Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-83-209Introduced by V/M Massaro Temp. #2812 .Rev. 7/27/83 1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 20 21 22 23 24 25 26 27 28 29 30 33 34 35 36 RESOLUTION NO. R-83-209 A RESOLUTION ISSUING REVISED DEVELOPMENT ORDER NO. 004-1 FOR A REVISED SITE PLAN FOR LAKES OF CARRIAGE HILLS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, pursuant to the instructions of the City Council of the City of Tamarac, Florida, a public meeting has been advertised in accordance with applicable law of the date, time and place of the meeting regarding the review of the application for a revised development order by the applicant for development approval; and WHEREAS, the City Council has examined and investigated the applica- tion, staff and Planning Commission recommendations; and the attached Develop- ment Review Status Sheet dated 7/15/83; and WHEREAS, the City Council reviewed the revised development order and accompanying documents at a public meeting; and WHEREAS, ttie City Council has determined that the application is in compliance with all elements of its Comprehensive Plan, or will be in compliance prior to the issuance of a Certificate of Occupancy for the development that is the subject of the application. NOW, UiEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the application for approval of a revised site plan for Lakes of Carriage Hills prepared by Craven -Thompson & Associates, Inc., revised July 17, 1983, to reflect deletion of two (2) driveways along Rock Island Road, the addition of one drive from Rock Island Road opposite the existing median opening, and addition of a new parking area with a minimum of a 5-foot back-up at the South end of the parking lot, is approved subject to the following conditions: A. Construction is to be in complete compliance with the plans and specifications submitted by the developer to the City of Tamarac as described in Section II of the Development Review Status Sheet and approved engineering drawings. B. Commencement of construction shall be no longer than one year from the date of this approval. If the development does not commence construc- tion within one year, this approval is null and void unless an extension has been granted in accordance with applicable regulations. -2- Temp. #2812 Rev. 7 27 83 ow M 3 4 5 .s 8' 9 12 13 14 15 16 17 20 21 22 23 24 25 26 MA KPA 29 30 ME 34 35 36 C. The development order is assignable, but an assignment does not discharge any assignee from strict compliance with the order unless the City Council consents to modify any of the original requirements. D. Additional conditions established in order to issue the develop- ment order are set forth as follows: 1. Estimated costs must be submitted and all appropriate fees are to be paid. 2. A revised site plan, at no additional fee to the developer, will be considered at the second reading of the rezoning application to reflect a temporary drive to Sabal Palm Boulevard East, and sidewalks. SECTION 2: Should any section or provision of this development order be declared by a court of competent jurisdiction to be invalid, the City Council shall determine if the other portions of the order remain valid or whether the approval shall be null and void. SECTION 3: This development order as conditioned shall become effec- tive immediately upon its passage. PASSED, ADOPTED AND APPROVED this 27th day of July, 1983. NVU1 -19 RECORD OF COUNCIL VOTE AOSISTANT CITY CLERK MAYOR FALCK: of I HEREBY CERTIFY that I have approved DIST. 1: C/M KRAVITZ: the form and correctness of this RESOLUTION. DIST. 2: V/M MASSARO: .- L DUST. 3: C/trl STELZER: CITY TTO D' 3T. 4: C&A KRANTZ: 11 I- 5Q.�3 5811 NORTHWEST 88TH AVENUE + TAMARAC TELEPHONE (305) 722.5900 DEVELOPMENT REVIEW STATUS SHEET FLORIDA 33321 MEMO # DATE 7/15/83 Orig. Dev. Order CVISED SITEPLAN FOR 0Q4 1Revised Dev. Order KES OF CARRIAGE HILLS SALES MODEL Master File # 21-81 Location Northeast corner Rock Island Rd and Sabal Palm Blvd. East Developer Lakes of Carriage Hills,Inc. Owner Lakes of Carriage Hills, Inc. Zoning S-1 Acres 1.527 Recommended Date for Council Action 7 2l 7/83 Future Land Use Designation Commercial Proposed UseCommerciallOpen space S-Ms"Model DEVELOPMENT ORDER FOR: Final Site Plan I. STAFF APPROVAL DATES: City Planner City Engineer Chief 6u4lding Official Fire �,hief Finance Director Final Plat Revised Site Plan x_ Final Site Plan Final Plat Revised Site Plan • II. PLANNING COMMISSION RECO; i; IENDATIONS: APPROVAL or APPROVAL WITH CONDITIONS/Date7/20/83 DENIAL/Date Final Site Plan dated Rev Final Plat. dated Rev Revised Site Plan dated 7 13 83 Rev 7/20/83 .. Planning Commission finding of compliance with Certified Plan: See Page 4 of this report III. FINAL ENGINEERING DRAV1IVGS: APPROVAL/Date APPROVAL AS REDLINED/Date DENIAL/Date Comments cont'd Page 2 �. DEVELOPMENT REVIEW STATUS SHEET ' CcLANDSCAPE PLAN: Ali7 Staff Action APPROVAL APPROVAL WITH CONDITIONS DETAL Date Beautification Committee Recommendation -Date: APPROVAL APPROVAL WITH CONDITIONS DENIAL 1 V. BROWARD COUNTY DEVELOPMENT REVIEW COMMI TTEE REPORT: Date If a —pp-1—i —ca U e Comments VI, DEVELOPERS AGREEMENTS/FEES (Where applicable): SUMMARY_ A. Water and 5ewer_Develoeer Agreement /¢ City Engineer Approval/Date City Attorney;Approval/Date B. Other Develop2ent Agreements (Covenants, Stipulations, etc.) C. Drainage Retention Fee Amount S 5% Required/Acres ...,. Provided Deficiency/Acres X $35,000/Acre D. Drainage.. Improvement Fee Amount S Project Acreage X $130/Acre E. Water b Sewer ContributiDn Charges Fee Amount 4 Number of ERCs X $1600 F. ERC Review Fee, if more than 10 ERCs Fee Amount $ G. Local Parks/Recreation Fee Amount S Acres Required Provided $/Acre X Deficiency/Acres H. Engineering Fees Fee Amount $ I. Bonds Bond Amount $ Date: Approved by City Engineer City Attorney J. On Site Beautification $120.00 (Fees to be paid at time of building permit issuance) cont'd 1 Page 3 DEVELOPMENT REVIEW STA' DEVELOPMENT REVIEW RE UIRE�"ENTS: A. Potable Water Service Certification of City Engineer or Consulting City Engineer of Availability 06,Aervice: AVAILABLE,_ V WILL BE AVAILABLE ^. NOT AVAILABLE. Date Comments B. Wastewater Treatment and Disposal Service Certification of City Engineer or Consulting City Enginrer of Availability g/ervice: AVAILABLE �/ WILL BE AVAILABLE NOT AVAILABLE Date Comments C. Solid Waste Disp sal Service V Determination, o�Availability of Service: AVAILABLE WILL BE AVAILABLE NOT AVAILABLE Date Comments f; D. Drainage Adequacy Certification of -City Engineer or Consulting City Engineer of Adequacy of ,Dra, page: ADEQUATE WILL BE ADEQUATE NOT ADEQAUTE Date Comments E. Regional Transportation Network Compliance wit Minimum Standards: COMPLIES. WILL COMPLY DOES NOT COMPLY Date Comments F. Local Streets a d Roads Compliance wit Minimum Standards: COMPLIES WILL COt-1PLY DOES NOT COMPLY Date Comments G. Fire Protection ervice Compliance wit Minimum Standards: COMPLIES WILL COMPLY DOES NOT COMPLY Date Comments N. Police Protection Service Compliance wit Minimum Standards: COMPLIES WILL COMPLY DOES NOT COMPLY Date Comments Memo # I. Local Parks (Parks and Recreation Facilities) f(/I!-11� Land D ication Required/Acres Provided Cash in Lieu of Land Gross Acres Max. X $ /AC = $ �— J. =QQi,5ite-S_ Compliance with the Standards of the Broward County School Board: SCHOOL SITES NEEDED FOR ELEMENTARY SCHOOL NOT NEEDED "It Itit MIDDLE SCHOOL NOT NEEDED to of to HIGH SCHOOL NOT NEEDED Letter from School Board Dated • ' 1 Page 4 DEVELOPMENT REVIEW STATUS SHEET VIll. PROCESSING FEES (PAID): Site Plan Review: -Revised Site Plan: $ 400.00 Plat Review: $ Schematic Eng.: 450.00 Other: STAFF COMMENTS: Proposed development is/tom in general conformance with Tamarac's Land Use Plan Element and recommends: Adoption of Development Order ` 004-1 Master File _ 21_-81 For: LAKES OF CARRIAGE HILLS SALES MODEL REVISED SITE PLAN TO REFLECT TEMPORARY DRIVE TO SABAL PALM BLVD. EAST,, DELETION OF 2 DRIVEWAYS ALONG ROCK ISLAND RD. AND T N OPENING Project subject to the requirements included in the Report and the following conditions: Recommendation for approval, subject to the following: 1. Drainage improvement and retention will be calculated with future commercial development 2. Place "No construction vehiclen sign at temporary drive. 3. Apron with 45 degree radius. 4. Sidewalk on south side of property to be built at the same time as temporary drive. r�