Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-82-3292 2 3 4 8 9 20 ' .0 32 33 14 15 26 17 20 21 22 33 24 25 26 27 29 29 32 33 34 35 36 Introduced by;�I Temp. Reso. #2512 CITY OF TAMARAC, FLORIDA RESOLUTION NO. R-82--4o?? A RESOLUTION ISSUING A DEVELOPMENT ORDER FOR THE SWANSON WEST PROJECT. DEVELOPMENT ORDER NO. 049 AND PROVIDING AN EFFECTIVE DATE. WHEREAS, pursuant to the instructions of the City Council of the City of Tamarac, Florida, a public meeting has been advertised in accordance with applicable law of the date, time and place of the meeting regarding the review of the application for a development order by the applicant for development approval; and WHEREAS, the City Council has examined and investigated the application, staff and Planning Commission recommendations, and the attached Development Review Status Sheet dated 9/9/82; and WHEREAS, the City Council reviewed the development order and accompanying documents at a public meeting; and WHEREAS, the City Council has determined that the application is in compliance with all elements of its Comprehensive Plan, or will be in compliance prior to the issuance of a Certificate of Occupancy for the development that is the subject of the application. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TAMARAC, FLORIDA: SECTION 1: That the development described on the attached development review status sheet dated 9/9/82 is granted a development order to proceed subject to the following conditions: A. Construction is to be in complete compliance with the plans and specifications submitted by the developer to the City of Tamarac as described in Section II of the Development Review Status Sheet and approved engineering drawings. B. Commencement of construction shall be no longer than one year from the date of this approval. If the development does not commence construction within one year, this approval is null and void unless an extension has been granted in accordance with applicable regulations. C. The development order is assignable, but an assignment does not discharge any assignee from strict compliance with the order unless the City Council consents to modify any of the original requirements. Temp. Reso. #2512 1 2 3 4 5 'il 9 10 11 12 13 14 15 16 17 2t 23 22 23 24 25 26 27 28 29 ,2 33 34 35 36 D. Additional conditions established in order to issue the development order are set forth as follows: 1. A catch basin to be installed on 57th Street and a positive lin( being installed to the system on Commercial Boulevard. 2. Failing to get proper -permission for this from Broward County, the drainage system will have to be reevaluated by the engineer! and approved by the City Engineer. 3. The median to be backfilled and sodded with bahia grass. SECTION 2: Should any section or provision of this development order be declared by a court of competent jurisdiction to be invalid, the City Council shall determine if the other portions of the order .remain valid or whether the approval shall be null and void. SECTION 3: This development order as conditioned shall become effective immediately upon its passage. j PASSED, APPROVED AND ADOPTED this J,"'-day of `�% ,1982. ATTEST: ASSISTANT CITY CLERK I HEREBY CERTIFY that I have approved the form and correct- ness of this RESO, UTION. MAYOR: DISTRICT DISTRICT DISTRICT DISTRICT MAYOR RECORD OF COUNCIL VOTE 5811 NORTHWEST 88TH AVENUE 0 TAMAAAC. FLORIDA 33321 TELEPHONE (305) 722-5900 DEVELOPMENT REVIEW STATUS SHEET MEMO # 1 DATE 9/9/82 #049 Orig. Dev. Order Revised Dev. Order Project SWANSON WEST Master File #e34-82 Location Lot 8, Block 7, Lyons Commercial Sub. NE corner Commercial Blvd and NW 84 T Developer Trans -American Corp. Owner Howard R. Swanson Zoning _ Acres 1.34 Recommended Date for Council Action 11/10/82 Future Land Use Designation Commercial Proposed Use Commercial DEVELOPMENT ORDER FOR: Final Site Plan x I. STAFF APPROVAL DATES: City Planner City Engineer Chief Building Official Fire Chief Finance Director Final Plat N/A Revised Site Plan Final Site Plan Final Plat Revised Site Plan II..PLANNING C0,111tISSION RECO; i; IENDATIONS: APPROVAL or APPROVAL WITH CONDITIONS/Date 10/7/82 DENIAL/Date Final Site Plan dated 8/6/82 Rev 10/12/82 Final Plat dated Rev Revised Site Plan dated Rev Planning Commission finding of compliance with Certified Plan: See page 4 of this report III. FINAL ENGINEERING DRAWINGS: APPROVAL/Date . APPROVAL AS REDLINED/Date 10/20/82 DENIAL/Date Comments See attached memo from City Engineer dated 10/22/82 lrracf cont'd Page 2 • DEVELOPMENT REVIEW STATUS SHEET IV. LANDSCAPE PLAN: Staff Action APPROVAL X APPROVAL WITH CONDITIONS DENIAL Date 8/31/82 Beautification Committee Recommendation -Date: 9/13/82 APPROVAL APPROVAL WITH CONDITIONS DENIAL V. BROWARD COUNTY DEVELOPMENT REVIEW COMMITTEE REPORT: I Date If app ica e Comments Already platted (Lot 8, Block 7, LYONS COMMERCIAL SUB., PB 69, P.4 VI. DEVELOPERS AGREEMENTS/FEES (Where applicable): SUMMARY A. Water and Sewer Developer Agreement City Engineer Approval/Date City Attorney Approval/Date B. Other Development Agreements (Covenants, Stipulations, etc.) 1)Easement for fire hydrant 2)Public ingress/egress easement C. Drainage Retention Fee Amount $ 2,345.00 5% Required/Acres 1.34 Provided -0- Deficiency/Acres .067 X $35,000/Acre D. Drainage Improvement Project Acreage 1.34 X $130/Acre E. Water & Sewer Contribution Charges Number of ERCs 2-1, X $1000 Fee Amount $ 174,20 Fee Amount $ 3-8 7 50. C 0 F. ERC Review Fee, if more than 10 ERCs Fee Amount $ N/A G. Local Parks/Recreation Fee Amount $ N/A Acres Required Provided $/Acre X Deficiency/Acres H. Engineering Fees Fee Amount $ 4,473.27 I. Bonds Bond Amount $ 4,993.25 Date: Approved by City Engineer _ City Attorney J. On Site Beautification gCO5.1 (Fees to be paid at time of building permit issuance) 1 cont'd 1 L� Page 3 VELOPMENT REVIEW STATUS Memo # DEVELOPMENT REVIEW REQUIREMENTS: A. Potable Water Service Certification of City Engineer or Consulting City Engineer of Availability of Service: AVAILABLE X WILL BE AVAILABLE NOT AVAILABLE Date Comments B. Wastewater Treatment and Disposal Service Certification of City Engineer o; Consulting City Engineer of Availability of Service: AVAILABLE ---X WILL BE AVAILABLE NOT AVAILABLE _.._— Dote Comments C. Solid Waste Disposal Service Determination of Availability of Service: _ AVAILABLE ___._._.. WILL BE AVAILABLE ._.X __ NOT AVAILABLE Date Comments D. Drainage Adequacy Certification of City Engineer or Consulting City Engineer of Adequacy of Drainage: ADEQUATE ____—. WILL BE ADEQUATE NOT ADEQAUTE Date Comments E. Regional Transportation Network Compliance with Minimum Standards: COMPLIES _ WILL COMPLY X DOES NOT COMPLY Date Comments F. Local Streets and Roads Compliance with Minimum Standards: COMPLIES____ X— WILL COMPLY DOES N07 COMPLY Date Comments G. Fire Protection Service Compliance with Minimum Standards: COMPLIES WILL COMPLY X DOES NOT COMPLY Date Comments H. Police Protection Service Compliance with Minimum Standards: COMPLIES X WILL COMPLY DOES NOT COMPLY Date Comments I. Local Parks (Parks and Recreation Facilities) N/A rand Dedicition Required/Acres Provided Cash in Lieu of Land _Gross Acres Max. X $ /AC = $ J. ,5choolr Sites N/A Compliance with the Standards of the Broward County School Board: SCHOOL SITES NEEDED FOR ELEMENTARY SCHOOL NOT NEEDED It to it It M1 DOLE SCHOOL NOT NEEDED HIGH SCHOOL NOT NEEDED Letter from School Board Dated _ — Page 4 DEVELOPMENT REVIEW STATUS SHEET VIII. PROCESSING FEES (PAID): Site Plan Review: $ 600.00 Revised Site Plan: $ Plat Review: $ Schematic Eng.: $ 450.00 Other: $ STAFF COMMENTS: Proposed development is/t in general conformance with Tamarac's Land Use Plan Element and recommends: Adoption of Development Order # 049 Master File # 34-82For: SWANSON WEST . Project subject to the requirements included in the Report and the following conditions: i 1. City to approve dedication of public ingress/egress easement 2. City to accept easement for fire hydrant. 3. Developer to be reminded that there is a limited number of parking spaces and it could create future problems With occupancy. * NOTE PLEASE NOTE THAT THE CITY'S CONSULTANT ENGINEERS ARE REVIEWING THE RATE SCHEDULE AND, IF APPROVED BY CITY COUNCIL PRIOR TO REVIEW OF THIS PROJECT, REVISED WATER AND SEWER FEES COULD RESULT.