HomeMy WebLinkAboutCity of Tamarac Resolution R-77-185Introduced by :
Temp. #882
I
1
CITY OF TAMA.RAC , FLORIDA
RESOLUTION NO. R-
A RESOLUTION ADOPTING A SCHEDULE OF STRUCTURAL,
PLUMBING, ELECTRICAL AND VARIOUS OTHER PERMITS
AND FEES; PROVIDING AN EFFECTIVE DATE.
WHEREAS,
Ordinance
No.
77-20
authorizes the
City
Council
to review the
schedule
of
various
fees required
prior
to init-
iation of construction, development or other improvements and
Council adopted such schedule by Resolution R-77-117 and
amended same by R-77-150, and
WHEREAS, the City Council has received a recommendation for
an amendment to Section D of R-77-117 and R-77-150, and wishes
to accept the recommendation.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
TAMARAC, FLORIDA:
SECTION 1:
That the schedule of Structural, Plumbing,
Electrical and other various permits and fees, as adopted by
Resolution R-77-117 and amended by R-77-150, is further revised by
correcting Section D thereof.
SECTION 2:
The. copy attached hereto of the complete schedule
is adopted by R-77-117 and reflecting its amendments pursuant to
R-77-150 and the revision to Section D referenced herein is hereby
adopted.
SECTION 8: This Resolution shall become effective immediately
upon its adoption.
PASSED, ADOPTED AND APPROVED this �� day of � 1977.
ATTEST:
CXT-Y/"CLERK
I HEREBY CERTIFY that I have
approved the form and correctness
of this RESOLUTION
RECORD OF COUNCIL VOTE
MAYOR W. FALCK_
V/M H. MASSARO r
C/M M. WEINBERGER
C/M I. M. DISRAELLY
C/M M. KLIKA
I
I
SCHEDULE of PERMIT FEES
SECTION A: BUILDING
STRUCTURAL FEES
1. Minimum Fee for structural permits $15.00
2. Residential (cu. ft. of space)
0,000 to 2,000 20.00
2,001
to
5,000
35.00
5,001
to
101000
70.00
10,001
to
15,000
100.00
15,001
to
20,000
120.00
over
20,000
add
$3.00
per 1000 or
fraction thereof
Commercial:
(includes
apt.
3 units and
over)
0,000
to
2,000
22.00
2,001
to
5,000
50.00
5,001
to
10,000
75.00
10,001
to
151000
100.00
151001
to
201000
120.00
20,001
to
25,000
135.00
25,001
to
501000
175.00
50,001
to
75,000
200.00
75,001
to
100,000
220.00
100,000 and over, each additional 1000 cu. ft., warehouses
and retail stores. single story apartment � buildings at
$3.00 per 1000.
Apt. Buildings (over one story)
100,000 and over, each 1000 cu. ft. 4.00
(a) Asphalt Plants (plumbing and electrical additional)
300.00
(b) Concrete Batching Plants (plumbing and Electrical
additional) 300.00
3. Concrete Slabs:
(a) Monolithic 0,000 to 1,500 sq. ft. inclusive (min)
Each additional 500 sq. ft.
Sidewalk (alone) (where site plan is not req'd)
Slab (alone)
Sidewalk and Slab
(b) If Site Plan is required, see site improvements
schedule.
(c) Concrete curbing
around
landscaping
per ft.
4. Paving and Parking: (If
site
plan is not
required)
(a) 0,000 to 1,000 inclusive
(b) 1,001 and over, each additional 500 sq. ft.
(c) If site plan is required, see site improvement
schedule.
12.00
2.50
11.00
11.00
13.50
.20
15.00
3.50
I
i
5.
6.
Roof ing and Siding
(a)
(b)
(c)
Repairs only
to existing
roof or siding
(min)
New roofing
or siding or
replacing
old
roofing
or siding: (sq. ft.)
02000 to 1,000 inclusive
1,001 and over, each additional 1,000 sq.
Replacing Rain Downspouts (min)
Each
(d) New Gutters and first two (2) downspouts
Each additional downspout
(e) Carport enclosures
Swimming Pools:
ft.
(min)
15.00
15.00
3.00
10.00
2.00
10.00
3.50
20.00
(a)
All pools
(including excavation)
0,000 to
16,000 gallons inclusive
48.00
16,001 to
30,000 gallons inclusive
72.00
30,001 and
over
100.00
(b)
Swimming
Pool Screened enclosures
27.00
(c)
Swimming
Pools Heater (oil or gas - see item
15
for tank
fee
22.00
(d)
Back Wash
Soakage Pit
11.00
7. Minimum Plumbing
Permit Fee (Except sewer, septic
tank,
Temp. toilet
15.00
8. Water Service:
(a)
Public Water Connection
each
10.00
(b)
Private Well Connection
each
9.00
(c)
Water Softeners
each
6.00
(d)
Water filtering System (inc.
under sink model)
each
6.00
(e)
Water Injection Purifier
each
6.00
9. Sewerage Connection
(a)
Sewer Hook-up
each
10.00
(b)
Septic Tank Hook -UP
each
10.00
(c)
Temp. Toilets
each
10.00
10. Fixtures:
(a)
Toilet
(b)
Kitchen Sink
(c)
Lavatory
(d)
Laundry Tray
(e)
Grease Traps
(f)
Interceptors
(g)
Lint Traps
(h)
Floor Drains
(i)
Hose Bibs (first
each additional
(j)
Catch Basins
(k)
Air Compressors
(1)
Roof Drains
(m)
Ice Makers
(n)
Bidet
(o)
Trap Primors
11. Appliances:
two)
(indirect- waste
each
each
each
each
each
each
each
each
each
lines )
each
each
each
each
each
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
3.50
.50
6.00
6.00
6.00
6.00
6.00
6.00
(a)
Clothes Washer
each
6.00
(b)
Coffee Urns
each
6.00
(c)
Dishwashers
each
6.00
(d)
Garbage Disposals
each
6.00
(e)
Sump Pumps
each
6.00
(f)
Water Heaters
each
6.00
(g)
Water Coolers
each
6.00
(h)
Drinking Fountains
each
6.00
(i)
Automatic Ice Cube Machine
each
6.00
(j)
Instant Hot Water Appliance
each
6.00
(k)
Suana Steam Unit
each
6.00
0 8
I
I
i
-I.
u
12. Equipment - A/C - Mechanical
(a) Minimum fee
(b) Air or Refrigeration Compressors 0 - 5 tons
5 -10 tons
10 -25 tons
over 25 tons
(c)
Air Compressor Outlets 1.00 ea.
(d)
Condensate Lines
2.50 ea.
(e)
Central Heat Systems
(f)
Central Heat and A/C
System
(g)
Wall -type Heaters - Oil
(h)
Temperature Control
minimum
Per Thermostat (Slave)
(i)
Radiator -type Heater
(Ceiling or -Wall Suspended)
(j)
Furnaces
(k)
Boilers
(1)
Steam Openings
Minimum
Each additional
(m)
Swimming Pool Heat -
Exchanger Units
(n)
Swimming Pool Heater
Electric Units
(o)
Pool Piping
Minimum
(p)
Solar Heating System
for Water
(q)
Process Piping (first
five) Minimum
Each additional
(r)
Vacuum Systems
Minimum
Per Opening
(s)
Ventilators
Each
(t)
Duct Work 1-10 drops
min. fee
Plus drops (if above
min.) Each
(u)
Drainage Pit (a/c condensate
& boiler blowoff )
13. wells
(a)
2" diameter well
or less
Minimum
(b),
Over 2" diameter,
See Site
Improvement Schedule
14. Sprinkler System:
(a) Fire Sprinklers(min fee up to 12 heads dry or wet)
Each additional head
(b) Hose Cabinets & connections (siamese) each
(c) Lawn Sprinkler (for first 12 heads)
Each head over 12
(d) Lawn Sprinkler Hookup (well, public water,
canal., lake)
15. Liquid Tanks - above or below ground
(a)
Fuel
Pumps and
Piping
(b)
0 -1,000
gallons
inclusive
(c)'
1,001
to 2,000
gallons inclusive
(d)
2,001
to 3,000
gallons inclusive
(e)
3,001
to 4,000
gallons inclusive
(f)
Each
additional
1,000 over 4,000 gallons
16. Mechanical Permits exceeding $50,000.00
(a) Requires certification, see Site Improvements
Item #10
OAS PERMIT FEES
$15.00
7.00
11.00
15.00
40.00
11.00
11.00
11.00
11.00
.50
11.00
11.00
11.00
10.00
.50
11.00
11.00
10.00
11.00
10.00
.50
12.00
2.50
4.00
9.00
.70
6.00
11.00
10.00
.50
5.00
11.00
.50
6.00
22.00
22.00
30.00
36.00
42.00
11.00
I Of 1%
17. Gas Service: (Natural, Liquid Petroleum Systems & Medical._)
(a) System installations including tanks or cylinders,
meter and two (2) outlets.
Tank size 0 to 251 gallons (total gallons or aggregate,
above or below ground) 10.00
No Text
Page 4
9 'p
(b) Systems installation including tanks, meter and two
(2) outlets
Tank size 251 to 2,001 gallons (total gallons or
aggregate, above or below grr)und) $18.00
(c) System installation including tanks, meter &
two (2) outlets
Tank Size 2,002 to 4,000 gallons (total gallons
or aggregate, above or below g mund 36.00
(d) Each added outlet or meter. 2.50
(e) Tank or cylinder only when gas outlets are
provided by others 4.50
18. Appliances: (Residential)
(a)
Clothes Dryers
Each
6.00
(b)
Water Heater
Each
6.00
19. Coin Operated Laundries:
20.
21.
22.
23.
24.
(a) Dryer Equipment - Gas Fired Each 9.00
(b) Water Heater Each 9.00
(c) Dry Cleaning Equipment Each 9.00
ELECTRICAL FEES
Minimum Electrical Permit Fees:
Including repair work per permit
Rough Wiring Outlets:
Light receptacle, switch & also telephone & other
low voltage outlets, excluding equipment outlets
15.00
(a) For each outlet .40
(b) Circuits Each .40
Services and Switchboards:
The following fees shall be charged for each service &
for each subfeed in new installations only. No charge will
be made for subfeeds in existing installations. Each service
fee shall include one subfeed. (Bus -ducts, busways, wireways
shall be considered as sub -feeds.)
(a) Temporary for construction 9.00
(b) All services up to 400 ampere (over 400 ampere
3.00 per 100) 9.00
(c) Service repair and/or meter change Min. 11.00
(d) Service change and/or addition .20 per amp, + min.
(e) Temporary Power (with affidavit letter) 15.00
Equipment Outlets or Permanent Connections:
(a)
All 110 volts major appliances
2.50
(b)
All 220 volts major appliances
5.00
(c)
Swimming Pools:
Grounding
6.00
Pool Light
3.50
Circulation (as per Item #25)
Motors:
(a)
Each 0 thru 5 hp single phase
7.00
(b)
Each 0 thru 5 hp three phase
9.00
(c)
Each over 5 thru 10 hp
11.00
(d)
Each over 10 thru 25 hp
15.00
(e)
Each over 25 hp
40.00
(f)
Air Conditioners (electrical work except wall
& window units - as per HP table)
A
I
[q
I
Page 5
25. Machine Outlets or Permanent Connections:
(a)
X-ray - Portable
$ 9.00
(b)
X-ray Stationary
12.00
(c)
Diathernic
12.00
26. Generators, Transformers Commercial Heating Equipment
and Strip Heaters:
27.
28.
29.
30.
31.
32.
(a)
Equipment
rated
up to 5 KVA
or KW
(b)
Equipment
rated
over 5 KVA
or KW
thru 10 KVA or KW
(c) Equipment rated over 10 KVA or KW
thru 15 KVA or KW
(d) Equipment rated over 15 KVA or KW
thru 20 KVA or KW
(e) Equipment rated over 20 KVA or KW
thru 25 KVA or KW
(f) Equipment rated over 25 KVA or KW
each
each
each
each
each
each
Plus $1.00 for each additional KVA or KW
Welding Machine Outlets:
(a) Up to 25 ampere
(b) Over 25 amperes to 50 amperes
(c) Over 50 amperes - $18.00, plus $4.5.0 for
each 25 amperes over 50 amperes or
fractions thereof.
Special Purpose Outlets: (Commercial)
6 00
15.00
17.00
19.00
21.00
9.00
18.00
Popcorn, doughnut, drink machines, coin music machines,
toasters, coffee urn, deep fryer, telephone booths,
refrigerator, display cases, sign circuit, etc.
Each 110 volts
Each 220 volts
Painting - Bake Ovens each
Signs:
(a) First 100 bulbs or 10 fluorescent tubes
(b) Each additional bulb each
(c) Each additional fluorescent tube each
(d) Transformers each
(e) Flasher
(f) Time Clock
(g) Ballasts each
(h) Sign repairs, connection & reconnection,
minimum fee
Fixtures:
(a) All fixtures counted as outlets
(b) Ballasts
(c) Flood lights: height under 3 ft.
110 volts up to 150 watts
Over 150 watts to 300 watts
(d) Poles over 3 feet
110 volts up to 150 watts
Over 150 watts to 300 watts
Streamers of Festoon Lights:
First 10 lights or less
Each additional 10 or less
Plugmold:
each
each
each
each
per foot
each
each
Minimum
2.50
5.00
5.50
5.00
.10
.50
6.00
6.00
6.00
5.00
10.00
.40
5.00
1.20
2.00
.20
1.20
2.00
9.00
.75
First 25 feet
Each 5 feet thereafter
1.25
.25
Fh
I
r
'LJ
33 . Temporary Work on Circuses , Carnivals. etc.:
(a) Minimum Fee $25.00
(b) Equipment Ground each 1.00
(c) Services (as per item #22)
(d) Generators (as per item #26)
34. (a)
Fire
or Smoke
Detection
System Installation:
1.
Installation,
Step Down
Transformer each
5.00
Over
2 relays
each
.80
2.
Head
or Target
Area with
protector
wire
of similar
character
each
.40
3.
Bell
or alarm
station
each
1.50
4.
Pull
Station
each
1.50
(b)
Fire
or Smoke
Detection
System Reinspection
Fee
REQUIRED
SEMIANNUALLY (NOT OPTIONAL).
1.
Bell
on alarm
station
each
1.50
2.
Head
or target
area
each
1.40
3.
Pull
Station
each
1.50
4.
Minimum
15.00
35. Master Television and Radio Receiving Antenna:
TV and radio antenna devices, wall outlets, suppressors ,
splitters, lightning arrestors, receivers, input devices,
audio amplifiers, ground connections, etc.
1 thru 5 devices 3.00
Each additional device .25
36. Burglar Alarm System (fee) 11.00
(a) Transformer 6.00
(b) Each contact station .40
37. General Supplementary Fees:
The following schedule applies to all building
classifications under Section A, See pages 1 thru 6
(a) Pre -inspection when required prior to issuing
a permit
12.00
(b)
Renewal -expired Permit (within 90 days of last
inspection pursuant to South Florida
Building Code - 304.3
50%
(c)
Each reinspection - violation (to inspect
after correction is made)
12.00
(d)
Each reinspection - not ready(requires
inspection - trip wasted.)
12.00
(e)
Each reinspection - not accessible
12.00
(f)
Permit Card Replacement --mutilated, destroyed
or lost.
5.00
(g)
Non -display of Permit Card - Penalty Fee
20.00
(h)
Each change in Design or Drawing - Affecting
plans with work underway, regular fee for each
50%
of
permit classification.
Original
Fee
Fire Inspection Required Before Certificate of
Occupancy 15.00
SECTION B : MISCELLANEOUS FEES
1. Excavations (land
canal, or lakes) fill or earth moving:
- r r • r rrrrr��r+.�r
(a) 500 cubic yards or less minimum 50.00
* (b) 501 cubic yards or more 37o of cost of job
*Sworn affidavit of cost shall be required
*An itemized unit cost certified by *Upon application for
permit tee ' s accountant shall be req t d Certificate of Occu .
I
I
{ Ar
2.
0
is
5.
Page 7
Blasting:
(a) Users (developers) (also see excavation pits) $500.00
(.b) Blasters 200.00
(c) Carriers 100.00
Demolition:
Buildings (No fee required when in compliance with the
Minimum Housing Code Requirements)
(a) Up to 1,500 sq, ft. of floor area minimum
(b) Each additional 11000 sq. ft. or fraction
thereof of floor area.
(c) Plumbing Additional
(d) Electrical Additional
(e) Demolition permit automatically expires
15 days after date of issuance.
Awning, Canopies and Tents:
(a) Window Awnings - $1.50 each minimum
(b) Patio Canopies
(c) Tents (Revival and Circus)
Screen Enclosures:
(a) Patio Screen Rooms
(b) Patio Screen Rooms Under existing roof
(c) Swimming Pool Screen Enclosures
(d) Carport on existing slab
(e) Cabana Rooms including roof
(f) Cabana Rooms under existing roof
(g) Screen doors and entranceways
6. Elevators and Escalators: Electrical Hook-up ,
See Item #24 Section A.
(a) Minimum Fee
(b) Per Landing
7. Sign Erection Permits:
(a) All signs see City of Tamarac - Sign Ordinance
8. Towers and Poles:
30.00
10.00
15.00
15.00
10.00
14.00
50.00
20.00
15.00
27.00
15.00
26.00
30.00
10.00
75.00
24.00
(a) Radio and Communication Towers for Commercial use Only
0 to 50 ft. high inclusive 24.00
51 to 75 ft. high inclusive 30.00
76 to 100 ft. high inclusive 42.00
101 and over plus each addition 5 ft. added 6.00
(b) Poles: for flags, etc., per pole up to 20'
high Minimum Fee 4.00
(Poles over 20 feet - refer to Item 8(a) 9.00
9. Fences and Walls:
(a) .Wire or Wood. Fences - 50 per lineal ft. Min. 11.00
(b) Concrete Pre -cast Types - 8� per lin. ft: Min. 15.00
(c) Masonry Walls - 150 per lineal ft. Min. 21.00
10. Docks: (add Item #11 if seawall)
(a) 0 to 30 lineal ft. inclusive 30.00
(b) 31 and over plus each additional 10 lineal
ft. fraction. 4.00
I
C�
I
6 +
11. Seawall - Bulkhead:
(a) Permit and construction inspection costs for the construction
of retaining walls and seawalls henceforth shall be found in
Ordinance NO. 74-45 of the Code of Ordinances of the City of
Tamarac, Florida, as presently in force or as hereinafter
may be amended; provided,. however , the fee schedule' set forth
in said Ordinance shall apply to all construction whether or
not said construction is incident to development of a sub-
division.
(b)
Repairs --
See Section
C - Permit Fee based on Cost of Job.
SECTION C:
PERMIT
FEE BASED ON
COST OF JOB.
1. That prior to initiation of construction, alteration or addition
to private property within the City of Tamarac, the person,
firm, or corporation desirous of performing said construction,
alteration or addition, which does not fall into any of the
above listed categories, or any categories contained in other
ordinances, shall be required to* obtain a permit from the
Building Department and upon the taking of such permit shall
be required to pay a fee as follows:
BASED ON COST OF JOB
0.00 TO 300.00
300.00 to less
500.00 to less
1,000 to less
1,500 to less
than 500.00
than 1, 000.00
than 1,500.00
than 2 , 000.00 - -
No permit
required.
$18.00
24.60
30.00
35.50
(a) For each additional $500.00 in cost of job,
adda fee of. * 0 * 0 * 0 0 0 0 0 0 0 0 * 9 0 0 0 0 * * * 0 e 0 * 0 0 0 0 0 * 0 0 0 0 0 0 5.00
(b) An affidavit and verification of job cost and
payment of any applicable fee increase required
before certificate of occupancy is issued.
(c) An itemized accounting, listing unit costs, shall be
required.
SECTION D S I TE IMPROVEMENTS
1. An application for an improvement permit shall be filed with
the City. Each application shall be accompanied by a plan
indicating the exact nature and location of the desired improve-
ments and an itemized, estimated cost of all site improvements,
certified by the applicant's engineer or accountant. The cost
of the improvement permit and inspection fees shall be paid in
accordance with the following schedule, prior to the issuance
of permits for. the site work:
(a) Canal excavation and bulkheads, bridges, seawalls, endwalls,
headwalls, water distribution, site preparation, and
beautification ......................3% of construction cost
(b) All other improvements ..............4% of construction cost
(c) Minimum Total Fee ...9...............$400.00
... to be assessed to any improvement project for which
a site development plan is required.
2. The permit and 'inspection fees shall be credited to a separate
account and plan review and engineering inspection expenses
expenses
shall be paid from this account.
C�
I
�J
3.
4.
5.
Notwithstanding the fee schedule set forth in this section,
in the event additional inspections are required by the City
Engineer because the work of which an inspection has been
requested is incomplete, obviously deficient or uncorrected
at the time the contractor has requested an inspection, or
plans approved by the City Engineer .are not available at the
jobsite, or a correct permit is not visibly displayed, the
contractor shall pay an additional fee of twenty dollars be-
fore any reinspection is made.- Written records of each
requested. inspection and reinspection shall be placed in the
project ' s master file.
Expiration of Permit
Permits issued pursuant to these regulations shall be deemed
in full force and effect until such time as the work covered
thereby is complete. However, if work covered by said permit
has not commenced within three months from the date of
issuance of said permit, or has been commenced and then suspended
or abandoned for
a period of
sixty
(60) days
from the
date
of
the most recent
reinspection
said
permit is
revoked
and
shall
become null and void. Work shall be considered to have commenced
and be in
active
progress when,
in the
opinion of the
City
Engineer,
a full
complement of
workmen
and equipment
is present
at the site to diligently incorporate materials and improvements
into the project. When a permit has been revoked, all fees paid
shall be' forfeited and any work started after such revocation
shall be subject to all the requirements and fees for a new per-
mit as provided herein.
The final cost of any or all site improvements shall be certified
by the permittee s engineer or accountant before the certificate
of occupancy is issued, which shall'be accompanied by an
itemized accounting listing unit costs,
SECTION E:
In the event
of an emergency requiring
immediate
repairs, a person
or firm may
proceed with such repairs,
provided
however, an application for the permit and the payment of appro-
priate fees are made during the first succeeding business day of
the city building department.
I
Page 10
SECTION F : It is unlawful for any person, firm or corporation
to fail to acquire a proper -permit prior to the commencement of any
construction, alteration or repair, on or within private property,
and such act is punishable as provided in Section 1-6 of the
Tamarac City Code.
I
I
I