Loading...
HomeMy WebLinkAboutCity of Tamarac Resolution R-81-2691 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 I J 21 22 23 24 25 26 27 28 29 30 1 33 34 35 36 Introduced by �LC� Temp. Reso.# 2 10 9 CITY OF TAMARAC, FLORIDA Rev. 12/9/81 RESOLUTION NO. — 7l— 2_6 9' A RESOLUTION ISSUING A DEVELOPMENT ORDER FOR THE LAKES OF CARRIAGE HILLS PROJECT. DEVELOP= ORDER 11,10. 4/81 ACID PROVIDING AN EFFECTIVE DATE. WFfR£AS, pursuant to the instructions of the City Council of the City of Tamarac, Florida, a public meeting has been advertised in accordance with applicable law of the gate, time and place of the meeting regarding the review of the applica- tion -for a development order by the applicant for development approval; and WHEREAS, the City Council has examined and investigated the application, staff and Planning Commission recommendations, and the attached Development Review Status Sheet dated 12/3/81 ; and WHEFAS, the City Council reviewed the develolpment order and accompanying documents at a public meeting; and %M1EAS, the City Council has deterraned that the application is in ccm- pliance with all elements of its Comprehensive Plan, or will be in compliance prior to the issuance of a Certificate of Occupancy for any unit on the development that is the subject of the application. NOW, THEREFORE, BE IT RESOLVED BY TFIE COUNCIL OF THE CITY OF TAMARAC, SECTION 1: That the development described on the attached development rev status sheet dated 12/3/81 is granted a development order to proceed subject to the following conditions: A. Construction is to be in complete compliance with the plans and spec- ificaticns sukmitted by the developer to the City of Tamarac as described in Section II of the Development Review Status Sheet and approved engineering drawings. B. Commencement of construction shall be no longer than one year from the date of this approval. If the development does not commence construction within one year, this approval is null and void unless an extension has been granted in accordance with applicable regulations. C. The development order is assignable, but an assignment does not discharge any assignee .from strict compliance with the order unless the City Council consents to modify any of the original requirements. D. Additional conditions established in order to issue the development order are set forth following: Temp. Reso. #2109 1 2 3 4 5 J 8 9 10 11 12 13 14 15 16 17 .n v 21 22 23 24 25 26 27 28 29 30 33 34 35 36 SITE PLAN 1. Surface water management permit is required. 2. Recreation area to be zoned S-1 (2.87 acres). 3. Acceptance of warranty deed for off -site roadways. 4. Vacation of all easements lying beneath building on existing plat. 5. Acceptance of blanket drainage, maintenance and flow -through easements. 6. Council waives seawall requirements. 7. Developer has agreed to provide heat and smoke detectors to be connected to a proprietary alarm company in the recreation center with an automatic fire sprinkler system in the craft and kitchen area (in accordance with N.F.P.A.#14). They also agree to provide a dry standpipe system located at each exterior exit. 8. Council to allow parking islands to be varied up to 20-feet in either direction to save indigenous vegetation. 9. The existing private sidewalk serving the Vanbots property located presently on the applicant's property to be relocated by the developer to Vanbots property and connected to the swimming pool/clubhouse facilities. 10. Fences adjacent to existing condominiums shall not exceed 4-feet in height. 11. Developer has agreed to install smoke detectors in all residential units. 12. All changes required by Broward County on the proposed plat and site plan on property being platted will require resubmission to the City Council prior to issuance of building permits. 13. Curb all new medians and developer has agreed to maintain all landscaping on medians and swales adjacent to their property. 14. (a) Bond construction of lakes not included in Phase 1 and Phase 2, to be sub- mitted to the City prior to obtaining the first building permit. The length of time for the bond shall be one year in an amount to be determined by the City Engineer, and shall be submitted to the City Council for review before that expiration period. (b) Provide proper easement to the City for both public access and for of all the waterways shown on the site plan not included in Phase 1 and Phase 2 in the event the work is not performed by the developer as required by the City. Temp. Reso. #2109 1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 l8 J 21 22 23 24 25 26 27 28 29 30 it 33 34 35 36 SITE PLAN - Continued 15. Provide headwalls with reinforced concrete extended sideways into the sloped banks according to the City Engineer's requirements. 16. Top of culvert connecting lakes to be a minimum of 8'0". 17. Remove sidewalks crossing public roadways. 18. Submission of recreation fees of $159,750 and submission of an Option Agreemen acceptable to the City Attorney to dedicate to the City existing 1.5 acre S-1 Parcel adjacent to Rock Island Road, or pay the remaining recreation fees of $112,500. 19. -Submission of the first month's interest on sewer capacity in the amount of 20. Developer has agreed to assist Vanbots' residents -in providing adequate fill, sod and giving them $200.00 to perform the necessary grading in their recreat area (north end of Vanbots' Clubhouse). 21. Submit bridge details for City Engineer approval, specifications to comply with South Florida Building Code and sealed by a professional engineer. SECTION 2: Should any section or provision of this development order be declared by a court of competent jurisdiction to be invalid, the City Council shall determine if the other portions of the order remain valid or whether the approval shall be null and void. SECTION 3: This development order as conditioned shall become effective immediately upon acceptance by the City Attorney of the form of the option agreement as set forth in Condition 418. PASSED, APPROVED AND ADOPTED this _-_ _day of � 1981. ATTEST: ASSISTANT CITY CLERK I HEREBY CERTIFY that I have approved the form and correctness of this RESOLUTION. MAYOR: DISTRICT DISTRICT DISTRICT DISTRICT 9AYOR RECORD OF COUNCIL VOTE 1 5811 NORTHWEST 88TH AVENUE TAMARAC, FLORIDA 33321 TELEPHONE (305) 722-5900 DEVELOPMENT REVIEW STATUS SHEET Project LAKES OF CARRIAGE HILLS MEMO i 141-8, DATE 12/3/81 X Orig. Dev. Order Revised Dev. Order Master File 4 21-81 Location 6180 Rock Island Road Developer -LAKES OF CARRIAGE HILLS, INC. Owner LAKES OF CARRIAGE HILLS, INC. Zoning R-4A Acres 40.335 Recommended Date for Council Actionl2/9/81 (Future Land Use Designation Multi -Family —M = u a DEVELOPMENT ORDER FOR: Final Site Plan I. STAFF APPROVAL DATES: City Planner City Engineer Chief Building Official Fire Chief Comments .X Final Plat Proposed Use Multi -Family T374 d/u/a-- Revised Site Plan Final Site Plan- 2p Final Piatl24Revised Site Plan II. PLANNING COMMISSION RECO KIENDATIONS: APPROVAL or APPROVAL WITH CONDITIONS/Date 11 /1 8/81DEMIAL/ Date Final Site Plan dated 10/8/81 Rev Final Plat dated 10/81 Rev Revised Site Plan dated _ A Rev Planning Commission finding of compliance with Certified Plan: Project conforms to Certified Plan. III. FINAL ENGINEERING DRAWINGS: APPROVAL/Date APPROVAL AS REDLINED/Date z s DENIAL/Date Comments cont'd Page 2 , r DEVELOPMENT REVIEW STATUS SHEET IV. LANDSCAPE PLAN: .Staff Action APPROVAL APPROVAL WITH CONDITIONS-x'- DENIAL Date 11/9/81 Beautification Committee Recommendation -Date: 11/16/81 APPROVAL APPROVAL WITH CONDITIONS X DENIAL V. BROWARD COUNTY DEVELOPMENT REVIEW COM14ITTEE REPORT: -Date If app ica e Comments VI. DEVELOPERS AGREEMENTS/FEES (Where applicable): SUMMARY A. 4in' a ■ird Sewer Developer Agreement City Engineer Approval/Date 12/1/81�� City Attorney Approval/Date 1212/83 B. Other Development Agreements (Covenants, Stipulations, etc.) C. Drainage Retention Fee Amount $ 5% Required/Acres Z•c Z Provided 5.34 Acres �- Deficiency/Acres X $35,000/Acre 9., ' D. Drainage Improvement Fee Amount $ 5,243.55 Project Acreage40.335 X $130/Acre E. Water & Sewer Contribution Charges Fee Amount $ 349,375.00 Number of ERCs 537.5 X $1000 F. ERC Review Fee, if more than 10 ERCs Fee Amount $ 500.00 K� G. Local Parks/Recreation Fee Amount $ 272.250.00 Acres Required 3.63 Provided $272,250. $/Acre 75,000. X 3.63 Deficiency/Acres H. Engineering Fees Fee Amount $ 26,027.49 PHASE I) I. Bonds Bond Amount $ * SEE BELOW Date: Approved by City Engineer 12 2 81 City Attorney 12/2/81 * BONDS'' ON SITE OFF SITE PHASE I $253,250. 121,150.50� Je_#L ' cont 'd Page 3 Memo # DEVELOPMENT REVIEW STATUS SHEET DEVELOPMENT REVIEW REQUIRE""ENTS: A. Potable Water Service Certification of City Engineer or Consulting City Engineer of Availability of Service: AVAILABLE WILL BE AVAILABLE X. _ NOT AVAILABLE Date Comments B. Wastewater Treatment and Disposal Service v '� Certification of City Engineer or Consulting City Engineer of Availability of Service: AVAILABLE WILL BE AVAILABLE .____X NOT AVAILABLE Date Comments C. Solid Waste Disposal Service Determination of Availability of Service: AVAILABLE --- WILL BE AVAILABLE __._ NOT AVAILABLE _ Date Comments D. Drainage Adequacy -- Certification of City Engineer or Consulting City Engineer of Adequacy of Drainage: ADEQUATE _ _ WILL BE ADEQUATE _...—_x _ NOT ADEQAUTE Date Comments E. Regional Transportation Network Compliance with Minimum Standards: COMPLIES WILL COMPLY --X DOES NOT COMPLY _.-_- Date Comments F. LocaT Streets and Roads _ Compliance with Minimum Standards: COMPLIES. WILL COMPLY_. X DOES NOT COMPLY Date Comments G. Fire Protection Service Compliance with Minimum Standards: COMPLIES_ WILL COMPLY yDOES NOT COMPLY Date Comments H. Police Protection Service Compliance with Minimum Standards: COMPLIES WILL COMPLY X DOES NOT COMPLY Date Comments I. Local Parks (Parks and Recreation Facilities) and Dedication Required/Acres .___ 3.63 Provided 0 Cash in Lieu of Land i r, Gross Acres Max. X $7r /AC = $ 272,260_;__. J. School Sites Compliance with t1he Standards of the Broward County School Board: SCHOOL SITES NEEDED FOR ELEMENTARY SCHOOL x NOT NEEDED If " " " MIDDLE SCHOOL X NOT NEEDED HIGH SCHOOL X NOT NEEDED Letter from School Board Dated cont'd Page 4 DEVELOPMENT REVIEW STATUS SHEET VIII. PROCESSING FEES (PAID): Site Plan Review: $ Revised Site Plan: $ Plat Review: $ Schematic Eng.: $ Other: $ 3,536.00 NA 546.39 450.00 225.00 (Vacations of Easements) Sign Deposit STAFF COMMENTS: Proposed development is/is not in general conformance with Tamarac's Land Use Plan Element and recommends: Adoption of Development Order # 4-81 Master File # 21-81 For: AKFS QF CARRIAGE HiLLS_---------•__ --------- _- _ Project subject to the requirements included in the Report and the following conditions: 1. Surface water management permit is required. 2. Rec area to be zoned S-1 (2.87 Acres) 3. Acceptance of warranty deed for off -site roadways. 4. Vacation of all easements lying beneath building on existing plat. 5. Acceptance of blanket drainage, maintenance and flow -through easements. 6. Council must consider request to waive seawall requirements. 7. Developer has agreed to provide heat and smoke detectors to be connected to a proprietory alarm company in the rec center with an automatic fire sprinkle system in the craft and kitchen area (in accordance with N.F.P.A. #14) They also agree to provide a dry standpipe system located at each exterior exit. 8., Council to consider Planner recommendation to allow parking islands to be varied up to 20' in either direction to save indigenous vegetation. 9. Vanbots sidewalk (located on applicant's property to be relocated on Vanbots property in accordance with Homewoners final agreement with petitioner. 10. All fences must be at least 25' from property line on side lot line. I