Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-83-2121 2 3 4 5 1 8 9 10 11 12 13 14 15 16 17 21 22 23 24 25 26 27 28 29 30 1-7 LI 33 34 35 36 Introduced by V/M Massaro CITY OF TAMARAC, FLORInA RESOLUTIc v NO. R- 8 3 - 212 Temp. Reso, # 2 810 A RESOLUTION ISSUING A DEVELOPMENT ORDER FOR TFIE GOLD -TAM SHOPS PROJECT. DEVELOPM=' ORDER NO. 080 AIM PROVIDING A'I EFFECTIVE DATE. WHEREAS, pursuant to the instructions of the City Council of the City of Tamarac, Florida, a public meeting has been advertised in accordance with applicable law of the date, time and place of the meeting regarding the review of the applica- tion -for a develoixvant order by the applicant for development approval; and WHG,_- As, the City Council has examined and investigated the application, staff and Planning Commission recomi►P.ndations, and the attached Development Review Status Sheet dated 5 / 13 / 8 3 ; and W W.WAS, the City Council reviewed the develcp ment order and acccnpanying documents at a public meeting; and VvMREA.S, the City Council has determined that the application is in com- pliance with all elements of its Comprehensive Plan, or will be in compliance Prior to the issuance of a Certificate of Occupancy for any unit on the development that is the subject of the application. NOW, THEREFORE, BE IT RESOLVED BY TIE COUNCIL OF THE CITY OF TAMARAC, lairs)-:0�7�� SECTION 1: That the development described on the attached development review status sheet dated 5/13/83 is granted a development order to proceed subject to the following conditions: A. Construction is to be in complete compliance with the plans and spec- ifications suhmitted by the developer to the City of Tamarac as described in Section II of the Development Review Status Sheet and approved engineering drawings. B. Ccmmencement of construction shall be no longer than one year from the date of this approval. If the development does not commence constructional within one year, this approval is null and void unless an extension has been granted in accordance with applicable regulations. C. The development order is assignable, but an assignment does not discharge any assignee from strict compliance with the order unless the City Council consents to nodify any of the original requirements. Temp. Reso. # 2 8_10 '} 1 D. Additional conditions established in order to issue the development i 2 i 3 ! 4 S :7 1 j. 9 1 10 11 12 13 14 15 16 17 .y 20 21 22 23 24 .Ir .2(l 27 28 29 I"I 3Zi 33 34 35 36 order are set forth as follows: I,- No second floor shall be placed over the north or south retail bays. 2 - County permit must be obtained for drainage overflow connections on Commercial Boulevard drainage system. 3 County and State approval must be obtained for driveway construction on Commercial Boulevard, if applicable. 4 -- Faymust must be received for fair share of fees to be assessed for sgnalization and no permits will be issued until this requirement is satisfied. SECTION 2: Should any section or provision of this development order be declared by a court of ca<npetent jurisdiction to be invalid, the City Council shall dete mine if the other portions of the order regain valid or whether the approval shall be null and void. SECTIM 3: This development order as conditioned shall became effective imtrediately upon passage. PASSED, ADOPTED AND APPROVED this 2 7 th Y -of_ July , 1983. ASSISTANT CITY CLERK I HEREBY CERTIFY that I have approved the form correct- nesshis Rosa cation. MAYOR - RECORD OF COUNCIL VOTE MAYOR FALCK: DIST. 1: C/M KRAVITZ: DIST. 2: M4 MASSARO: DIST. 3: C/M STELZER: � GIST. 4: C/M KRPo -I`Z: _ 1 I's 6811 NORTHWEST 88TH AVENUE • TAMARAG, FLORIDA 33321 TELEPHONE (305) 722-5900 DEVELOPMENT REVIEW STATUS SHEET MEM9 # i r DP.TE.5/13/83 80 Orig. Dev. Order Revised Dev. Order Project -GOLD TAM SHORS- - Master File # 1-83 Location , Nor_th_S.i&_CQmmercia3 .81_v&=_west of Sutter 8 rdwarE-_ ._,,,_ Developer Owner Rarhara Gn3rlman Trustee Zoning _ B-1 Acres ,67 _ _ Recommended Date for Council Action 7 277/�83 Future Land Use Designation .,Commercial ._ Proposed Use Z_5tory retail/Qfjjces DEVELOPME14T ORDER FOR: (Final Site Plan X I. STAFF APPROVAL DATES: City Planner City Engineer Chief 5u4lding Official Fire :-Jef Finance Director Final Plat XRevised Site Plan Final Site Plan Final Plat Revised Site Plan ":G COMMISSION RFC0 i;1ENDATIONS: Site Plan 6/15/83 Plat 5/18/83 ,rhUrAL or APPROVAL WITH CONDITIONS/Date DE�.!IAL/Date Final Site Plan dated Rev _ 51/92/83,,,,,,,,,,_ - Final Plat dated 5/18/83 Rev Revised Site Plan dated Rev Planning Commission finding of compliance with Certified Plan: See Page 4 of this report III. FINAL ENGINEERING DRA TKCS- . APPROVAL/Date 2121,183 APPROVAL AS REDLINED/Date DENIAL/Date Comments L cont'd Page 2 DEVELOPMENT REVIEW STATUS SHEET ' IV. LANDSCAPE PLAN: x 3/15/83 Staff Action APPROVAL APPROVAL WITH CONDITIONS^ X DEMAL Date Beautification Committee Recommendation -Date: 3/21/83 APPROVAL __,_r_ APPROVAL WITH CONDITIONS X DENIAL V. BROWARD COUNTY DEVELOPMEIT REVIEW COMMITTEE REPORT: If applicable Comments see attached VI. DEVELOPERS AGREEMENTS/FEES (Where applicable): S U M M A R Y A. Water and Serer Develo er A reemen City Engineer Approval/Date 7/20/83 City Attorney :Approval/Date ... ____.. B. Other Development A reemen 1: (Covenants, Stipulations, etc.) Water Retention Agreement 7/20/83 Date 2/8/83 C. Drainage Retention Fee Amount S 1,190.00 5% Required/Acres -- .67 Provided Deficiency/Acre�.034 X $35,000/Acre D. Drainage Improvement Project Acreage 0.67 X $130/Acre E. Water & Sewer Contribution Charges Number of ERCs 22 X $1500 F. ERC Review Fee, if more than 10 ERCs G. Local Parks/Recreation Fee Amount S 87.10 Fee Amount 5 3,750.00 Fee Amount $ N/A Fee Amount S Acres Required Provided $/Acre X._....,.�,_ Deficiency/Acres H. Engineering Fees Fee Amount S 2,355.99 I. Bonds Bond Amount S 1,800.00 Date: Approved by City Engineer City Attorney J. On Site Beautification 1266.97 (Fees to be paid at time of building permit issuance) 1 11 Ll cont'd • Page 3 Memo DEVELOPMENT REVIEW STATUS -SHE DEVELOPMENT REVIEW REQUIREMENTS: A. Potable Water Service Certification of City Engineer or Consulting City Engineer of Availability of Service: AVAILABLE x WILL BE AVAILABLE --- . NOT AVAILABLE 1( Date Comments B. Wastewater Treatment and Disposal Service Certification of City Engineer or Consulting City Engineer of Availability of Service: AVAILABLE x WILL BE AVAILABLE --- NOT AVAILABLE Date Comments C. Solid Waste Disposal Service Determination of Availability of Service: AVAILABLE..._ WILL BE AVAILABLE NOT AVAILABLE -.- Date Comments D. Drainage Adequacy Certification of City Engineer or Consulting City Engineer of Adequacy of,Drainage: ADEQUATEy WILL BE ADEQUATE NOT ADEQAUTE Date Comments E. Regional Transportation Network Compliance with Minimum Standards: COMPLIES _____.X WILL COMPLY DOES NOT COMPLY Date Comments F. Local Streets and Roads Compliance with Minimum Standards: COMPLIES WILL COMPLY DOES NOT COMPLY Date Comments G. Fire Protection Service Compliance with Minimum Standards: COMPLIES . x WILL COMPLY DOES NOT COMPLY Date Comments H. Police Protection Service Compliance with Minimum Standards: COMPLIES x WILL COMPLY DOES NOT COMPLY Date Comments I. Local Parks (Parks and Recreation Facilities) N/A Land Dedication Required/Acres Provided Cash in Lieu of Land Gross Acres Max. ll # /AC = #----�— J. 5chool Sites N/A Compliance with the Standards of the Broward County School Board: SCHOOL SITES NEEDED FOR ELEMENTARY SCHOOL NOT NEEDED to of MIDDLE SCHOOL NOT NEEDED 19 " " " HIGH SCHOOL NOT NEEDED Letter from School Board Dated -- Page 4 DEVELOPMENT REVIEW STATUS SHEET VIII. PROCESSING FEES (PAID): 600.00 Site Plan Review: _ Revised Site Plan: $ Plat Review: S70.Q0 450.00 Schematic Eng.: Other: S STAFF COMMENTS: ' Proposed development is/' in general conformance with Tamarac's Land Use Plan Element and recomnen s: Adoption of Development Order # 08—� Master Fi]e 1-83 For. GOLD TAM SHOPS Project subject to the requirements included in the Report and the following conditions: The developer shall not place arkingsecond wouldfloor inadequatenorth and south retail bays, inasmuch asp Obtain County permit for drainage overflow connection to Commercial Blvd, drain system. Obtain County and State approval for driveway construction on Commercial Blvd., if applicable. n