CITY OF TAMARAC, FLORIDA
RESOLUTION NO. R- S?'(d -
A RESOLUTION AWARDING A BID FOR
TUW PROJECT #85-7 WELLFIELD PROTECTION
FACILITIES - BID #86-2
WHEREAS, The City Council authorized the Administration to go
to bid at its meeting on January 10, 198 6, and,
WHEREAS, bids were advertised in the Fort Lauderdale News
a newspaper of general circulation in Broward County on January 16
and January 23 , 1986 , and
WHEREAS, bids were opened onJanuary27_, 1986 , and
WHEREAS, E.G.Cam bell & Son Inc. is the lowest fully
responsive and responsible bidder.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF TAMARAC, FLORIDA:
SECTION 1: That the bid of E.G.Cam bell & Son Inc. in the
amount of $46,009.00 , is hereby approved with the breakdown that
follows:
1:
A1B
- Construction related to generator
at Wastewater
Treatment Plant, complete, but not
including
addition of a second tank - $6,815.00.
2:
A2
- Construction related to generator
at Water Treatment
Plant, complete - $20,977.00.
3:
A3
- Construction related to generator
at Fire Station
No. 1, complete - $2,089.00.
4:
A4
- Construction related to generator
at Fire Station
No. 2, complete - $1,965.00.
5:
A5
- Mobilization related to Bid Item 1
and 2 - $13,129.00
6:
A6
- Mobilization related to Bid Items
3 and 4 - $1,034.00
SECTION
2: This Resolution shall become effective
immediately
upon adoption.
PASSED, ADOPTED AND APPROVED this
198 6.
ATTEST
PTY, CL r
I HEREBY CERTIFY that I '_lave
approved the Prm and correctness
of this RESO r TION.
;�
I
day of
MAYO
RECORD OF COUNCIL VOTE -
MAYOR: ERA_ VITz
DIST 4: C/M $TEiN
DIST 3: C/M GOTTESMAN
DIST 2: C/M MUNITZ
DIST 1: V/M MASSARn�
BID FORMS
BID SCHEDULE A - LUMP SUM
WELLFIELD PROTECTION
BID #86-2
Note: Bid Schedule A is mutually exclusive with Bid Schedules B
and C. If an Award is made 'under Schedule A, then no Awards
shall be made under either Schedules B or C, and vice versa.
Prospective Bidders may submit, at their option, Bids for
any one, two, or three of the Schedules. The prices bid for
the same item of work under two different Bid Schedules need
not be equal. An Award made under any Bid Schedule shall be
based solely upon prices submitted under that Schedule.
Schedule of prices for construction of wellfield, protection facilities in
accordance with the Contract Documents.
E.G.CAMPBELL & SON INC.
Item . -
No. : Description Amount
= LUMP SUM ITEMS
:NOTE: Items AIA and AlB are mutually exclusive alternatives.:
:If an award is made under Bid Schedule A, it shall be
:made, at the City's option, using either Al A, or A1B, or
:only A2 through A6.
AIA Furnish all labor, materials, tools and equipment for
constructing wellfield protection facilities related
: to generator at Wastewater Treatment Plant, complete,
including addition of a second tank, in accord-
ance with the Specifications and Drawing C-2
. For Lump Sum of
$
15 206.00
: A1B Furnish all labor, materials, tools and equipment for
s : constructing wellfield protection facilities related
s to generator at Wastewater Treatment Plant, complete,
but not including addition of a second tank, in accord-
ance with the Specifications and Sketches G and H,
Addendum No. 1
.
. For Lump Sum of
$
_..6815.00
A2 Furnish all labor, materials, tools and equipment for
s oonstructing wellfield protection facilities related
to generator at Water Treatment Plant, complete, in
accordance with the Specifications and Drawings
. For Lump Sum of
$
20,977.00
091585 BID FORMS -BID SCHEDULE(S)
CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-1
FOR ADDENDUM #1
E.G.Campbell & Son Inc.
■ 1
El
BID FORMS
BID SCHEUULE A - LUMP SUM
WELLFIELD PROTECTION
BID #86-2
N INC.
Item .
No. : Description Amount
: A3
Furnish all labor, materials, tools and equipment
for
: constructing wellfield protection facilities related
to generator at Fire Station No. 1, complete, in
s
s accordance with the Specifications and Drawings
:
For Lump Sum
of
$
2089.00
A4
Furnish all labor, materials, tools and equipment
for
:
constructing wellfield protection facilities related
to generator at Fire Station No. 2, complete, in
accordance with the Specifications and Drawings
.
For Lump Sum
of
: $
1965.00
s A5
Mobilization related to Bid Item 1 and 2 of this
,
Bid Schedule
For Lump Sum
of
.
3 1 29.0(�-�
139129.00
: A6
Mobilization related to Bid Items 3 and 4 of this
Bid Schedule
For Lump Sum
of
$
1014.00
:
:
SUBTOTAL Items A2 through A6, incl.
: $
s
TOTAL BID PRICE USING ALTERNATIVE AIA
: $
4 0.00
s
TOTAL BID PRICE USING ALTERNATIVE A1B
: $
9.00
091585 BID FORMS -BID SCHEDULE(S)
CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-2
FOR ADDENDUM #1
.
BID FORMS
BID SCHEDULE B - LUMP SUM
WELLFIELD PROTECTION
BID #86-2 E.G.CAMPBELL & SON INC.
Note: Bid Schedule A is mutually exclusive with Bid Schedules B
and C. If an Award is made under Schedule A, then no Awards
shall be made under either Schedules B or C, and vice versa.
Prospective Bidders may submit, at their option, Bids for
any one, two, or three of the Schedules. The prices bid for
the same item of work under two different Bid Schedules need
not be equal. An Award made under any Bid Schedule shall be
based solriv -jtx)r, prices submitted under that Schedule.
Schedule of prices for construction of wellfield protection facilities in
accordance with the Contract Documents.
: Item
: No. Description : Amount ;
• LUMP SUM ITEMS
:NOTE: Items B1A and BIB are mutually exclusive alternatives.:
:If an award is to be made under Bid Schedule B, it shall be :
:made)at the City's option, using either B1A, or BIB, or only
:only B2 and B3 .
s
B1A Furnish all labor, materials, tools and equipment for
constructing wellfield protection facilities related
to generator at Wastewater Treatment Plant, complete,
including addition of a second tank, in accord- .
_ ante with the Specifications and Drawing C-2
• For Lump Sum of $
--15,2Q6.00
: BIB Furnish all labor, materials, tools and equipment for
constructing wellfield protection facilities related
to generator at Wastewater Treatment Plant, complete,
• but not including addition of a second tank, in accord-
. : ante with the Specifications and Sketches G and H, .
Addendum No. 1
• For Lump Sum of $
6815.00
B2 Furnish all labor, materials, tools and equipment for .
. constructing wellfield protection facilities related .
. to generator at Wastewater Treatment Plant, complete,
in accordance with the Specifications and Drawings
For Lump Sum of $ .
091585 BID FORMS -BID SCHEDULES)
CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-3
FOR ADDENDUM #1
BID FORMS
BID SCM EDULE B - LUMP SUM
WELLFIELD PROTECTION
BID #86-2
E.G.CAMPBELL & SON INC.
Item . -
No. : Description Amount
: B3 : Mobilization related to Bid Items 1 and 2 of this
Bid Schedule -
For Lump Sum of $
13,129.0
SUBTOTAL Items B2 through B3, incl. : $
34,106.0
TOTAL BID PRICE USING ALTERNATIVE B1A $ -
- 49..21
TOTAL BID PRICE USING ALTERNATIVE B1B $ .
40 9 0
11
091585 BID FORMS -BID SCHEDULE(S)
CONSTRUCTION OF WELLFIELD PROTECTION FACILITIES PAGE BF-4
FOR ADDENDUM #1