HomeMy WebLinkAboutCity of Tamarac Resolution R-86-049q It 1 2 3 4 5 Introduced by�?�_ _ Temp. # 3989 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R- S?'(d - A RESOLUTION AWARDING A BID FOR TUW PROJECT #85-7 WELLFIELD PROTECTION FACILITIES - BID #86-2 WHEREAS, The City Council authorized the Administration to go to bid at its meeting on January 10, 198 6, and, WHEREAS, bids were advertised in the Fort Lauderdale News a newspaper of general circulation in Broward County on January 16 and January 23 , 1986 , and WHEREAS, bids were opened onJanuary27_, 1986 , and WHEREAS, E.G.Cam bell & Son Inc. is the lowest fully responsive and responsible bidder. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the bid of E.G.Cam bell & Son Inc. in the amount of $46,009.00 , is hereby approved with the breakdown that follows: 1: A1B - Construction related to generator at Wastewater Treatment Plant, complete, but not including addition of a second tank - $6,815.00. 2: A2 - Construction related to generator at Water Treatment Plant, complete - $20,977.00. 3: A3 - Construction related to generator at Fire Station No. 1, complete - $2,089.00. 4: A4 - Construction related to generator at Fire Station No. 2, complete - $1,965.00. 5: A5 - Mobilization related to Bid Item 1 and 2 - $13,129.00 6: A6 - Mobilization related to Bid Items 3 and 4 - $1,034.00 SECTION 2: This Resolution shall become effective immediately upon adoption. PASSED, ADOPTED AND APPROVED this 198 6. ATTEST PTY, CL r I HEREBY CERTIFY that I '_lave approved the Prm and correctness of this RESO r TION. ;� I day of MAYO RECORD OF COUNCIL VOTE - MAYOR: ERA_ VITz DIST 4: C/M $TEiN DIST 3: C/M GOTTESMAN DIST 2: C/M MUNITZ DIST 1: V/M MASSARn� BID FORMS BID SCHEDULE A - LUMP SUM WELLFIELD PROTECTION BID #86-2 Note: Bid Schedule A is mutually exclusive with Bid Schedules B and C. If an Award is made 'under Schedule A, then no Awards shall be made under either Schedules B or C, and vice versa. Prospective Bidders may submit, at their option, Bids for any one, two, or three of the Schedules. The prices bid for the same item of work under two different Bid Schedules need not be equal. An Award made under any Bid Schedule shall be based solely upon prices submitted under that Schedule. Schedule of prices for construction of wellfield, protection facilities in accordance with the Contract Documents. E.G.CAMPBELL & SON INC. Item . - No. : Description Amount = LUMP SUM ITEMS :NOTE: Items AIA and AlB are mutually exclusive alternatives.: :If an award is made under Bid Schedule A, it shall be :made, at the City's option, using either Al A, or A1B, or :only A2 through A6. AIA Furnish all labor, materials, tools and equipment for constructing wellfield protection facilities related : to generator at Wastewater Treatment Plant, complete, including addition of a second tank, in accord- ance with the Specifications and Drawing C-2 . For Lump Sum of $ 15 206.00 : A1B Furnish all labor, materials, tools and equipment for s : constructing wellfield protection facilities related s to generator at Wastewater Treatment Plant, complete, but not including addition of a second tank, in accord- ance with the Specifications and Sketches G and H, Addendum No. 1 . . For Lump Sum of $ _..6815.00 A2 Furnish all labor, materials, tools and equipment for s oonstructing wellfield protection facilities related to generator at Water Treatment Plant, complete, in accordance with the Specifications and Drawings . For Lump Sum of $ 20,977.00 091585 BID FORMS -BID SCHEDULE(S) CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-1 FOR ADDENDUM #1 E.G.Campbell & Son Inc. ■ 1 El BID FORMS BID SCHEUULE A - LUMP SUM WELLFIELD PROTECTION BID #86-2 N INC. Item . No. : Description Amount : A3 Furnish all labor, materials, tools and equipment for : constructing wellfield protection facilities related to generator at Fire Station No. 1, complete, in s s accordance with the Specifications and Drawings : For Lump Sum of $ 2089.00 A4 Furnish all labor, materials, tools and equipment for : constructing wellfield protection facilities related to generator at Fire Station No. 2, complete, in accordance with the Specifications and Drawings . For Lump Sum of : $ 1965.00 s A5 Mobilization related to Bid Item 1 and 2 of this , Bid Schedule For Lump Sum of . 3 1 29.0(�-� 139129.00 : A6 Mobilization related to Bid Items 3 and 4 of this Bid Schedule For Lump Sum of $ 1014.00 : : SUBTOTAL Items A2 through A6, incl. : $ s TOTAL BID PRICE USING ALTERNATIVE AIA : $ 4 0.00 s TOTAL BID PRICE USING ALTERNATIVE A1B : $ 9.00 091585 BID FORMS -BID SCHEDULE(S) CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-2 FOR ADDENDUM #1 . BID FORMS BID SCHEDULE B - LUMP SUM WELLFIELD PROTECTION BID #86-2 E.G.CAMPBELL & SON INC. Note: Bid Schedule A is mutually exclusive with Bid Schedules B and C. If an Award is made under Schedule A, then no Awards shall be made under either Schedules B or C, and vice versa. Prospective Bidders may submit, at their option, Bids for any one, two, or three of the Schedules. The prices bid for the same item of work under two different Bid Schedules need not be equal. An Award made under any Bid Schedule shall be based solriv -jtx)r, prices submitted under that Schedule. Schedule of prices for construction of wellfield protection facilities in accordance with the Contract Documents. : Item : No. Description : Amount ; • LUMP SUM ITEMS :NOTE: Items B1A and BIB are mutually exclusive alternatives.: :If an award is to be made under Bid Schedule B, it shall be : :made)at the City's option, using either B1A, or BIB, or only :only B2 and B3 . s B1A Furnish all labor, materials, tools and equipment for constructing wellfield protection facilities related to generator at Wastewater Treatment Plant, complete, including addition of a second tank, in accord- . _ ante with the Specifications and Drawing C-2 • For Lump Sum of $ --15,2Q6.00 : BIB Furnish all labor, materials, tools and equipment for constructing wellfield protection facilities related to generator at Wastewater Treatment Plant, complete, • but not including addition of a second tank, in accord- . : ante with the Specifications and Sketches G and H, . Addendum No. 1 • For Lump Sum of $ 6815.00 B2 Furnish all labor, materials, tools and equipment for . . constructing wellfield protection facilities related . . to generator at Wastewater Treatment Plant, complete, in accordance with the Specifications and Drawings For Lump Sum of $ . 091585 BID FORMS -BID SCHEDULES) CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-3 FOR ADDENDUM #1 BID FORMS BID SCM EDULE B - LUMP SUM WELLFIELD PROTECTION BID #86-2 E.G.CAMPBELL & SON INC. Item . - No. : Description Amount : B3 : Mobilization related to Bid Items 1 and 2 of this Bid Schedule - For Lump Sum of $ 13,129.0 SUBTOTAL Items B2 through B3, incl. : $ 34,106.0 TOTAL BID PRICE USING ALTERNATIVE B1A $ - - 49..21 TOTAL BID PRICE USING ALTERNATIVE B1B $ . 40 9 0 11 091585 BID FORMS -BID SCHEDULE(S) CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-4 FOR ADDENDUM #1