Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-85-181I Introduced by: �- �� Temp. #MA 2 3 4 5 12 13 14 15 16 17 18 19 ?0 21 22 23 24 25 26 27 28 29 30 1 32 33 34 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-85-L-4?/_ A RESOLUTION REVISING CERTAIN BUILDING DE- PARTMENT PERMIT FEES; REPEALING RESOLUTIONS IN CONFLICT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Section 7--4 of the Tamarac City Code authorizes the City Council to review, alter, add to, modify, deduct from or in any other way change any fees or any categories of building permit fees by Resolution; and WHEREAS, the City Manager and the Chief Building Official has recommended that a review of such fees should be made; and WHEREAS, the City Council has reviewed and accepts these recommendations; Now, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF TAMARAC, FLORIDA: That the schedule of fee permits, a copy of which is attached hereto and made a part hereof as Exhibit A, is hereby adopted. All resolutions or parts of resolutions including fee schedules in conflict herewith are hereby repealed to the extent of such conflict. 5B_CT_ QN__ : This Resolution shall become effective immediately upon passage. PASSED, ADOPTED AND APPROVED this,&L day of_ 1985. ATTEST: �_I LLERP_. I HEREBY CERTIFY that I have approved the form and correct- ness of this RESOLUTION. T ATT3RNEYr 1204052385/t n MAYOR RECORD OF COUNCIL VOTE MAYOR: KRAVIT,7 MST 3: C/�� C�C7TTI�, . �1,AN MST 2: C/M MUNITZ DI sT 1: V/lad MASSARO -� VU EXHIBIT A to R-85-/F/ (Temp. Reso. #3649 ) TAMARAC BUILDING PERMIT SCHEDULE OF FEES REVISED JUNE 1�, 1985 SECTION A: SITE IMPROVEMENTS * indicates revision An application for an improvement permit shall be filed with the City. Each application shall be accompanied by a plan indicating the exact nature and location of the desired improvements and an itemized, esti- mated cost of all site improvements. certified by the applicant's engineer or accountant. The cost of the improvement permit and inspection fees shall be paid in accordance with the following schedule, prior to the issuance of permits for the site work: (a) Canal excavation and bulkheads, bridges, seawalls, endwalls, headwalls, water distribution, site preparation and beautification . . . . . . . . . . . . . 61% of construction cost (b) All other improvements. . . . . . . . . 7k% of construction cost (c) Minimum Total Fee . . . . $450.00 To be assessed to any improvement project for which a site development plan is required. (d) Reinspection fee. . . . . . . . . . . . $20.00 The permit and inspection fees shall be credited to a separate account and plan review and engineering inspection expenses shall be paid from this account. Notwithstanding the fee schedule set forth in this section, in the event additional inspections are required by the City Engineer because the work of which an inspection has been requested is incomplete, obviously deficient or uncorrected at the time the contractor has requested an inspection, or plans approved by the City Engineer are not available at the jobsite, or a correct permit is not visibly displayed ,the contractor shall pay an additional fee of twenty ($20.00) dollars before any reinspection is made. Written records of each requested inspection and reinspection shall be placed in the project's master file. The final cost of any or all site improvements shall be certified by the permittee's engineer or accountant before the Certificate of Occupancy is issued, which shall be accompanied by an itemized accounting listing unit costs. SECTION B: MISCELLANEOUS FEES 1. Excavations land canal or lakes fill or earth movin : a 500 cubic yards or less - Minimum (b) 501 cubic yards or more - 6�% of cost of job based on minimum cost of $1.00 per cubic yard - payable monthly 1-1 Excavations and filling -of excavations in A-5 Districts Origina fee $905.00 plus 61z% of cost of job. Minimum cost $1.00 per cubic yard. Annual renewal fee $300.00 plus 62% of cost of job minimum cost $1.00 per cubic yard payable monthly. *Sworn affidavit of cost relating to Items 1 and 1-1 shall be required. Is 100.00 SECTION C: In the event of an emergency requiring immediate repairs, a person or firm may proceed with such repairs: provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION D: As set forth in Section 301 of the South Florida Building Code, it is unlawful for any person, firm or corporation to fail to acquire a proper permit prior to.the commencement of any construction, alteration or repair on or within private property, and such act is punishable as provided in Section 1-6 of the Tamarac City Code. Page 2 SECTION E: Certificationmaintenance p$ -Allpermits for new construction 1/100/100�th of 1% of estimatedcost All fees collected for certification maintenance shall be reserved for education and schooling to maintain certification of personnel as required by the South Florida Building Code. SECTION F: PERMIT FEE BASED ON COST OF JOB: 1. No permit shall be required for general maintenance or repairs which do not change the Occupancy and the value of which does not exceed three hundred ($300.00) dollars in labor and material as determined by the Building Official. Constof items not iset forthaabove. thelcostsofrwhichsexceedst$300,eshall items not pay a fee as set forth below: BASED ON COST OF JOB 301.00 to less than 500.00 25.00 500.00 to less than 1,000.00 32.50 1,000.00 to less than 1,500.00 40.00 1,500.00 to less roan 2,000.00 47.00 (a) For each additional $500.00 in cost of job add fee of 6.00 (b) An affidavit and verification of job cost and payment of any applicable fee increase required before certificate of occupancy is issued. (c) An itemized accounting, listing unit costs, shall be required. 2. GENERAL SUPPLEMENTARY FEES: The following schedule applies to all building classifications under Section G. (a) Pre -inspection when required prior to issuing a 25.00 permit 50% (b) Renewal - expired permit (within 90 days of last inspection pursuant to South Florida Building Code 304.3 2D.OD (c) Each reinspection - violation (to inspect after correction is made) (d) Each reinspection - not ready (requires inspection - 20.00 trip wasted) 20.00 (e) Each reinspection - not accessible 15.00 (f) Pre -payment for inspection of "future" fixtures connected to existing piping 7.50 (g) Permit Card.Replacement - mutilated, destroyed or lost 10.00 (h) Non -display of permit card - penalty fee 25% (i) Each change in design or drawing - affecting plans with work underway, regular fee for each permit classification 25.00 (j) Revision of plumbing plan after issue of permits 10% (k) Drawing Replacement - checking 15.00 (1) Plan Processing Fee .50 ea. (m) Photostats (copies) (n) Fire Inspection required before Certificate of 25.00 Occupancy - Commercial and Residential over 3 Units 3. Blasting: 00.00 (a) Users (developers) (also see excavation pits) 700.00 (b) Blasters 175.00 (c) Carriers ' Page 3 4. Demolition: Buildings (no fee required when in compliance with the Minimum Housing Code Requirements) (a) Up to 1,500 sq. ft. of floor area minimum 62.50 (b) Each additional 1,000 sq. ft. or fraction thereof 12.50 of floor area (c) Plumbing Sewer & Water (additional $5 per fixture) 25.00 ' (d) Electrical Additional 25.00 `y (e) Demolition permit automatically expires 30 days after date of issuance. SECTION G: BUILDING STRUCTURAL FEES 1. Minimum Fee for structural permits 30.00 (a) Plan Review fee Commercial - NO REFUND 25.00 ' Residential 20.00 2. Rbsideential (cu. ft. of space) 0,000 to 2,000 35.00 2,001 to 5,000 65.00 5,001 to 10,000 106.00 10,001 to 15,000 155.00 15,001 to 20,000 182.00 Over 20,000 add $4.30 per 1000 or fraction thereof Commercial: (includes apt. 3 units and over) 0,000 to 2,000 36.00 2,001 to 5,000 83.00 5,001 to 10,000 125.00 10,001 to 15,000 165.00 15,001 to 20,000 182.00 20,001 to 25,000 225.00 25,001 to 50,000 290.00 50,001 to 75,000 330.00 75,001 to 100,000 360.00 100,000 and over, each additional 1000 cu. ft., warehouses and retail stores, single story apartment buildings at $5.30 per 1,000. Apt. Buildings (over one story) 100,000 and over, each 1000 cu. ft. 6.00 (a) Asphalt Plants (plumbing and electrical additional) 450.00 (b) Concrete Batching Plants (plumbing and electrical additional) 450.00 3. Concrete Slabs: (a) Monolithic-chattahoochee or tile floors 0,000 to 1,000 sq. ft. (inclusive) (min.) 18.00 Each additional 500 sq. ft. 5.00 Sidewalk (alone) (where site plan is not required) 17.50 Slab (alone 20.00 Sidewalk and Slab 25.00 (b) If Site Plan is required, see site improvements , schedule. (c) Concrete curbing around landscaping per ft. .30 (d) Concrete slab with tool shed 36.00 Page 4 f C] 4. Blacktop Paving and Parkin (if site plan is not required) (a) 0,000 to 1,000 inclusive 23.00 (b) 1,001 and over, each additional 500 sq. ft. 5.00 (c) If site plan is required, see site improvement schedule. 5. Roofing and Sidin : (a) Repairs only to existing roof or siding (min.) 25.00 (b) New roofing or siding or replacing old roofing or siding (sq. ft.) 0,000 to 1,000 inclusive 25.00 1,001 and over, each additional 1,000 sq. ft. 4.75 *(c) Replacing Rain Downspouts (single family) min. 7.50 *(d) New Gutters and first two_(2) downspouts (s.f,) min. 7.50 6. Carport enclosure 30.00 7. fnsu1*ation 2% cost of job or $20.00 whichever is higher. B. Miscellaneous Fees: Plumbing, mechanical and electrical equipment not specifically covered shall be priced according to cost of job as per Section F-1. 9. Swimming Pools: (a) All pools (including excavation) 0,000 to 16,000 gallons inclusive 75.00 16,001 to 30,000 gallons inclusive 120.00 30,001 and over 155.00 Spa 50.00 (b) Swimming Pool Screened Enclosures 40.00 (c) Swimming Pools Heater (oil or gas - see item 15 for tank fee) 27.50 (d) Chemical generating system 15.00 (e) Chemical feeder system for pool 15.00 (f) Chlorine gas system 25.00 (g) Automatic water supply for pool 10.00 (h) Each water supplied appliance such as slide, waterfall, etc. 7.50 jj� Automatic cleaning system 15.00 j Back wash soakage pit 14.00 (k) Separate Spa or Hot Tub Piping 25.00 (1) Pool piping for residential pool with built in spa 40.00 (m) Pool piping for residential only 25.00 (n) Commercial pool piping 65.00 (ol Pool deck drains 15.00 * (p) Time Clock 10.00 * 10. (a) Minh n„ Plumbing Permit Fee (Except temp. toilet) 25,00 (b) FeplaceM. nt of :+later heaters 15.00 (c) Installation of plumbing fixture to existing system - 50% of original fee 11. Water Service: (a) Public water connection 15.00 (b) Water softeners 10.00 (c) Water filtering system (incl. under sink model) 10.00 (d) Water injection purifier 10.00 12. Sewera a Connection: (a) Sewer Hook-up 15.00 (b) Septic tank hook up, grease traps, interceptors and lint trap hook-ups 15.00 (c) Temp, toilets - 15.00 (d) Portable or temporary sanitary holding tanks 15.00 Page 5 13. Fixtures: (a) Toilet 10.50 (b) Kitchen sink 0 & 2 compartment) 10.50 (c) Kitchen sink over two compartments 14.50 (d) Lavatory 10.50 (e) Laundry tray 10.50 (f) Grease trap (hook-up separate - 15.00 ea.) 10.50 (g) Interceptor (hook-up separate - 15.00 ea.) 10.50 (h) Lint trap (hook-up separate - 15.00 ea.) 10.50 (i) Floor drains 10.50 (j) Hose bibs (first two) 10.50 each additional 1.00 (k) Catch basins 10.50 (1) Indirect waste lines, to include but not limited to HWH pan drains and A.C. overflows 10.50 (m) Roof drains 10.50 (n) Ice makers 10.50 (o) Bidet 10.50 (p) Trap primers 10.50 (q) All other plumbing fixtures 10.50 +_ (r) Relief lines or valves on other heat producing equipment not permitted in section 13 or 14 of this rate sheet 10.50 (s) Heat recovery system plumbing connection 10.50 s (t) Medical vacuum system - tank.& piping 20.00 ' Each opening 3.00 (u) Water connection to heat producing equipment 10.50 (v) Rain water disposal piping (per connection) (except single family residential) 10.50 (w) Rain water downspouts (except single family 10.50 - *(x) residential) Solar Heaters - including 2 panels 20.00 14. 'Appliances: . -Each additional panel 10.00 (a) Clothes washer 10.50 (b) Coffee urns 10.50 (c) Dishwashers 10.50 (d) Garbage disposals 10.50 (e) Sump pumps 10.50 (f) Water Heaters 10.50 (g) Water Coolers 10.50 (h) Drinking fountains 10.50 (i) Automatic ice cube machine 10.50 0) Instant hot water appliance 10.50 (k) Sauna steam unit 10.50 (1) Commercial fountains, waterfalls, etc. 25.00 (piping only) 15. Pumps (Plumbing Connections only) (a) Each 0 through 5 hp 11.00 (b) Each over 5 through 10 hp 14.00 (c) Each over 10 through 25 hp 19.00 (d) Each over 25 hp 50.00 16. Wells: (a) 2" diameter well or less - minimum 25.00 '- (b) Over 2" diameter to 4" diameter well 45.00 (c) Over 4" diameter, see Site Improvement Schedule (d) Chemical induction system (per cost) 25.00 (e) Seal abandon well 20.00 Page 6 17. Fire Sprinkler System: (a) Fire sprinklers 25.00 Each head for above 1.00 (b) Chemical fire system 25.00 Each head for above 1.00 Each tank for above 8.50 (c) Remote pull stations 8.50 (d) Automatic gas or electric shut off valve 8.50 (e) Fire hose cabinets, siamese connections, flow valves, 8.50 tamper valves, and inspectors test valve - each 18. Irrigation Sprinkler System: (a) Single family residential (per building) 10.00 (aa) Duplex (per building) 20.00 (b) Multi family residential (per building) (connected to main system) 25.00 (c) Multi family residential (per building) (connected to individual water source) 50.00 (d) Project main line or loop (only) lf- perconstruction phase includes first 2500' 50.00 each additional 100' 2.00 (,e) *Commercial projects under 50,000 S.F. of total site area 50.00 50,001 to 200,000 S.F. of total site area 100.00 over 200,001 S.F. of total site area 150.00 (f) First 10 heads 11.00 each additional head .50 (g) Lawn sprinkler hook-up (well, public water, canal or lake) 10.00 (h) Zone valves 10.00 (i) Vacuum breaker 10.00 19. Liquid Tanks - above or below ground (a) Fuel pumps and piping 40.00 10.00 (b) Dispensing units - per nozzle (c)) 0 - 1,000 gallons inclusive 40.00 (d) 1,001 to 2;000 gallons inclusive 45.00 (e) 2,001 to 3,000 gallons inclusive 60.00 (f) 3,001 to 4,000 gallons inclusive 75.00 (g) Each additional 1,000 over 4,000 gallons 15.00 (h) Reinspection of existing fuel tanks 20.00 ea. tank GAS PERMIT FEES 20. Gas Service: (Natural, Liquid Petroleum, Medical and other non fuel systems (a) Tank size 0 to 251 gallons (total gallons or aggregate above ground or below ground) 15.00 (b) Tank size 251 to 2,001 gallons (total gallons or aggregate, above or below ground 26.00 (c) Tank size 2,001 to 4,000 gallons (total gallons or aggregate, above or below ground) 54.00 (d) Piping system only - excluding outlets 15.00 (e) Each outlet, meter or alarm panel 3.50 (f) Appliance connection fee - see Items 21 & 22 (9) Remove abandoned underground tanks 15.00 Page 7 21. Connection & Venting of Gas Fired Appliances (Residential) (a) Clothes Dryer 10.00 (b) Water Heater 10.00 (c) All others not listed 10.00 22. Connection & Ventim of Gas Fired Appliances (Commercial) (a) Dryer Equipment 15.00 (b) Water Heater 15.00 (c) Dry Cleaning Equipment 15.00 (d) Range 15.00 (e) Ovens 15.00 (f) All others not listed 15.00 23. Mechanical Permits exceeding $50,000.00 1.5% (a) Requires certification, see Site Improvements Item #A 24. Equipment - A/C - Mechanical: (a) Minimum Fee 25.00 (b) Air Conditioning - Refrigeration - to 3 HP (per unit) 25.00 4 Each additional H.P. 3.00 (c) Drops 0-12 per system 17.50 Each additional drop 2.00 (d) Condensate Drains 5.00 ea. (e) Heat Recovery Unit 10.00 ea. (f) Thermostat 20.00 ea. (g) Exhaust Ducts - Residential 5.00 ea. (h) Air Compressors - 10.00 (i) Compressor Outlets 2.00 ea. (j) Hydraulic Lifts 20.00 ea. (k) Walk in coolers 15.00 (1) Water Towers 35.00 (m) Commercial Kitchen Hoods 30.00 (n) Commercial Exhausters or Fans 10.00 ea. (o) Boilers 30.00 (p) Steam Openings 2.00 ea. (q) Fire Dampers 5.00 ea. (r) Wall A.C. Unit 15.00 (s) Vacuum System 25.00 Each Outlet 3.00 (t) Central Heat System 30.00 (u) Suspended Heaters 15.00 ea. (v) Heat Exchanger - Swimming Pool 25.00 ELECTRICAL FEES 25. Minimum Electrical Permit Fees: Including repair work, per permit 26. Rough Wiring Outlets: Light receptacle, switch & also telephone & other low voltage outlets, excluding equipment outlets (a) 1-10 outlets (b) For each outlet (c) Circuits 25.00 12.00 .75 ea. 1.00 ea. Page 8 27. Services and Switchboards: The following fees shall be charged for each service & for each subfeed in new installations only. No charge will be made for subjeeds in existing installations. Each service fee shall include one subfeed. (Bus -ducts, busways, wireways, shall be considered as sub -feeds.) (a) Temporary for construction 15.00 (b) All services up to 400 ampere 20.00 (over 400 ampere 3.60 per 100) (c) Service repair and/or meter change Mini= 20.00 (d) Service Change and/or addition .25 per amp. & Minimum 20.00 - (e) Temporary Power (with affidavit letter) 25.00 (f) Each Sub feed and each free standing cubicle 13.00 (g) Intercom System 22.50 * 27.A. Generators, Transformers, Commercial Heating Equipment and Stri Heaters: (a) Equipment rated up to 5 KVA or KW each 7.50 (b) Equipment rated over 5 KVA or KW each 10.00 through 10 KVA or KW (c) Equipment ratted over 10 KVA or KW each 19.00 through 15 KVA or KW (d) Equipment raged over 15 IVA or KW each 21.50 through 20 KVA or KW (e) Equipment rated over 20 KVA or KW each 24.00 through 25 KVA or KW (f) Equipment raged over 25 KVA or KW each 26.00 Plus $1.00 for each additional KVA or KW 28. Equij�ment Outlets or Permanent Connection,: (a) All 110 volts :major appliances 3.75 (b) All 220 volts major appliances 7.50 (c) Swimming Pools: complete pool hookup 45.00 (d) Each additional. light 7.00 (e) Each additional transformer 7.00 (f) Acid and chlorine injection control including motor operated injectors and mixers 7.50 (g) Therapeutic and hot tub hookup 35.00 (h) Heater (electrical) 27.50 * . (i_) Spa Book up 35.00 29. Motors: (a) Each 0 through 5 hp single please 10.00 (b) Each 0 through 5 hp three. phase 12.00 (c) Each over 5 through 10 hp 16.00 (d) Each over 10 through 25 hp 25.00 (e) Each over 25 hp - 1.00 per hp 1.00 hp (f) Air conditioners (electrical work except wall and window units - as per IIP table) *(g) Paddle and Exchange fans 4.50 30. Machine Outlets or Permanent Connections: (a) X-ray - Portable 12.50 (b) X-ray - Stationary 17.50 (c) Diathernic 15.00 31. welding Machine Outlets: (a) Up to 25 ampere 15.00 (b) Over 25 amperes to 50 amperes 22.50 (c) Over 50 amperes - $24.00 plus $6.00 for each 25 amperes over 50 amperes or fractions thereof 32. Special Purpose Outlets (Commercial): Popcorn, doughnut, drink machines, coin music machines, toasters, coffee urn, deep fryer, telephone boots, refrigerator, display cases, sign circuit, ets. Each 110 volts 4.50 Each 220 volts 3.00 Fainting - Bake Ovens 35.00 ea. Page 9 33. Signs: (a) First 100 bulbs or 10 fluorescent tubes 8.00 (b) Each additional bulb .20 ea. (c) Each additional fluorescent tube .80 ea. (d) Transformers 7.50 ea. (e) Flasher 9.00 (f) Time Clock 9.00 (g) Ballasts 6.50 ea. (h) Sign repairs, connection & reconnection 15.00 (i) Minimum Fee 25.00 34. Fixtures: (a) All fixtures counted as outlets .75 ea. (b) Ballasts 8.00 ea. (c) Flood lights: Height under 3 ft. 2.00 ea. 110 volts up to 150 watts Over 150 watts to 300 watts 3.00 ea. (d) Poles over 3 feet .30 per ft. 110 volts up to 150 watts 2.00 ea-. Over 150 watts to 300 watts 3.00 ea. () Beacon lights 17.50 ea. 35. Streamers of Festoon Light's: First 10 lights or less - Min. 15.00 Each additional 10 or less 1.00 36. P1_ugmold: First 25 feet 2.50 Each 5 feet thereafter .40 37. Temporary Work on Circuses Carnivals etc.: (a) Minimum Fee 45.00 (b) Equipment Ground 1.75 ea. (c) Services (as per Item #27) 38. Fire or Smoke Detection Svstem Installation: (a) Installation, Step Down Transformer 8.00 ea. Over 2 relays 1.50 ea. (b) Head or Target Area with protector wire of .75 ea. similar character - (c) Bell or alarm station 1.85 ea. (d) Pull Station 1.85 ea. Fire or Smoke Detection System Reins ection Fee RE UIRED SEMI-ANNUALLY NOT OPTIONAL (a) Bell on alarm station 1.85 ea. (b) Head or target area 1.75 ea. (c) Pull Station 1.85 ea. (d) Minimum 25.00 39. Master Television and Radio Receiving Antenna: TV and radio antenna devices, wall outlets, suppressors, splitters, lightning arrestors, receivers,• input devices, audio amplifiers, ground connections, etc. 1 through 5 devices 6.00 Each additional device .40 * 40. Burglar Alarm System (fee) or'adding to existing � 25.00 (a) Transformer `' ' 11.00 (b) Each contact station .85 (c) Camera 2.00 Page 10 41. Awning, Canopies and Tents: (a) Window Awnings - $1.50 each - minimum 15.00 (b) Patio Canopies 25.00 (c) Tents (Revival and Circus) 75.00 - 42. Screen Enclosures: (a) Patio Screen Rooms 30.00 `- (b) Patio Screen Rooms under existing roof 25.00 (c) Swimming Pool Screen Enclosures 45.00 (d) Carport on existing s'ab 22.00 (e) Cabana Rooms including roof 45.00 (f) Cabana Rooms under existing roof 35.00 (g) Screen doors and entranceways 15.00 43. Elevators and Escalators: Electrical Hook-up See Section 29, (a) Minimum Fee 85.00 (b) Par Landing 28.00 44. Sinn rrortinn Permits- (a) All signs see City of Tamarac, Sign Ordinance (b) All ground signs require building permit 45. Towers and Poles: (a) Radio and communications Towers: 0 to 50 ft. high inclusive 40.00 51 to 75 ft. high inclusive 50.00 76 to 100 ft. high inclusive 60.00 101 and over plus each additional 5 ft. added 10.00 (b) Poles: for flags, etc., per pole up to 20' high - minimum fee 7.50 Poles over 20 feet - refer to Item (a) above 46. Fences and Walls: (a) Wire or wood fences - 15t per lineal ft. - Minimum 20.00 (b) Concrete Pre -cast types - 20t per lineal ft. - Minimum 25.00 (c) Masonry Walls - 20t per lineal ft. • Minimum 25.00 47. Docks: (add Item 49 if seawall) (a) 0 to 30 lineal ft. inclusive 45.00 (b) 31 and over plus each additional 10 lineal ft. fraction 6.00 48. Miscellaneous: (a) Fireplace, including chimney (b) Utility Shed only 49. Seawall - Bulkhead: (a) Permit and construction inspection costs for the construction of retaining walls and seawalls henceforth shall be found in Ordinance No. 74-45 of the Code of Ordinances of the City of Tamarac, Florida as presently in force or as hereinafter may be amended; provided, however, the fee schedule set forth in said Ordinance shall apply to all construction whether or not said construction is incident to development of a subdivision. (b) Repairs - See Section C - Permit Fee based on Cost of Job. 37.50 20.00