Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-80-144Introduced by: TMp. # 1680 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R- A RESOLUTION REVISING CERTAIN BUILDING DEPARTMENT PERMIT FEES, REPEALING RESOLUTIONS IN CONFLICT; PROVIDING AN EFFECTIVE DATE. WHEREAS, Ordinance No. 77-20 authorizes the City Council to review, alter, add to , modify; deduct from or in any other way change any fees or any categories of building permit fees by Resolution, and WHEREAS, the Chief Building Official has recommended to the City Council that a review of such fees should be made; and WHEREAS, the City Council wishes to accept the recommendation of the Chief Building Official. NOW, THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the schedule of Structural,Plumbing, Electrical and other various fee permits, copy of which is attached hereto and made a part hereof as Exhibit A is hereby adopted. SECTION 2: That Resolutions No. R-79-1 and R-79-285 are hereby repealed. SECTION 3: This Resolution shall become effective immediately upon its adoption. PASSED, ADOPTED AND APPROVED this day of , 1980. ATTEST: _4�d .CITY CLERK I HEREBY CERTIFY that I have approved the form and correctness of this RESOLUTION. CITY ATTORNEY RECORD OF COUNCIL VOTE MAYOR: D' DISTRICT 1: DISTRICT 2: DISTRICT 3: DISTRICT 4: DRAFT 5/22/80 SCHEDULE OF PERMIT FEES - " R" G� r+151 r po.1T ! G p O SECTION A: BUILDING ,:Re's STRUCTURAL FEES 1. Painting: All commercial and condo buildings 0-$25,000 cost of job 1% of cost over $25,000 - 2% of cost of job. 2. Minimum Fee for structural permits $25.00 (20.00) (a) Plan Review fee commercial- NO REFUND $19.00 (15.00)(new) 3. Residential (cu. ft. of space) 0,000 to 2,000 $27.00 (22.00) 2,001 to 5,000 48.00 (39.00) 5,001 to 10,000 96.00 (77.00) 10,001 to 15,000 138.00 (110.00) 15,001 to 20,000 165.00 (132.00) Over 20,000 add $3.50 per 1000 or fraction thereof Commercial: (includes apt. 3 units and over) 0,000 to 2,000 $30.00 2,001 to 5,000 69.00 5,001 to 10,000 104.00 10,001 to 15,000 138.00 15,001 to 20,000 165.00 20,001 to 25,000 187.00 25,001 to 50,000 241.00 50,001 to 75,000 275.00 75,001 to 100,000 300.00 100,000 and over, each additional 1000 cu. ft., warehouses and retail stores, single story apartment buildings at $4.40 per 1,000. Apt. Buildings (over one story) 100,000 and over, each 1000 cu. ft. $ 5.00 (a) Asphalt Plants (plumbing and electrical additional) (b) Concrete Batching Plants (plumbing and Electrical additional 4. Concrete Slabs: 375.00 (24.00) (55.00) (83.00) (110.00) (132.00) (150.00) (193.00) (220.00) (242.00) ( 4.00) (300.00) 375.00 (300.00) (a) Monolithic-chattahoochee or tile floors 0,000 to 1,000 sq. ft. inclusive (min) 15.00 (12.00) Each additional 500 sq. ft. 4.40 ( 3.50) Sidewalk (alone) (where site plan is not req'd) 14.00 (11.00) Slab (alone) 15.00 (12.00) Sidewalk and Slab 19.00 (15.00) (b) If Site Plan is required, see site improvements schedule (c) Concrete curbing around landscaping per ft. .25 ( .20) (d) Concrete slab with tool shed 30.00 5. Blacktop Paving and Parking: (If site plan is not required) (a) 0,000 to 1,000 inclusive 19.00 (15.00) (b) 1,001 and over, each additional 500 sq. ft. 4.40 (3.50) (c) If site plan is required, see site improvement schedule Page 2 6. Roofing and Siding: (a) Repairs only to existing roof or siding (min) (b) New roofing or siding or replacing old roofing or siding (sq. ft.) 0,000 to 1,000 inclusive 1,001 and over, each additional 1,000 sq. ft. (c) Replacing Rain Downspouts (min) Each (d) New Gutters and first two (2) downspouts (min) Each additional downspout (e) Carport enclosures (f) Insulation 2% cost of job or $20.00 whichever is 7. Swimming Pools: (a) All pools (including excavation) 0,000 to 16,000 gallons inclusive 16,001 to 30,000 gallons inclusive 30,001 and over (b) Swimming Pool Screened Enclosures (c) Swimming Pools Heater (oil or gas - see item 15 for tank fee (d) Back Wash Soakage Pit (e) Separate Spas & Hot Tubs (f) Pool piping for residential pool with built in spa (g) Pool piping for residential only (h) Commercial pool piping g. Minimum Plumbing Permit Fee (Except sewer, septic tank, or Temp. toilet) but including repair word not listed 20.00 19.00 4.00 15.00 2.50 15.00 4.40 25.00 higher. (15.00) (15.00) ( 3.00) (10.00) ( 2.00) (10.00) ( 3.50) (20.00) 65.00 (52.00) 100.00 (79.00) 137.00 (110.00) 40.00 (30.00) 27.50 (22.00) 14.00 (11.00) 32.00 (25.00) 30.00 15.00 45.00 20.00 (15.00)min 9. Water Service: (a) Public Water Connection each 12.50 (10.00) (b) Water Softeners each 9.00 ( 7.00) (c) Water filtering System (inc. under sink model) each 9.00 ( 7.00) (d) Water Injection Purifier each 9.00 ( 7.00) 10• Sewerage Connection: (a) Sewer Hook-up each 12.50 (10.00) (b) Septic Tank Hook Up each 12.50 (10.00) (c) Temp. Toilets each 12.50 (10.00) 11• Fixtures: (a) Toilet each 9.00 ( 7.00) (b) Kitchen Sink (1 & 2 compartment) each 9.00 ( 7.00) (c) Kitchen Sink Over two compartment each 12.00' ( 9.00) (d) Lavatory each 9.00 ( 7.00) (e) Laundry Tray each 9.00 ( 7.00) (f) Grease Traps each 9.00 ( 7.00) (g) Interceptors - Gasoline each 9.00 ( 7.00) (h) Lint Traps each 9.00 ( 7.00) (i) Floor Drains each 9.00 ( 7.00) (j) Hose Bibs (first two) 5.00 ( 4.00) each additional .65 ( .50) (k) Catch Basins each 9.00 ( 7.00) (1) Indirect waste lines each 9.00 ( 7.00) (m) Roof Drains each 9.00 ( 7.00) (n) Ice Makers each 9.00 ( 7.00) (o) Bidet each 9.00 ( 7.00) (p) Trap Primers each 9.00 ( 7.00) (q) All other plumbing fixtures each 9.00 ( 7.00) 12- Appliances: . (a) Clothes Washer each (b) Coffee Urns each ( 9.00) ( 7.00) ( 9.00) ( 7.00) Page 3 14 15. Appliances: (cont'd) (c) Dishwashers each 9.00 ( 7.00) (d) Garbage Disposals each 9.00 ( 7.00) (e) Sump Pumps each 9.00 ( 7.00) (f) Water Heaters each 9.00 ( 7.00) (g) Water Coolers each 9.00 ( 7.00) (h) Drinking Fountains each 9.00 ( 7.00) (i) Automatic Ice Cube Machine each 9.00 ( 7.00) (j) Instant Hot Water Appliance each 9.00 ( 7.00) (k) Sauna Steam Unit each 9.00 ( 7.00) 13 Equipment - A/C - Mechanical: (a) Minimum fee 20.00 (15.00) (b) Air or Refrigeration Compressors 0 - 5 tons 10.00 ( 8.00) 5 -10 tons 16.00 (12.50) 10 -25 tons 21.00 (17.00) Over 25 tons 56.00 (45.00) (c) Air Compressor Outlets (1.00 ea) ----- 1.25 (d) Condensate Lines (2.50 ea) ----- 3.00 (e) Central Heat Systems 20.00 (15.00) (f) 1-3 ton package or split 20.00 (g) each additional ton or fraction thereof 2.50 (h) Central Heat and A/C System 20.00 (15.00) (i) Wall -type Heaters - Oil 20.00 (15.00) (j) Temperature Control Minimum 20.00 (15.00) Per Thermostat (Slave) .75 ( .50) (k) Radiator -type Heater (Ceiling or Wall 20.00 (15.00) Suspended) (1) Furnaces 20.00 (15.00) (m) Boilers 20.00 (15.00) (n) Steam Openings Minimum 20.00 (15.00) Each additional .75 ( .50) (o) Swimming Pool Heat -Exchanger Units 20.00 (15.00) (p) Swimming Pool Heater Electric Units 20.00 (15.00) (q) Pool Piping Minimum 20.00 (15.00) (r) Solar Heating System for domestic water 20.00 (15.00) (s) Process Piping (first five) Minimum 20.00 (15.00) Each additional .75 ( .50) (t) Vacuum Systems Minimum 20.00 (15.00) Per Opening 3.00 ( 2.50) (u) Ventilators Each 5.00 (4.00) (v) Duct Work 1-10 drops min. fee 14.00 (11.00) Plus drops (if above min.) Each 1.25 ( 1.00) (w) Drainage Pit (a/c condensate & boiler 7.50 ( 6.00) blowoff) (x) Fire Dampers 5.00 ( 4.00) (y) Commercial Range Hoods 12.50 (10.00) (z) Wall Unit 12.00 (10.00) (aa) Solar heater for pools first two panels 20.00 Each additional panel each 7.50 Wells: (a) 2" diameter well or less Minimum (b) Over 2" diameter, See Site Improvement Schedule (c) Chemical Induction System (per cost) (d) Seal abandon well Sprinkler System: 20.00 (11.00) 25.00 15.00 (a) Fire Sprinklers (min fee up to 12 heads dry or 20.00 (10.00) wet) Each additional head each .75 ( .50) (b) Chemical fire System (2 heads and tank) 20.00 (15.00)new Additional heads .65 ( .50)new Additional tanks 6.50 ( 5.00)new (c) Hose Cabinets and Connections (siamese) each 6.50 ( 5.00) (d) Lawn Sprinkler (for first 12 heads) 14.00 (11.00) Each head over 12 .65 ( .50) (e) Lawn Sprinkler Hookup (Well, public water, 7.50 ( 6.00) canal lake) (f) Zone valves each 7.50 5/22/80 PAGE 3A 16. Liquid Tanks - above or below ground (a) Fuel Pumps and Piping 32.00 (25.00) (b) 0-1,000 gallons inclusive 32.00 (25.00) (c) 1,001 to 2,000 gallons inclusive 41.00 (33.00) (d) 2,001 to 3,000 gallons inclusive 48.00 (39.00) (e) 3,001 to 4,000 gallons inclusive 58.00 (46.00) (f) Each additional 1,000 over 4,000 gallons 15.00 (12.00) • a 5/22/80 Page 4 17. Mechanical Permits exceeding $50,000.00 (a) Requires certification, see Site Improvements item #10 GAS PERMIT FEES 18. Gas Service: (Natural, Liquid Petroleum and other non fuel systems (a) Tank size 0 to 251 gallons (total gallons or aggregate above ground or below ground) (b) Systems installation including tanks, meter and two (2) outlets Tank size 251 to 2,001 gallons (total gallons or aggregate, above or below ground (c) System installation including tanks, meter & two (2) outlets Tank size, 2,001 to 4,000 gallons (total gallons or aggregate, above or below ground (d) Piping system includes 2 outlets (e) Each added outlet or meter (f) Tank or cylinder only when gas outlets are provided by others (g) Remove abandoned underground tanks 1.5% (1%) 12.50 (10.00) 23.00 (18.00) 45.00 (36.00) 12.50 3.00 (2.50) 8.00 ( 4.50) 12.50 (10.00) 19. Appliances: (Residential) (a) Clothes Dryers each 9.00 ( 7.00) (b) Water Heater each 9.00 ( 7.00) 20. Coin Operated Laundries: (a) Dryer Equipment - Gas Fired each 12.50 (10.00) (b) Water Heater each 12.50 (10.00) (c) Dry Cleaning Equipment each 12.50 (10.00) ELECTRICAL FEES 21 . Minimum Electrical Permit Fees: Including repair work, per permit 22. Rough Wiring Outlets: Light receptable, switch & also telephone & other low voltage outlets, excluding equipment outlets (a) For each outlet each (b) Circuits 23. Services and Switchboards: it The following fees shall be charged for each service & for each subfeed in new installations only. No charge will be made for subfeeds in existing installations. Each service fee shall include one subfeed. (Bus -ducts, busways, wireways, shall be considered as sub -feeds). (a) Temporary for construction (b) All services up to 400 ampere (over 400 ampere 3.00 per 100) 20.00 (15.00) .50 ( .40) .50 ( .40) 11.00 ( 9.00) 11.00 ( 9.00) 5/22/80 Services & Switchboards - cont"d_ PAGE 5 (c) Service repair and/or meter change Minimum $15.00 (11.00) (d) Service Change and/or addition .25 per amp,+ min.15,.00 (11.00) (e) Temporary Power (with affidavit letter) 19.00 (15.00) (f) Each Sub feed 11.00 ( 9.00)new (g) Intercom System 19.00 (15.00)new 24. Equipment Outlets or Permanent Connections: (a) All 110 volts major appliances 3.00 ( 2.50) (b) All 220 volts major appliances 6.50 ( 5.00) (c) Swimming Pools: complete pool hookup 35.00 (d) Each additional light 7.00 (e) Each additional transformer 7.00 (f) Acid and chlorine injection control incl. 5.00 motor operated injectors and mixers '(g) Therapeutic and hot tub hookup 25.00 (h) Heater (electrical) 22.00 25. Motors: (a) Each 0 through 5 hp single phase 9.00 ( 7.00) (b) Each 0 through 5 hp three phase 11.00 ( 9.00) (c) Each over 5 through 10 hp 14.00 (11.00) (d) Each over 10 through 25 hp 19.00 (15.00) (e) Each over 25 hp 50.00 (40.00) (f) Air conditioners (electrical work except wall and window units - as per HP table). 26. Machine Outlets or Permanent Connections: (a) X-ray - Portable 11.00 ( 9.00) (b) X-ray - Stationary 15.00 (12.00) (c) Diathernic 15.00 (12.00) 27. Generators, Transformers, Commercial Heating Equipment and Strip Heaters: (a) Equipment rated up to 5 KVA or KW each 7.50 ( 6.00) (b) Equipment rated over 5 KVA or KW each 10.00 ( 8.00) through 10 KVA or KW (c) Equipment rated over 10 KVA or KW each 19.00 (15.00) through 15 KVA or KW (d) Equipment rated over 15 KVA or KW each 21.50 (17.00) through 20 KVA or KW (e) Equipment rated over 20 KVA or KW each 24.00 (19.00) through 25 KVA or KW (f) Equipment rated over 25 KVA or Kw each 26.00 (21.00) Plus $1.00 for each additional KVA or KW 28. Welding Machine Outlets: (a) Up to 25 ampere 11.00 ( 9.00) (b) Over 25 amperes to 50 amperes 22.50 (18.00) (c) Over 50 amperes - $24.00 (18.00) plus 6.00 (4.50) for each 25 amperes over 50 amperes or fractions thereof. 29. Special Purpose Outlets (Commercial): Popcorn, doughnut, drink machines, coin music machines, toasters, coffee urn, deep fryer, telephone booths, 1-refrigerator, display cases, sign circuit, etc. Each 110 volts 3.00 ( 2.50) Each 220 volts 6.50 ( 5.00) Painting - Bake Ovens each 7.00 ( 5.50) 30: Signs: (a) First 100 bulbs or 10 fluorescent tubes 6.50 ( 5.00) (b) Each additional bulb each .15 ( .10) (c) Each additional fluorescent tube each .60 ( .50) (d) Transformers each 7.50 ( 6.00) (e) Flasher 7.50 ( 6.00) 0 5/22/80 Signs (_continued) PAGE 6 (f) Time Clock 7.50 ( 6.00) (g) Ballasts each 6.50 ( 5.00) (h) Sign repairs, connection & reconnection 12.50 (10.00) Minimum fee 31. Fixtures: (a) All fixtures counted as outlets each .50 ( .40) (b) Ballasts each 6.50 ( 5.00) (c) Flood lights: Height under 3 ft. each 1.50 ( 1.20) 110 volts up to 150 watts Over 150 watts to 300 watts each 2.50 ( 2.00) (d) Poles over 3 feet per foot .25 ( .20) 110 volts up to 150 watts each 1.50 ( 1.20) Over 150 watts to 300 watts each 2.50 ( 2.00) (e) Beacon lights each 15.00 32. Streamers of Festoon Lights: First 10 lights or less Min. 11.00 ( 9.00) Each additional 10 or less .90 ( .75) 33. Plugmold: First 25 feet 1.50 ( 1.25) Each 5 feet thereafter .30 ( .25) 34.. Temporary Work on Circuses, Carnivals: etc. (a) Minimum Fee 32.00 (25.00) (b) Equipment Ground each 1.25 ( 1.00) (c) Services (as per item #22) (d) Generators (as per item #26) 35. (a) Fire or Smoke Detection System Installation: 1. Installation, Step Down Transformer each 6.50 ( 5.00) Over 2 relays each 1.00 ( .80) 2. Head or Target Area with protector each .50 ( .40) wire of similar character 3. Bell or alarm station each 1.65 ( 1.50) 4. Pull Station each 1.65 ( 1.50) (b) Fire or Smoke Detection System Reinspection Fee REQUIRED SEMIANNUALLY (NOT OPTIONAL) 1. Bell on alarm station each 1.65 ( 1.50) 2. Head or target area each 1.50 ( 1.40) 3. Pull Station each 1.65 ( 1.50) 4. Minimum 20.00 (15.00) 36. Master Television and Radio Receiving Antenna: TV and radio antenna devices, wall outlets, suppressors, splatters, lightning arrestors, receivers, input devices, audio amplifiers, ground connections, etc. 1 through 5 devices 4.00 ( 3.00) Each additional device .30 ( .25) 37. Burglar Alarm System (fee) 15.00 (13.00) (a) Transformer 9.00 ( 7.00) (b) Each contact station .65 ( .50) 5/22/80 PAGE 7 38. General Supplementary Fees: The following schedule applies to all building classifications under Section A, See pages 1 through 6 (a) Pre -inspection when required prior to issuing 15.00 (12.00) a permit (b) Renewal -expired permit (within 90 days of last 50% ( 50% ) Inspection pursuant to South Florida Building Code - 304.3 (c) Each reinspection - violation (to inspect after 15.00 (12.00) correction is made) (d) Each reinspection - not ready (requires 15.00 .' (12.00) inspection - trip wasted) (e) Each reinspection - not accessible 15.00 (12.00) (f) Permit Card Replacement - mutilated, 5.00 ( 5.00) destroyed or lost (g) Non -display of permit card - penalty fee 5.00 (20.00) (h) Each change in design or drawing- affecting 25% ( 50%) plans with work underway, regular fee for of each permit classification. original fee (i) Drawing Replacement - checking 10% ( 10%)new of original fee (j) Plan Processing Fee 15.00 (15.00)new (k) Photostats (copies) each .50 ( .50)new (1) Fire Inspection Required Before Certificate 20.00 (15.00) of Occupancy SECTION B: MISCELLANEOUS FEES 1. Excavations (land, canal or lakes) fill or earth moving: (a) 500 cubic yards or less Minimum 75.00 (b) 501 cubic yards or more-6;�%o.fcost of job based on minimum cost of $1.00 per cubic yard -payable monthly 1-1. Excavations and filling of excavations in A-5 Districts original fee $500.00 plus 6�% of cost of job. Minimum cost $1.00 per cubic yard. Annual renewal fee $300.00 plus 6�% of cost of job minimum cost $1.00 per cubic yard payable monthly. *Sworn addidavit of cost relating to Items 1 and 1-1 shall be required. 2. Blasting: (a) Users (developers) (also see excavation pits) 625.00 (500.00) (b) Blasters 250.00 (200.00) (c) Carriers 125.00 (100.00) 3. Demolition: Buildings (no fee required when in compliance with the Minimum Housing Code Requirements) (a) Up to 1,500 sq. ft. of floor area minimum 62.50 ( 50.00) (b) Each additional 1,000 sq. ft. or fraction 12.50 ( 10.00) thereof of floor area. (c) Plumbing Additional 19.00 ( 15.00) (d) Electrical Additional 19.00 ( 15.00) (e) Demolition permit automatically expires 30 days after date of issuance. 4. Awning, Canopies and Tents: (a) Window Awnings - $1.50 each minimum 15.00 ( 10.00) (b) Patio Canopies 19.00 ( 15.00) (c) Tents (Revival and Circus) 62.50 ( 50.00) (d) Fumigation (Tenting) 62.50 ( 50.00) 5. Screen Enclosures: (a) Patio Screen Rooms 27.50 ( 22.00) (b) Patio Screen Rooms under existing roof 20.00 ( 16.00) (c) Swimming Pool Screen Enclosures 37.50 ( 30.00) (d) Carport on existing slab 17.50 ( 15.00) (e) Cabana Rooms including roof 35.00 ( 28.00) (f) Cabana Rooms under existing roof 27..50 ( 22.00) (g) Screen doors and entranceways 12'.50 ( 10.00) PAGE 8. 6. Elevators and Escalators: Electrical Hook-up, See Item #24 Section A. (a) Minimum Fee 75.00 (75.00)new (b) Per Landing 24.00 (24.00)new 7. Sign Erection Permits: (a) All signs see City of Tamarac, Sign Ordinance 8. Towers and Poles: (a) Radio and Communication Towers: 0 to 50 ft high inclusive 30.00 (24.00) 51 to 75 ft. high inclusive 37.50 (30.00) 76 to 100 ft. hing inclusive 52.50 (42.00) 101 and over plus each addition 5 ft. added 7.50 ( 6.00) (b) Poles: for flags, etc., per pole up to 20' high - minimum fee 5.00 ( 4.00) Poles over 20 feet - refer to Item 8 (a) 11.00 ( 9.00) 9. Fences and Walls: (a) Wire or wood fences-10fi (54) per lineal ft. Min.15.00 (11.00) (b) Concrete Pre -cast types-15� (8G) per lineal ft. , minimum 20.00 (15.00) (c) Masonry Walls-20� (15�) per lin. ft. Minimum 25.00 (21.00) 10. Docks: (add Item #11 if seawall) (a) 0 to 30 lineal ft. inclusive 37.50 (30.00) (b) 31 and over plus each additional 10 linegl 5.00 ( 4.00) ft. fraction 11. Miscellaneous: (a) Fireplace, including chimney 32.00 (25.00) (b) Utility Shed only. 20.00 (15.00) 12. Seawall - Bulkhead: (a) Permit and construction inspection costs for the construction of retaining walls and seawalls henceforth shall be found in Ordinance No. 74-45 of the Code of Ordinances of the City of Tamarac, Florida as presently in force or as hereinafter may be amended; provided, however, the fee schedule set forth in said Ordinance shall apply to all construction whether or not said construction is incident to development of a subdivision. (b) Repairs - See Section C - Permit Fee based on Cost of Job. SECTION C: PERMIT FEE BASED ON COST OF JOB. 1. No permit shall be required for general maintenance or repairs which do not change_the Occupancy and the value of which does not exceed three hundred ($300.00) dollars in labor and material as determined by the Building Official, other than electrical work, a permit for which is required regardless of the cost of the work. Construction, alterations, additions, repairs & maintenance of items not set forth above, the cost of which exceeds $300, shall pay 'a fee as set forth below: BASED ON COST OF JOB 301.00 to less than 500.00 20.00 (18.00) 500.00 to less than 1,000.00 27.00 (24.60) 1-000.00 to less than 1,500.00 33.00 (30.00) 1,500.00 to less than 2,000.00 39.00 (35.50) (a) For each additional $500.00 in cost of job add fee of ... $5.00 (b) An affidavit and verification of job cost and payment of any applicable fee increase required before certificate of occupancy -is issued. (c) An itemized accounting, listing unit costs, shall be required. 5/22/80 PAGE 9 SECTION D: SITE IMPROVEMENTS 1. An application for an improvement permit shall be filed with the City. Each application shall be accompanied by a plan indicating the exact nature and location of the desired improvements and an itemized, esti- mated cost of all site improvements, certified by the applicant's engineer or accountant. The cost of the improvement permit and inspection fees shall be paid in accordance with the following schedule, prior to the issuance of permits for the site work: (a) Canal excavation and bulkheads, bridges, seawalls, endwalls, headwalls, water distribution, site preparation and beautification ................ 6�% (4%) of construction cost (3%) (b) All other improvements........ 7�% (50) of construction cost (40) (c) Minimum Total fee ............. $450.00 (400.00) To be assessed to any improvement project for which a site development plan is required. (d) Reinspection fee $ 20.00 2. The permit and inspection fees shall be credited to a separate account and plan review and engineering inspection expenses shall be paid from this account. 3. Notwithstanding the fee schedule set forth in this section, in the event additional inspections are required by the City Engineer because the work of which an inspection has been requested is incomplete, obviously deficient or uncorrected at the time the contractor has requested an inspection, or plans approved by the City Engineer are not available at the jobsite, or a correct permit is not visibly displayed, the contractor shall pay an additional fee of twenty ($20.00) dollars before any reinspection is made. Written records of each requested inspection and reinspection shall be placed in the project's master file. 4. Expiration of Permit: As set forth in the South Florida Building Code, permits issued pursuant to these regulations shall be deemed in full force and effect until such time as the work covered thereby is complete. However, if work covered by said permit has not commenced within three months from the date of issuance of said permit, or has been commenced and then suspended or abandoned for a period of sixty (60) days from the date of the most recent reinspection, said permit is revoked and shall become null and void. Work shall be considered to have commenced and be in active progress when, in the opinion of the City Engineer, a full complement of workmen and equipment is pre- sent at the site to diligently incorporate materials and improvements into the project. When a permit has been revoked, all fees paid shall be forfeited and any work started after such revocation shall be subject to all the requirements and fees for a new permits as provided herein. 5/22/80 PAGE 10 5. The final cost of any or all site improvements shall be certified by the permittee's engineer or accountant before the Certificate of Occupancy is issued, which shall be accompanied by an itemized accounting listing unit costs. SECTION E: In the event of an emergency requiring immediate repairs, a person or firm may proceed with such repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the City Building Department. SECTION F: As set forth in Section 301 of the South Florida Building Code, it is unlawful for any person, firm or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration or repair on or within private property, and such act is punishable as provided in Section 1-6 of the Tamarac City Code. t I