Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-77-117PROPOSED BY: AY INTRODUCED BY: T Temp.#807 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R- 77- // % A RESOLUTION REVISING CERTAIN STRUCTUAL, PLUMBING, ELECTRICAL AND VARIOUS OTHER FEE PERMITS; PROVIDING AN EFFECTIVE DATE. WHEREAS, Ordinance No. 7 7-at) authorizes the City Council to review the schedule of building permit and various other fees required to be issued prior to initiation of construction, development or other improvements, and WHEREAS, the Chief Building Official has recommended to the City Council that a review of such fees should be made; and WHEREAS, the City Council wishes to accept the recommendation of the Chief Building Official. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the schedule of Structual, Plumbing, Electrical and other various other fee permits, copy of which is attached hereto and made a part hereof is hereby adopted. SECTION 2: This Resolution shall become effective immediately upon its adoption. PASSED, ADOPTED AND APPROVED this day of , 1977. YOR I HEREBY CERTIFY that I have approved the form and correctness of this RESOLUTION. IV CITY ORNEY RECORD OF C®UNCIL VOTE MAYOR W. FALCK VIM H. MASSARO_.- CjPvt M. WEINBERGE" ---- CjM 1. M. DISRAE'-t.Y_„� —? ..... CJM M. KLI1tA --�.•'. "EXTITPIEF All SCHEDULE OF PERN11T FEES "U.CJ'.0Y,, A: BUILDING ISTRUCTURAL FEES 1. ifin-lmur.-i Fee for structural permits 2. Residential (Cu. ft of space) --2, 001_to. 5 0.00--i 5,00" 'co 1.0,00") 15'GO", 15,001_t-o 20,000.1 Ova i- 20,000 add $3.00_per 1000 or fraction Lhere-ol; Commercial: '(includes apt. 3 units and oven-�� 0,000 to 2,000 ,001 c-001 c) I 5, 00J. co 10, 0,10' IJ, G� o 2 0, 0 G' 0 to W'W 5t 1, 00 1 -/5,( 75,001 00, 0,0Q, 100,000 and over, each additional 1000 cu. ft., warehouses and retail stores, single story apt. buildings at $3.00 per 1000. Apt. Bldgs..(over one story) 100,001 and over, each 1G00 cu. ft (a) Asphalt Plants (Plumbing and Electrical additional) (b) Concrete Batching Plants (Plumbing and Electrical additional) 3. Concrete Slabs: (a) Monolithic 0,000 to 1,500 sq. ft. inclusive (min) Each additional 500 sq. ft. Sidewalk (alone) (Where site plan is not reqyd) Slab (alone) Sidewalk and Slab (b) If Site Plan is required, see site improvements schedule (c) Concrete curbing around landscaping g L)er ft _ 4. Paving and Parkiog: (If site plan is not required) (a) 0,000 to 1,000 inclusive (i)) 1,0011 and ova:", each additio-nal 500; sq. f`t'. -S L! $11. 5. 0 0 22.00 50 ` 00 ell) 1p' . 0 o 4.00 300.00 300.00 z. J 2.50 11.00 11.00 13.50 .20 15 0 0 Page 2 �) Repairs only, to existing roof or si;-";.gig (chin.) i5.00 t-2; Poofing or siding or replacing M}_s.t roofing or siding: (sq ft) 0,000 to 1,000 inclusive 15.00 1,001 and over, each additional 1,000 sq. ft. 3.00 (c) Ieplacing Rain Downspouts (min.) 1.0.00 Each 2.00 (d) New Cutters and first two (2) downspouts (min.) 1.0.00 Each additional downspout 3.50 (e) Carport enclosures 20.00 6. S,airniz Pools: (a) All Pools (including excavation) 0,000 to 16,000 gallons inclusive 118.00 16,001 to 30,000 gallons inclusive 72.00 30,001 and over 100.00 (,) Pool Screened enclosures _ a. 27 00 (c) �Swimman Swcr,ming Pool Heater (oil or gas) item 15 for tank Er j_ 22.00 ' '(ci) Back jJash Soakage Pit 12 00 =' ; . ins rc nn Plumb ing Permit Fee (Except , �p c tank, sewers septic temp toilet) t) 15 , t3 8. 6iater Service: (a) Public Water Connection each 10.00 (b) Private Well Connection each 9.00 (e�__.Water Softener s.-_._-_r�._ each _ 6 00 , r _.. _, T _ (ci) i'n�er I'cl.ter�ng System (Inc under sink model) _ c cli lj.00i (e) ,ai e�' 7n-j"ection urifier . _ .._, . �_ each 9. Sewerage Connection each io. Ci? (al Se,7er Hook-up _ ' Septic Tan,U-pj a 4 10. C O 4 10.00 Toilets(c) Teiiijo. each 10. Fixtures: (a) Toilet i each 6.00 (b) Kl'tcllonc Sink) each 6.00 `(c_) L1-VnLO1_-y I each 6.00 l} L Lu 7dry Tray 7 each 6.00 (e) 'Grease Traps each 6.00 (f) Interceptors each 6.00 (g) Lint Traps each 6.00 (h) Floor Drains each 6.00 (i) Hose Bibs (first two) 3.50 Each Additional .50 ,Q) t _Cach Basins -_< ._____ .__ _ . -� each 6.00 (1;} Air Compressors (Indirect waste lines each 6.00 '(1)"-'µRoof Drains each 6.00 (m) Ice Makers each 6.00 (n) Bidet __._._ __,_ each 0.,00 (o)-- Trap Primors each 11. AD-pliances : (a) Clothes Washer each 6.00 (b) Coffee Urns each 6.00 (c) Dishwashers each 6.00 (d) Garbage Disposals each 6.00 (e) Sump Pumps each 6.00 (f) Water Heaters each 6,00 (g) Water Coolers each 6.00 (h) Drinking Fountains each 6.1+.; t ur,)in.atic Tce C; ;De i`:.?.(chiin �-) ' C':3c}'1 r rF, i ,� t 6/29/77 Page 3 "_ �-­:-\-'Lca-L 12. Eq ui mzient - _'A Efe chan (a) Minimum Fee 15.00 (b) Air or Refrigeration Compressors 0 - 5 ton 7.00 - - ---- 5 - 10 tons 11.00 10 - 25 tons 15.00 over 25 tons 00] c) Air Co m _-e f7 so r outlets 1.0 0 ea., J)_....Condensate Lines 2 5 (e) Central Heat Systems 11.00 (f) Central Heat and A/C -';Systerii 11.00 (g) Wall -type Heaters - OiY 11.00 (rk) Temperature Control-- Minimum 11.00 Per Thermostat "I (Slav .50 (i) Radiator -type H� Iceiling or Wall Suspended) 11.00 (j) Furnaces 11.00 (k) Boilers 11.00 Steam Openings Minimum 10.00 Each additional .50 Swimming Pool Heat - Exchanger Units 11.00 Swimming 11.00 (n) Swimming Pool Heater Electric Up -its .00 m 1 Minimum 0 (o) Pool Piping Min11.00 (p) Solar Heating System for Water Minimum 10.00 (q) Process Piping (first five 50 Each Additional (r) Vacuum Systems Minimum 12.00 Per Op-ening 2,50 1 Each r4 - Dtl Ventilators 1%ork 1-1 L Duct -.fie___ Each 70 ;Plus Drops (if above min.), ;(u) Drainage Pit (a/c condensate and boiler blowoff` 13. 'Wells (a) 2"diameter well or less Minimum 11.00 (b) Over 2" diameter, See Site Improvement Schedule 14. Sprinkler System: (a) Fire Sprinklers (minimum fee up to 12 headsdry or we) 10.00 Each additional head 50 (b) Hose Cabinets and connections (siamese) each 5.00 (c) Lawn Sprinkler (for first 12 heads) 11.00 (d) Each Lawn head over Sprinkler 12 Hookup (well, public water, canal, lake) .50 15. Liquid Tanks - above or below ground (a) Fuel Pumps and Piping 22.00 22.00 (b) 0 - 1,000 gallons inclusive 30.00 (c) 1,001 to 2,000 gallons inclusive 36.00 (d) 2,001 to 3,000 gallons inclusive 42.00 (e) 3,001 to 4,000 gallons inclusive 11.00 M Each additional 1,000 over 4,000 gallons 16. Mechanical Permits exceeding $50,000.00 1/2 of 1% (a) Requires certification, see Site Improvements Item #10 I GAS PERMIT FEES 17. Gas Service: (Natural, Liquid Petroleum Systems, a�nd'­Redical (a) System in I stallation including tanks or cylinders, meter and two (2) outlets Tank size 0 to 251 gallons (total gallons or aggregate, aDo-,,,e or -below ground) (-D a c tl K- 6/29/77 Page 4 1 1 (c) System installation including tanks, meter and two(2) outlets Tank Size 2,002 to 4,000 gallons (total gallons or aggregate, above or below ground) (d) Each added outlet or meter (e) Tank or cylinder only When gas outlets are provided by others la. Appliances: (Residential) (a) Clothes Dryers (b) Water Heater 19. Coin Operated Laundries: (a) Dryer Equipment - Gas Fired �(b) LJater_ Heater _ �� (.c) Dry Cleaning Equipment ELECTRICAL FEES each each each each reac 20. Minimum Electrical Permit Fees: Including repair work, per permit 2 Rough Wiring Outlets: Light receptacle, switch and also telephone and other low voltage outlets, excluding equipment outlets (a) For each outlet (b) Circuits each 22. Services and Switchboards: The following fees shall be charged for each service and for each subfeed in new installations only. No charge will be made for subfeeds in existing installations. Each service fee shall include one subfeed. (Bus -ducts, busways, wireways shall be considered as sub -feeds.) (a) Temporary for construction (b) All services up to 400 ampere (Over 400 ampere 3.00 per 100) (c) Service repair and/or meter change Minimum (d) Service change and/or addition .20 per amp, plus minimum 23. Equipment Outlets or Permanent Connections: (a) All 110 volts major appliances (b) All 220 volts major appliances (c) Swimming Pools: Grounding Pool light Circulation (as per Item #25) 24. Motors: (a) Each 0 thru 5 hp single phase (b) Each 0 thru 5 hp three phase (c) Each over 5 thru 10 Hp (d) Each over 10 th.ru 25'Hp (e) Each over. 25 Hp (f) Air conditioners (electrical work except wall and -;window units - as per Hi table) 36.00 2.50 4.50 9.00 _9.00 15.00 40 . .40 9.00 9.00 11.00 2.50 5.00 6.00 3.50 7.00 9.00 11.00 15.00 40.00 t al 0!2'/77 206. Generators, Transformers, Commercial Heating Equipment and Strip Heaters: (a) Equipment rated up to 5 KVA or KW each (b) Equipment rated over 5 KVA or KW thru 10 KVA or KW each (c) Equipment rated over 10 KVA or KW thru 15 KVA or KW (d) Equipment rated over 15 KVA or KW thru each 20 KVA or KW each (e) Equipment rated over 20 KVA or KW thru 25 KVA or KW each (f) Equipment rated over 25 KVA or KW each Plus $1.00 for each additional KVA or KW 27. Welding Machine Outlets: (a) Up to 25 ampere (b) Over 25 amperes to 50 amperes (c) Over 50 amperes -- $18.00, plus $4.50 for each 25 amperes over 50 amperes or fractions thereof 28. Special Purpose Outlets: (Commercial) Popcorn, doughnut, drink machines, coin music machines, toasters, coffee urn, deep fryer, telephone booths, refrigerator, display cases, sign circuit, etc. Each 110 volts Each 220 volts Painting ,- Bake Ovens each 1 29. Signs: (a) First 100 bulbs or 10 fluorescent tubes (b) Each additional bulb each (c) Each additional fluorescent tube each (d) Transformers each (e) Flasher (f) Time Clock (g) Ballasts each (h) Sign repairs, connection and reconnection, minimum fee 30. Fixtures: (a) All fixtures counted as outlets each (b) Ballasts each (c) Flood lights: height under 3 ft 110 volts up to 150 watts each Over 150 watts to 300 watts each (d) Poles over 3 feet per foot 110 volts up to 150 watts each Over 150 watts to 300 watts each 31. Streamers of Festoon Lights: First 10 lights or less Minimum Each additional 10 or less 32. Pl omold: First 25 feet Each 5 feet thereafter 33. Temporary Work on Circuses, Carnivals, etc. : (a) �liniml�i ��ee ,b) Eqi, )Pi+=n.;_ +t. o end Cc? ) ,r 2t ! ,r2 26 Page 5 6.00 8.00 15.00 17.00 19.00 21.00 2.50 5.00 5.50 5.00 .10 .50 6.00 6.00 6.00 5.00 10.00 .40 5.00 1.20 2.00 .20 1.20 2.00 9.00 .75 1.25 .25 25.00 1,00 1 1 6/29/77 34. (a) Fire or Smoke Detection System Installation: 1. Installation, Step Down Transformer each Over 2 relays each 2. Head or Target Area with protector wire of similar character each 3. Bell or alarm station each 4. Pull Station each (b) Fire or Smoke Detection Svstem Reinspection Fee REQUIRED SEMIANNUALLY (NOT OPTIONAL): 1. Bell on alarm station each 2. Head or target area each 3. Pull Station each 4. Minimum 35. Master Television and Radio Receiving Antenna: TV and radio antenna devices, wall outlets, supressors, splitters, lightning arrestors, receivers, input devices, audio amplifiers, ground connections, etc. 1 thru 5 devices Each additional device 36. Burglar Alarm System (fee) (a) Transformer (b) Each contact station 37. General Supplementary Fees: The following schedule applies to all building classifications under Section A, See pages 1 thru 6 ,(a) Pre -inspection when required prior to issuin .-a permit_ (b) Renewal -expired Permit (within 90 days of last ,inspection pursuant to South Florida a Building Code - 304. (c)Each reinspection - violation (to inspect kafter correction is made) (d) «Each reinspection - Not ready (requires.] _- inspection - trip wasted) -- -� ;(e)- Each reinspection not accessible.; (f)`-Permit Card Replacement --mutilated, destroyed or lost (g) Non -display of Permit Card - Penalty Fee (h) Each Change in Design or Drawing - Affecting plans with work underway, regular fee for each permit classification 'Fire Inspection Required Before Certificate of Occupancy.-] SECTION B: MISCELLANEOUS FEES 1. Excavations (land, canal, or lakes)'fill or earth moving: Page 6 5.00 .80 .40 1.50 1.50 1.50 1.40 1.50 15.00 3.00 .25 11.00 6.00 .40 12.09j 50% 12.00 Z2.00 5.00 20.00 50% of Original. Fee - (a) 500 cubic yards or less minimum 50.00 * (b) 501 cubic yards or more 3% of cost of job *Sworn affidavit of cost shall be required *An itemized unit cost.certified by *Upon application for _permittee`s accountant shall be required Certificate of Occupancy 2. Blasting: (a) Users (.developers) (also see excavation pits) 500,00 ;? 'r ; .� r 6f2j/77 Page 7 3. Demolition: Buildings (No fee required when in compliance with the Minimum Housing Code Requirements) (a) Up to 1,500 sq. ft. of floor area minimum 30.00 (b) Each additional 1,000 sq. ft. or fraction thereof of floor area 10.00 (c) Plumbing Additional (d) Electrical Additional 15.00 15.00 (e) Demolition permit automatically expires 15 days after date of issuance. 4. Awning, Canopies and Tents: (a) Window Awnings - $1.50 each minimum 10.00 (b) Patio Canopies 14.00 (c) Tents (Revival and Circus) 50.00 5. Screen Enclosures: (a) Patio Screen Rooms 20.00 (b) Patio Screen Rooms Under existing roof 15.00 (c) Swimming Pool Screen Enclosures 27.00 (d) Carport on existing slab 15.00 (e) Cabana Rooms including roof 26.00 (f) Cabana Rooms under existing roof 20.00 (g) Screen doors and entranceways 10.00 6. Elevators and Escalators: Electrical Hook-up, See Item #24, Section A. (a) Minimum Fee 75.00 (b) Per Landing 24.00 7. Sign Erection Permits: (a) All signs see City of Tamarac - Sign Ordinance 8. Towers and Poles: (a) Radio and Communication Towers 0 to 50 ft high inclusive 24.00 51 to 75 ft. high inclusive 30.00 76 to 100 ft. high inclusive 42.00 101 and over plus each addition 5 ft added 6.00 (b) Poles: for flags, etc., per pole up to 20' high Minimum Fee 4.00 (Poles over 20 feet - refer to Item 8(a) 9.00 9. Fences and Walls: -. (a) Wire or Wood Fences - 5F per lineal ft. Minimum 11.00 (b) Concrete Pre -cast Types - 8p per lineal ft. Minimum 15.00 (c) Masonry Walls - 15(,� per lineal ft. Minimum 21.00 10. Docks: (Add item #11 if seawall) (a) 0 to 30-lineal ft inclusive 30.00 (b) 31 and over plus each additional 10 lineal ft fraction 4.00 1 Page 8 11. Seawall Bulkhead: (a) Permit and construction inspection costs for the construction of retaining walls and seawalls henceforth.shall be found in Ordinance No. 74-45 of the Code of Ordinances of the City of Tamarac, Florida, as presently in force or as hereinafter may be amended; provided, however, the fee schedule set forth.in said Ordinance shall apply to all construc- tionwhether or not said construction'is incident to development of a subdivision. (b) Repairs - See Section C - Permit Fee based on Cost of Job. SECTION C: PERMIT FEE BASED'ON'COST'OF JOB. 1. That prior to initiation of construction, alteration or addition to private property within the City -of Tamarac, the person, firm or corporation desir- ous of performing said construction, alteration or addition, which does not fall into any -of the above listed categories, or any categories contained.in other ordinances, shall be required to obtain a permit from the Building Department and upon the taking of such permit shall be required to pay a fee as follows: BASED ON COST OF JOB 0.00 to 25.00 26.00 to less than 50.00 50.00 to less than 100.00 100.00 to less than 500.00 500.00 to less than 1,000. 1,000. to less than 1,500. 1,500. to less than 2,000. No permit Required Permit Required No Charge 10.00 18.00 24.60 30.00 a 35.50 ! (a) For each additional $500.00 in cost of job, add a fee of ...................... ••..........................5.00 (DI An affidavit and verification of joh cost and payment of any applicable fee. increase. 'required before. certificate of 'occupancy, iA issued.. (c) An itemized'accountitig; 1i4tiAg unit. costs,- shall he. requ:"`red. SECTION D: SITE. 1,IPROVEXENTS' 1. Water Distribution Systems (Including wells over 2" in diameter), for private developments (Plus laterals) 4% of cost 2. Water Treatment Plants 3% of cost 3. Sewage Collection Systems for private developments (plus laterals) 4% of cost 4. Sewage Treatmant Plants 4% of cost 5. Lift Stations 4% of cost 6. Sidewalks, slabs and concrete curbing 3% of cost 7.' Pavement and Drainage Systems 4% of cost 8._ Seawall, retaining wall or bulkhead (a) Construction inspection costs for the construction of retaining walls and seawalls henceforth shall be found in Ordinance No. 74-45 of the Code of Ordinances of the City of Tamarac', Florida, as presently in farce or as hereinafter may be a,:encled. 400. ;;dl ..... ' f. A Page 9 6129�77 SECTION E; In the.event of an emergency requiring immediate repairs, a person or firm may proceed with such, repairs; provided however, an application for the permit and the payment of appropriate fees are made during the first succeeding business day of the city building department. SECTION F: It is unlawful for any person, firm or corporation to fail to acquire a proper permit prior to the commencement of any construction, alteration or repair, on or within private property, and such act is punishable as provided in Section 1-6 of the Tamarac City Code. 1