HomeMy WebLinkAboutCity of Tamarac Resolution R-90-066Temp. Reso. #5717
1
29
30
31
1.
34
35
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R--90-
A RESOLUTION AWARDING A BID FOR TAMARAC UTILITIES
WEST PROJECT 87-19, REHABILITATION OF SEWAGE PUMP
STATIONS 11, 11A AND 14B, BID NO. 90-1; AND PRO-
VIDING AN EFFECTIVE DATE.
WHEREAS, bids were advertised in the Fort Lauderdale
News/Sun Sentinel, a newspaper of general circulation in
Broward County on January 8, 1990 and January 16, 1990; and
WHEREAS, bids were opened on February 5, 1990; and
WHEREAS, UTILITIES SERVICES, INC. is the lowest fully
responsive and responsible bidder.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
TAMARAC, FLORIDA:
SECTION 1: That the bid of Utilities Services, Inc.,
1940 N.W. 22nd Street, Pompano Beach, Florida 33069, in the
amount of $202,091.40, for Tamarac Utilities West Project
87-19, Rehabilitation of Sewage Pump Stations 11, 11A and
14B, with funds to be taken from Account #425-367-535-6PL,
entitled Rehabilitation of Pump Stations 6, 11, 11A and 14B,
is HEREBY APPROVED.
SECTION 2: This Resolution shall become effective imme-
diately upon adoption.
PASSED, ADOPTED AND APPROVED this u day of
1990. y
ATTEST:
CAROL . EVANS
CITY CLERK
I HEREBY CERTIFY that I have
approved this RESOLUTION as
to form. k
ALAN K. RUF
INTERIM CITX ATTO WE
RECORD OF COUNCIL. VOTE
MAYOR A8RAM0WITZ !2e_L._.
DISTRICT 1: C/M ROHL .—
DISTRICT 2: C/M TEUER
DISTRICT 3: C/M HOFFMAN
DISTRICT 4: n_ VP1 11-NDER
�0
•
PROPOSAL
CITY OF_TAMARAC, FLORIDA
To the City of Tamarac, Florida as the party of the first
part.
41
Proposal made by yc CA.
as party of the second part,
whose business address is / 9 /- 7-2 A- s4ua
State whether Bidder is an individual, a partnership or a
corporation .�
If a partnership or corporation,
or officers
,-� 6 2:jtQ 4
give names of all partners
Accompanying this Proposal is a bid security for
FromL10�11�E.�
Name of Surety
1. The undersigned party of the second part, do hereby
declare that we have carefully examined the Contract
Documents relating to the above entitled matter and the
work, and have personally inspected the location of the
work.
2. The undersigned do hereby declare that we are the only
person or persons interested in the said bid; that it is
made without any connection with any person submitting
another bid for the same contract; that the bid is in all
respects fair and without collusion, fraud, or mental
reservations; that no official of the Owner or any person
in the employ of the said is directly or indirectly
interested in said bid or in the supplies of work to
which it relates, or in any portion of the profits
thereof.
3. The undersigned do hereby offer and agree to furnish all
` materials to fully and faithfully construct, perform and
execute all work in the above entitled matter in
accordance with the Specifications relating thereto, and
P-1
to furnish all labor, tools, implements, machinery,
forms, transportation, and materials necessary and proper
for the said purpose at the prices named below for the
various items of work.
4. The undersigned do hereby declare that the prices so
stated cover all expenses of every kind incidental.to the
completion of said work and the Contract therefor,
including all claims that may arise through damages or
other cause whatsoever.
5. The undersigned do hereby declare that we shall make no
claim on account of any variation of the approximate
estimate in the -quantities of work to be done, nor on
account of any misunderstanding or misconception of the
nature of the work to be done or the grounds or place
where it is to be done.
6. The undersigned do hereby agree that we will execute a
Contract therefor, containing all the terms, conditions,
provisions, and covenants necessary to complete the work,
according to the Drawings and Specifications therefor,
within ten (10) calendar days after the award of the Con-
tract and notification of the acceptance of this proposal
by the party of the first part, and if we fail to execute
said Contract within said period of time, that the party
of the first part shall have the power to rescind said .
award and also retain for the Owner the bid security
accompanying his proposal which shall become forfeited as
liquidated damages.
7. The undersigned also declare and agree that we will com-
plete the work fully and in every respect on or before
the time specified in said Contract, and so authorized
the party of the first part in case of failure to
complete the work within such specified time to employ
such men, equipment, and materials as may be necessary
for the proper completion of said work and to deduct the
cost therefor from the amount due under this Contract.
8. The undersigned hereby agree that we will, at our own
expense, insure all persons employed by us in prosecuting
the work hereunder against accident as provided by the
Workmen's Compensation Law of the State of Florida.
9. The price for the work shall be stated in both words and
figures in the appropriate place in the Proposed form.
In the event that there is a discrepancy between the
price written in words and the price written in figures,
the former shall govern, .
11
P-2
LJ
•
10. The undersigned bidder acknowledges receipt of Addenda as
listed below and agree that we will be bound by all
addenda whether or no listed herein.
Receipt of Addendum No. Date
No. Date
No. Date
No. Date
No. Date
No. Date
is hereby acknowledged, Ilk
Contractor U' - 44" 'U~4j% t—
By
r
Titles-'
Address 40
Corporate Seal
Attest: .•.
License No. C G GD 3 5
P-3
P/S11,11A,14B
PROPOSAL
TAMARAC UTILITIES WEST
PUMP STATION REHABILITATION
CITY PROJECT NO. 87-19
CITY OF TAMARAC BROWARD COUNTY FLORIDA
PROPOSAL FOR REHABILITATION OF PUMP STATION NO. 11
Item Estimated
No. Quantity► Description
11-1 Lump Sum Removal and disposal of all items
so designated on the contract drawings
at the Lump Sun► price price of:
Total
n&U6!
Dollars and
Cents
11-2 Lump Sum Furnish and install dual submersible
pumps and motors, and all appurten-
ances, including.raising the top of
concrete wet well to a higher elevation
and providing a new concrete cover slab
and aluminum hatch cover at the Lump
Sum price of:
. C.C.
Dollars and
Cents
Pump Supplier:
11-3 Lump Sum Electrical conduits, wire and all
connections including wet well float
control system at the lump sum price
of:
Dollars and
Cents so? 113, go
P-4
J
Item Estimated
No.'Quantity
igtion
Total
11-4 Lump Sump
Furnish and install the concrete
valve vault, valve vault piping,
aluminum hatch cover and all
appurtenances at the Lump Sum
price of:
kLa�eaz
U.
Dollars and
Cents8.5���.
�U
11-5 Lump Sum
Emergency pump by-pass piping and
all appurtenances including 4 inch
isolation plug valve, at the lump
sum price of:
•
Dollars and
.a Cents
11-6 Lump Sum
Fosroc interior surfaces of existing
and new portions of wet well at the
lump sum price of:
Dollars and
ZA Cents
$ 3a 13 . �C,
0
P-5
E
Item Estimated
No. Quantity Description Total
11-7 Lump Sum Electric by pane pumping for
total lift station Work at the
lump sum price of:
Dollars and
Cents $ 3
11-8 Lump Sum Electrical control cabinet, concrete
support, conduits, power supply and
all appurtenances at the lump sum
price of:
tZ!/I2� Dollars and •
cents Q 5C-), 5 O
11-9 Lump Sum Modular Remote Telemetering Unit (MRTU)
at the lump sum price of:
Dollars and
cents $
P-6 0
•
0
Item Estimated
No. 2uantity Description
11-10 Lump Sum Site Type No. 1, Bahia sodding
at the lump sum price of:
Dollars and
Cents
PUMP STATION NO. 11 GRAND TOTAL FOR ITEMS 11-1 THROUGH 11-10
Total
' / NTOTAL (WRITTV (FIGURES)
P/S-REHAB#2
P•-7
g
PROPOSAL FOR REHABILITATION OF PUMP STATION NO. 11A
Item Estimated
No. Quantity Descri tion Total
11A-1 Lump Sum Removal and disposal of all items
so designated on the contract drawings
at the Lump Sum price of:
OZ2 , ii
rrCi'
Dollars and
Cents G d
11A-2 Lump Sum Furnish and install dual submersible
pumps and motors, and all appurten-
ances, including raising the top of
concrete wet well to a higher elevation
and providing a new concrete cover slab
and aluminum hatch cover at the Lump is
price of:
r r � YIG�iGfG�
Dollars and
Cents // 5 6 3.6 G
Pump Supplier:
11A-3 Lump Sum Electrical conduits, wire and all
connections including wet well float
control system at the lump sum price of:
Dollars and
Cents Q
Ll
P-8
C1
�J
0
Item Estimated
No. Quantity Description Total
11A-4 Lump Sump Furnish and install the concrete
valve vault, valve vault piping,
aluminum hatch cover and all appurt-
enances at the Lump Sum price of:
IfUMLN'Zi&6=22� E&UWZLT�QWd
='�'Dollars and
Cents Q
11A-5 Lump Sum Emergency pump by-pass piping and
all appurtenances including 4 inch
isolation plug valve, at the lump
sum price of:
Dollars .
.1.•Cents
11A-6 Lump Sum Fosroc interior surfaces of existing
and new portions of wet well at the
lump sum price of:
WAS
a �L:Dollars
P-9
zs�.c&
' 21340
Item Estimated
No. Quantity Description Total
11A-7 Lump Sum Electric by pass pumping for total
lift station work at the lump sum
price of:
eel Dollars and
Cents $ y222,2-0
11A-8 Lump Sum
11A-9 Lump Sum
Electrical control cabinet, concrete
support, conduits, power supply and
all appurtenances at the lump sum
price of:
Cents
Modular Remote Telemetering unit (MRTU)
at the lump sum price of:
P-10
Dollars and
Cents
•
$512 L1/• ';?D
It 0
Item Estimated
No. Quantity Description Total
11A-10 Lump Sum Site Type No. 1, Bahia sodding
at the lump sum price of:
Dollars and
Cents $ .�
PUMP STATION NO. 11A GRAND TOTAL FOR ITEMS 11A-1 THROUGH 11A-10
IR
�
RAND TOTAL (WRI
0
•
P-11
/) I -!
(FIGURE )
PROPOSAL FOR REHABILITATION OF PUMP STATION NO. 14B 0
Item Estimated
No. QuantitX Description Total
14B-1 Lump Sum Removal and disposal of all items
so designated on the contract drawings
at the Lump Sum price price of:
,L Dollars and
Cents �G
14B-2 Lump Sum Furnish and install dual submersible
pumps and motors, and all appurten-
ances, including raising the top of
concrete wet well to a higher elevation and
providing a new concrete cover slab
and aluminum hatch cover at the Lump
Sum. price ofy:
l.�
Dollars and
Cents
Pump Supplier:
14B-3 Lump Sum Electrical conduits, wire and all
connections including wet well float
control system at the lump sum price of:
Dollars and
Cents $ o? 113 E
•
P-12
11
� _C]O -- &v e
Item Estimated
No. Ouantity Description Total
14B-4 Lump Sump Furnish and install the concrete
valve vault, valve vault piping,
aluminum hatch cover and all appur-
te nces a the Lump Sum nric6e
WItUtA Dollars and
Cents q
14B-5 Lump Sum Emergency pump by-pass piping and
all appurtenances including 4 inch
isolation plug valve, at the lump
sum price of:
Dollars and
_ Cents via �ilJ
14B-6 Lump Sum Fosroc interior surfaces of existing
and new portions of wet well at the
lump sum price of:
�4 ., �..
Dollars and
zdzz Cents
P-13
Item Estimated
No. Quantity Descri tion Total
14B-7 Lump Sum Electric by pass pumping for
total lift station work at the
lump sum price of:
22d� Dollars and
/ 4
149-8 Lump Sum Electrical control cabinet, concrete
support, conduits, power supply and
all appurtenances at the lump sum
price of:
r Dollars and
Cents G9Z G
14B-9 Lump Sum Modular Remote Telemetering Unit (MRTU)
at the lump sum price of:
Dollars and
Cents
P-14
•
Item Estimated
o Quantity .....,._ . Description-- Total��.��,_....
14B-10 Lump Sum Site Type No. 1, Bahia sodding
at the lump sum price of:
Dollars and
Dents $ G
PUMP STATION NO. 14B GRAND TOTAL FOR ITEMS 14B-1 THROUGH 14B-10
GRAND TOTAL (WRITTEN)
P-15
1"
(FI RES)
.70
Item Estimated
No. QuantitX Description Total •
INDEMNIFICATION
1-i Lump Sum Consideration to Indemnification
for all Pump Statiions at the lump
sum price of:
Twenty Five Dollars and
NO Cents $ 25.00
DEDUCTIVE ALTERNATE FOR
FOR PUMP STATION RERABILITATION
Item Estimated
No. Quantity Description Total
D1 Lump Sum Owner provides the pump control
panel for Pump Station it complete
with all components installed for
the lump sum savings to the Owner of:
Dollars and
` Cents $ G G
P-16 41
1 Item
Estimated
I No.
.
Quantity
Description ,.
D2
Lump Sum
Owner provides the pump control
panel for Pump Station 11A complete
with all components installed for
the lump sum savings to the Owner of:
Dollars and
Cents
D3
Lump Sum
Owner provides the pump control
panel for Pump Station 14B complete
with all components installed foir
M
the lump sum savings to the owner of:
Dollars and
-f�-- Cents
11
TOTAL DEDUCTIONS FOR ALTERNATE BID ITEMS
(Items D1 Through D3 Inclusive)
P-17
K-�O-(04
M_-_,
/ u0U
GG
(FIGURES)
g sa-(p4�;,
RECAPITULATION OF CONTRACT 49
PUMP Station 11 Rehabilitation
Items 11-1
through 11-10 Inclusive
$L! 7
Pump Station 11A
Rehabilitation
Items 11A-1
through 11A-10 Inclusive
Pump Station 14B
Rehabilitation
Items 14B-1
through 14B-10 Inclusive
$ (q� v�' Z, 1
Indemnification
Item 1-1
25.00
BID GRAND TOTAL
/, Z16
(Figures)
11
TOTAL DEDUCTIONS FOR ALTERNATIVE BID ITEMS
Items D-1 through D-3 Inclusive $ G
ALTERNATE BID GRAND TOTAL
A ERNATE BI RAND TOTAL W TTEN) $ 9 1 G
(FI(rJRES)
THE ENTIRE WORK SHALL BE COMPLETED WITHIN 180 CALENDAR DAYS FROM
DATE OF "NOTICE TO PROCEED," UNLESS MODIFIED BY ARTICLE 14 OF THE
INSTRUCTIONS TO BIDDERS AND STATED .WITHIN THE NOTICE TO PROCEED.
L;12-u*-