A RESOLUTION ISSUING A DEVELOPMENT ORDER FOR TFIE
GOLD -TAM SHOPS
PROJECT. DEVELOPM=' ORDER NO. 080 AIM PROVIDING
A'I EFFECTIVE DATE.
WHEREAS, pursuant to the instructions of the City Council of the City of
Tamarac, Florida, a public meeting has been advertised in accordance with applicable
law of the date, time and place of the meeting regarding the review of the applica-
tion -for a develoixvant order by the applicant for development approval; and
WHG,_- As, the City Council has examined and investigated the application,
staff and Planning Commission recomi►P.ndations, and the attached Development Review
Status Sheet dated 5 / 13 / 8 3 ; and
W W.WAS, the City Council reviewed the develcp ment order and acccnpanying
documents at a public meeting; and
VvMREA.S, the City Council has determined that the application is in com-
pliance with all elements of its Comprehensive Plan, or will be in compliance Prior
to the issuance of a Certificate of Occupancy for any unit on the development that
is the subject of the application.
NOW, THEREFORE, BE IT RESOLVED BY TIE COUNCIL OF THE CITY OF TAMARAC,
lairs)-:0�7��
SECTION 1: That the development described on the attached development review
status sheet dated 5/13/83 is granted a development order to proceed subject to
the following conditions:
A. Construction is to be in complete compliance with the plans and spec-
ifications suhmitted by the developer to the City of Tamarac as described in
Section II of the Development Review Status Sheet and approved engineering drawings.
B. Ccmmencement of construction shall be no longer than one year from the
date of this approval. If the development does not commence constructional within
one year, this approval is null and void unless an extension has been granted in
accordance with applicable regulations.
C. The development order is assignable, but an assignment does not
discharge any assignee from strict compliance with the order unless the City Council
consents to nodify any of the original requirements.
Temp. Reso. # 2 8_10
'} 1 D. Additional conditions established in order to issue the development
i 2
i 3
! 4
S
:7
1
j. 9
1
10
11
12
13
14
15
16
17
.y
20
21
22
23
24
.Ir
.2(l
27
28
29
I"I
3Zi
33
34
35
36
order are set forth as follows:
I,- No second floor shall be placed over the north or south retail bays.
2 - County permit must be obtained for drainage overflow connections on
Commercial Boulevard drainage system.
3 County and State approval must be obtained for driveway construction on
Commercial Boulevard, if applicable.
4 -- Faymust must be received for fair share of fees to be assessed for
sgnalization and no permits will be issued until this requirement is
satisfied.
SECTION 2: Should any section or provision of this development order be
declared by a court of ca<npetent jurisdiction to be invalid, the City Council shall
dete mine if the other portions of the order regain valid or whether the approval
shall be null and void.
SECTIM 3: This development order as conditioned shall became effective
imtrediately upon passage.
PASSED, ADOPTED AND APPROVED this 2 7 th Y -of_ July , 1983.
ASSISTANT CITY CLERK
I HEREBY CERTIFY that I have
approved the form correct-
nesshis Rosa cation.
MAYOR -
RECORD OF COUNCIL VOTE
MAYOR FALCK:
DIST. 1: C/M KRAVITZ:
DIST. 2: M4 MASSARO:
DIST. 3: C/M STELZER: �
GIST. 4: C/M KRPo -I`Z: _
1
I's
6811 NORTHWEST 88TH AVENUE • TAMARAG, FLORIDA 33321
TELEPHONE (305) 722-5900
DEVELOPMENT REVIEW STATUS SHEET
MEM9 # i
r DP.TE.5/13/83
80 Orig. Dev. Order
Revised Dev. Order
Project -GOLD TAM SHORS- - Master File # 1-83
Location , Nor_th_S.i&_CQmmercia3 .81_v&=_west of Sutter 8 rdwarE-_ ._,,,_
Developer
Owner Rarhara Gn3rlman Trustee
Zoning _ B-1 Acres ,67 _ _ Recommended Date for Council Action 7 277/�83
Future Land Use Designation .,Commercial ._ Proposed Use Z_5tory retail/Qfjjces
DEVELOPME14T ORDER FOR:
(Final Site Plan X
I. STAFF APPROVAL DATES:
City Planner
City Engineer
Chief 5u4lding Official
Fire :-Jef
Finance Director
Final Plat XRevised Site Plan
Final Site Plan Final Plat Revised Site Plan
":G COMMISSION RFC0 i;1ENDATIONS: Site Plan 6/15/83
Plat 5/18/83
,rhUrAL or APPROVAL WITH CONDITIONS/Date DE�.!IAL/Date
Final Site Plan dated Rev _ 51/92/83,,,,,,,,,,_ -
Final Plat dated 5/18/83 Rev
Revised Site Plan dated Rev
Planning Commission finding of compliance with Certified Plan:
See Page 4 of this report
III. FINAL ENGINEERING DRA TKCS- .
APPROVAL/Date 2121,183 APPROVAL AS REDLINED/Date DENIAL/Date
Comments
L
cont'd
Page 2
DEVELOPMENT REVIEW STATUS SHEET '
IV. LANDSCAPE PLAN: x 3/15/83
Staff Action APPROVAL APPROVAL WITH CONDITIONS^ X DEMAL
Date
Beautification Committee Recommendation -Date: 3/21/83
APPROVAL __,_r_ APPROVAL WITH CONDITIONS X DENIAL
V. BROWARD COUNTY DEVELOPMEIT REVIEW COMMITTEE REPORT:
If applicable
Comments see attached
VI. DEVELOPERS AGREEMENTS/FEES (Where applicable): S U M M A R Y
A. Water and Serer Develo er A reemen
City Engineer Approval/Date 7/20/83
City Attorney :Approval/Date ... ____..
B. Other Development A reemen 1: (Covenants, Stipulations, etc.)
Water Retention Agreement 7/20/83
Date 2/8/83
C. Drainage Retention Fee Amount S 1,190.00
5% Required/Acres -- .67 Provided
Deficiency/Acre�.034 X $35,000/Acre
D. Drainage Improvement
Project Acreage 0.67 X $130/Acre
E. Water & Sewer Contribution Charges
Number of ERCs 22 X $1500
F. ERC Review Fee, if more than 10 ERCs
G. Local Parks/Recreation
Fee Amount S 87.10
Fee Amount 5 3,750.00
Fee Amount $ N/A
Fee Amount S
Acres Required Provided
$/Acre X._....,.�,_ Deficiency/Acres
H. Engineering Fees Fee Amount S 2,355.99
I. Bonds Bond Amount S 1,800.00
Date: Approved by City Engineer City Attorney
J. On Site Beautification 1266.97
(Fees to be paid at time of building permit issuance)
1
11
Ll
cont'd
• Page 3 Memo
DEVELOPMENT REVIEW STATUS -SHE
DEVELOPMENT REVIEW REQUIREMENTS:
A. Potable Water Service
Certification of City Engineer or Consulting City Engineer of
Availability of Service:
AVAILABLE x WILL BE AVAILABLE --- . NOT AVAILABLE
1( Date Comments
B. Wastewater Treatment and Disposal Service
Certification of City Engineer or Consulting City Engineer of
Availability of Service:
AVAILABLE x WILL BE AVAILABLE --- NOT AVAILABLE
Date Comments
C. Solid Waste Disposal Service
Determination of Availability of Service:
AVAILABLE..._ WILL BE AVAILABLE NOT AVAILABLE -.-
Date Comments
D. Drainage Adequacy
Certification of City Engineer or Consulting City Engineer of
Adequacy of,Drainage:
ADEQUATEy WILL BE ADEQUATE NOT ADEQAUTE
Date Comments
E. Regional Transportation Network
Compliance with Minimum Standards:
COMPLIES _____.X WILL COMPLY DOES NOT COMPLY
Date Comments
F. Local Streets and Roads
Compliance with Minimum Standards:
COMPLIES WILL COMPLY DOES NOT COMPLY
Date Comments
G. Fire Protection Service
Compliance with Minimum Standards:
COMPLIES . x WILL COMPLY DOES NOT COMPLY
Date Comments
H. Police Protection Service
Compliance with Minimum Standards:
COMPLIES x WILL COMPLY DOES NOT COMPLY
Date Comments
I. Local Parks (Parks and Recreation Facilities) N/A
Land Dedication Required/Acres Provided
Cash in Lieu of Land Gross Acres Max. ll # /AC = #----�—
J. 5chool Sites N/A
Compliance with the Standards of the Broward County School Board:
SCHOOL SITES NEEDED FOR ELEMENTARY SCHOOL NOT NEEDED
to of MIDDLE SCHOOL NOT NEEDED
19 " " " HIGH SCHOOL NOT NEEDED
Letter from School Board Dated --
Page 4
DEVELOPMENT REVIEW STATUS SHEET
VIII. PROCESSING FEES (PAID):
600.00
Site Plan Review: _
Revised Site Plan: $
Plat Review:
S70.Q0
450.00
Schematic Eng.:
Other: S
STAFF COMMENTS: '
Proposed development is/' in general conformance with Tamarac's Land
Use Plan Element and recomnen s:
Adoption of Development Order # 08—� Master Fi]e 1-83 For.
GOLD TAM SHOPS
Project subject to the requirements included in the Report and the following
conditions:
The developer shall
not
place
arkingsecond
wouldfloor
inadequatenorth and south
retail bays, inasmuch asp
Obtain County permit for drainage overflow connection to Commercial Blvd,
drain system.
Obtain County and State approval for driveway construction on Commercial
Blvd., if applicable.
n