HomeMy WebLinkAboutCity of Tamarac Resolution R-80-144Introduced by: TMp. # 1680
CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R-
A RESOLUTION REVISING CERTAIN BUILDING DEPARTMENT
PERMIT FEES, REPEALING RESOLUTIONS IN CONFLICT;
PROVIDING AN EFFECTIVE DATE.
WHEREAS, Ordinance No. 77-20 authorizes the City Council to
review, alter, add to , modify; deduct from or in any other way
change any fees or any categories of building permit fees by
Resolution, and
WHEREAS, the Chief Building Official has recommended to the
City Council that a review of such fees should be made; and
WHEREAS, the City Council wishes to accept the recommendation of
the Chief Building Official.
NOW, THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
TAMARAC, FLORIDA:
SECTION 1: That the schedule of Structural,Plumbing, Electrical
and other various fee permits, copy of which is attached hereto
and made a part hereof as Exhibit A is hereby adopted.
SECTION 2: That Resolutions No. R-79-1 and R-79-285 are
hereby repealed.
SECTION 3: This Resolution shall become effective immediately
upon its adoption.
PASSED, ADOPTED AND APPROVED this day of , 1980.
ATTEST:
_4�d .CITY CLERK
I HEREBY CERTIFY that I have
approved the form and correctness
of this RESOLUTION.
CITY ATTORNEY
RECORD OF COUNCIL VOTE
MAYOR: D'
DISTRICT 1:
DISTRICT 2:
DISTRICT 3:
DISTRICT 4:
DRAFT 5/22/80
SCHEDULE OF PERMIT FEES - " R"
G� r+151
r po.1T !
G p O
SECTION A: BUILDING ,:Re's
STRUCTURAL FEES
1. Painting: All commercial and condo buildings 0-$25,000 cost of job
1% of cost
over $25,000 - 2% of cost of
job.
2. Minimum Fee for structural permits $25.00 (20.00)
(a) Plan Review fee commercial- NO REFUND $19.00 (15.00)(new)
3. Residential (cu. ft. of space)
0,000 to 2,000 $27.00 (22.00)
2,001 to 5,000 48.00 (39.00)
5,001 to 10,000 96.00 (77.00)
10,001 to 15,000 138.00 (110.00)
15,001 to 20,000 165.00 (132.00)
Over 20,000 add $3.50 per 1000 or fraction thereof
Commercial: (includes apt. 3 units and over)
0,000 to 2,000 $30.00
2,001 to 5,000 69.00
5,001 to 10,000 104.00
10,001 to 15,000 138.00
15,001 to 20,000 165.00
20,001 to 25,000 187.00
25,001 to 50,000 241.00
50,001 to 75,000 275.00
75,001 to 100,000 300.00
100,000 and over, each additional 1000 cu. ft., warehouses
and retail stores, single story apartment buildings at
$4.40 per 1,000.
Apt. Buildings (over one story)
100,000 and over, each 1000 cu. ft. $ 5.00
(a) Asphalt Plants (plumbing and electrical
additional)
(b) Concrete Batching Plants (plumbing and
Electrical additional
4. Concrete Slabs:
375.00
(24.00)
(55.00)
(83.00)
(110.00)
(132.00)
(150.00)
(193.00)
(220.00)
(242.00)
( 4.00)
(300.00)
375.00 (300.00)
(a) Monolithic-chattahoochee or tile floors
0,000 to 1,000 sq. ft. inclusive (min) 15.00 (12.00)
Each additional 500 sq. ft. 4.40 ( 3.50)
Sidewalk (alone) (where site plan is not req'd) 14.00 (11.00)
Slab (alone) 15.00 (12.00)
Sidewalk and Slab 19.00 (15.00)
(b) If Site Plan is required, see site
improvements schedule
(c) Concrete curbing around landscaping per ft. .25 ( .20)
(d) Concrete slab with tool shed 30.00
5. Blacktop Paving and Parking: (If site plan is not required)
(a) 0,000 to 1,000 inclusive 19.00 (15.00)
(b) 1,001 and over, each additional 500 sq. ft. 4.40 (3.50)
(c) If site plan is required, see site improvement
schedule
Page 2
6. Roofing and Siding:
(a) Repairs only to existing roof or siding (min)
(b) New roofing or siding or replacing old roofing
or siding (sq. ft.)
0,000 to 1,000 inclusive
1,001 and over, each additional 1,000 sq. ft.
(c) Replacing Rain Downspouts (min)
Each
(d) New Gutters and first two (2) downspouts (min)
Each additional downspout
(e) Carport enclosures
(f) Insulation 2% cost of job or $20.00 whichever is
7. Swimming Pools:
(a) All pools (including excavation)
0,000 to 16,000 gallons inclusive
16,001 to 30,000 gallons inclusive
30,001 and over
(b) Swimming Pool Screened Enclosures
(c) Swimming Pools Heater (oil or gas - see item 15
for tank fee
(d) Back Wash Soakage Pit
(e) Separate Spas & Hot Tubs
(f) Pool piping for residential pool with built in spa
(g) Pool piping for residential only
(h) Commercial pool piping
g. Minimum Plumbing Permit Fee (Except sewer, septic tank,
or Temp. toilet) but including repair word not listed
20.00
19.00
4.00
15.00
2.50
15.00
4.40
25.00
higher.
(15.00)
(15.00)
( 3.00)
(10.00)
( 2.00)
(10.00)
( 3.50)
(20.00)
65.00 (52.00)
100.00 (79.00)
137.00 (110.00)
40.00 (30.00)
27.50 (22.00)
14.00 (11.00)
32.00 (25.00)
30.00
15.00
45.00
20.00 (15.00)min
9. Water
Service:
(a)
Public Water Connection
each
12.50
(10.00)
(b)
Water Softeners
each
9.00
( 7.00)
(c)
Water filtering System (inc.
under sink model) each
9.00
( 7.00)
(d)
Water Injection Purifier
each
9.00
( 7.00)
10• Sewerage Connection:
(a)
Sewer Hook-up
each
12.50
(10.00)
(b)
Septic Tank Hook Up
each
12.50
(10.00)
(c)
Temp. Toilets
each
12.50
(10.00)
11• Fixtures:
(a)
Toilet
each
9.00
(
7.00)
(b)
Kitchen Sink (1 & 2 compartment)
each
9.00
(
7.00)
(c)
Kitchen Sink Over two compartment
each
12.00'
(
9.00)
(d)
Lavatory
each
9.00
(
7.00)
(e)
Laundry Tray
each
9.00
(
7.00)
(f)
Grease Traps
each
9.00
(
7.00)
(g)
Interceptors - Gasoline
each
9.00
(
7.00)
(h)
Lint Traps
each
9.00
(
7.00)
(i)
Floor Drains
each
9.00
(
7.00)
(j)
Hose Bibs (first two)
5.00
(
4.00)
each additional
.65
(
.50)
(k)
Catch Basins
each
9.00
(
7.00)
(1)
Indirect waste lines
each
9.00
(
7.00)
(m)
Roof Drains
each
9.00
(
7.00)
(n)
Ice Makers
each
9.00
(
7.00)
(o)
Bidet
each
9.00
(
7.00)
(p)
Trap Primers
each
9.00
(
7.00)
(q)
All other plumbing fixtures
each
9.00
(
7.00)
12- Appliances: .
(a) Clothes Washer each
(b) Coffee Urns each
( 9.00) ( 7.00)
( 9.00) ( 7.00)
Page 3
14
15.
Appliances: (cont'd)
(c)
Dishwashers
each
9.00
( 7.00)
(d)
Garbage Disposals
each
9.00
( 7.00)
(e)
Sump Pumps
each
9.00
( 7.00)
(f)
Water Heaters
each
9.00
( 7.00)
(g)
Water Coolers
each
9.00
( 7.00)
(h)
Drinking Fountains
each
9.00
( 7.00)
(i)
Automatic Ice Cube Machine
each
9.00
( 7.00)
(j)
Instant Hot Water Appliance
each
9.00
( 7.00)
(k)
Sauna Steam Unit
each
9.00
( 7.00)
13 Equipment
- A/C - Mechanical:
(a)
Minimum fee
20.00
(15.00)
(b)
Air or Refrigeration Compressors
0 - 5 tons
10.00
( 8.00)
5 -10 tons
16.00
(12.50)
10 -25 tons
21.00
(17.00)
Over 25 tons
56.00
(45.00)
(c)
Air Compressor Outlets (1.00 ea) -----
1.25
(d)
Condensate Lines (2.50 ea) -----
3.00
(e)
Central Heat Systems
20.00
(15.00)
(f)
1-3 ton package or split
20.00
(g)
each additional ton or fraction thereof
2.50
(h)
Central Heat and A/C System
20.00
(15.00)
(i)
Wall -type Heaters - Oil
20.00
(15.00)
(j)
Temperature Control Minimum
20.00
(15.00)
Per Thermostat (Slave)
.75
( .50)
(k)
Radiator -type Heater (Ceiling
or Wall
20.00
(15.00)
Suspended)
(1)
Furnaces
20.00
(15.00)
(m)
Boilers
20.00
(15.00)
(n)
Steam Openings Minimum
20.00
(15.00)
Each additional
.75
( .50)
(o)
Swimming Pool Heat -Exchanger
Units
20.00
(15.00)
(p)
Swimming Pool Heater Electric
Units
20.00
(15.00)
(q)
Pool Piping Minimum
20.00
(15.00)
(r)
Solar Heating System for domestic
water
20.00
(15.00)
(s)
Process Piping (first five)
Minimum
20.00
(15.00)
Each additional
.75
( .50)
(t)
Vacuum Systems
Minimum
20.00
(15.00)
Per Opening
3.00
( 2.50)
(u)
Ventilators
Each
5.00
(4.00)
(v)
Duct Work 1-10 drops min. fee
14.00
(11.00)
Plus drops (if above min.) Each
1.25
( 1.00)
(w)
Drainage Pit (a/c condensate
& boiler
7.50
( 6.00)
blowoff)
(x)
Fire Dampers
5.00
( 4.00)
(y)
Commercial Range Hoods
12.50
(10.00)
(z)
Wall Unit
12.00
(10.00)
(aa)
Solar heater for pools first
two panels
20.00
Each additional panel
each 7.50
Wells:
(a) 2" diameter well or less Minimum
(b) Over 2" diameter, See Site Improvement
Schedule
(c) Chemical Induction System (per cost)
(d) Seal abandon well
Sprinkler System:
20.00 (11.00)
25.00
15.00
(a)
Fire
Sprinklers (min fee up to 12 heads
dry or
20.00
(10.00)
wet)
Each
additional head
each
.75
( .50)
(b)
Chemical fire System (2 heads
and tank)
20.00
(15.00)new
Additional heads
.65
( .50)new
Additional tanks
6.50
( 5.00)new
(c)
Hose
Cabinets and Connections
(siamese)
each
6.50
( 5.00)
(d)
Lawn
Sprinkler (for first 12
heads)
14.00
(11.00)
Each
head over 12
.65
( .50)
(e)
Lawn
Sprinkler Hookup (Well,
public water,
7.50
( 6.00)
canal lake)
(f)
Zone
valves
each
7.50
5/22/80
PAGE 3A
16. Liquid Tanks - above or below ground
(a) Fuel Pumps and Piping 32.00 (25.00)
(b) 0-1,000 gallons inclusive 32.00 (25.00)
(c) 1,001 to 2,000 gallons inclusive 41.00 (33.00)
(d) 2,001 to 3,000 gallons inclusive 48.00 (39.00)
(e) 3,001 to 4,000 gallons inclusive 58.00 (46.00)
(f) Each additional 1,000 over 4,000 gallons 15.00 (12.00)
•
a
5/22/80
Page 4
17. Mechanical Permits exceeding $50,000.00
(a) Requires certification, see Site Improvements item #10
GAS PERMIT FEES
18. Gas Service: (Natural, Liquid Petroleum and other non
fuel systems
(a) Tank size 0 to 251 gallons (total gallons or aggregate
above ground or below ground)
(b) Systems installation including tanks, meter and two (2)
outlets
Tank size 251 to 2,001 gallons (total gallons or
aggregate, above or below ground
(c) System installation including tanks, meter & two (2)
outlets
Tank size, 2,001 to 4,000 gallons (total gallons or
aggregate, above or below ground
(d) Piping system includes 2 outlets
(e) Each added outlet or meter
(f) Tank or cylinder only when gas outlets are provided
by others
(g) Remove abandoned underground tanks
1.5% (1%)
12.50 (10.00)
23.00 (18.00)
45.00 (36.00)
12.50
3.00 (2.50)
8.00 ( 4.50)
12.50 (10.00)
19. Appliances: (Residential)
(a) Clothes Dryers each 9.00 ( 7.00)
(b) Water Heater each 9.00 ( 7.00)
20. Coin Operated Laundries:
(a) Dryer Equipment - Gas Fired each 12.50 (10.00)
(b) Water Heater each 12.50 (10.00)
(c) Dry Cleaning Equipment each 12.50 (10.00)
ELECTRICAL FEES
21 . Minimum Electrical Permit Fees:
Including repair work, per permit
22. Rough Wiring Outlets:
Light receptable, switch & also telephone & other low voltage
outlets, excluding equipment outlets
(a) For each outlet each
(b) Circuits
23. Services and Switchboards:
it
The following fees shall be charged for each service & for
each subfeed in new installations only. No charge will be
made for subfeeds in existing installations. Each service
fee shall include one subfeed. (Bus -ducts, busways, wireways,
shall be considered as sub -feeds).
(a) Temporary for construction
(b) All services up to 400 ampere (over 400 ampere
3.00 per 100)
20.00 (15.00)
.50 ( .40)
.50 ( .40)
11.00 ( 9.00)
11.00 ( 9.00)
5/22/80
Services & Switchboards - cont"d_
PAGE 5
(c)
Service repair and/or meter change Minimum
$15.00
(11.00)
(d)
Service Change and/or addition .25 per amp,+
min.15,.00
(11.00)
(e)
Temporary Power (with affidavit letter)
19.00
(15.00)
(f)
Each Sub feed
11.00
( 9.00)new
(g)
Intercom System
19.00
(15.00)new
24. Equipment Outlets or Permanent Connections:
(a)
All 110 volts major appliances
3.00
( 2.50)
(b)
All 220 volts major appliances
6.50
( 5.00)
(c)
Swimming Pools: complete pool hookup
35.00
(d)
Each additional light
7.00
(e)
Each additional transformer
7.00
(f)
Acid and chlorine injection control incl.
5.00
motor operated injectors and mixers
'(g)
Therapeutic and hot tub hookup
25.00
(h)
Heater (electrical)
22.00
25. Motors:
(a) Each 0 through 5 hp single phase 9.00 ( 7.00)
(b) Each 0 through 5 hp three phase 11.00 ( 9.00)
(c) Each over 5 through 10 hp 14.00 (11.00)
(d) Each over 10 through 25 hp 19.00 (15.00)
(e) Each over 25 hp 50.00 (40.00)
(f) Air conditioners (electrical work except wall
and window units - as per HP table).
26. Machine Outlets or Permanent Connections:
(a) X-ray - Portable 11.00 ( 9.00)
(b) X-ray - Stationary 15.00 (12.00)
(c) Diathernic 15.00 (12.00)
27. Generators, Transformers, Commercial Heating Equipment
and Strip Heaters:
(a) Equipment rated up to 5 KVA or KW each 7.50 ( 6.00)
(b) Equipment rated over 5 KVA or KW each 10.00 ( 8.00)
through 10 KVA or KW
(c) Equipment rated over 10 KVA or KW each 19.00 (15.00)
through 15 KVA or KW
(d) Equipment rated over 15 KVA or KW each 21.50 (17.00)
through 20 KVA or KW
(e) Equipment rated over 20 KVA or KW each 24.00 (19.00)
through 25 KVA or KW
(f) Equipment rated over 25 KVA or Kw each 26.00 (21.00)
Plus $1.00 for each additional KVA or KW
28. Welding Machine Outlets:
(a) Up to 25 ampere 11.00 ( 9.00)
(b) Over 25 amperes to 50 amperes 22.50 (18.00)
(c) Over 50 amperes - $24.00 (18.00) plus 6.00 (4.50) for
each 25 amperes over 50 amperes or fractions
thereof.
29. Special Purpose Outlets (Commercial):
Popcorn, doughnut, drink machines, coin music machines,
toasters, coffee urn, deep fryer, telephone booths,
1-refrigerator, display cases, sign circuit, etc.
Each 110 volts 3.00 ( 2.50)
Each 220 volts 6.50 ( 5.00)
Painting - Bake Ovens each 7.00 ( 5.50)
30: Signs:
(a) First 100 bulbs or 10 fluorescent tubes 6.50 ( 5.00)
(b) Each additional bulb each .15 ( .10)
(c) Each additional fluorescent tube each .60 ( .50)
(d) Transformers each 7.50 ( 6.00)
(e) Flasher 7.50 ( 6.00)
0
5/22/80
Signs (_continued)
PAGE 6
(f) Time Clock 7.50 ( 6.00)
(g) Ballasts each 6.50 ( 5.00)
(h) Sign repairs, connection & reconnection 12.50 (10.00)
Minimum fee
31. Fixtures:
(a) All fixtures counted as outlets each .50 ( .40)
(b) Ballasts each 6.50 ( 5.00)
(c) Flood lights: Height under 3 ft. each 1.50 ( 1.20)
110 volts up to 150 watts
Over 150 watts to 300 watts each 2.50 ( 2.00)
(d) Poles over 3 feet per foot .25 ( .20)
110 volts up to 150 watts each 1.50 ( 1.20)
Over 150 watts to 300 watts each 2.50 ( 2.00)
(e) Beacon lights each 15.00
32. Streamers of Festoon Lights:
First 10 lights or less Min. 11.00 ( 9.00)
Each additional 10 or less .90 ( .75)
33. Plugmold:
First 25 feet 1.50 ( 1.25)
Each 5 feet thereafter .30 ( .25)
34.. Temporary Work on Circuses, Carnivals: etc.
(a) Minimum Fee 32.00 (25.00)
(b) Equipment Ground each 1.25 ( 1.00)
(c) Services (as per item #22)
(d) Generators (as per item #26)
35. (a) Fire or Smoke Detection System Installation:
1. Installation, Step Down Transformer each 6.50 ( 5.00)
Over 2 relays each 1.00 ( .80)
2. Head or Target Area with protector each .50 ( .40)
wire of similar character
3. Bell or alarm station each 1.65 ( 1.50)
4. Pull Station each 1.65 ( 1.50)
(b) Fire or Smoke Detection System Reinspection Fee
REQUIRED SEMIANNUALLY (NOT OPTIONAL)
1. Bell on alarm station each 1.65 ( 1.50)
2. Head or target area each 1.50 ( 1.40)
3. Pull Station each 1.65 ( 1.50)
4. Minimum 20.00 (15.00)
36. Master Television and Radio Receiving Antenna:
TV and radio antenna devices, wall outlets, suppressors,
splatters, lightning arrestors, receivers, input devices,
audio amplifiers, ground connections, etc.
1 through 5 devices 4.00 ( 3.00)
Each additional device .30 ( .25)
37. Burglar Alarm System (fee) 15.00 (13.00)
(a) Transformer 9.00 ( 7.00)
(b) Each contact station .65 ( .50)
5/22/80
PAGE 7
38. General Supplementary Fees:
The following schedule applies to all building
classifications under Section A, See pages 1 through 6
(a)
Pre -inspection when required prior to issuing
15.00
(12.00)
a permit
(b)
Renewal -expired permit (within 90 days of last
50%
( 50% )
Inspection pursuant to South Florida Building
Code - 304.3
(c)
Each reinspection - violation (to inspect after
15.00
(12.00)
correction is made)
(d)
Each reinspection - not ready (requires
15.00 .'
(12.00)
inspection - trip wasted)
(e)
Each reinspection - not accessible
15.00
(12.00)
(f)
Permit Card Replacement - mutilated,
5.00
( 5.00)
destroyed or lost
(g)
Non -display of permit card - penalty fee
5.00
(20.00)
(h)
Each change in design or drawing- affecting
25%
( 50%)
plans with work underway, regular fee for
of
each permit classification.
original
fee
(i)
Drawing Replacement - checking
10%
( 10%)new
of original
fee
(j)
Plan Processing Fee
15.00
(15.00)new
(k)
Photostats (copies) each
.50
( .50)new
(1)
Fire Inspection Required Before Certificate
20.00
(15.00)
of Occupancy
SECTION
B: MISCELLANEOUS FEES
1. Excavations (land, canal or lakes) fill or earth moving:
(a)
500 cubic yards or less Minimum
75.00
(b)
501 cubic yards or more-6;�%o.fcost of job based
on minimum
cost
of $1.00 per cubic yard -payable monthly
1-1. Excavations and filling of excavations in A-5 Districts
original fee $500.00 plus 6�% of cost of job. Minimum
cost
$1.00 per cubic yard. Annual renewal fee $300.00 plus
6�%
of
cost of job minimum cost $1.00 per cubic yard payable
monthly.
*Sworn addidavit of cost relating to Items 1 and 1-1
shall
be
required.
2. Blasting:
(a)
Users (developers) (also see excavation pits)
625.00
(500.00)
(b)
Blasters
250.00
(200.00)
(c)
Carriers
125.00
(100.00)
3. Demolition:
Buildings (no fee required when in compliance with
the
Minimum Housing Code Requirements)
(a)
Up to 1,500 sq. ft. of floor area minimum
62.50
( 50.00)
(b)
Each additional 1,000 sq. ft. or fraction
12.50
( 10.00)
thereof of floor area.
(c)
Plumbing Additional
19.00
( 15.00)
(d)
Electrical Additional
19.00
( 15.00)
(e)
Demolition permit automatically expires
30 days after date of issuance.
4. Awning, Canopies and Tents:
(a)
Window Awnings - $1.50 each
minimum 15.00
( 10.00)
(b)
Patio Canopies
19.00
( 15.00)
(c)
Tents (Revival and Circus)
62.50
( 50.00)
(d)
Fumigation (Tenting)
62.50
( 50.00)
5. Screen Enclosures:
(a)
Patio Screen
Rooms
27.50
( 22.00)
(b)
Patio Screen
Rooms under existing roof
20.00
( 16.00)
(c)
Swimming Pool
Screen Enclosures
37.50
( 30.00)
(d)
Carport on existing
slab
17.50
( 15.00)
(e)
Cabana Rooms
including roof
35.00
( 28.00)
(f)
Cabana Rooms
under existing roof
27..50
( 22.00)
(g)
Screen doors
and entranceways
12'.50
( 10.00)
PAGE 8.
6. Elevators and Escalators: Electrical Hook-up,
See Item #24 Section A.
(a) Minimum Fee 75.00 (75.00)new
(b) Per Landing 24.00 (24.00)new
7. Sign Erection Permits:
(a) All signs see City of Tamarac, Sign Ordinance
8. Towers and Poles:
(a) Radio
and Communication Towers:
0 to 50
ft high inclusive
30.00
(24.00)
51 to
75 ft. high inclusive
37.50
(30.00)
76 to
100 ft. hing inclusive
52.50
(42.00)
101 and over plus each addition 5 ft. added
7.50
( 6.00)
(b) Poles:
for flags, etc., per pole up to 20'
high -
minimum fee
5.00
( 4.00)
Poles
over 20 feet - refer to Item 8 (a)
11.00
( 9.00)
9. Fences and Walls:
(a) Wire or wood fences-10fi (54) per lineal ft. Min.15.00 (11.00)
(b) Concrete Pre -cast types-15� (8G) per lineal ft. ,
minimum 20.00 (15.00)
(c) Masonry Walls-20� (15�) per lin. ft. Minimum 25.00 (21.00)
10. Docks: (add Item #11 if seawall)
(a) 0 to 30 lineal ft. inclusive 37.50 (30.00)
(b) 31 and over plus each additional 10 linegl 5.00 ( 4.00)
ft. fraction
11. Miscellaneous:
(a) Fireplace, including chimney 32.00 (25.00)
(b) Utility Shed only. 20.00 (15.00)
12. Seawall - Bulkhead:
(a) Permit and construction inspection costs for the construction
of retaining walls and seawalls henceforth shall be found in
Ordinance No. 74-45 of the Code of Ordinances of the City of
Tamarac, Florida as presently in force or as hereinafter may
be amended; provided, however, the fee schedule set forth
in said Ordinance shall apply to all construction whether
or not said construction is incident to development of a
subdivision.
(b) Repairs - See Section C - Permit Fee based on Cost of Job.
SECTION C: PERMIT FEE BASED ON COST OF JOB.
1. No permit shall be required for general maintenance or repairs which
do not change_the Occupancy and the value of which does not exceed
three hundred ($300.00) dollars in labor and material as
determined by the Building Official, other than electrical work,
a permit for which is required regardless of the cost of the work.
Construction, alterations, additions, repairs & maintenance
of items not set forth above, the cost of which exceeds $300, shall
pay 'a fee as set forth below:
BASED ON COST OF JOB
301.00 to less than 500.00 20.00 (18.00)
500.00 to less than 1,000.00 27.00 (24.60)
1-000.00 to less than 1,500.00 33.00 (30.00)
1,500.00 to less than 2,000.00 39.00 (35.50)
(a) For each additional $500.00 in cost of job add fee of ... $5.00
(b) An affidavit and verification of job cost and payment of
any applicable fee increase required before certificate
of occupancy -is issued.
(c) An itemized accounting, listing unit costs, shall be required.
5/22/80
PAGE 9
SECTION D: SITE IMPROVEMENTS
1. An application for an improvement permit shall be filed with the City.
Each application shall be accompanied by a plan indicating the exact
nature and location of the desired improvements and an itemized, esti-
mated cost of all site improvements, certified by the applicant's
engineer or accountant. The cost of the improvement permit and
inspection fees shall be paid in accordance with the following
schedule, prior to the issuance of permits for the site work:
(a) Canal excavation and bulkheads, bridges, seawalls, endwalls,
headwalls, water distribution, site preparation and
beautification ................ 6�% (4%) of construction cost (3%)
(b) All other improvements........ 7�% (50) of construction cost (40)
(c) Minimum Total fee ............. $450.00 (400.00)
To be assessed to any improvement project for which
a site development plan is required.
(d) Reinspection fee
$ 20.00
2. The permit and inspection fees shall be credited to a separate
account and plan review and engineering inspection expenses shall be
paid from this account.
3. Notwithstanding the fee schedule set forth in this section, in the event
additional inspections are required by the City Engineer because the
work of which an inspection has been requested is incomplete, obviously
deficient or uncorrected at the time the contractor has requested an
inspection, or plans approved by the City Engineer are not available
at the jobsite, or a correct permit is not visibly displayed, the
contractor shall pay an additional fee of twenty ($20.00) dollars
before any reinspection is made. Written records of each requested
inspection and reinspection shall be placed in the project's master
file.
4. Expiration of Permit: As set forth in the South Florida Building Code,
permits issued pursuant to these regulations shall be deemed in full
force and effect until such time as the work covered thereby is
complete. However, if work covered by said permit has not commenced
within three months from the date of issuance of said permit, or has
been commenced and then suspended or abandoned for a period of sixty
(60) days from the date of the most recent reinspection, said permit
is revoked and shall become null and void. Work shall be considered
to have commenced and be in active progress when, in the opinion of
the City Engineer, a full complement of workmen and equipment is pre-
sent at the site to diligently incorporate materials and improvements
into the project. When a permit has been revoked, all fees paid shall
be forfeited and any work started after such revocation shall be
subject to all the requirements and fees for a new permits as provided
herein.
5/22/80
PAGE 10
5. The final cost of any or all site improvements shall be certified by
the permittee's engineer or accountant before the Certificate of
Occupancy is issued, which shall be accompanied by an itemized
accounting listing unit costs.
SECTION E: In the event of an emergency requiring immediate repairs,
a person or firm may proceed with such repairs; provided however, an
application for the permit and the payment of appropriate fees are made
during the first succeeding business day of the City Building Department.
SECTION F: As set forth in Section 301 of the South Florida Building Code,
it is unlawful for any person, firm or corporation to fail to acquire a
proper permit prior to the commencement of any construction, alteration
or repair on or within private property, and such act is punishable as
provided in Section 1-6 of the Tamarac City Code.
t
I