Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-80-2711 2 3 4 5 rj I� 8 9 10 11 12 13 14 15 16 17 Fill 20 21 22 III 23 24 25 26 27 28 29 J2 33 34 35 36 Introduced by /--"Temp #%?r© v CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-80-a�/ A RESOLUTION AWARDING A BID FOR STORM DRAINAGE IMPROVEMENT - ENGINEERS PROJECT 17?7- jp- B I D # 80-30^- 'WE TWOOD CO .MUN I TY 5 N.! st Street Outfall �Modified� WHEREAS, The City Council authorized the Administration to go to bid at its meeting on October 8, ,1980, and, WHEREAS, bids were advertised in the Fort Lauderdale News a newspapel of general circulation in Broward County on October 22, 28 and - November 18,1980, and WHEREAS, bids were opened on November 20 ,1980, and WHEREAS., Lanzo Construction Companyis the lowest fully 'responsive and responsible bidder. NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TAMARAC, FLORIDA: SECTION 1:That the bid of Lanzo Construction Company in the amount of $180,240.00 , is hereby approved. PASSED, ADOPTED AND APPROVED this day of . ,1980. ATTEST: CITY CLERK I HEREBY CERTIFY that I have approved the form and correctness of this RESOLUTION'. CITY ATTORREY MAYOR: DISTRICT DISTRICT DISTRICT DISTRICI RECORD OF COUNCIL VOTE C z') ; . 1 WILLIAMS, HATFIELD 8 STONER, INC. Qvd and CowuUmW Bnginmrs Land Sprveyors \ �f �50. i 2312 WILTON DRIVE, WILTON MANORS, FORT LAUDERDALE, FLORIDA 33305 • TELEPHONE 3OSi566-6341 E. GEX WILLIAMS, JR., P. E. AIRPORTS LEE P. HATFIELD, JR., P.C. ----- HIGHWAYS 6 BRIDGES E. W. (GENE) STONER, P. L.S. WATER 6 SEWER SYSTEMS A14THONY A. NOLAN, P.C. LAND SURVEYS SUBDIVISION DEVELOPMENT C. R. SANDERS, P.C. DRAINAGE 6 FLOOD CONTROL A. L.(SKIP) HARVEY, JR., P.E. PORT 6 MARINE FACILITIES RICHARD C. WOHLFARTH, P.E. MUNICIPAL ENGINEERING December 2, 1980 The Honorable Walter W. Falck, Mayor City of Tamarac 5811 N.W. 88th Avenue Tamarac, Florida 33321 Subject: 1980 Storm Drainage Improvements Dear Mayor Falck: Having reviewed the bids from the second advertising of the 1980 Storm Drainage Improvements project, it is our recommendation that the following subdivisions be awarded to the corresponding contractors who, in turn, are the low bidders per sub- division. McNab Road and N.W. 88th Avenue Intersection Award to Triple R Paving, Inc. for $74,280.00 (45 days) vVestwood Community 5 - N.W. 81st Street Outfall (Modified) Award to Lanzo Construction Company for $180,240.DO (120 days) NOTE M This subdivision had to be modified to keep the amount awarded within 2 1/2% of the current budget (award not to exceed $181,024.00). The project was modified in the L(a llowing manner: ) Eliminate manhole K-24; 20' of 42" RCP between manholes K-9 and K-24 changes to 20' of 48" RCP. ) All construction north of structure K-3 is eliminated. Existing inlet K-2 will continue to be connected to the existing inlet east of new inlet K-3. ✓Westwood Community 5.- N.W. 83rd Street Outfall Award to Campanella Corporation for $68,950.00 (180 days) Westwood Community 3 Award to Lanzo Construction Company for $106,230.00 (120 days) Heathgate - N.W. 74th Terrace Outfall (Modified) Award to Lanzo Construction Company for $181,015.00 (120 days) 1707-2A WESTWOOD COMMUNITY 5 N. W. 81ST STREET OUTFALL DESCRIPTION AND ESTIMATED UNIT PRICE TOTAL FOR ITEM NO. UNIT PRICE (WORDS) QUANTITY (IN FIGURES) ITEM 1-01 Storm Drainage Inlets Price Per Inlet: 5 sl000.00 00, 00✓ 1-02 Storm Drainage Manholes Price Per Manhole: .¢1�✓ 9000. 00 �1 5 $ Iwo,00 $ Soov, o0 1-03 Modify Existing Storm Drainage Inlets Price Per Inlet: 2-15 15-Inch Reinforced Concrete Pipe Price Per Linear Foot: 45 L.F. $•_00 $ . 00 P-2.5 54i/lI/101580 1707-2A UNIT PRICE TOTAL FOR ESTIMATED ITEM DESCRIPTION AND _QUANTITY (IN FIGURES) ITEM. NO_ UNIT PRICE (WORDS) 2-15-1 15-Inch Corrugated Metal Pipe Price Per Linear Foot: f 0 V 10 L.F. $ 3a.00 3a-o,00 2-18-1 18-Inch Corrugated Metal Pipe Price Per Linear Foot: $ 10 L.F. $ 3� 2-24 24-Inch Reinforced Concrete Pipe Price Per Linear Foot: 40 L.F. $ S0.00 $ 1�0,00 2-24-1 24-Inch Corrugated Metal Pipe Price Per Linear Foot: 40 L.F. $ �?0,00 $ 1A40.00 2-30 30-Inch Reinforced Concrete Pipe Price Per Linear Foot: �� o , 00 610 L.F. $ .vv $ P-2.6 54i/lI/101580 1707-2A .DESCRIPTION AND ITEM NO. UNIT PRICE (WORDS) 2-42 42-Inch Reinforced Concrete Pipe Price Per Linear Foot: 2-48 48-Inch Reinforced Concrete Pipe Price Per Linear Foot: J 2-54 54-Inch Reinforced Concrete Pipe Price Per Linear Foot: 2-60 60-Inch Reinforced Concrete Pipe Price Per Linear Foot: 2-66 66-Inch Reinforced Concrete Pipe /Price Per Linear Foot: i 54i/lI/101580 ESTIMATED UNIT PRICE TOTAL FOR QUANTITY (IN FIGURES) ITEM 305 L.F. $ Q 00 $ / / 9 , i)4 ✓ It 160 L.F. $ 0 a'00.00 ✓ / $5� ✓ 460 L.F. $ 2(�, DO D.00 250 L.F. 55 L.F. P-2.7 $ M6, od $ -%Al Soo, oo'' $ 6'30, 00 rv. 1707-2A DESCRIPTION AND ESTIMATED UNIT PRICE TOTAL FOR ITEM NO. UNIT PRICE (WORDS) QUANTITY (IN FIGURES) ITEM 5-12 Water and Sewer Force Main Reconstruction (12-Inch Water Main) Price Per Linear Foot: J 4� .� 20 L.F. $�� Ud $ /500.00 P-2.8 54i/lI/101580 1707-2A DESCRIPTION AND ESTIMATED UNIT PRICE TOTAL FOR ITEM NO. UNIT PRICE (WORDS) QUANTITY (IN FIGURES) ITEM 5-24-1 Water and Sewer Force Main Reconstruction (24-Inch Force Main) Price Per Linear Foot: 20 L.F. $ 0 ✓ $ y00 at 00lp b-00 Water and Sew �--* Service : Lateral Adjustments` ` ' 7. r.. . ,Price_.Per ;Linear :Foot 4 - - - 8-00 Concrete Curb Restoration -:-' Price Per Linear Foot - 140 L.F. $ Aq 00 $ No, 00 � 9-02 .Vdm� 11-00 Concrete Endwall Price Per Cubic Yard: 12.6 C.Y. Pavement Restoration Price Per Linear Foot: 54i/lI/101580 475 L.F. P-2.9 00, 00 5 D.00' 0. 0 4 $ yi50. 00 .1.1 i 1707-2A DESCRIPTION AND ITEM NO. UNIT PRICE (WORDS) ESTIMATED UNIT PRICE QUANTITY (IN FIGURES) hub-TOtal Vateuaar vayb LUX LHLb DGI.Livu vain. V �-- P-2.10 54i/lI/101580 TOTAL FOR ITEM