac will supply a written commitment to maintain
the landscape in perpetuity.